SlideShare a Scribd company logo
1 of 3
Download to read offline
Page 1 of 3
I. Problem Definition
	 What: 	 Lost Production
	 When: 	 December 18, 2013
	 Where: 	 USA
	 Facility: 	 Central 3
	 System: 	 Processor
	 Significance: 	 High
	 Safety: 	Minimal impact – increased exposure to lifted loads and slippery
conditions
	Environment: 	 No Impact
	 Revenue: 	 Downtime 44 Hours
	 Cost: 	 $2.4M
	 Frequency: 	 First 1
II. Report Summary
Lost production was caused by the CHP having to be shut down when the wet end bearing failed.
This bearing failed because of metal-to-metal contact due to the bearing lubrication becoming
ineffective because the grease was washed and contamination was present.
The grease was washed out because the wet end labyrinth seal failed and allowed the entry
of gland water. Excessive wear occurred in the end cover and the labyrinth seal because the
lubricant supply ran out.
The contamination was caused by the failure of the screen filtration system due to the self-
cleaning system not operating and the subsequent blockage not being identified. The self-
cleaning system failure was caused by the water pressure falling below the minimum because
of demands on the water supply elsewhere on the site. This, in turn, was caused by new planned
production arrangements and the limited capacity of the water storage.
LOST PRODUCTION
	Purpose: 	 To prevent recurrence, not place blame.
	 Report Date: 	 12-12-2013
	 Start Date: 	 03-12-2013
	Report Number: 	 NC23-0351
Page 2 of 3
III. Solutions
Causes Solutions Solution Owner Due Date
Water pressure fell
below 25 psi
Install uprated pump to
ensure supply
Phil Sager 03-02-2014
Blockage not identified
Increase inspections of
screens to weekly
Stirling Maus 25-12-2013
Lubricant supply
exhausted
Double capacity of lube
supply
Nando Alonso 14-02-2014
Lubricant supply
exhausted
Schedule weekly
inspections of supply
Stirling Mice 25-12-2013
IV. Team Members
Name Email Member Info
Phil Sager psage@somewhere.com Reliability Superintendent
Roy Davies rdavies@somewhere.com Defect Elimination Officer
Nando Alonso nalonso@somewhere.com Plant Mechanical Engineer
Stirling Maus smaus@somewhere.com Plant Maintenance Supervisor
Bryson Fittipaldi bfittipaldi@somewhere.com Condition Monitoring Co-ordinator
Merv Shews mshews@somewhere.com Condition Monitoring Technician
Les Gibston lgibson@everywhere.com Facilitator  Reliability Engineer
V. Notes
1. Realitychart Status: The Realitychart and Incident Report have been finalized.
