GREEN
ENERGY
SOLUTIONS
MISSION
The Company
Who we are Track Record
 To deliver tailored solutions to our Client’s specific process energy
challenges, optimally applying advanced technologies in cost-
effective real-world solutions, conscious of the environment.
 To partner with our Clients, to assist in assessing, planning,
designing, implementing and operating a suitable heating, steaming,
waste materials, solar, biogas or combined system, optimally.
 To work closely with our Clients to effectively reduce energy costs
and environmental impact without compromising profits.
WE ARE A GREEN ENERGY SOLUTIONS COMPANY
Fre
Our
Fre
eval
Afri
The Company
MISSION TRACK RECORD
Paul Gorremans
A Multi-discipline Engineer with broad expertise in the
building and heating industry. Our Group CEO is a
master of sustainable, renewable energy, with great
expertise from Europe, and the application of first-
world technology in Africa.
Bruno Migliorini
A Business Manager passionate about technological
innovations positively impacting our environment,
Bruno acts within Sustainable Heating as General
Manager, giving commercial and managerial support.
Steven Dramat
Our Design Engineer and projects implementation
manager supervises the construction of our boiler
houses and installation of our biomass machinery.
Derick Lloyd
As the Operational manager in Kwazulu-Natal, with
more than 20 years experience in the heating and
incinerating industry, Derick oversees operations at
several of our installations. He is also a coded welder, a
qualified electrician with applicable expertise.
Anthony Messina
With more than 40 years experience in the
construction and engineering industry, Tony
supervises the implementation of our projects with
Steven. Tony oversees all the on-site construction
activities, and a knowledgeable engineer.
Tyron Fritz
Our Operations manager in the Western Cape is an
electrical engineer with extensive experience in
management within several major manufacturers in
the food- and printing industries.
Faan Cloete
Responsible for Business Development and Legal, Faan
is also a qualified liquidator and attorney. Focused on
marketing, sales and strategic planning as a committed
member of the Sustainable Heating team, Faan
vigorously promotes green energy in industrial
applications to benefit the environment.
Fred van Leeuwen
Fred is a senior member of our sales team, and has
a wealth of personal experience as consultant and
monitor for the European Union, in many projects
across Africa where international funding was
deployed.
And our Partners:
WHO WE ARE
The Company
MISSION WHO WE ARE
   Heavy Duty Biomass Furnaces and
Boilers – Leaders in South Africa.
Biogas – Highly efficient anaerobic
digestion technologies for organic
waste treatment and biogas
production.
Solar Projects – 257,8 MWh - One of
the biggest service providers in
Southern Africa .
  
