SlideShare a Scribd company logo
1 of 1574
Download to read offline
PP66 HHeellpp
JJaannuuaarryy 22001122
2
Oracle Primavera P6 Help for Print First Half
Copyright © 1997, 2012, Oracle and/or its affiliates. All rights reserved.
Oracle and Java are registered trademarks of Oracle and/or its affiliates. Other names
may be trademarks of their respective owners.
The Programs (which include both the software and documentation) contain proprietary
information; they are provided under a license agreement containing restrictions on use
and disclosure and are also protected by copyright, patent, and other intellectual and
industrial property laws. Reverse engineering, disassembly, or decompilation of the
Programs, except to the extent required to obtain interoperability with other
independently created software or as specified by law, is prohibited.
The information contained in this document is subject to change without notice. If you
find any problems in the documentation, please report them to us in writing. This
document is not warranted to be error-free. Except as may be expressly permitted in your
license agreement for these Programs, no part of these Programs may be reproduced or
transmitted in any form or by any means, electronic or mechanical, for any purpose.
The platform-specific hardware and software requirements included in this document
were current when this document was published. However, because new platforms and
operating system software versions might be certified after this document is published,
review the certification matrix on the My Oracle Support Web site for the most up-to-date
list of certified hardware platforms and operating system versions. The My Oracle Support
Web site is available at the following URL:
http://support.oracle.com/
If the Programs are delivered to the United States Government or anyone licensing or
using the Programs on behalf of the United States Government, the following notice is
applicable: U.S. GOVERNMENT RIGHTS Programs, software, databases, and related
documentation and technical data delivered to U.S. Government customers are
"commercial computer software" or "commercial technical data" pursuant to the
applicable Federal Acquisition Regulation and agency-specific supplemental
regulations. As such, use, duplication, disclosure, modification, and adaptation of the
Programs, including documentation and technical data, shall be subject to the licensing
restrictions set forth in the applicable Oracle license agreement, and, to the extent
applicable, the additional rights set forth in FAR 52.227-19, Commercial Computer
Software -- Restricted Rights (June 1987). Oracle USA, Inc., 500 Oracle Parkway,
Redwood City, CA 94065.
Copyright
Copyright
3
The Programs are not intended for use in any nuclear, aviation, mass transit, medical, or
other inherently dangerous applications. It shall be the licensee's responsibility to take all
appropriate fail-safe, backup, redundancy and other measures to ensure the safe use of
such applications if the Programs are used for such purposes, and we disclaim liability for
any damages caused by such use of the Programs.
The Programs may provide links to Web sites and access to content, products, and
services from third parties. Oracle is not responsible for the availability of, or any content
provided on, third-party Web sites. You bear all risks associated with the use of such
content. If you choose to purchase any products or services from a third party, the
relationship is directly between you and the third party. Oracle is not responsible for: (a)
the quality of third-party products or services; or (b) fulfilling any of the terms of the
agreement with the third party, including delivery of products or services and warranty
obligations related to purchased products or services. Oracle is not responsible for any
loss or damage of any sort that you may incur from dealing with any third party.
To view the list of third party technology disclosures related to this product, please see
the Commercial Notices and Disclosures document for the release.
5
Contents
Copyright ................................................................................................ 2
Preface ................................................................................................. 41
Where to Get Documentation .................................................................... 41
Where To Get Training ............................................................................ 44
Where to Get Support ............................................................................. 44
Documentation Accessibility...................................................................... 45
Introduction............................................................................................ 47
About Oracle Primavera P6 Enterprise Project Portfolio Management..................... 47
Working with the Oracle Primavera P6 EPPM Suite ........................................... 48
About P6 ......................................................................................... 51
About P6 Team Member Applications........................................................ 52
About P6 Progress Reporter ................................................................... 53
About Oracle Universal Content Management .............................................. 54
About P6 Professional .......................................................................... 54
About Oracle BI Publisher and the OBIEE Platform ........................................ 55
About P6 Reporting Database ................................................................. 55
About P6 Analytics.............................................................................. 55
About the Oracle Business Process Management Suite .................................... 57
About the P6 Integration API.................................................................. 57
About P6 EPPM Web Services ................................................................. 58
What's New in P6 EPPM............................................................................ 58
P6 Overview ........................................................................................... 59
Working with P6 .................................................................................... 59
Customizing the P6 User Experience ............................................................ 61
About Industry-Specific Field Names......................................................... 62
About the User Interface.......................................................................... 63
Working with the P6 User Interface.......................................................... 63
About Screen Controls....................................................................... 65
Working with the Main Menus.............................................................. 66
About the Most Recently Used List........................................................ 67
Working with Tables ......................................................................... 68
About Columns (Fields)...................................................................... 69
Showing or Hiding Columns in a Table ................................................... 69
Selecting Items from a List of Available Items.......................................... 70
Working with Toolbars ...................................................................... 71
Customizing Toolbars........................................................................ 72
Working with "Select a Value" Dialog Boxes ............................................. 72
Selecting Values from "Select a Value" Dialog Boxes .................................. 74
Working with Data in P6 .................................................................... 75
Working with Detail Windows.............................................................. 76
P6 Help
6
About Portlets ................................................................................ 78
About Data Entry Controls.................................................................. 78
About Security ...................................................................................... 78
Printing Pages Using P6 Printing Tools .......................................................... 79
Printing Pages Using Your Web Browser ........................................................ 80
About E-Mail Notifications ........................................................................ 80
Working with E-Mail Notifications ............................................................ 81
Sending Activity Views by E-Mail .......................................................... 82
Sending E-Mail about Documents.......................................................... 82
Sending E-Mail about Issues ................................................................ 83
Sending E-Mail about Milestones .......................................................... 83
Sending E-Mail about Timesheets to Resources......................................... 84
Sending E-Mail Notifications about Resource Assignments ........................... 84
Sending E-Mail to a Project Manager ..................................................... 85
Sending E-Mail to Activity Resources ..................................................... 86
Sending E-Mail to Project Resources...................................................... 86
Sending E-Mail to Resource Teams........................................................ 87
Updating the Progress of Activities Using E-mail....................................... 88
About Grouping and Sorting ...................................................................... 88
Working with Group and Sort Features ...................................................... 89
Grouping and Sorting Information ............................................................ 90
About Find, Search, and Filter Features ........................................................ 91
Working with Find, Search, and Filter Features............................................ 91
Finding Entries................................................................................ 92
Searching for Entries ........................................................................ 92
About Filters .................................................................................. 93
Working with Filters ......................................................................... 93
Filtering Data ................................................................................. 95
Pages Supporting Filters .................................................................... 96
Creating, Modifying, Saving, and Deleting Data ............................................... 97
Cutting, Copying, and Pasting Data .......................................................... 97
About Removing and Deleting Data .......................................................... 98
Deleting Entries .............................................................................. 99
Undoing Mistakes ............................................................................... 99
About Metrics and Calculations .................................................................100
