Service Quality Presentation
Godwin Chidiebere Nwafor
Port Harcourt, NGA
SchlumbergerPrivate
2
Outline
• Introduction
• Sequence of Events
• Summary of the Events
• Remedial Actions
• Focus of Investigation
• Action Plan
• Corrective Action Plan
• Plots/Charts & Pictures
• Client’s Opinion
SchlumbergerPrivate
3
Introduction
Customer: Sterling Energy
Exploration &
Production Company
SLB Supervisor: Godwin Nwafor
Treatment #: 983738 Has FSM been contacted? Yes
Equipment #
involved in incident:
Cementing silos Has FQC/HSE been
contacted?
No
Job or Type of
Activity:
9 5/8” production
casing
If you have entered a RIR,
please give Quest #
20130611132500
Location: Anieze 9 Date of incident: 10th
June, 2013
Time of incident: 12:10 pm 3rd
Party Name if applicable: NA
Customer Contact
Field:
Anieze Customer phone number: +234-8152092254
SchlumbergerPrivate
4
Sequence of Events
4:00 am – Arrived rig site to prepare for the up coming job with
the cementing crew. Started mixing chemicals in the pits
already prepared earlier.
7:17 am – Carried out STEM 1 on all equipment on location.
Primed the cementing unit using water
9:00am – Conducted safety meeting with all going to be
involved during the job on the rig floor.
9:27 am – Flushed cementing lines before conducting the
pressure test
9:32 am – Tested cementing surface lines to 4000 psi
SchlumbergerPrivate
5
Sequence of Events
9:55 am – Rig pumped 20 bbls of base oil and
10:00 am – Rig pumped 50 bbls of Scavenger mud
10:19 am – Dowell pumped 30 bbls of chemical wash from
cementing unit
10:29 am – Rig pumped 62 bbls of MUDPUSH II spacer
10:47 am – Bottom plug was released from cement head on rig
floor
10:54 am – 12:05 pm – Started mixing lead slurry at 12.5 ppg
SchlumbergerPrivate
6
Sequence of Events
 Mixed slurry in the mix tub to the required density
 Mud engineer took sample from sampling point to ascertain
density
 Company representative confirmed density and gave go
ahead to start pumping.
 Pumped a total of 355.4 bbls of lead slurry
12:05 pm – 12:10 pm – Started mixing tail slurry at density 16.4
ppg. Confirmed tail density with company representative and
continued pumping downhole
SchlumbergerPrivate
7
Sequence of Events
12:50 pm – observed difficulty in maintaining required tail
density,
 Signalled to bulk operator to check supply of cement.
 Stopped pumping to troubleshoot and find root cause of poor
cement supply.
 The silos were checked to confirm discharge supply
 Confirmed silos were empty without cement
SchlumbergerPrivate
8
Sequence of Events
1:10pm – The situation on the rig was communicated with
SEEPCO office in town and the decision to drop the top plug
and displace was taken.
 Pumped the remaining slurry in the mixing tub. Total tail
slurry volume pumped was 84.6 bbls
 Climbed up to the rig floor to release top plug from cement
head
 Pumped 5 bbls of Water to flush cement off the lines
SchlumbergerPrivate
9
Sequence of Events
1:18pm – 2:48 pm – Rig took over displacement, pumping
SOBM
 Pumped a total of 538.7 bbls
 Bumped plugs with 1604 psi
 Casing was tested to 3500 psi for 10 minutes using
cementing unit
 Pressure bled off after successful pressure test.
3:00 pm – Did a thorough and proper wash up of cementing unit
to ensure all lines were clean.
SchlumbergerPrivate
10
Summary of the Events
While pumping the tail slurry during the 9 5/8” casing cement
job on Anieze 9, the cementer observed he was unable to
maintain the required designed density of 16.4 ppg for the tail
slurry. After several attempts to increase the density, and
after beckoning to his bulk plant operator, he observed there
was no more cement in the silos to feed the surge can. At
this point, the client asked him to pump the slurry left in his
mix tub downhole. The total volume of tail slurry pumped was
84.6bbls.
SchlumbergerPrivate
11
Summary of the Events
The top plug was then dropped by the cementing crew and
then displacement commenced. 5 bbls of water was pumped
from the cementing unit after which the rig took over and
continued with the displacement. The plugs were bumped
with 1604 psi after which the casing was tested to 3500 psi
for 10 minutes. The pressure was then bled off after a
successful pressure test.
SchlumbergerPrivate
12
SchlumbergerPrivate
13
Remedial Actions
Time was taken to check the silos to confirm if they were empty.
Checked all discharge lines to confirm no blockage or
restriction along the lines. A crew was mobilized to the
location to maintain the silos in preparation for the next job.
SchlumbergerPrivate
14
Focus of Investigation
• Discharge problems from the silos due to blockage or
restrictions.
• Inadequate cement on location due to improper inventory
management prior to cementing job
• Shortage of cement supplied to the rig during last bulk
transfer.
• Poor fluffing of cement prior to the job
• Emergency Security Evacuation of Personnel from the Rig
and Rushing for the job
• Poor maintenance of Silo and leftover of handgloves inside
the Silo that blocked the discharge line
SchlumbergerPrivate
15
Action Plan - Immediate
• Attempted severally to aerate the silos and totally discharge
any left over cement within silos.
• Opened the silo hatches to see inside the silos and confirm
exact picture.
• Mobilized cementing crew to carry out thorough
maintenance on the silos.
SchlumbergerPrivate
16
Corrective Action Plan
• Plan to have extra cement onsite
• Proper inspection of all silos prior to offloading cement
• Proper inventory tracking for both chemical and cement on
site
SchlumbergerPrivate
17
Plots/Charts
SchlumbergerPrivate
18
Pictures
Pictures of Cement Silos when opened after the Job
SchlumbergerPrivate
19
Pictures
Closer view of opened hatch showing some cement left inside
SchlumbergerPrivate
20
Pictures