2. Rules Check Status: Missing Causes Resolved.
3. Rules Check Status: Conjunctions Resolved.
VI. References
1. Photo # 17
2. mining development plan at 23.01.2014
3. photo # 13
Page 3 of 3
Action
METAL TO METAL
CONTACT
Condition
HIGH INJECTION
FREQUENCY
Root Cause (A)
LUBRICANT
SUPPLY
EXHAUSTED
Action
SELF-CLEANING
SYSTEM FAILED
Action
METAL TO METAL
CONTACT
Primary Effect
LOST
PRODUCTION
Action
SELF-CLEANING
SYSTEM FAILED
Condition
MIN PRESSURE IS
25 PSI
Other Cause Paths More
Productive
ORIGINAL DESIGN
Condition
PUMP ROTATING
Desired Condition
Action
BEARING GREASE
WASHED OUT
Desired Condition
Root Cause (A)
WATER
PRESSURE FELL
BELOW 25 PSI
Desired Condition
Condition
MIN PRESSURE IS
25 PSI
Condition
FEED PUMP
REQUIRED FOR
PROCESS
Other Cause Paths More
Productive
Condition
CONTAMINANTS
COMPROMISE
PERFORMANCE
Condition
SINGLE POINT
LUBE INJECTION
SYSTEM
Condition
SYSTEM
PRESSURISED
Action
BEARING GREASE
WASHED OUT
Action
GLAND WATER
ENTERED
Action
SUPPLY NOT
REPLENISHED
New Primary Effect
Action
WET END
BEARING SEIZED
Condition
25 PSI IS MINIMUM
REQUIREMENT
Condition
BEARING
PERMITS
ROTATION
Desired Condition
Condition
LUBRICANT
PREVENTS WEAR
Condition
HIGH INJECTION
FREQUENCY
Root Cause (A)
WET END
LABYRINTH WORN
Condition
COVER PROVIDES
PROTECTION
Condition
PUMP ROTATING
Condition
COVER PROVIDES
PROTECTION
Desired Condition
New Primary Effect
Action
GLAND WATER
ENTERED
Condition
CLEANING
INHIBITS
CONTAMINATION
Action
OTHER
PRODUCTION
REQUIREMENTS
PREVAILED
Action
EXCESSIVE WEAR
OCCURRED IN
END COVER
Lack Of Control
Action
SUPPLY NOT
REPLENISHED
Root Cause (A)
WET END
LABYRINTH WORN
Condition
LUBRICANT
FAILURE
Action
LUBRICANT
CONTAMINATED
Action
COARSE FEED
PUMP STOPPED
Desired Condition
Desired Condition
Condition
LUBRICANT
PREVENTS WEAR
Action
EXCESSIVE WEAR
OCCURRED IN
END COVER
Root Cause (A)
LUBRICANT
SUPPLY
EXHAUSTED
Desired Condition
Action
OTHER
PRODUCTION
REQUIREMENTS
PREVAILED
Action
WET END
BEARING SEIZED
Condition
LABYRINTH SEAL
PREVENTS
WATER ENTRY
Desired Condition
Condition
SINGLE POINT
LUBE INJECTION
SYSTEM
Action
LUBRICANT
CONTAMINATEDPrimary Effect
LOST
PRODUCTION
Condition
LABYRINTH SEAL
PREVENTS
WATER ENTRY
Condition
FEED PUMP
REQUIRED FOR
PROCESS
Condition
CLEANING
INHIBITS
CONTAMINATION
Condition
25 PSI IS MINIMUM
REQUIREMENT
Condition
SYSTEM
PRESSURISED
Action
COARSE FEED
PUMP STOPPED
Condition
CONTAMINANTS
COMPROMISE
PERFORMANCE
Condition
LUBRICANT
FAILURE
Condition
BEARING
PERMITS
ROTATION
Root Cause (A)
WATER
PRESSURE FELL
BELOW 25 PSI