Using Visual Indicators ........................................................................100
About Importing and Exporting Data ...........................................................101
About Importing and Exporting Projects ...................................................102
About P6 Help......................................................................................102
Viewing Help Content .........................................................................102
Working with P6 Help Topics.................................................................104
About Timesheets .................................................................................106
Working with Timesheets.....................................................................106
Approving or Rejecting Timesheets .........................................................107
Sending E-Mail about Timesheets to Resources ...........................................108
Assigning a Project Manager Delegate for Timesheets ...................................109
Contents
7
Assigning a Resource Manager Delegate for Timesheets .................................110
Dashboards and Workspaces...................................................................... 113
About Dashboards, Workspaces, and Workgroups ............................................113
About Dashboards .................................................................................113
Working with Dashboards.....................................................................114
Creating Dashboards...........................................................................117
Customizing Dashboards ......................................................................117
Configuring Dashboard Content ..........................................................118
Configuring Dashboard Access ............................................................118
Configuring Dashboard Filters ............................................................119
Configuring Dashboard Layout ............................................................119
Showing and Hiding Dashboards ..........................................................120
Working with Workflows in P6 ...............................................................120
About Project Workspaces .......................................................................123
Working with Project Workspaces...........................................................124
Customizing Project Workspace .............................................................124
Configuring Workspace Content ..........................................................124
Configuring Workspace Layout............................................................125
Sending E-Mail to Project Resources........................................................126
About Project Performance Metrics.........................................................127
Assessing Project Performance ...........................................................127
Assessing Project Health...................................................................127
Customizing Project Statistics ............................................................128
Identifying Critical Activities Behind Schedule ........................................129
About Performance Thresholds ...........................................................129
Working with Performance Thresholds ..................................................130
About Milestones ............................................................................130
Sending E-Mail about Milestones .........................................................131
About Cost Performance Index (CPI) ....................................................131
About Schedule Performance Index (SPI) ...............................................132
About To-Complete Performance Index (TCPI) ........................................132
About Contract Management.................................................................132
Working with Contract Management.....................................................133
Opening the Contract Management Control Center...................................133
Linking P6 and Contract Management Projects........................................134
Linking P6/P6 Professional and Contract Management Applications...............135
About Project Workgroups .......................................................................135
Working with Workgroups ....................................................................135
Assigning Documents to Projects .........................................................135
Creating Workgroups .......................................................................136
Customizing Workgroups...................................................................137
Assigning Workgroup Activities ...........................................................138
Creating Workgroup Issues ................................................................138
Sending E-Mail to Activity Resources ....................................................139
About Portlets .....................................................................................140
Working with Portlets .........................................................................140
List of Portlets...............................................................................143
Customizing Portlets........................................................................145
P6 Help
8
Customizing the My Risks Portlet.........................................................145
Customizing the Resource Analysis Chart Portlet .....................................145
Customizing the Open Requests for Resources Portlet ...............................146
Customizing Portfolio View Portlets .....................................................146
Customizing Scorecard Portfolio View Portlets ........................................147
Analyzing Resource Team Usage in the Resource Team Summary Portlet ........147
Creating Portfolio View Portlets..........................................................148
Document Review and Workflow Portlets ..............................................148
Participating in Document Reviews ......................................................149
Terminating Document Reviews ..........................................................149
About Workflows ............................................................................150
Working with Workflows in P6 ............................................................150
Participating in Workflows ................................................................153
Linking the Cost Worksheet to Contract Management................................154
Opening Projects from Dashboard Portlets.............................................155
Sending E-Mail to Resource Teams.......................................................155
Sending E-Mail Notifications about Resource Assignments ..........................156
Creating Custom Portlets ..................................................................156
Portfolios ............................................................................................. 159
About Portfolios ...................................................................................159
Working with Portfolios ..........................................................................159
Opening Portfolios .............................................................................160
Creating Portfolios.............................................................................160
Creating Projects While Working with Portfolios .........................................161
Creating Projects in a Portfolio View Scorecard Portlet .................................161
Creating Projects on the Portfolio Analysis Page .........................................162
Assigning Projects to a Portfolio.............................................................163
Defining Performance Thresholds ...........................................................163
Portfolio Views ....................................................................................165
About Portfolio Views .........................................................................165
Working with Portfolio Views ................................................................165
Creating Portfolio Views ...................................................................166
Working with Portfolio View Scorecards....................................................167
Working with Portfolio View Bubble Charts................................................169
Working with Portfolio View Pie Charts ....................................................171
Working with Portfolio View Histograms ...................................................173
Portfolio Scenarios ................................................................................175
About Portfolio Scenarios.....................................................................175
About What-if Analysis ........................................................................175
Working with Portfolio Scenarios............................................................176
Creating Portfolio Scenarios ..............................................................176
Sending E-Mail About Scenarios...........................................................176
Capacity Planning .................................................................................177
About Capacity Planning......................................................................177
Working with the Capacity Planning Page..................................................177
Contents
9
Analyzing Role Allocation (Capacity Planning).........................................179
Projects............................................................................................... 181
About Projects.....................................................................................181
Working with Projects.........................................................................181
Creating Projects ..............................................................................182
Assigning Locations to Projects..............................................................182
Opening Projects or Templates..............................................................183
Opening Dependent Projects.................................................................184
Importing and Exporting Projects ...........................................................185
Working with Primavera XML Project Import...........................................185
Working with Primavera XML Project Export...........................................187
Working with Microsoft Project Import .................................................189
Working with Microsoft Project Export..................................................191
About Opening a Project Exclusively........................................................192
Opening Projects Exclusively..............................................................192
Removing the Exclusive Lock on Projects...............................................193
Working with Oracle ERP, Fusion PPM Bridge, and Other Integrated Solutions.......195