More Related Content

What's hot

Method statement for expansion joint
Method statement for expansion jointMethod statement for expansion joint
Method statement for expansion jointakash yadav
 
final presentation
final presentationfinal presentation
final presentationJason Rubin
 
Method of Statement - Road furniture works
Method of Statement - Road furniture worksMethod of Statement - Road furniture works
Method of Statement - Road furniture worksMohd Nizam Mohd Zan
 
CV-English_Bartilotti-16-12-2014
CV-English_Bartilotti-16-12-2014CV-English_Bartilotti-16-12-2014
CV-English_Bartilotti-16-12-2014Manuel Bartilotti
 
NDOT's Concrete Pavement: Past, Present & Future
NDOT's Concrete Pavement: Past, Present & FutureNDOT's Concrete Pavement: Past, Present & Future
NDOT's Concrete Pavement: Past, Present & FutureJill Reeves
 
Corrocoat USA Lowers Costs and Increases Reliability at Chemical Plant
Corrocoat USA Lowers Costs and Increases Reliability at Chemical PlantCorrocoat USA Lowers Costs and Increases Reliability at Chemical Plant
Corrocoat USA Lowers Costs and Increases Reliability at Chemical PlantEd Cilli
 
DOGANGUNES - Presentation - 2015
DOGANGUNES - Presentation - 2015DOGANGUNES - Presentation - 2015
DOGANGUNES - Presentation - 2015Ayse Dogangunes
 
Turnkey M&E Installation Ww Tw
Turnkey M&E Installation Ww TwTurnkey M&E Installation Ww Tw
Turnkey M&E Installation Ww Twftwg
 
Best practices at (aditya cement works site) n ew
Best practices at (aditya cement works site) n ewBest practices at (aditya cement works site) n ew
Best practices at (aditya cement works site) n ewPraveen Rathore
 

What's hot (11)

Method statement for expansion joint
Method statement for expansion jointMethod statement for expansion joint
Method statement for expansion joint
 
final presentation
final presentationfinal presentation
final presentation
 
Method of Statement - Road furniture works
Method of Statement - Road furniture worksMethod of Statement - Road furniture works
Method of Statement - Road furniture works
 
CV-English_Bartilotti-16-12-2014
CV-English_Bartilotti-16-12-2014CV-English_Bartilotti-16-12-2014
CV-English_Bartilotti-16-12-2014
 