More Related Content

Similar to 292089 rca report---mining-lost-production

Stormwater Infrastructure Management-December 2015
Stormwater Infrastructure Management-December 2015Stormwater Infrastructure Management-December 2015
Stormwater Infrastructure Management-December 2015Fairfax County
 
Assessment Presentation_Adib Arman.pptx
Assessment Presentation_Adib Arman.pptxAssessment Presentation_Adib Arman.pptx
Assessment Presentation_Adib Arman.pptxPayelBasak4
 
15. Addressing challeneges in wastewater netwroks - Michael Goss - Water Even...
15. Addressing challeneges in wastewater netwroks - Michael Goss - Water Even...15. Addressing challeneges in wastewater netwroks - Michael Goss - Water Even...
15. Addressing challeneges in wastewater netwroks - Michael Goss - Water Even...Environmental Protection Agency, Ireland
 
Deepwater A Competitive Business Ethics Simulation Game ©.docx
Deepwater A Competitive Business Ethics Simulation Game  ©.docxDeepwater A Competitive Business Ethics Simulation Game  ©.docx
Deepwater A Competitive Business Ethics Simulation Game ©.docxsimonithomas47935
 
PC Duracaps(r) CI Corrosion Inhibitor Brochure 2016
PC Duracaps(r) CI  Corrosion Inhibitor Brochure 2016PC Duracaps(r) CI  Corrosion Inhibitor Brochure 2016
PC Duracaps(r) CI Corrosion Inhibitor Brochure 2016Muzaffar Khan
 
An investigation into the cause of loss of containment from the supply of min...
An investigation into the cause of loss of containment from the supply of min...An investigation into the cause of loss of containment from the supply of min...
An investigation into the cause of loss of containment from the supply of min...Turlough Guerin GAICD FGIA
 
MCUD #4 STAND-BY BOND ELECTION MEETING PRESENTATION
MCUD #4 STAND-BY BOND ELECTION MEETING PRESENTATIONMCUD #4 STAND-BY BOND ELECTION MEETING PRESENTATION
MCUD #4 STAND-BY BOND ELECTION MEETING PRESENTATIONThe Texas Network, LLC
 
Cooling Water Treatment leaflet (1) (1)
Cooling Water Treatment leaflet (1) (1)Cooling Water Treatment leaflet (1) (1)
Cooling Water Treatment leaflet (1) (1)Eddie Khoo
 
Accident_Cases_2.pptAccident_Cases_2.ppt
Accident_Cases_2.pptAccident_Cases_2.pptAccident_Cases_2.pptAccident_Cases_2.ppt
Accident_Cases_2.pptAccident_Cases_2.pptconnecttoumair
 
Final Lafarge Presentation
Final Lafarge PresentationFinal Lafarge Presentation
Final Lafarge Presentationmardiah johani
 
The Leak Management Opportunity
The Leak Management OpportunityThe Leak Management Opportunity
The Leak Management OpportunityEdwin A Merrick
 
Ami Adini & Associates - Southern California Environmental Firm
Ami Adini & Associates - Southern California Environmental FirmAmi Adini & Associates - Southern California Environmental Firm
Ami Adini & Associates - Southern California Environmental Firmamiadini.
 

Similar to 292089 rca report---mining-lost-production (20)

Stormwater Infrastructure Management-December 2015
Stormwater Infrastructure Management-December 2015Stormwater Infrastructure Management-December 2015
Stormwater Infrastructure Management-December 2015
 
Assessment Presentation_Adib Arman.pptx
Assessment Presentation_Adib Arman.pptxAssessment Presentation_Adib Arman.pptx
Assessment Presentation_Adib Arman.pptx
 
Automating Leak Testing
Automating Leak TestingAutomating Leak Testing
Automating Leak Testing
 
Alpla_EKTHA.pptx
Alpla_EKTHA.pptxAlpla_EKTHA.pptx
Alpla_EKTHA.pptx
 
JSW KAIZEN Udan.pptx
JSW KAIZEN Udan.pptxJSW KAIZEN Udan.pptx
JSW KAIZEN Udan.pptx
 
15. Addressing challeneges in wastewater netwroks - Michael Goss - Water Even...
15. Addressing challeneges in wastewater netwroks - Michael Goss - Water Even...15. Addressing challeneges in wastewater netwroks - Michael Goss - Water Even...
15. Addressing challeneges in wastewater netwroks - Michael Goss - Water Even...
 
Deepwater A Competitive Business Ethics Simulation Game ©.docx
Deepwater A Competitive Business Ethics Simulation Game  ©.docxDeepwater A Competitive Business Ethics Simulation Game  ©.docx
Deepwater A Competitive Business Ethics Simulation Game ©.docx
 
PC Duracaps(r) CI Corrosion Inhibitor Brochure 2016
PC Duracaps(r) CI  Corrosion Inhibitor Brochure 2016PC Duracaps(r) CI  Corrosion Inhibitor Brochure 2016
PC Duracaps(r) CI Corrosion Inhibitor Brochure 2016
 
sealing open project
sealing open projectsealing open project
sealing open project
 