Sending Project Data to an ERP System.................................................196
Sending Project Data to Fusion...........................................................197
About Project Templates ........................................................................198
Working with Project Templates ............................................................198
Creating Project Templates..................................................................199
The EPS .............................................................................................200
About the Enterprise Project Structure (EPS) .............................................200
Working with the EPS.......................................................................200
Creating EPS Elements .....................................................................202
Configuring the EPS.........................................................................203
Opening Projects or Templates in the EPS .............................................203
About Projects .................................................................................204
Creating Projects............................................................................204
Creating Projects from Existing Projects or Templates ..............................205
Deleting Projects or EPS Elements .......................................................205
Customizing Detail Windows ..............................................................206
Configuring Project Preferences .........................................................207
Configuring History Settings for P6 Analytics ..........................................207
Configuring Project Calculations .........................................................207
Linking P6 and Contract Management Projects ........................................208
Configuring Project Defaults ..............................................................208
Configuring General Project Preferences...............................................209
Configuring P6 Progress Reporter ........................................................209
Configuring Project Summarization and Publication Services.......................210
Configuring P6 Team Member Status Update Reviews................................210
Configuring P6 Team Member Application View Preferences .......................211
Opening Projects or Templates...........................................................213
About Gantt Charts ............................................................................214
Working with the Activity Gantt Chart ..................................................214
P6 Help
10
Configuring Gantt Charts ..................................................................215
About Baselines ................................................................................216
Working with Baselines.....................................................................216
Creating Baselines ..........................................................................218
About Summary Data ..........................................................................219
Working with the Summarizer Service ..................................................220
Summarizing Projects ......................................................................220
About Importing and Exporting Projects ...................................................221
Importing and Exporting Projects ........................................................222
Exporting Projects using Microsoft Project XML .......................................222
Configuring Microsoft Project Templates ...............................................222
Exporting Projects using Primavera XML Format ......................................223
Importing Projects using Microsoft Project XML .......................................223
Importing Projects using Primavera XML Format ......................................224
Exporting Projects to Excel ...............................................................225
About Budgets..................................................................................225
Working with Budgets ......................................................................226
Establishing Budgets ........................................................................228
Creating Budget Change Requests .......................................................228
Approving or Denying Budget Change Requests .......................................229
About Spending and Benefit Plans .......................................................230
Working with Spending and Benefit Plans ..............................................231
Configuring Spending and Benefit Plans ................................................233
About Return on Investment (ROI) .......................................................233
About Project Views...........................................................................234
Configuring EPS Views......................................................................234
Configuring EPS View Columns............................................................234
Configuring EPS View Grouping ...........................................................235
Configuring EPS View Filters ..............................................................236
Applying Filters..............................................................................236
Creating Filters ..............................................................................237
Configuring Filters ..........................................................................238
Configuring EPS View Gantt Chart Bars .................................................239
Configuring EPS View Gantt Chart .......................................................240
Configuring EPS View Access ..............................................................240
About Columns (Fields) ....................................................................240
About Grouping and Sorting ...............................................................241
About Filters .................................................................................241
About Funding Sources........................................................................241
Working with Funding Sources ............................................................241
Assigning Project Funding Sources .......................................................244
About Gantt Charts ............................................................................244
Configuring Gantt Charts ..................................................................244
About Bars....................................................................................245
About Project Codes ..........................................................................246
Assigning Project Codes....................................................................247
About P6 Progress Reporter ..................................................................247
About Contract Management.................................................................248
Contents
11
Linking P6/P6 Professional and Contract Management Applications...............248
About Notebooks ..................................................................................248
About Notebook Topics .......................................................................249
Working with Notebooks ......................................................................249
Assigning Notebook Topics ...................................................................249
Activities ...........................................................................................250
About Activities ................................................................................250
Working with Activities ....................................................................250
Creating Activities ..........................................................................251
Configuring General Activity Information...............................................252
Assigning Locations to Activities .........................................................253
Recalculating Assignment Costs ..........................................................254
Sending Project Data to an ERP System.................................................254
Customizing Detail Windows ..............................................................255
About Activity Types........................................................................256
About WBS Summary Activities ...........................................................256
About Suspending and Resuming Activities.............................................257
About the Activity Table...................................................................257
About Activity Networks ...................................................................257
Working with the Activity Network ......................................................258
About Calendar View .......................................................................259
Working with the Activity Calendar......................................................260
About Activity Views ..........................................................................261
Working with Activity Views ..............................................................261
Creating Activity or EPS Views............................................................262
Configuring Activity Views.................................................................262
Configuring Activity View Columns.......................................................263
Configuring Activity View Grouping......................................................264
Configuring Activity View Filters .........................................................265
Applying Filters..............................................................................266
Creating Filters ..............................................................................266
Configuring Filters ..........................................................................267
Configuring Activity View Gantt Chart Bars ............................................268
Configuring Activity View Gantt Chart ..................................................269
Configuring Activity Network .............................................................270
Configuring Activity View Access.........................................................270
Sending Activity Views by E-Mail .........................................................271
About Columns (Fields) ....................................................................271
About Filters .................................................................................272
About Grouping and Sorting ...............................................................272
About Activity Codes ..........................................................................272
Creating Activity Code Values for Activities ...........................................272
Assigning Activity Code Values to Activities............................................273
About Gantt Charts ............................................................................274