  
TRACK RECORD
The Contract
WAY OF WORKING BENEFITS
•  Sustainable Heating
– 
– 
– 
– 
Understands and details the needs of the customer
Agrees with the customer on a viable solution
Engineers, Procures, and Constructs the facility
Organises the capital financing of the project (this item can be adjusted
according to requirements of the Client)
Operates and Maintains the facility
Over long term contract
– 
– 
•  The Customer
–  Pays ONLY for the energy used, measured and invoiced monthly
PRINCIPLES
The Contract
PRINCIPLES BENEFITS
•  Sustainable Heating delivers high quality standards by:
– 
– 
– 
– 
– 
– 
Planning and designing carefully and comprehensively
Investing in the best available technology
Partnering with the right funders and suppliers
Putting in the extra effort to satisfy the Client
Observing strict Health, Safety and Environment standards
Offering a 24/7 assistance service to the Client
WAY OF WORKING
• Save money: Switch to Sustainable Heating contract heat and you can immediately
reduce your process energy costs by 10 to 30 % compared to fossil fuels such as heating
oil or propane, with zero upfront investment. Solar and Biogas are naturally free...
• Become greener: Biomass Fuel, Solar and Biogas are renewable and thus carbon neutral.
All our installations comply with the world‘s highest (Austrian, Geman, Californian)
emmision standards - saving the environment and carbon tax. Waste from the
processing of timber is an industry challenge, while Solar and Biogas are nature‘s gift.
These are now efficiently harnassed forthe responsible development of mankind.
• Support the local economy, save local jobs: The biomass waste material used as raw
biofuel is sourced in your local community, the biomass chips are produced in your
neighborhood by local people and hauled by local companies.
• Reduced uncertainty: Biomass (wood, husk, sawdust etc), Solar Power and Biogas are
sustainable, environmentally responsible, renewable energy sources, as opposed to the
depleting fossil fuels such as coal, where competition and prices are increasing.
The Contract
PRINCIPLES WAY OF WORKING BENEFITS
Risk Control
• Operators on-site 24/7
• South African technical support team available 24/7
• Suppliers helpdesk 24/7
• Collaboration from Client technical team is usually requested, as to promote skills transfer
and Client understanding of our modern installations.
ASSISTANCE BACK-UP RESPONSIBILITIES AVOIDED RISKS
Risk Control
• Sustainable Heating will supply and operate up a back-up boiler system on-site, with the
separate installation fueled from an independent source.
• Back-up system always operational within 2 hours of demand.
• Maintenance, management and operation of back-up system is part of the service provided
by Sustainable Heating.
ASSISTANCE BACK-UP RESPONSIBILITIES AVOIDED RISKS
Risk Control
• At any given time during the contract period, Sustainable Heating has to:
– Supply Steam
– At the correct pressure/temperature
– When requested
– At the predefined price
– Comply with the site rules of the Client
– Observe and comply with Health and Safety Legislation, independently and in collaboration with the
Client
– Observe and comply with all relevant legal requirements pertaining to Pressure Vessels, including
ancillary equipment and installations
ASSISTANCE BACK-UP RESPONSIBILITIES AVOIDED RISKS
Risk Control
• Very few risks are associated with biomass fueled boiler installations:
– Fuel storage in specially designed bunkers, not fuel tanks.
– Minimal dust, noise and smoke: No significant public health threat.
– No rehabilitation in case of spillage, minimal ash waste produced.(0,2%)
– No pollution or environmental problems with biomass fuels or boilers.
ASSISTANCE BACK-UP RESPONSIBILITIES SPECIFIC RISKS
The Steam Technology
LOADING SYSTEM FUEL MONITORINGBOILERS
The Steam Technology
BOILERS FUEL MONITORINGLOADING SYSTEM
• Low fuel costs, as biofuel consists of processed waste material.
• Our furnaces can run on a wide fuel range, with varying moisture
content up to 55%. (E.g. Saw dust, woodchips, briquettes, energy crop
pellets, husk, bagasse, corn stalks, etc.)
• Sustainable Heating operates several chipping- and biofuel production
facilities, with more than 30 suppliers of raw material.
The Steam Technology
BOILERS FUEL MONITORINGLOADING SYSTEM
The Steam Technology
BOILERS FUEL MONITORINGLOADING SYSTEM
The Steam Technology
BOILERS FUEL MONITORINGLOADING SYSTEM
Ongoing Projects Steam
CAPE TOWN CAPE TOWN HOWICK
• 
• 
• 
Shakaskraal (Durban), bakery
2.7 Tons/hour, fuel: woodchips
CO2 Savings over contract length:
DURBAN
Ongoing Projects Steam
DURBAN CAPE TOWN HOWICK
• 
• 
• 
Cape Town, Bakery
1.2 Tons/hour, fuel: woodchips
CO2 Savings over the contract length:
30 Tons
liquid Carbon
30 Tons
liquid Carbon
30 Tons
liquid Carbon
30 Tons
liquid Carbon
30 Tons
liquid Carbon
30 Tons
liquid Carbon
30 Tons
liquid Carbon
24.3 Kilometers
CAPE TOWN
Ongoing Projects Steam
DURBAN CAPE TOWN HOWICK
• 
• 
• 
Milnerton, Prin,ng
Power: 6 MW, fuel: woodchips, 30% alien trees
CO2 Savings over the contract length:
30 Tons
liquid Carbon
30 Tons
liquid Carbon
30 Tons
liquid Carbon
30 Tons
liquid Carbon
30 Tons
liquid Carbon
30 Tons
liquid Carbon
30 Tons
liquid Carbon
182 Kilometers
CAPE TOWN
Ongoing Projects Steam
DURBAN CAPE TOWN CAPE TOWN
• 
• 
• 
Howick, Dairy Industry
Power: 6 MW, fuel: Woodchips
CO2 Savings over the contract length:
30 Tons
liquid Carbon
30 Tons
liquid Carbon
30 Tons
liquid Carbon
30 Tons
liquid Carbon
30 Tons
liquid Carbon
30 Tons
liquid Carbon
30 Tons
liquid Carbon
182 Kilometers
HOWICK
The Steam Technology: Next Steps
• Price per Ton of steam in the Client’s plant, based on:
– Volume of fuel:
– Fuel type:
– Fuel price:
– Maintenance (Scheduled):
– Water treatment:
– Payroll: Operators, Management:
– Rent of Boiler House:
– Additional costs: (Repairs, relocation, replacement of old equipment, etc.)
NOTE: These expenses are all included in the price of our steam
COST ANALYSIS PROPOSAL DISCUSSION SIGNATURE
The Steam Technology: Next Steps
• Sustainable Heating prepares a specific solution:
– A structured price proposal
– A detailed technical design proposal
– A draft contract (Long-term Steam Supply Agreement) for discussion
– A mutual confidentiality agreement to protect the Parties
COST ANALYSIS PROPOSAL DISCUSSION SIGNATURE
The Steam Technology: Next Steps
• Using the base proposal Sustainable Heating and the Client discuss:
– The anticipated steam/heating needs
– The design and ideal location of the new biomass boiler installation
– The contract terms
– The specificities of the site and the industry
• All the details are captured in a final contract
COST ANALYSIS PROPOSAL DISCUSSION SIGNATURE
The Steam Technology: Next Steps
• Once the Parties agree, the final contract is signed
• Sustainable Heating orders the required equipment, and prepares to install the new
biomass boiler system
• Usually, 6 months have to be foreseen until commissioning:
– Boiler construction and shipping
– Building plans approval and construction of new boiler house
– Boiler installation, including ancillary equipment and piping
– Building completion and finishing, including landscaping
– Piping and ty-in to Client installation
– Testing, certification and commissioning of boiler and installation
COST ANALYSIS PROPOSAL DISCUSSION SIGNATURE
Conclusion
Be more green and save money!
www.sustainableheating.co.za
faan@sustainableheating.co.za / +27 (0) 76 593 3093
bruno@sustainableheating.co.za / +27 (0) 74 657 6010