NDOT's Concrete Pavement: Past, Present & Future
NDOT's Concrete Pavement: Past, Present & FutureNDOT's Concrete Pavement: Past, Present & Future
NDOT's Concrete Pavement: Past, Present & Future
 
sapl-presentation
sapl-presentationsapl-presentation
sapl-presentation
 
Corrocoat USA Lowers Costs and Increases Reliability at Chemical Plant
Corrocoat USA Lowers Costs and Increases Reliability at Chemical PlantCorrocoat USA Lowers Costs and Increases Reliability at Chemical Plant
Corrocoat USA Lowers Costs and Increases Reliability at Chemical Plant
 
DOGANGUNES - Presentation - 2015
DOGANGUNES - Presentation - 2015DOGANGUNES - Presentation - 2015
DOGANGUNES - Presentation - 2015
 
Turnkey M&E Installation Ww Tw
Turnkey M&E Installation Ww TwTurnkey M&E Installation Ww Tw
Turnkey M&E Installation Ww Tw
 
RAT
RATRAT
RAT
 
Best practices at (aditya cement works site) n ew
Best practices at (aditya cement works site) n ewBest practices at (aditya cement works site) n ew
Best practices at (aditya cement works site) n ew
 

Similar to GNwafor_CMS Presentation

Water shut off ppt
Water shut off pptWater shut off ppt
Water shut off pptAdjei Sephen
 
Deepwater Horizon Case Slides
Deepwater Horizon Case SlidesDeepwater Horizon Case Slides
Deepwater Horizon Case SlidesBrandon Swartwood
 
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...Association for Project Management
 
Bursting Of Sand Blasting Hopper
Bursting Of Sand Blasting HopperBursting Of Sand Blasting Hopper
Bursting Of Sand Blasting Hoppervtsiri
 
150911 Management of Reactive Ground - E Heiland
150911 Management of Reactive Ground - E Heiland150911 Management of Reactive Ground - E Heiland
150911 Management of Reactive Ground - E HeilandErik Heiland
 
Albany Expeller project (2)
Albany Expeller project (2)Albany Expeller project (2)
Albany Expeller project (2)Paul Richardson
 
Flixborough disaster
Flixborough disasterFlixborough disaster
Flixborough disasterSameer Phadke
 
Flixborough disaster
Flixborough disasterFlixborough disaster
Flixborough disasterSameer Phadke
 
Civil Eng. priject presentation
Civil Eng. priject presentationCivil Eng. priject presentation
Civil Eng. priject presentationVj NiroSh
 
IJSRED-V2I3P90
IJSRED-V2I3P90IJSRED-V2I3P90
IJSRED-V2I3P90IJSRED
 
IJSRED-V2I3P90
IJSRED-V2I3P90IJSRED-V2I3P90
IJSRED-V2I3P90IJSRED
 
Cement & cement tests pdf
Cement & cement tests pdfCement & cement tests pdf
Cement & cement tests pdfSaqib Imran
 
City Council March 19, 2013 Hickory update
City Council March 19, 2013 Hickory updateCity Council March 19, 2013 Hickory update
City Council March 19, 2013 Hickory updateCity of San Angelo Texas
 
Roklin's VariFlo Machine
Roklin's VariFlo MachineRoklin's VariFlo Machine
Roklin's VariFlo MachineTamar Swan
 
Stuart Cooper C.V. NEW 2014
Stuart Cooper C.V. NEW 2014Stuart Cooper C.V. NEW 2014
Stuart Cooper C.V. NEW 2014Stuart Cooper
 
19-07-06 Scheme Description details
19-07-06 Scheme Description details19-07-06 Scheme Description details
19-07-06 Scheme Description detailsAonghus Murray
 

Similar to GNwafor_CMS Presentation (20)

Water shut off ppt
Water shut off pptWater shut off ppt
Water shut off ppt
 
Deepwater Horizon Case Slides
Deepwater Horizon Case SlidesDeepwater Horizon Case Slides
Deepwater Horizon Case Slides
 
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
 
Bursting Of Sand Blasting Hopper
Bursting Of Sand Blasting HopperBursting Of Sand Blasting Hopper
Bursting Of Sand Blasting Hopper
 