Working with the Activity Gantt Chart ..................................................274
Configuring Gantt Charts ..................................................................274
About Progress Spotlight...................................................................275
About Bars....................................................................................276
P6 Help
12
About Work Breakdown Structures (WBS) ..................................................277
Working with WBS Elements ..............................................................277
About Siblings and Children ...............................................................279
Creating a WBS ..............................................................................279
Creating a WBS from a Template.........................................................280
Configuring General WBS Information ...................................................280
Defining Earned Value Calculations for WBS Elements ...............................281
Working with WBS Milestones .............................................................282
Working with WBS Categories.............................................................283
About Baselines ................................................................................284
Working with Baselines.....................................................................285
Creating Baselines ..........................................................................287
About Scheduling Projects....................................................................288
Scheduling Projects.........................................................................288
Configuring General Scheduling Options ................................................289
Configuring Advanced Scheduling Options..............................................289
About Float .....................................................................................290
About Critical Path Activities ................................................................290
Working with Critical Activities ..........................................................291
Creating Baselines ..........................................................................295
About Schedule Preview ......................................................................296
Enabling Schedule Preview ................................................................296
About Resource Leveling......................................................................297
Configuring Resource Leveling Options and Priorities ................................297
Leveling Project Resources................................................................299
About Activity Progress .......................................................................300
About Updating Progress...................................................................300
Working with Updating Progress in a Browser Running P6 ...........................300
Updating the Progress of Activities Using P6...........................................301
About The Apply Actuals Feature ........................................................301
Working with the Apply Actuals Feature................................................301
Applying Actuals to a Project .............................................................303
Working with Activity Updates by E-mail using E-mail Statusing Service .........304
Supporting E-mail Updates with E-mail Statusing Service ...........................308
Updating the Progress of Activities Using E-mail ......................................309
Updating the Progress of Activities Using P6 Team Member Web ..................310
Updating the Progress of Activities Using the P6 Team Member for iPhone App 310
About P6 Team Member Status Updates....................................................310
Working with P6 Team Member Status Updates .......................................311
Assigning a Status Reviewer to a WBS ...................................................313
Selecting an Activity for Review .........................................................313
Reviewing Team Member Status Updates...............................................314
Sending E-mail to a Team Member About a Status Update ..........................315
Viewing Team Member Status Updates History ........................................315
About the Auto Compute Actuals Feature..................................................316
Working with the Auto-Compute Actuals Feature.....................................316
Applying Auto Compute Actuals to Activities ..........................................317
About Store Period Performance ............................................................318
Storing Period Performance ...............................................................318
Contents
13
About Importing and Exporting Data........................................................319
Importing Activities.........................................................................319
Exporting Activities to Excel ..............................................................320
Creating Import Templates for Importing Activities ..................................320
About Relationship Lines .....................................................................322
About Progress Lines ..........................................................................322
About Resources ...............................................................................322
Assigning Resources to an Activity .......................................................322
Assigning a Resource to Multiple Activities.............................................323
Configuring Activity Resources ...........................................................324
Adding Activity Resource Estimates .....................................................324
Requesting Resources for Activities .....................................................325
Specifying Resource Assignment Rates ..................................................325
Assigning Resource Curves to Resource or Role Assignments from the Activities Page
.................................................................................................326
Assigning Resources to Unstaffed Activities ............................................326
Searching Resources ........................................................................327
About the Recalculate Assignment Costs Feature.....................................328
Recalculating Assignment Costs ..........................................................329
Configuring Resource Leveling Options and Priorities ................................330
Leveling Project Resources................................................................331
About the Check Resource Overallocation Service....................................332
Working with the Check Resource Overallocation Service...........................333
Checking for and Resolving Overallocated Resources ................................334
About Roles .....................................................................................335
Assigning Roles to an Activity .............................................................336
Assigning a Role to Multiple Activities...................................................336
Configuring Activity Roles .................................................................337
About Activity Owners ........................................................................337
Assigning an Activity Owner to an Activity .............................................337
About Documents ..............................................................................338
Assigning Documents to Activities........................................................338
About Expenses ................................................................................339
Creating Expenses...........................................................................339
Configuring Expenses .......................................................................339
Configuring Auto Compute Actuals for Expenses ......................................340
About Feedback................................................................................340
Adding Feedback ............................................................................341
Adding the New Feedback Column.......................................................341
Acknowledging Feedback ..................................................................342
About Duration Types .........................................................................342
Working with Duration Types .............................................................343
About Constraints..............................................................................343
Working with Activity Constraints........................................................344
About Issues ....................................................................................345
Creating Activity Issues ....................................................................345
Configuring Activity Issues.................................................................346
About Notebooks...............................................................................346
Working with Notebooks ...................................................................346
About Notebook Topics .......................................................................347
P6 Help
14
Assigning Notebook Topics ................................................................347
About Relationships ...........................................................................347
Creating Activity Relationships ...........................................................348
Configuring Activity Relationships .......................................................349
Assigning Predecessor Relationships .....................................................349
Configuring Predecessor Relationships ..................................................350
Assigning Successor Relationships ........................................................351
Configuring Successor Relationships .....................................................351
About Risks .....................................................................................352
Working with Project Risks ................................................................352
Assigning a Risk to an Activity ............................................................354
About Steps.....................................................................................355
Working with Activity Steps ...............................................................355
Creating Activity Steps.....................................................................356
Configuring Activity Steps .................................................................356
About Step Templates.........................................................................357
Adding Activity Steps from a Step Template...........................................357
About Trace Logic .............................................................................358
Viewing Relationships with Trace Logic.................................................358