More Related Content

What's hot

Increased value from biomass with Valmet processes and technologies
Increased value from biomass with Valmet processes and technologiesIncreased value from biomass with Valmet processes and technologies
Increased value from biomass with Valmet processes and technologiesBiorrefinaria Brasil
 
Palm Oil Mill Waste Utilization (biogas, biomass briquette, biomass gasificat...
Palm Oil Mill Waste Utilization (biogas, biomass briquette, biomass gasificat...Palm Oil Mill Waste Utilization (biogas, biomass briquette, biomass gasificat...
Palm Oil Mill Waste Utilization (biogas, biomass briquette, biomass gasificat...Tara F Khaira
 
UK AD & Biogas 2016: Day Two green seminar 7 July
UK AD & Biogas 2016: Day Two green seminar 7 JulyUK AD & Biogas 2016: Day Two green seminar 7 July
UK AD & Biogas 2016: Day Two green seminar 7 JulyUKADBiogas
 
6 fa sva_siré_diallo
6 fa sva_siré_diallo6 fa sva_siré_diallo
6 fa sva_siré_dialloF_Chanelle_K
 
Factsheet briquette potential in the region
Factsheet briquette potential in the regionFactsheet briquette potential in the region
Factsheet briquette potential in the regionPT carbon indonesia
 
Lafarge Tarmac sustainable products
Lafarge Tarmac sustainable productsLafarge Tarmac sustainable products
Lafarge Tarmac sustainable productsTarmac
 