150911 Management of Reactive Ground - E Heiland
150911 Management of Reactive Ground - E Heiland150911 Management of Reactive Ground - E Heiland
150911 Management of Reactive Ground - E Heiland
 
Summer training 2008
Summer training 2008Summer training 2008
Summer training 2008
 
Albany Expeller project (2)
Albany Expeller project (2)Albany Expeller project (2)
Albany Expeller project (2)
 
Flixborough disaster
Flixborough disasterFlixborough disaster
Flixborough disaster
 
Flixborough disaster
Flixborough disasterFlixborough disaster
Flixborough disaster
 
CV_Mohammad Iqbal Hadzir
CV_Mohammad Iqbal HadzirCV_Mohammad Iqbal Hadzir
CV_Mohammad Iqbal Hadzir
 
Civil Eng. priject presentation
Civil Eng. priject presentationCivil Eng. priject presentation
Civil Eng. priject presentation
 
IJSRED-V2I3P90
IJSRED-V2I3P90IJSRED-V2I3P90
IJSRED-V2I3P90
 
IJSRED-V2I3P90
IJSRED-V2I3P90IJSRED-V2I3P90
IJSRED-V2I3P90
 
Cement & cement tests pdf
Cement & cement tests pdfCement & cement tests pdf
Cement & cement tests pdf
 
City Council March 19, 2013 Hickory update
City Council March 19, 2013 Hickory updateCity Council March 19, 2013 Hickory update
City Council March 19, 2013 Hickory update
 
resume
resumeresume
resume
 
Roklin's VariFlo Machine
Roklin's VariFlo MachineRoklin's VariFlo Machine
Roklin's VariFlo Machine
 
Stuart Cooper C.V. NEW 2014
Stuart Cooper C.V. NEW 2014Stuart Cooper C.V. NEW 2014
Stuart Cooper C.V. NEW 2014
 
TCD2011 - Kunne bedre kompetanse avverget Macondo-ulykken i Mexico-gulfen? v/...
TCD2011 - Kunne bedre kompetanse avverget Macondo-ulykken i Mexico-gulfen? v/...TCD2011 - Kunne bedre kompetanse avverget Macondo-ulykken i Mexico-gulfen? v/...
TCD2011 - Kunne bedre kompetanse avverget Macondo-ulykken i Mexico-gulfen? v/...
 
19-07-06 Scheme Description details
19-07-06 Scheme Description details19-07-06 Scheme Description details
19-07-06 Scheme Description details
 