MDE's Stormwater Permitting Requirements
MDE's Stormwater Permitting RequirementsMDE's Stormwater Permitting Requirements
MDE's Stormwater Permitting Requirements
 
An investigation into the cause of loss of containment from the supply of min...
An investigation into the cause of loss of containment from the supply of min...An investigation into the cause of loss of containment from the supply of min...
An investigation into the cause of loss of containment from the supply of min...
 
mcd_SOAR A
mcd_SOAR Amcd_SOAR A
mcd_SOAR A
 
apea REV1
apea REV1apea REV1
apea REV1
 
MCUD #4 STAND-BY BOND ELECTION MEETING PRESENTATION
MCUD #4 STAND-BY BOND ELECTION MEETING PRESENTATIONMCUD #4 STAND-BY BOND ELECTION MEETING PRESENTATION
MCUD #4 STAND-BY BOND ELECTION MEETING PRESENTATION
 
Cooling Water Treatment leaflet (1) (1)
Cooling Water Treatment leaflet (1) (1)Cooling Water Treatment leaflet (1) (1)
Cooling Water Treatment leaflet (1) (1)
 
Accident_Cases_2.pptAccident_Cases_2.ppt
Accident_Cases_2.pptAccident_Cases_2.pptAccident_Cases_2.pptAccident_Cases_2.ppt
Accident_Cases_2.pptAccident_Cases_2.ppt
 
Apea rev2
Apea rev2Apea rev2
Apea rev2
 
Final Lafarge Presentation
Final Lafarge PresentationFinal Lafarge Presentation
Final Lafarge Presentation
 
The Leak Management Opportunity
The Leak Management OpportunityThe Leak Management Opportunity
The Leak Management Opportunity
 
Ami Adini & Associates - Southern California Environmental Firm
Ami Adini & Associates - Southern California Environmental FirmAmi Adini & Associates - Southern California Environmental Firm
Ami Adini & Associates - Southern California Environmental Firm
 

Recently uploaded

一比一原版(曼大毕业证书)曼尼托巴大学毕业证成绩单留信学历认证一手价格
一比一原版(曼大毕业证书)曼尼托巴大学毕业证成绩单留信学历认证一手价格一比一原版(曼大毕业证书)曼尼托巴大学毕业证成绩单留信学历认证一手价格
一比一原版(曼大毕业证书)曼尼托巴大学毕业证成绩单留信学历认证一手价格q6pzkpark
 
Predictive Precipitation: Advanced Rain Forecasting Techniques
Predictive Precipitation: Advanced Rain Forecasting TechniquesPredictive Precipitation: Advanced Rain Forecasting Techniques
Predictive Precipitation: Advanced Rain Forecasting TechniquesBoston Institute of Analytics
 
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptx
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptxRESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptx
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptxronsairoathenadugay
 
Abortion Clinic in Kempton Park +27791653574 WhatsApp Abortion Clinic Service...
Abortion Clinic in Kempton Park +27791653574 WhatsApp Abortion Clinic Service...Abortion Clinic in Kempton Park +27791653574 WhatsApp Abortion Clinic Service...
Abortion Clinic in Kempton Park +27791653574 WhatsApp Abortion Clinic Service...mikehavy0
 
Northern New England Tableau User Group (TUG) May 2024
Northern New England Tableau User Group (TUG) May 2024Northern New England Tableau User Group (TUG) May 2024
Northern New England Tableau User Group (TUG) May 2024patrickdtherriault
 
Digital Transformation Playbook by Graham Ware
Digital Transformation Playbook by Graham WareDigital Transformation Playbook by Graham Ware
Digital Transformation Playbook by Graham WareGraham Ware
 
Pentesting_AI and security challenges of AI
Pentesting_AI and security challenges of AIPentesting_AI and security challenges of AI
Pentesting_AI and security challenges of AIf6x4zqzk86
 