About Budgets..................................................................................359
Creating Budget Change Requests .......................................................359
Approving or Denying Budget Change Requests .......................................360
About Earned Value ...........................................................................361
Configuring WBS Earned Value............................................................361
About Milestones...............................................................................362
Creating WBS Milestones...................................................................362
Team Usage ........................................................................................363
About Team Usage.............................................................................363
Customizing Team Usage ..................................................................363
Assigning Resources to Unstaffed Activities ............................................364
Exporting Team Usage Spreadsheets ....................................................364
Searching Resources ........................................................................365
Sending E-Mail to a Project Manager ....................................................366
Issues................................................................................................367
About Issues ....................................................................................367
Working with Issues.........................................................................367
Creating Project Issues.....................................................................368
Configuring Project Issues .................................................................369
Customizing Project Issues ................................................................369
Assigning Related Items to Issues ........................................................370
Sending E-Mail about Issues ...............................................................371
About Issue Codes .............................................................................371
Assigning Issue Codes.......................................................................372
About Issue Forms .............................................................................372
Creating Issue Forms .......................................................................372
Assigning Projects to Issue Forms ........................................................373
Risks.................................................................................................374
About Risks .....................................................................................374
Risk Enterprise Data...........................................................................374
Working with Risks Enterprise Data......................................................374
Contents
15
Configuring Risk Enterprise Data .........................................................375
Risk Thresholds ..............................................................................375
About Risk Thresholds ......................................................................375
Working with Risk Thresholds .............................................................376
Creating Risk Thresholds...................................................................377
Modifying Risk Thresholds .................................................................378
Risk Scoring Matrices .......................................................................379
About Risk Scoring Matrices ...............................................................379
Working with Risk Scoring Matrices ......................................................380
Creating Risk Scoring Matrices............................................................383
Assigning a Risk Scoring Matrix to a Project............................................384
Assigning a Risk Scoring Matrix to a Project from the Enterprise Data Pane .....384
Assigning a Risk Scoring Matrix to a Project from the EPS Page ....................385
Assigning a Risk Scoring Matrix to a Project from the Portfolios Section .........385
Risk Categories ..............................................................................386
About Risk Categories ......................................................................386
Creating Risk Categories ...................................................................386
Risk UDFs .....................................................................................387
About Risk User Defined Fields ...........................................................387
Creating Risk UDFs ..........................................................................387
Project Risks....................................................................................387
Working with Project Risks ................................................................387
Managing Project Risks.....................................................................389
Creating Project Risks......................................................................389
Adding Detailed Project-Level Risks .....................................................390
Adding Project Risks to Activities ........................................................391
Adding High-Level Project Risks..........................................................392
Assigning a Risk to an Activity ............................................................393
Risk Response Plans.........................................................................393
About Risk Response Plans.................................................................393
Working with Risk Response Plans .......................................................394
Developing a Risk Response Plan .........................................................395
Adding Risk Response Plans ...............................................................395
Adding Risk Response Plan Action Items ................................................396
Assigning Activities to Risk Response Plan Action Items .............................397
Exporting Risk Data .........................................................................397
About Documents..................................................................................398
Working with Documents without the Content Repository ..............................398
Adding Documents to a Project without the Content Repository ..................399
Configuring Document Details without the Content Repository ....................399
Assigning Related Items to Documents without the Content Repository ..........400
Sending E-Mail about Documents without the Content Repository.................400
Working with Documents with a Content Repository .....................................401
About the Document Content Repository...............................................402
Creating Document Templates ...........................................................403
Copying Documents from Existing Templates ..........................................404
Adding Documents to a Project and Storing Them in the Content Repository ...404
Adding Documents to a Project from the Content Repository ......................405
P6 Help
16
Configuring Document Details ............................................................406
Assigning Related Items to Documents ..................................................407
Checking Out Documents ..................................................................407
Checking In Documents ....................................................................408
Sending E-Mail about Documents.........................................................409
Assigning Documents to Workgroups.....................................................409
Creating Document Folders ...............................................................410
About Document Reviews..................................................................410
Working With Document Reviews ........................................................411
Reviewing Documents ......................................................................412
Creating Document Reviews ..............................................................413
Participating in Document Reviews ......................................................414
Terminating Document Reviews ..........................................................414
Searching for Documents ..................................................................415
Searching for Documents (Advanced Search) ..........................................415
Searching for Documents (Quick Search) ...............................................416
Viewing Documents .........................................................................417
Downloading Documents ...................................................................417
About Project Scheduled Services ..............................................................418
Creating Project Scheduled Services........................................................418
Configuring Project Scheduled Services ....................................................418
About Publication Services and Reporting.....................................................419
Working with Publication Services for Reporting..........................................420
Publishing P6 Data for Reports ...........................................................423
Defining Publication Periods ..............................................................423
Enabling Automatic Publishing of P6 Project Data for Reports .....................424
Enabling Automatic Publishing of P6 Global Data for Reports ......................426
Configuring Publication Service Settings for Projects ................................426
Manually Publishing P6 Project Data for Reports......................................427
Manually Publishing P6 Global Data for Reports .......................................428
Resources ............................................................................................ 429
Roles ................................................................................................429
About Roles .....................................................................................429
Creating Roles..................................................................................429
Assigning a Resource to a Role...............................................................430
Assigning a Role Team to a Role.............................................................431
Assigning Rates to Roles ......................................................................432
Assigning Work Limits to Roles...............................................................432
Role Teams.........................................................................................433
About Role Teams .............................................................................433
Creating Role Teams ..........................................................................433
Assigning a Role to a Role Team.............................................................433