Complete Solution for Biogas Power Plant
Complete Solution for Biogas Power PlantComplete Solution for Biogas Power Plant
Complete Solution for Biogas Power PlantWindri Aji Brata
 
Engineering Waste Into Sustainable Energy
Engineering Waste Into Sustainable EnergyEngineering Waste Into Sustainable Energy
Engineering Waste Into Sustainable EnergyTipperary Energy Agency
 
Borowiec Jerzy- Energa Biogas Programme
Borowiec Jerzy- Energa Biogas ProgrammeBorowiec Jerzy- Energa Biogas Programme
Borowiec Jerzy- Energa Biogas ProgrammePomcert
 

What's hot (12)

Increased value from biomass with Valmet processes and technologies
Increased value from biomass with Valmet processes and technologiesIncreased value from biomass with Valmet processes and technologies
Increased value from biomass with Valmet processes and technologies
 
Conference Theatre Day One - 6 July
Conference Theatre Day One - 6 JulyConference Theatre Day One - 6 July
Conference Theatre Day One - 6 July
 
Palm Oil Mill Waste Utilization (biogas, biomass briquette, biomass gasificat...
Palm Oil Mill Waste Utilization (biogas, biomass briquette, biomass gasificat...Palm Oil Mill Waste Utilization (biogas, biomass briquette, biomass gasificat...
Palm Oil Mill Waste Utilization (biogas, biomass briquette, biomass gasificat...
 
UK AD & Biogas 2016: Day Two green seminar 7 July
UK AD & Biogas 2016: Day Two green seminar 7 JulyUK AD & Biogas 2016: Day Two green seminar 7 July
UK AD & Biogas 2016: Day Two green seminar 7 July
 
6 fa sva_siré_diallo
6 fa sva_siré_diallo6 fa sva_siré_diallo
6 fa sva_siré_diallo
 
Factsheet briquette potential in the region
Factsheet briquette potential in the regionFactsheet briquette potential in the region
Factsheet briquette potential in the region
 
Lafarge Tarmac sustainable products
Lafarge Tarmac sustainable productsLafarge Tarmac sustainable products
Lafarge Tarmac sustainable products
 
Complete Solution for Biogas Power Plant
Complete Solution for Biogas Power PlantComplete Solution for Biogas Power Plant
Complete Solution for Biogas Power Plant
 
Engineering Waste Into Sustainable Energy
Engineering Waste Into Sustainable EnergyEngineering Waste Into Sustainable Energy
Engineering Waste Into Sustainable Energy
 
Breeam
BreeamBreeam
Breeam
 
Borowiec Jerzy- Energa Biogas Programme
Borowiec Jerzy- Energa Biogas ProgrammeBorowiec Jerzy- Energa Biogas Programme
Borowiec Jerzy- Energa Biogas Programme
 
Biomass Investment Opportunity
Biomass Investment OpportunityBiomass Investment Opportunity
Biomass Investment Opportunity
 

Similar to 2016 . Q2 . Presentation . Steam

GHG Lda - VER Developer
GHG Lda - VER DeveloperGHG Lda - VER Developer
GHG Lda - VER DeveloperLuke Murray
 
Brochure gasification plant eng
Brochure gasification plant engBrochure gasification plant eng
Brochure gasification plant engMartina Andreoni
 
Environmental management and sustainability in the uk property land securities
Environmental management and sustainability in the uk property  land securitiesEnvironmental management and sustainability in the uk property  land securities
Environmental management and sustainability in the uk property land securitiesKhamael Zhiyong
 
(Ximb) sustainability electrical equipment industry
(Ximb) sustainability electrical equipment industry(Ximb) sustainability electrical equipment industry
(Ximb) sustainability electrical equipment industrySustainabilityXIMB
 
Torrgas - Erwin Eymans
Torrgas - Erwin EymansTorrgas - Erwin Eymans
Torrgas - Erwin EymansEBAconference
 
Conrad properties newzealand-sustainability_report_2012
Conrad properties newzealand-sustainability_report_2012Conrad properties newzealand-sustainability_report_2012
Conrad properties newzealand-sustainability_report_2012conradproperties
 