DAA Assignment Solution.pdf is the best1
DAA Assignment Solution.pdf is the best1DAA Assignment Solution.pdf is the best1
DAA Assignment Solution.pdf is the best1sinhaabhiyanshu
 
DS Lecture-1 about discrete structure .ppt
DS Lecture-1 about discrete structure .pptDS Lecture-1 about discrete structure .ppt
DS Lecture-1 about discrete structure .pptTanveerAhmed817946
 
Capstone in Interprofessional Informatic // IMPACT OF COVID 19 ON EDUCATION
Capstone in Interprofessional Informatic  // IMPACT OF COVID 19 ON EDUCATIONCapstone in Interprofessional Informatic  // IMPACT OF COVID 19 ON EDUCATION
Capstone in Interprofessional Informatic // IMPACT OF COVID 19 ON EDUCATIONLakpaYanziSherpa
 
Jual Obat Aborsi Bandung (Asli No.1) Wa 082134680322 Klinik Obat Penggugur Ka...
Jual Obat Aborsi Bandung (Asli No.1) Wa 082134680322 Klinik Obat Penggugur Ka...Jual Obat Aborsi Bandung (Asli No.1) Wa 082134680322 Klinik Obat Penggugur Ka...
Jual Obat Aborsi Bandung (Asli No.1) Wa 082134680322 Klinik Obat Penggugur Ka...Klinik Aborsi
 
如何办理(Dalhousie毕业证书)达尔豪斯大学毕业证成绩单留信学历认证
如何办理(Dalhousie毕业证书)达尔豪斯大学毕业证成绩单留信学历认证如何办理(Dalhousie毕业证书)达尔豪斯大学毕业证成绩单留信学历认证
如何办理(Dalhousie毕业证书)达尔豪斯大学毕业证成绩单留信学历认证zifhagzkk
 
Simplify hybrid data integration at an enterprise scale. Integrate all your d...
Simplify hybrid data integration at an enterprise scale. Integrate all your d...Simplify hybrid data integration at an enterprise scale. Integrate all your d...
Simplify hybrid data integration at an enterprise scale. Integrate all your d...varanasisatyanvesh
 
Identify Customer Segments to Create Customer Offers for Each Segment - Appli...
Identify Customer Segments to Create Customer Offers for Each Segment - Appli...Identify Customer Segments to Create Customer Offers for Each Segment - Appli...
Identify Customer Segments to Create Customer Offers for Each Segment - Appli...ThinkInnovation
 
DATA SUMMIT 24 Building Real-Time Pipelines With FLaNK
DATA SUMMIT 24  Building Real-Time Pipelines With FLaNKDATA SUMMIT 24  Building Real-Time Pipelines With FLaNK
DATA SUMMIT 24 Building Real-Time Pipelines With FLaNKTimothy Spann
 
如何办理(WashU毕业证书)圣路易斯华盛顿大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(WashU毕业证书)圣路易斯华盛顿大学毕业证成绩单本科硕士学位证留信学历认证如何办理(WashU毕业证书)圣路易斯华盛顿大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(WashU毕业证书)圣路易斯华盛顿大学毕业证成绩单本科硕士学位证留信学历认证acoha1
 
社内勉強会資料_Object Recognition as Next Token Prediction
社内勉強会資料_Object Recognition as Next Token Prediction社内勉強会資料_Object Recognition as Next Token Prediction
社内勉強会資料_Object Recognition as Next Token PredictionNABLAS株式会社
 
5CL-ADBA,5cladba, Chinese supplier, safety is guaranteed
5CL-ADBA,5cladba, Chinese supplier, safety is guaranteed5CL-ADBA,5cladba, Chinese supplier, safety is guaranteed
5CL-ADBA,5cladba, Chinese supplier, safety is guaranteedamy56318795
 
Ranking and Scoring Exercises for Research
Ranking and Scoring Exercises for ResearchRanking and Scoring Exercises for Research
Ranking and Scoring Exercises for ResearchRajesh Mondal
 