Resources...........................................................................................434
Contents
17
About Resources ...............................................................................434
Adding Resources ..............................................................................434
Assigning a Role to a Resource...............................................................435
Assigning a Resource Team to a Resource .................................................436
Configuring Resource Settings ...............................................................437
Assigning Calendars to Resources ...........................................................437
Assigning Locations to Resources............................................................438
Configuring Timesheet Reporting for Resources ..........................................439
Configuring Resource Settings for Timesheet Reporting .............................439
Assigning Resource Codes.....................................................................440
Assigning Resource Rates .....................................................................441
Creating Import Templates for Importing Resources .....................................441
Importing Resource Data .....................................................................442
Deleting Resources ............................................................................443
Resource Teams ...................................................................................444
About Resource Teams........................................................................444
Creating Resource Teams.....................................................................444
Assigning a Resource to a Resource Team .................................................445
Resource Assignments ............................................................................445
About Resource Assignments.................................................................445
Working with Resource Assignments in the Gantt Chart .................................445
Viewing Resource Assignments in a Gantt Chart ......................................446
Configuring the Resources Assignments Gantt Chart Bars ...........................446
Setting the Resources Detailed Assignments Gantt Chart Timescale ..............447
Modifying Resource Assignment Dates in the Gantt Chart ...........................448
Assigning a Resource to an Activity Assignment...........................................448
Viewing Assignment Unit and Cost Spreads ................................................449
Exporting Resource Assignment Data .......................................................450
Assigning Resource Curves to Resource or Role Assignments from the Resources
Assignments Page ..............................................................................451
Applying the Progress Spotlight to the Resources Assignments View ..................451
Resource Planning.................................................................................452
About Resource Planning .....................................................................452
Customizing the Resource Planning Spreadsheet .........................................453
Assigning Projects or WBS Elements to Resources or Roles..............................454
Assigning Resources or Roles to Projects or WBS Elements..............................455
Modifying Resource or Role Assignment Dates.............................................456
Allocating Units or the Percentage of Available Units to Resources or Roles .........457
Synchronizing Resource Planning Dates ....................................................458
Splitting a Resource or Role Assignment ...................................................459
Categorizing Resource or Role Assignments using Status Codes ........................460
Exporting the Resource Planning Spreadsheet ............................................461
Resource Analysis .................................................................................461
About Resource Analysis ......................................................................461
Analyzing Resource Allocations ..............................................................462
Assigning Resources to Unstaffed Activities ...............................................463
Viewing Role Usage............................................................................464
P6 Help
18
Viewing Resource Usage ......................................................................465
Exporting Resource or Role Usage Data ....................................................467
Exporting Resource Data .........................................................................468
Exporting Resource Administration Data ...................................................468
Exporting Resource Assignment Data .......................................................469
Exporting the Resource Planning Spreadsheet ............................................469
Exporting Resource or Role Usage Data ....................................................470
Reports ............................................................................................... 473
About Reports......................................................................................473
Working with Reports .........................................................................474
Scheduling Reports..........................................................................475
Running Reports On-Demand..............................................................476
Exporting a List of Reports ................................................................477
Viewing the Report Run History ..........................................................478
About Publication Services and Reporting.....................................................478
Working with Publication Services for Reporting..........................................479
Publishing P6 Data for Reports ...........................................................482
Defining Publication Periods ..............................................................482
Enabling Automatic Publishing of P6 Project Data for Reports .....................483
Enabling Automatic Publishing of P6 Global Data for Reports ......................485
Configuring Publication Service Settings for Projects ................................485
Manually Publishing P6 Project Data for Reports......................................486
Manually Publishing P6 Global Data for Reports .......................................487
Administration....................................................................................... 489
About Administration .............................................................................489
About My Preferences ............................................................................490
Working with My Preferences ................................................................490
Customizing My Preferences Global Preferences..........................................491
Customizing Global Currency Preferences..............................................491
Customizing Global Date Format Preferences .........................................492
Customizing Global General Preferences ...............................................492
Customizing Global Issues Preferences..................................................493
Customizing Global Performance Threshold Preferences ............................493
Customizing Global Project Score Preferences ........................................493
Customizing Global Resources Preferences ............................................494
Customizing Global Row Number Preferences .........................................494
Customizing Global Time Units Format Preferences..................................495
Sending E-Mail Notifications about Resource Assignments ..........................496
Customizing My Preferences View Preferences............................................496
Changing Your Own Password ................................................................497
About My Calendar ................................................................................498
Configuring My Calendar......................................................................498
Setting Work Hours Per Time Period for My Calendar ................................498
Configuring the Standard Work Week for My Calendar...............................499
Modifying Calendar Days on My Calendar ...............................................499
Importing Events to My Calendar.........................................................499
Contents
19
About Application Settings.......................................................................500
Working with Application Settings ..........................................................501
Configuring Data Limits Settings.............................................................502
Configuring Earned Value Settings ..........................................................502
Defining Earned Value Calculations for WBS Elements ...............................503
Configuring General Settings.................................................................503
Configuring ID Lengths Settings..............................................................504
Configuring Summarization Periods .........................................................505
Configuring General Settings.................................................................505
Configuring Timesheets Settings.............................................................506
Configuring Time Periods Settings...........................................................506
About Enterprise Data ............................................................................507
Working with Enterprise Data................................................................508
About Baseline Types..........................................................................509
Creating Baseline Types....................................................................509
About Funding Sources........................................................................510
Creating Funding Sources..................................................................510
About Notebook Topics .......................................................................510
Creating Notebook Topics .................................................................511
About Calendars ...............................................................................511
Working with Calendars....................................................................511
Creating Global Calendars.................................................................512
Configuring Global Calendars .............................................................513
Setting Work Hours Per Time Period for Global Calendars ..........................513
Configuring the Standard Work Week for Global Calendars .........................513
Modifying Calendar Days on Global Calendars .........................................513
Setting the Default Global Calendar.....................................................514
