Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.
POME + Biomass 
Utilization 
BIOGAS POWER PLANT 
BIOMASS GASIFICATION POWER PLANT 
PLUS BIOMASS BRIQUETTE EXPORT 
December...
BIOGAS 
Palm Oil Mill Effluent 
======= Renewable Energy
Losses of using ponds.. 
Environmental effects 
 Underground water contamination 
 Methane emission causing global 
warm...
ENVIRONMENTAL BENEFITS 
• No Under ground water 
pollution 
• Methane is captured at 
higher efficiency and used 
for prod...
MONETARY ADVANTAGES : 
• Profit from electricity sales 
• Recovery of sludge oil 
• Profit from Carbon Credit 
• Profits f...
BIOGAS – A Proven technology 
• Successfully completed 5 projects and another 
11 palm oil mill effluent treatment project...
Process Flow Diagram 
SCRUBBER 
GAS 
ENGINE 
or CNG
Simplified PFD
BIOGAS COMPOSITION 
Methane (CH4) : 60-73% 
Carbon dioxide (CO2) : 26-30% 
Nitrogen (N2) : 0-1 % 
Hydrogen Sulphide (H2S) ...
PROJECT #1
Project #1 
PT. MESKOM, Sarimas Group, Bengkalis 
• Capacity 45->75 Ton / hour 
• POME Volume : 900m3 / day 
• POME Parame...
* During construction
* Operational
* Operational
* Biogas digunakan pada Boiler
* Performance 
• Eficiency >80% 
• Biogas/M 3 POME : 30-35 NM 3 
Biogas 
• Final Discharge 
• COD: <250 Mg/L 
• BOD: <100 ...
1st in Indonesia & Asia Tenggara 
Biogas Project without any pond 
BENGKALIS, RIAU
PROJECT #2
Project #2 
PT. AGRO MUKO, Tolan Tiga Group (SIPEF) 
• Capacity: 60 Ton / hour 
• POME Volume : 720m3 / day 
• POME Parame...
* During Construction
* Inauguration
* Operational
PROJECT #3
Project #3 
PT. MAI, Poliplant Group, Indonesia 
• Capacity 55 Ton / hour 
• Volume POME : 726m3 / day 
• Parameter POME :...
* During construction
* Operational
Project #3
Other PROJECTS 
Lokasi: 
West New Britain, 
Papua New Guinea 
Tahap konstruksi 
Barema Ltd, Sipef Group, Papua New Guinea
Other PROJECTS 
Lokasi: 
Dusun Tanjung 
Mulia, Sumatera 
Utara 
Tahap konstruksi 
PT UMW, Sipef Group – 60 TPH Mill, Indon...
Other PROJECTS 
Lokasi: 
Tanjung Langsat, 
Malaysia 
Tahap Konstruksi 
EVYAP SABUN MALAYSIA SDN BHD (EVYAP Group of Turkey...
Other PROJECTS 
Lokasi: 
Hulu Sungai Selatan, 
Kalimantan Timur 
Tahap Konstruksi 
Astra Agro Lestari Tbk – 60 TPH Mill, I...
BIOMASS 
BRIQUETTING 
Empty Fruit Bunches 
======= Renewable Energy
Feedstock Preparation 
Briquetting Station 
Biomass Pellet dari Tandan Kosong
BIOMASS 
GASIFICATION 
Palm Kernel Shell 
======= Renewable Energy
All solid organic waste can be utilised as feedstock
Biomass 
Gasification 
conversion of 
solid biomass 
into flammable 
gas, known as 
Producer Gas 
Drying  Pyrolysis  Com...
PLTBm Gasifikasi 
200kWe : 
Kovilpatti, India 
1.2MWe : Gujarat, India 
5MWe : Thailand
Gasifier
BIOGAS 
• Biogas from POME to 
electricity (sell to PLN/ or 
Community) 
BIOMASS 
BRIQUETTING 
• Export 
• Additional feed...
“Thank You Very Much 
For Your Valuable Time & Attention” 
46
Palm Oil Mill Waste Utilization (biogas, biomass briquette, biomass gasification)
Palm Oil Mill Waste Utilization (biogas, biomass briquette, biomass gasification)
Palm Oil Mill Waste Utilization (biogas, biomass briquette, biomass gasification)
Palm Oil Mill Waste Utilization (biogas, biomass briquette, biomass gasification)
Palm Oil Mill Waste Utilization (biogas, biomass briquette, biomass gasification)
Palm Oil Mill Waste Utilization (biogas, biomass briquette, biomass gasification)
Upcoming SlideShare
Loading in …5
×

Palm Oil Mill Waste Utilization (biogas, biomass briquette, biomass gasification)

5,862 views

Published on

Palm Oil Mill Waste Utilization
1. BIOGAS POWER PLANT
2. BIOMASS GASIFICATION POWER PLANT
PLUS BIOMASS BRIQUETTING FOR EXPORT

Published in: Investor Relations

Palm Oil Mill Waste Utilization (biogas, biomass briquette, biomass gasification)