GNwafor_CMS Presentation

  • 1. Service Quality Presentation Godwin Chidiebere Nwafor Port Harcourt, NGA
  • 2. SchlumbergerPrivate 2 Outline • Introduction • Sequence of Events • Summary of the Events • Remedial Actions • Focus of Investigation • Action Plan • Corrective Action Plan • Plots/Charts & Pictures • Client’s Opinion
  • 3. SchlumbergerPrivate 3 Introduction Customer: Sterling Energy Exploration & Production Company SLB Supervisor: Godwin Nwafor Treatment #: 983738 Has FSM been contacted? Yes Equipment # involved in incident: Cementing silos Has FQC/HSE been contacted? No Job or Type of Activity: 9 5/8” production casing If you have entered a RIR, please give Quest # 20130611132500 Location: Anieze 9 Date of incident: 10th June, 2013 Time of incident: 12:10 pm 3rd Party Name if applicable: NA Customer Contact Field: Anieze Customer phone number: +234-8152092254
  • 4. SchlumbergerPrivate 4 Sequence of Events 4:00 am – Arrived rig site to prepare for the up coming job with the cementing crew. Started mixing chemicals in the pits already prepared earlier. 7:17 am – Carried out STEM 1 on all equipment on location. Primed the cementing unit using water 9:00am – Conducted safety meeting with all going to be involved during the job on the rig floor. 9:27 am – Flushed cementing lines before conducting the pressure test 9:32 am – Tested cementing surface lines to 4000 psi
  • 5. SchlumbergerPrivate 5 Sequence of Events 9:55 am – Rig pumped 20 bbls of base oil and 10:00 am – Rig pumped 50 bbls of Scavenger mud 10:19 am – Dowell pumped 30 bbls of chemical wash from cementing unit 10:29 am – Rig pumped 62 bbls of MUDPUSH II spacer 10:47 am – Bottom plug was released from cement head on rig floor 10:54 am – 12:05 pm – Started mixing lead slurry at 12.5 ppg
  • 6. SchlumbergerPrivate 6 Sequence of Events  Mixed slurry in the mix tub to the required density  Mud engineer took sample from sampling point to ascertain density  Company representative confirmed density and gave go ahead to start pumping.  Pumped a total of 355.4 bbls of lead slurry 12:05 pm – 12:10 pm – Started mixing tail slurry at density 16.4 ppg. Confirmed tail density with company representative and continued pumping downhole
  • 7. SchlumbergerPrivate 7 Sequence of Events 12:50 pm – observed difficulty in maintaining required tail density,  Signalled to bulk operator to check supply of cement.  Stopped pumping to troubleshoot and find root cause of poor cement supply.  The silos were checked to confirm discharge supply  Confirmed silos were empty without cement
  • 8. SchlumbergerPrivate 8 Sequence of Events 1:10pm – The situation on the rig was communicated with SEEPCO office in town and the decision to drop the top plug and displace was taken.  Pumped the remaining slurry in the mixing tub. Total tail slurry volume pumped was 84.6 bbls  Climbed up to the rig floor to release top plug from cement head  Pumped 5 bbls of Water to flush cement off the lines
  • 9. SchlumbergerPrivate 9 Sequence of Events 1:18pm – 2:48 pm – Rig took over displacement, pumping SOBM  Pumped a total of 538.7 bbls  Bumped plugs with 1604 psi  Casing was tested to 3500 psi for 10 minutes using cementing unit  Pressure bled off after successful pressure test. 3:00 pm – Did a thorough and proper wash up of cementing unit to ensure all lines were clean.
  • 10. SchlumbergerPrivate 10 Summary of the Events While pumping the tail slurry during the 9 5/8” casing cement job on Anieze 9, the cementer observed he was unable to maintain the required designed density of 16.4 ppg for the tail slurry. After several attempts to increase the density, and after beckoning to his bulk plant operator, he observed there was no more cement in the silos to feed the surge can. At this point, the client asked him to pump the slurry left in his mix tub downhole. The total volume of tail slurry pumped was 84.6bbls.
  • 11. SchlumbergerPrivate 11 Summary of the Events The top plug was then dropped by the cementing crew and then displacement commenced. 5 bbls of water was pumped from the cementing unit after which the rig took over and continued with the displacement. The plugs were bumped with 1604 psi after which the casing was tested to 3500 psi for 10 minutes. The pressure was then bled off after a successful pressure test.
  • 13. SchlumbergerPrivate 13 Remedial Actions Time was taken to check the silos to confirm if they were empty. Checked all discharge lines to confirm no blockage or restriction along the lines. A crew was mobilized to the location to maintain the silos in preparation for the next job.
  • 14. SchlumbergerPrivate 14 Focus of Investigation • Discharge problems from the silos due to blockage or restrictions. • Inadequate cement on location due to improper inventory management prior to cementing job • Shortage of cement supplied to the rig during last bulk transfer. • Poor fluffing of cement prior to the job • Emergency Security Evacuation of Personnel from the Rig and Rushing for the job • Poor maintenance of Silo and leftover of handgloves inside the Silo that blocked the discharge line
  • 15. SchlumbergerPrivate 15 Action Plan - Immediate • Attempted severally to aerate the silos and totally discharge any left over cement within silos. • Opened the silo hatches to see inside the silos and confirm exact picture. • Mobilized cementing crew to carry out thorough maintenance on the silos.
  • 16. SchlumbergerPrivate 16 Corrective Action Plan • Plan to have extra cement onsite • Proper inspection of all silos prior to offloading cement • Proper inventory tracking for both chemical and cement on site
  • 18. SchlumbergerPrivate 18 Pictures Pictures of Cement Silos when opened after the Job
  • 19. SchlumbergerPrivate 19 Pictures Closer view of opened hatch showing some cement left inside