Recently uploaded (20)

一比一原版(曼大毕业证书)曼尼托巴大学毕业证成绩单留信学历认证一手价格
一比一原版(曼大毕业证书)曼尼托巴大学毕业证成绩单留信学历认证一手价格一比一原版(曼大毕业证书)曼尼托巴大学毕业证成绩单留信学历认证一手价格
一比一原版(曼大毕业证书)曼尼托巴大学毕业证成绩单留信学历认证一手价格
 
Predictive Precipitation: Advanced Rain Forecasting Techniques
Predictive Precipitation: Advanced Rain Forecasting TechniquesPredictive Precipitation: Advanced Rain Forecasting Techniques
Predictive Precipitation: Advanced Rain Forecasting Techniques
 
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptx
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptxRESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptx
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptx
 
Abortion Clinic in Kempton Park +27791653574 WhatsApp Abortion Clinic Service...
Abortion Clinic in Kempton Park +27791653574 WhatsApp Abortion Clinic Service...Abortion Clinic in Kempton Park +27791653574 WhatsApp Abortion Clinic Service...
Abortion Clinic in Kempton Park +27791653574 WhatsApp Abortion Clinic Service...
 
Northern New England Tableau User Group (TUG) May 2024
Northern New England Tableau User Group (TUG) May 2024Northern New England Tableau User Group (TUG) May 2024
Northern New England Tableau User Group (TUG) May 2024
 
Abortion pills in Doha {{ QATAR }} +966572737505) Get Cytotec
Abortion pills in Doha {{ QATAR }} +966572737505) Get CytotecAbortion pills in Doha {{ QATAR }} +966572737505) Get Cytotec
Abortion pills in Doha {{ QATAR }} +966572737505) Get Cytotec
 
Digital Transformation Playbook by Graham Ware
Digital Transformation Playbook by Graham WareDigital Transformation Playbook by Graham Ware
Digital Transformation Playbook by Graham Ware
 
Pentesting_AI and security challenges of AI
Pentesting_AI and security challenges of AIPentesting_AI and security challenges of AI
Pentesting_AI and security challenges of AI
 
DAA Assignment Solution.pdf is the best1
DAA Assignment Solution.pdf is the best1DAA Assignment Solution.pdf is the best1
DAA Assignment Solution.pdf is the best1
 
DS Lecture-1 about discrete structure .ppt
DS Lecture-1 about discrete structure .pptDS Lecture-1 about discrete structure .ppt
DS Lecture-1 about discrete structure .ppt
 
Capstone in Interprofessional Informatic // IMPACT OF COVID 19 ON EDUCATION
Capstone in Interprofessional Informatic  // IMPACT OF COVID 19 ON EDUCATIONCapstone in Interprofessional Informatic  // IMPACT OF COVID 19 ON EDUCATION
Capstone in Interprofessional Informatic // IMPACT OF COVID 19 ON EDUCATION
 
Jual Obat Aborsi Bandung (Asli No.1) Wa 082134680322 Klinik Obat Penggugur Ka...
Jual Obat Aborsi Bandung (Asli No.1) Wa 082134680322 Klinik Obat Penggugur Ka...Jual Obat Aborsi Bandung (Asli No.1) Wa 082134680322 Klinik Obat Penggugur Ka...
Jual Obat Aborsi Bandung (Asli No.1) Wa 082134680322 Klinik Obat Penggugur Ka...
 
如何办理(Dalhousie毕业证书)达尔豪斯大学毕业证成绩单留信学历认证
如何办理(Dalhousie毕业证书)达尔豪斯大学毕业证成绩单留信学历认证如何办理(Dalhousie毕业证书)达尔豪斯大学毕业证成绩单留信学历认证
如何办理(Dalhousie毕业证书)达尔豪斯大学毕业证成绩单留信学历认证
 
Simplify hybrid data integration at an enterprise scale. Integrate all your d...
Simplify hybrid data integration at an enterprise scale. Integrate all your d...Simplify hybrid data integration at an enterprise scale. Integrate all your d...
Simplify hybrid data integration at an enterprise scale. Integrate all your d...
 