Business session
Business session  Business session
Business session jennykur
 
company_profile_BioEnergy_AlternativeFuels
company_profile_BioEnergy_AlternativeFuelscompany_profile_BioEnergy_AlternativeFuels
company_profile_BioEnergy_AlternativeFuelsMahmoud Mostafa
 
Intro slides cm sustainable manufacture 23 sept 2010
Intro slides cm sustainable manufacture 23 sept 2010Intro slides cm sustainable manufacture 23 sept 2010
Intro slides cm sustainable manufacture 23 sept 2010mikegolfbravo1
 
NEWE REAL ESTATE & ENERGY HOLDING, LLC
NEWE REAL ESTATE & ENERGY HOLDING, LLCNEWE REAL ESTATE & ENERGY HOLDING, LLC
NEWE REAL ESTATE & ENERGY HOLDING, LLChundkrealestate
 
Smart energy efficiency for industrial consumer systems
Smart energy efficiency for industrial consumer systemsSmart energy efficiency for industrial consumer systems
Smart energy efficiency for industrial consumer systemsGeorges Seil, PhD
 
Smart energy efficiency for industrial consumer systems
Smart energy efficiency for industrial consumer systemsSmart energy efficiency for industrial consumer systems
Smart energy efficiency for industrial consumer systemsGeorges Seil, PhD
 
Finnish Waste-to-Energy and Bioenergy offering
Finnish Waste-to-Energy and Bioenergy  offeringFinnish Waste-to-Energy and Bioenergy  offering
Finnish Waste-to-Energy and Bioenergy offeringBusiness Finland
 
Bringing Energy Cost Control Back to the User
Bringing Energy Cost Control Back to the UserBringing Energy Cost Control Back to the User
Bringing Energy Cost Control Back to the UserEMEX
 
Sustainex 2013 - Profit through Environmental Management Resource Efficiency ...
Sustainex 2013 - Profit through Environmental Management Resource Efficiency ...Sustainex 2013 - Profit through Environmental Management Resource Efficiency ...
Sustainex 2013 - Profit through Environmental Management Resource Efficiency ...Invest Northern Ireland
 

Similar to 2016 . Q2 . Presentation . Steam (20)

GHG Lda - VER Developer
GHG Lda - VER DeveloperGHG Lda - VER Developer
GHG Lda - VER Developer
 
Brochure gasification plant eng
Brochure gasification plant engBrochure gasification plant eng
Brochure gasification plant eng
 
Environmental management and sustainability in the uk property land securities
Environmental management and sustainability in the uk property  land securitiesEnvironmental management and sustainability in the uk property  land securities
Environmental management and sustainability in the uk property land securities
 
O2E Wood Recycling
O2E Wood RecyclingO2E Wood Recycling
O2E Wood Recycling
 
(Ximb) sustainability electrical equipment industry
(Ximb) sustainability electrical equipment industry(Ximb) sustainability electrical equipment industry
(Ximb) sustainability electrical equipment industry
 
Torrgas - Erwin Eymans
Torrgas - Erwin EymansTorrgas - Erwin Eymans
Torrgas - Erwin Eymans
 
Conrad properties newzealand-sustainability_report_2012
Conrad properties newzealand-sustainability_report_2012Conrad properties newzealand-sustainability_report_2012
Conrad properties newzealand-sustainability_report_2012
 
Business session
Business session  Business session
Business session
 
Gasification Technology General v48
Gasification Technology General v48Gasification Technology General v48
Gasification Technology General v48
 
company_profile_BioEnergy_AlternativeFuels
company_profile_BioEnergy_AlternativeFuelscompany_profile_BioEnergy_AlternativeFuels
company_profile_BioEnergy_AlternativeFuels
 
The Carbon Trust
The Carbon TrustThe Carbon Trust
The Carbon Trust
 
Intro slides cm sustainable manufacture 23 sept 2010
Intro slides cm sustainable manufacture 23 sept 2010Intro slides cm sustainable manufacture 23 sept 2010
Intro slides cm sustainable manufacture 23 sept 2010
 