Creating Project Calendars................................................................514
Configuring Project Calendars ............................................................515
Assigning a Base Calendar to a Project Calendar......................................515
Setting Work Hours Per Period for a Project Calendar ...............................516
Configuring the Standard Work Week for Project Calendars ........................516
Modifying Calendar Days on Project Calendars ........................................517
Changing a Project Calendar to a Global Calendar ...................................517
Creating Resource Calendars..............................................................518
Configuring Resource Calendars ..........................................................518
Assigning a Base Calendar to a Resource Calendar....................................519
Assigning a Resource to a Resource Calendar ..........................................519
Setting Work Hours Per Time Period for a Resource Calendar ......................520
Configuring the Standard Work Week for Resource Calendars ......................520
Modifying Calendar Days ...................................................................521
Changing the Calendar Type ..............................................................521
About Locations................................................................................522
Creating Locations ..........................................................................522
P6 Help
20
Importing Locations.........................................................................523
Creating Import Templates for Importing Locations..................................523
About Project Codes ..........................................................................524
Creating Project Codes.....................................................................524
Creating Project Code Values.............................................................524
Configuring Project Codes .................................................................525
Configuring Project Code Values .........................................................526
About User Defined Fields ....................................................................526
Working with User Defined Fields ........................................................526
Creating Project UDFs......................................................................527
Defining Formulas for User Defined Fields..............................................528
Defining Indicators for User Defined Fields ............................................528
Defining Statements for User Defined Fields...........................................529
Creating WBS UDFs..........................................................................530
Creating Activity UDFs .....................................................................531
Creating Expense UDFs.....................................................................531
Creating Step UDFs .........................................................................531
Creating Risk UDFs ..........................................................................532
Creating Issue UDFs.........................................................................532
Creating Document UDFs ..................................................................532
Creating Assignment UDFs .................................................................533
Creating Resource UDFs....................................................................533
About Work Breakdown Structures (WBS) ..................................................533
Working with WBS Categories.............................................................534
Creating WBS Categories...................................................................536
About Activity Codes ..........................................................................536
Working with Activity Codes ..............................................................537
Creating Activity Codes ....................................................................538
Creating Activity Code Values ............................................................539
Configuring Activity Code Values.........................................................540
About Cost Accounts ..........................................................................541
Creating Cost Accounts ....................................................................541
About Expenses ................................................................................542
Creating Expense Categories..............................................................542
About Step Templates.........................................................................543
Creating Step Templates ..................................................................543
Configuring Step Templates...............................................................543
About Risks .....................................................................................544
Working with Risks Enterprise Data......................................................544
Configuring Risk Enterprise Data .........................................................545
About Risk Scoring Matrices ...............................................................545
Working with Risk Scoring Matrices ......................................................546
Creating Risk Scoring Matrices............................................................549
Assigning a Risk Scoring Matrix to a Project............................................550
Assigning a Risk Scoring Matrix to a Project from the Enterprise Data Pane .....550
Assigning a Risk Scoring Matrix to a Project from the EPS Page ....................551
Assigning a Risk Scoring Matrix to a Project from the Portfolios Section .........551
About Risk Thresholds ......................................................................552
Working with Risk Thresholds .............................................................552
Contents
21
Creating Risk Thresholds...................................................................554
Modifying Risk Thresholds .................................................................555
About Risk Categories ......................................................................556
Creating Risk Categories ...................................................................556
About Issues ....................................................................................556
Creating Issue Codes........................................................................557
Creating Issue Code Values................................................................557
About Document Categories and Statuses..................................................558
Creating Document Categories ...........................................................558
Creating Document Statuses ..............................................................558
About Currencies...............................................................................559
Adding a Currency ..........................................................................559
Defining a Base Currency ..................................................................560
About Financial Periods.......................................................................560
Creating Financial Periods.................................................................560
Creating a Financial Period Batch........................................................561
About Overhead Codes........................................................................562
Creating Overhead Codes..................................................................562
About Timesheet Periods .....................................................................563
Creating Timesheet Periods ...............................................................563
About Resource and Role Rate Types .......................................................563
Configuring Resource and Role Rate Types.............................................564
About Resource Codes ........................................................................564
Creating Resource Codes ..................................................................564
Creating Resource Code Values...........................................................565
About Resource Curves........................................................................565
Defining Resource Curves..................................................................565
About Units of Measure .......................................................................566
Creating Units of Measure .................................................................566
About User Access.................................................................................567
About Users.....................................................................................567
The Default Admin Superuser.............................................................568
Creating User Accounts for P6 EPPM.....................................................568
Adding Users in Native Authentication Mode...........................................569
Adding Users in LDAP or SSO Authentication Mode....................................570
Configuring User Access....................................................................571
Assigning Associated Resources...........................................................572
Assigning Global Security Profiles ........................................................572
Assigning Module Access ...................................................................573
Assigning OBS Elements to Users .........................................................573
Assigning Resource Access.................................................................574
Assigning User Interface Views ...........................................................575
Changing Passwords.........................................................................575
Changing User Passwords ..................................................................575
Counting Users...............................................................................576
Deactivating User Accounts ...............................................................576
P6 Help
22
Deleting User Accounts ....................................................................577
About the OBS..................................................................................577
Creating an OBS .............................................................................577
Assigning Users to an OBS..................................................................578
About Security Profiles........................................................................579
Working with Security Profiles............................................................580
Creating Global Security Profiles.........................................................581
Creating Project Security Profiles........................................................582
About User Interface Views......................................................................583