Identify Customer Segments to Create Customer Offers for Each Segment - Appli...
Identify Customer Segments to Create Customer Offers for Each Segment - Appli...Identify Customer Segments to Create Customer Offers for Each Segment - Appli...
Identify Customer Segments to Create Customer Offers for Each Segment - Appli...
 
DATA SUMMIT 24 Building Real-Time Pipelines With FLaNK
DATA SUMMIT 24  Building Real-Time Pipelines With FLaNKDATA SUMMIT 24  Building Real-Time Pipelines With FLaNK
DATA SUMMIT 24 Building Real-Time Pipelines With FLaNK
 
如何办理(WashU毕业证书)圣路易斯华盛顿大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(WashU毕业证书)圣路易斯华盛顿大学毕业证成绩单本科硕士学位证留信学历认证如何办理(WashU毕业证书)圣路易斯华盛顿大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(WashU毕业证书)圣路易斯华盛顿大学毕业证成绩单本科硕士学位证留信学历认证
 
社内勉強会資料_Object Recognition as Next Token Prediction
社内勉強会資料_Object Recognition as Next Token Prediction社内勉強会資料_Object Recognition as Next Token Prediction
社内勉強会資料_Object Recognition as Next Token Prediction
 
5CL-ADBA,5cladba, Chinese supplier, safety is guaranteed
5CL-ADBA,5cladba, Chinese supplier, safety is guaranteed5CL-ADBA,5cladba, Chinese supplier, safety is guaranteed
5CL-ADBA,5cladba, Chinese supplier, safety is guaranteed
 
Ranking and Scoring Exercises for Research
Ranking and Scoring Exercises for ResearchRanking and Scoring Exercises for Research
Ranking and Scoring Exercises for Research
 