NEWE REAL ESTATE & ENERGY HOLDING, LLC
NEWE REAL ESTATE & ENERGY HOLDING, LLCNEWE REAL ESTATE & ENERGY HOLDING, LLC
NEWE REAL ESTATE & ENERGY HOLDING, LLC
 
Smart energy efficiency for industrial consumer systems
Smart energy efficiency for industrial consumer systemsSmart energy efficiency for industrial consumer systems
Smart energy efficiency for industrial consumer systems
 
Smart energy efficiency for industrial consumer systems
Smart energy efficiency for industrial consumer systemsSmart energy efficiency for industrial consumer systems
Smart energy efficiency for industrial consumer systems
 
Finnish Waste-to-Energy and Bioenergy offering
Finnish Waste-to-Energy and Bioenergy  offeringFinnish Waste-to-Energy and Bioenergy  offering
Finnish Waste-to-Energy and Bioenergy offering
 
Bringing Energy Cost Control Back to the User
Bringing Energy Cost Control Back to the UserBringing Energy Cost Control Back to the User
Bringing Energy Cost Control Back to the User
 
Launch slides part 2
Launch slides part 2Launch slides part 2
Launch slides part 2
 
Presentation belgian companies active in sustainable building
Presentation belgian companies active in sustainable buildingPresentation belgian companies active in sustainable building
Presentation belgian companies active in sustainable building
 
Sustainex 2013 - Profit through Environmental Management Resource Efficiency ...
Sustainex 2013 - Profit through Environmental Management Resource Efficiency ...Sustainex 2013 - Profit through Environmental Management Resource Efficiency ...
Sustainex 2013 - Profit through Environmental Management Resource Efficiency ...
 