  1. 1. POME + Biomass Utilization BIOGAS POWER PLANT BIOMASS GASIFICATION POWER PLANT PLUS BIOMASS BRIQUETTE EXPORT December 2014 Tara F Khaira, MBA
  2. 2. BIOGAS Palm Oil Mill Effluent ======= Renewable Energy
  3. 3. Losses of using ponds.. Environmental effects  Underground water contamination  Methane emission causing global warming  Waste of fertile land  Bad odor Few Countries have banned open lagoons for effluent treatment due to hazards Monetary Losses USD 2 mio Loss (in 10 years) Sludge oil losses from POME CARBON CREDIT losses Diesel consumption No savings of BIOMASS Non productive Sludge Cost Center – No ROI and additional annual expenses for maintenance of lagoons
  4. 4. ENVIRONMENTAL BENEFITS • No Under ground water pollution • Methane is captured at higher efficiency and used for productive use • Only 80 x 80m required for 60 TPH mill, upto 5 hectares land is saved • No Bad odor • This technology takes care of any future change of govt regulations/environment laws
  5. 5. MONETARY ADVANTAGES : • Profit from electricity sales • Recovery of sludge oil • Profit from Carbon Credit • Profits from sale of BIOMASS (PKS & Fiber Briquette Revenue) saved by using biogas in boiler • Saving on Diesel cost • End Sludge available for fertilizer
  6. 6. BIOGAS – A Proven technology • Successfully completed 5 projects and another 11 palm oil mill effluent treatment projects under construction • More than 85 to 90% of BOD and COD Removal • The final discharge meets the local environmental standards
  7. 7. Process Flow Diagram SCRUBBER GAS ENGINE or CNG
  8. 8. Simplified PFD
  9. 9. BIOGAS COMPOSITION Methane (CH4) : 60-73% Carbon dioxide (CO2) : 26-30% Nitrogen (N2) : 0-1 % Hydrogen Sulphide (H2S) : 0-0.3 % Hydrogen (H2) : 0-1 % Oxygen (O2) : 0-2 %
  10. 10. PROJECT #1
  11. 11. Project #1 PT. MESKOM, Sarimas Group, Bengkalis • Capacity 45->75 Ton / hour • POME Volume : 900m3 / day • POME Parameters: COD 80,000 Reactor Volume : 9170 m3 • Construction started: Dec 2011 • Project completion: Dec 2012 • Full operation since Jan 2013
  12. 12. * During construction
  13. 13. * Operational
  14. 14. * Operational
  15. 15. * Biogas digunakan pada Boiler
  16. 16. * Performance • Eficiency >80% • Biogas/M 3 POME : 30-35 NM 3 Biogas • Final Discharge • COD: <250 Mg/L • BOD: <100 Mg/L • TSS: <100 Mg/L • O&G: 0 Mg/L • Methane Content more than 70%!!!
  17. 17. 1st in Indonesia & Asia Tenggara Biogas Project without any pond BENGKALIS, RIAU
  18. 18. PROJECT #2
  19. 19. Project #2 PT. AGRO MUKO, Tolan Tiga Group (SIPEF) • Capacity: 60 Ton / hour • POME Volume : 720m3 / day • POME Parameters: COD 56,000 BOD 30,000 • Reactor Volume : 6763 m3 • Construction started: Sept 2012 • Project completion: April 2013 • Project inauguration : Mei 2013
  20. 20. * During Construction
  21. 21. * Inauguration
  22. 22. * Operational
  23. 23. PROJECT #3
  24. 24. Project #3 PT. MAI, Poliplant Group, Indonesia • Capacity 55 Ton / hour • Volume POME : 726m3 / day • Parameter POME : COD 65,000 BOD 30,000 • Reactor Volume : 7500m3 • Construction started: Agustus 2012 • Project completion: Juni 2013
  25. 25. * During construction
  26. 26. * Operational
  27. 27. Project #3
  28. 28. Other PROJECTS Lokasi: West New Britain, Papua New Guinea Tahap konstruksi Barema Ltd, Sipef Group, Papua New Guinea
  29. 29. Other PROJECTS Lokasi: Dusun Tanjung Mulia, Sumatera Utara Tahap konstruksi PT UMW, Sipef Group – 60 TPH Mill, Indonesia.
  30. 30. Other PROJECTS Lokasi: Tanjung Langsat, Malaysia Tahap Konstruksi EVYAP SABUN MALAYSIA SDN BHD (EVYAP Group of Turkey). Proyek terbesar di dunia Oleochemical. Greenfield project pada lahan 50 Acre dengan investasi sebesar USD 350 juta (One Million Ringgit Project) Volume limbah per hari adalah 1000 MT Standar Baku Mutu BOD <20 Mg/L & COD <80 Mg/L
  31. 31. Other PROJECTS Lokasi: Hulu Sungai Selatan, Kalimantan Timur Tahap Konstruksi Astra Agro Lestari Tbk – 60 TPH Mill, Indonesia.
  32. 32. BIOMASS BRIQUETTING Empty Fruit Bunches ======= Renewable Energy
  33. 33. Feedstock Preparation Briquetting Station Biomass Pellet dari Tandan Kosong
  34. 34. BIOMASS GASIFICATION Palm Kernel Shell ======= Renewable Energy
  35. 35. All solid organic waste can be utilised as feedstock
  36. 36. Biomass Gasification conversion of solid biomass into flammable gas, known as Producer Gas Drying  Pyrolysis  Combustion  Reduction
  37. 37. PLTBm Gasifikasi 200kWe : Kovilpatti, India 1.2MWe : Gujarat, India 5MWe : Thailand
  38. 38. Gasifier
  39. 39. BIOGAS • Biogas from POME to electricity (sell to PLN/ or Community) BIOMASS BRIQUETTING • Export • Additional feedstock for gasification BIOMASS GASIFICATION • Biomass Gasification from PKS to electricity (sell to PLN/ or Community) ELECTRICITY GENERATION BIOGAS GENERATI NG BUFFERI NG STORAGE CHOP/ SHRED DRYING ELECTRICITY GENERATION GASIFI-CATION HEAT GENERATIN G Proposed Solution PLN EKSPOR Pupuk
  40. 40. “Thank You Very Much For Your Valuable Time & Attention” 46

×