292089 rca report---mining-lost-production

  • 1. Page 1 of 3 I. Problem Definition What: Lost Production When: December 18, 2013 Where: USA Facility: Central 3 System: Processor Significance: High Safety: Minimal impact – increased exposure to lifted loads and slippery conditions Environment: No Impact Revenue: Downtime 44 Hours Cost: $2.4M Frequency: First 1 II. Report Summary Lost production was caused by the CHP having to be shut down when the wet end bearing failed. This bearing failed because of metal-to-metal contact due to the bearing lubrication becoming ineffective because the grease was washed and contamination was present. The grease was washed out because the wet end labyrinth seal failed and allowed the entry of gland water. Excessive wear occurred in the end cover and the labyrinth seal because the lubricant supply ran out. The contamination was caused by the failure of the screen filtration system due to the self- cleaning system not operating and the subsequent blockage not being identified. The self- cleaning system failure was caused by the water pressure falling below the minimum because of demands on the water supply elsewhere on the site. This, in turn, was caused by new planned production arrangements and the limited capacity of the water storage. LOST PRODUCTION Purpose: To prevent recurrence, not place blame. Report Date: 12-12-2013 Start Date: 03-12-2013 Report Number: NC23-0351
  • 2. Page 2 of 3 III. Solutions Causes Solutions Solution Owner Due Date Water pressure fell below 25 psi Install uprated pump to ensure supply Phil Sager 03-02-2014 Blockage not identified Increase inspections of screens to weekly Stirling Maus 25-12-2013 Lubricant supply exhausted Double capacity of lube supply Nando Alonso 14-02-2014 Lubricant supply exhausted Schedule weekly inspections of supply Stirling Mice 25-12-2013 IV. Team Members Name Email Member Info Phil Sager psage@somewhere.com Reliability Superintendent Roy Davies rdavies@somewhere.com Defect Elimination Officer Nando Alonso nalonso@somewhere.com Plant Mechanical Engineer Stirling Maus smaus@somewhere.com Plant Maintenance Supervisor Bryson Fittipaldi bfittipaldi@somewhere.com Condition Monitoring Co-ordinator Merv Shews mshews@somewhere.com Condition Monitoring Technician Les Gibston lgibson@everywhere.com Facilitator Reliability Engineer V. Notes 1. Realitychart Status: The Realitychart and Incident Report have been finalized. 2. Rules Check Status: Missing Causes Resolved. 3. Rules Check Status: Conjunctions Resolved. VI. References 1. Photo # 17 2. mining development plan at 23.01.2014 3. photo # 13
  • 3. Page 3 of 3 Action METAL TO METAL CONTACT Condition HIGH INJECTION FREQUENCY Root Cause (A) LUBRICANT SUPPLY EXHAUSTED Action SELF-CLEANING SYSTEM FAILED Action METAL TO METAL CONTACT Primary Effect LOST PRODUCTION Action SELF-CLEANING SYSTEM FAILED Condition MIN PRESSURE IS 25 PSI Other Cause Paths More Productive ORIGINAL DESIGN Condition PUMP ROTATING Desired Condition Action BEARING GREASE WASHED OUT Desired Condition Root Cause (A) WATER PRESSURE FELL BELOW 25 PSI Desired Condition Condition MIN PRESSURE IS 25 PSI Condition FEED PUMP REQUIRED FOR PROCESS Other Cause Paths More Productive Condition CONTAMINANTS COMPROMISE PERFORMANCE Condition SINGLE POINT LUBE INJECTION SYSTEM Condition SYSTEM PRESSURISED Action BEARING GREASE WASHED OUT Action GLAND WATER ENTERED Action SUPPLY NOT REPLENISHED New Primary Effect Action WET END BEARING SEIZED Condition 25 PSI IS MINIMUM REQUIREMENT Condition BEARING PERMITS ROTATION Desired Condition Condition LUBRICANT PREVENTS WEAR Condition HIGH INJECTION FREQUENCY Root Cause (A) WET END LABYRINTH WORN Condition COVER PROVIDES PROTECTION Condition PUMP ROTATING Condition COVER PROVIDES PROTECTION Desired Condition New Primary Effect Action GLAND WATER ENTERED Condition CLEANING INHIBITS CONTAMINATION Action OTHER PRODUCTION REQUIREMENTS PREVAILED Action EXCESSIVE WEAR OCCURRED IN END COVER Lack Of Control Action SUPPLY NOT REPLENISHED Root Cause (A) WET END LABYRINTH WORN Condition LUBRICANT FAILURE Action LUBRICANT CONTAMINATED Action COARSE FEED PUMP STOPPED Desired Condition Desired Condition Condition LUBRICANT PREVENTS WEAR Action EXCESSIVE WEAR OCCURRED IN END COVER Root Cause (A) LUBRICANT SUPPLY EXHAUSTED Desired Condition Action OTHER PRODUCTION REQUIREMENTS PREVAILED Action WET END BEARING SEIZED Condition LABYRINTH SEAL PREVENTS WATER ENTRY Desired Condition Condition SINGLE POINT LUBE INJECTION SYSTEM Action LUBRICANT CONTAMINATEDPrimary Effect LOST PRODUCTION Condition LABYRINTH SEAL PREVENTS WATER ENTRY Condition FEED PUMP REQUIRED FOR PROCESS Condition CLEANING INHIBITS CONTAMINATION Condition 25 PSI IS MINIMUM REQUIREMENT Condition SYSTEM PRESSURISED Action COARSE FEED PUMP STOPPED Condition CONTAMINANTS COMPROMISE PERFORMANCE Condition LUBRICANT FAILURE Condition BEARING PERMITS ROTATION Root Cause (A) WATER PRESSURE FELL BELOW 25 PSI