2016 . Q2 . Presentation . Steam

  • 2. MISSION The Company Who we are Track Record  To deliver tailored solutions to our Client’s specific process energy challenges, optimally applying advanced technologies in cost- effective real-world solutions, conscious of the environment.  To partner with our Clients, to assist in assessing, planning, designing, implementing and operating a suitable heating, steaming, waste materials, solar, biogas or combined system, optimally.  To work closely with our Clients to effectively reduce energy costs and environmental impact without compromising profits. WE ARE A GREEN ENERGY SOLUTIONS COMPANY
  • 3. Fre Our Fre eval Afri The Company MISSION TRACK RECORD Paul Gorremans A Multi-discipline Engineer with broad expertise in the building and heating industry. Our Group CEO is a master of sustainable, renewable energy, with great expertise from Europe, and the application of first- world technology in Africa. Bruno Migliorini A Business Manager passionate about technological innovations positively impacting our environment, Bruno acts within Sustainable Heating as General Manager, giving commercial and managerial support. Steven Dramat Our Design Engineer and projects implementation manager supervises the construction of our boiler houses and installation of our biomass machinery. Derick Lloyd As the Operational manager in Kwazulu-Natal, with more than 20 years experience in the heating and incinerating industry, Derick oversees operations at several of our installations. He is also a coded welder, a qualified electrician with applicable expertise. Anthony Messina With more than 40 years experience in the construction and engineering industry, Tony supervises the implementation of our projects with Steven. Tony oversees all the on-site construction activities, and a knowledgeable engineer. Tyron Fritz Our Operations manager in the Western Cape is an electrical engineer with extensive experience in management within several major manufacturers in the food- and printing industries. Faan Cloete Responsible for Business Development and Legal, Faan is also a qualified liquidator and attorney. Focused on marketing, sales and strategic planning as a committed member of the Sustainable Heating team, Faan vigorously promotes green energy in industrial applications to benefit the environment. Fred van Leeuwen Fred is a senior member of our sales team, and has a wealth of personal experience as consultant and monitor for the European Union, in many projects across Africa where international funding was deployed. And our Partners: WHO WE ARE
  • 4. The Company MISSION WHO WE ARE    Heavy Duty Biomass Furnaces and Boilers – Leaders in South Africa. Biogas – Highly efficient anaerobic digestion technologies for organic waste treatment and biogas production. Solar Projects – 257,8 MWh - One of the biggest service providers in Southern Africa .       TRACK RECORD
  • 5. The Contract WAY OF WORKING BENEFITS •  Sustainable Heating –  –  –  –  Understands and details the needs of the customer Agrees with the customer on a viable solution Engineers, Procures, and Constructs the facility Organises the capital financing of the project (this item can be adjusted according to requirements of the Client) Operates and Maintains the facility Over long term contract –  –  •  The Customer –  Pays ONLY for the energy used, measured and invoiced monthly PRINCIPLES
  • 6. The Contract PRINCIPLES BENEFITS •  Sustainable Heating delivers high quality standards by: –  –  –  –  –  –  Planning and designing carefully and comprehensively Investing in the best available technology Partnering with the right funders and suppliers Putting in the extra effort to satisfy the Client Observing strict Health, Safety and Environment standards Offering a 24/7 assistance service to the Client WAY OF WORKING
  • 7. • Save money: Switch to Sustainable Heating contract heat and you can immediately reduce your process energy costs by 10 to 30 % compared to fossil fuels such as heating oil or propane, with zero upfront investment. Solar and Biogas are naturally free... • Become greener: Biomass Fuel, Solar and Biogas are renewable and thus carbon neutral. All our installations comply with the world‘s highest (Austrian, Geman, Californian) emmision standards - saving the environment and carbon tax. Waste from the processing of timber is an industry challenge, while Solar and Biogas are nature‘s gift. These are now efficiently harnassed forthe responsible development of mankind. • Support the local economy, save local jobs: The biomass waste material used as raw biofuel is sourced in your local community, the biomass chips are produced in your neighborhood by local people and hauled by local companies. • Reduced uncertainty: Biomass (wood, husk, sawdust etc), Solar Power and Biogas are sustainable, environmentally responsible, renewable energy sources, as opposed to the depleting fossil fuels such as coal, where competition and prices are increasing. The Contract PRINCIPLES WAY OF WORKING BENEFITS
  • 8. Risk Control • Operators on-site 24/7 • South African technical support team available 24/7 • Suppliers helpdesk 24/7 • Collaboration from Client technical team is usually requested, as to promote skills transfer and Client understanding of our modern installations. ASSISTANCE BACK-UP RESPONSIBILITIES AVOIDED RISKS
  • 9. Risk Control • Sustainable Heating will supply and operate up a back-up boiler system on-site, with the separate installation fueled from an independent source. • Back-up system always operational within 2 hours of demand. • Maintenance, management and operation of back-up system is part of the service provided by Sustainable Heating. ASSISTANCE BACK-UP RESPONSIBILITIES AVOIDED RISKS
  • 10. Risk Control • At any given time during the contract period, Sustainable Heating has to: – Supply Steam – At the correct pressure/temperature – When requested – At the predefined price – Comply with the site rules of the Client – Observe and comply with Health and Safety Legislation, independently and in collaboration with the Client – Observe and comply with all relevant legal requirements pertaining to Pressure Vessels, including ancillary equipment and installations ASSISTANCE BACK-UP RESPONSIBILITIES AVOIDED RISKS
  • 11. Risk Control • Very few risks are associated with biomass fueled boiler installations: – Fuel storage in specially designed bunkers, not fuel tanks. – Minimal dust, noise and smoke: No significant public health threat. – No rehabilitation in case of spillage, minimal ash waste produced.(0,2%) – No pollution or environmental problems with biomass fuels or boilers. ASSISTANCE BACK-UP RESPONSIBILITIES SPECIFIC RISKS
  • 12. The Steam Technology LOADING SYSTEM FUEL MONITORINGBOILERS
  • 13. The Steam Technology BOILERS FUEL MONITORINGLOADING SYSTEM
  • 14. • Low fuel costs, as biofuel consists of processed waste material. • Our furnaces can run on a wide fuel range, with varying moisture content up to 55%. (E.g. Saw dust, woodchips, briquettes, energy crop pellets, husk, bagasse, corn stalks, etc.) • Sustainable Heating operates several chipping- and biofuel production facilities, with more than 30 suppliers of raw material. The Steam Technology BOILERS FUEL MONITORINGLOADING SYSTEM
  • 15. The Steam Technology BOILERS FUEL MONITORINGLOADING SYSTEM
  • 16. The Steam Technology BOILERS FUEL MONITORINGLOADING SYSTEM
  • 17. Ongoing Projects Steam CAPE TOWN CAPE TOWN HOWICK •  •  •  Shakaskraal (Durban), bakery 2.7 Tons/hour, fuel: woodchips CO2 Savings over contract length: DURBAN
  • 18. Ongoing Projects Steam DURBAN CAPE TOWN HOWICK •  •  •  Cape Town, Bakery 1.2 Tons/hour, fuel: woodchips CO2 Savings over the contract length: 30 Tons liquid Carbon 30 Tons liquid Carbon 30 Tons liquid Carbon 30 Tons liquid Carbon 30 Tons liquid Carbon 30 Tons liquid Carbon 30 Tons liquid Carbon 24.3 Kilometers CAPE TOWN
  • 19. Ongoing Projects Steam DURBAN CAPE TOWN HOWICK •  •  •  Milnerton, Prin,ng Power: 6 MW, fuel: woodchips, 30% alien trees CO2 Savings over the contract length: 30 Tons liquid Carbon 30 Tons liquid Carbon 30 Tons liquid Carbon 30 Tons liquid Carbon 30 Tons liquid Carbon 30 Tons liquid Carbon 30 Tons liquid Carbon 182 Kilometers CAPE TOWN
  • 20. Ongoing Projects Steam DURBAN CAPE TOWN CAPE TOWN •  •  •  Howick, Dairy Industry Power: 6 MW, fuel: Woodchips CO2 Savings over the contract length: 30 Tons liquid Carbon 30 Tons liquid Carbon 30 Tons liquid Carbon 30 Tons liquid Carbon 30 Tons liquid Carbon 30 Tons liquid Carbon 30 Tons liquid Carbon 182 Kilometers HOWICK
  • 21. The Steam Technology: Next Steps • Price per Ton of steam in the Client’s plant, based on: – Volume of fuel: – Fuel type: – Fuel price: – Maintenance (Scheduled): – Water treatment: – Payroll: Operators, Management: – Rent of Boiler House: – Additional costs: (Repairs, relocation, replacement of old equipment, etc.) NOTE: These expenses are all included in the price of our steam COST ANALYSIS PROPOSAL DISCUSSION SIGNATURE
  • 22. The Steam Technology: Next Steps • Sustainable Heating prepares a specific solution: – A structured price proposal – A detailed technical design proposal – A draft contract (Long-term Steam Supply Agreement) for discussion – A mutual confidentiality agreement to protect the Parties COST ANALYSIS PROPOSAL DISCUSSION SIGNATURE
  • 23. The Steam Technology: Next Steps • Using the base proposal Sustainable Heating and the Client discuss: – The anticipated steam/heating needs – The design and ideal location of the new biomass boiler installation – The contract terms – The specificities of the site and the industry • All the details are captured in a final contract COST ANALYSIS PROPOSAL DISCUSSION SIGNATURE
  • 24. The Steam Technology: Next Steps • Once the Parties agree, the final contract is signed • Sustainable Heating orders the required equipment, and prepares to install the new biomass boiler system • Usually, 6 months have to be foreseen until commissioning: – Boiler construction and shipping – Building plans approval and construction of new boiler house – Boiler installation, including ancillary equipment and piping – Building completion and finishing, including landscaping – Piping and ty-in to Client installation – Testing, certification and commissioning of boiler and installation COST ANALYSIS PROPOSAL DISCUSSION SIGNATURE
  • 25. Conclusion Be more green and save money! www.sustainableheating.co.za faan@sustainableheating.co.za / +27 (0) 76 593 3093 bruno@sustainableheating.co.za / +27 (0) 74 657 6010