Working with User Interface Views..........................................................583
Creating User Interface Views ...............................................................584
Configuring User Interface Views............................................................586
About User Sessions...............................................................................587
Resetting User Sessions .......................................................................587
About Publication Services and Reporting.....................................................588
Working with Publication Services for Reporting..........................................589
Publishing P6 Data for Reports ...........................................................592
Defining Publication Periods ..............................................................592
Enabling Automatic Publishing of P6 Project Data for Reports .....................593
Enabling Automatic Publishing of P6 Global Data for Reports ......................595
Configuring Publication Service Settings for Projects ................................595
Manually Publishing P6 Project Data for Reports......................................596
Manually Publishing P6 Global Data for Reports .......................................597
CSH .................................................................................................... 598
Access Tab of the Create Filter Dialog Box of the Assignments Page......................598
Access Tab of the Create or Modify Filter Dialog Box........................................598
Access Tab of the Customize Activity View Dialog Box ......................................599
Access Tab of the Customize Dashboard Page ................................................599
Access Tab of the Customize EPS View Dialog Box ...........................................600
Access Tab of the Customize Resources Assignments View Dialog Box of the Assignments Page
.......................................................................................................600
Access Tab of the Issue Forms Page ............................................................601
Action Required Tab of the Document Reviews Portlet of the Dashboards Page ........602
Action Required Tab of the Workflows Portlet of the Dashboards Page ..................603
Activities Detail Window of the Project Security Profiles Page ............................606
Activities Detail Window of the Risks Page....................................................607
Activities Page.....................................................................................611
Activities Portlet of the Workgroup Workspace Page ........................................613
Activities Work Area of the Timesheet Approval Page.......................................614
Activity Calendar Format of the Activities Page..............................................617
Activity Codes - EPS Page ........................................................................619
Activity Codes - Global Page.....................................................................620
Activity Codes - Project Page ...................................................................621
Contents
23
Activity Codes Details Page of the Activity Form Page ......................................622
Activity Codes Page ...............................................................................622
Activity Details Dialog Box .......................................................................623
Activity Details Dialog Box of the Resource Staffing Dialog Box............................624
Activity Details of the Resources Dialog Box ..................................................625
Activity Editing Tab of the User Interface View Details Page...............................626
Activity Form Page................................................................................626
Activity Gantt Chart Format of the Activities Page ..........................................628
Activity List for WBS Dialog Box.................................................................630
Activity Network Format of the Activities Page ..............................................631
Activity Tab of the Modify Template Dialog Box of the Import/Export Project Dialog Box632
Activity Table Format of the Activities Page..................................................634
Activity UDFs Page ................................................................................636
Add Activity Expenses Page of the Activity Form Page ......................................636
Add Folder Dialog Box ............................................................................637
Add Issue Page.....................................................................................638
Add Location Dialog Box of the Locations Page...............................................640
Add or Edit Service Dialog Box of the Project Scheduled Services Page ..................642
Add Steps Page of the Activity Form Page.....................................................643
Add User Dialog Box...............................................................................644
Add Users from LDAP Dialog Box of the Users Page ..........................................645
Administration Detail Window of the Global Security Profiles Page.......................647
Administration Page ..............................................................................648
Advanced Tab of the Add Project Dialog Box .................................................648
Advanced Tab of the Add Project Template Dialog Box.....................................650
Advanced Tab of the Scheduling Options Dialog Box.........................................652
Analysis Page.......................................................................................653
Analytics Page of the Project Preferences Dialog Box.......................................654
Application Settings Pane ........................................................................654
Apply Actuals Dialog Box of the Activities Page ..............................................655
Approve Document Review Dialog Box .........................................................656
Assign by Search Dialog Box of the Planning Page............................................657
Assign Project Manager Delegate Dialog Box of the Timesheet Approval Page ..........659
Assign Resource Manager Delegate Dialog Box of the Timesheet Approval Page ........660
Assignment UDFs Page............................................................................660
Assignments Detail Window of the Activities Page ...........................................661
Assignments Page .................................................................................663
Bars Tab of the Customize Activity View or Gantt Chart Options Dialog Box ............664
Bars Tab of the Customize EPS View or Gantt Chart Options Dialog Box .................666
Bars Tab of the Customize Resource Assignments View or Gantt Chart Options Dialog Box of
the Assignments Page.............................................................................667
Baseline Types Page ..............................................................................669
P6 Help
24
Baselines Dialog Box ..............................................................................669
BEI - Activities with No Project Baseline Finish Date Section of the Schedule Check Report
Dialog Box ..........................................................................................670
Calculations Page of the Project Preferences Dialog Box ...................................671
Calendar Tab of the Global Calendars Page...................................................673
Calendar Tab of the Project Calendars Page..................................................674
Calendar Tab of the Resource Calendars Page................................................676
Calendar Tab of the View Calendar Dialog Box ...............................................677
Cause Detail Window of the Risks Page ........................................................679
Change Password Dialog Box of the Users Page...............................................680
Chart Tab of the Customize Project Issues Dialog Box.......................................680
Check Schedule Dialog Box ......................................................................683
Check Summary Section of the Schedule Check Report Dialog Box........................685
Codes Detail Window of the Activities Page...................................................686
Codes Detail Window of the EPS Page..........................................................687
Codes Detail Window of the Global Security Profiles Page .................................687
Codes Detail Window of the Project Security Profiles Page ................................690
Codes Detail Window of the Resources Tab of the Administration Page ..................691
Codes Section of the Activity Form Page ......................................................692
Columns Tab of the Customize Cost Worksheet Dialog Box .................................693
Columns Tab of the Customize Project Issues Dialog Box ...................................694
Columns Tab of the Customize Project Statistics Dialog Box ...............................695
Columns Tab of the Customize Risks Portlet Dialog Box.....................................695
Columns Tab of the Customize Scorecards Dialog Box of the Portfolio Views Section of the
Customize Dashboard Page ......................................................................697
Columns Tab of the Customize Spreadsheet Dialog Box of the Planning Page ...........698
Common Screen Elements for Customizing Columns or Values.............................699
Communication Center Portlet of the Dashboards and Workspace Page..................699
Content Tab of the Customize Dashboard Page ..............................................700
Content Tab of the Customize Workgroup Workspace Page ................................701
Content Tab of the User Interface View Details Page .......................................702
Content Tab of the Workspace Details Page ..................................................707
Contract Documents Portlet of the Workspace Page ........................................708
Contract Issues Portlet of the Workspace Page...............................................708
Contract Management Page of the Project Preferences Dialog Box .......................709
Contract Management Section of the Content Tab of the Customize Dashboard Page .709
Contract Management Section of the Content Tab of the Customize Workspace Page .710
Contract Reports Portlet of the Workspace Page.............................................711
Copy Project Options Dialog Box................................................................712
Cost Accounts Page ...............................................................................714
Cost Worksheet Portlet of the Dashboards or Workspace Page ............................715
Count Dialog Box of the Users Page ............................................................715
Contents
25
Create Filter Dialog Box of the Assignments Page............................................716
Create or Modify Filter Dialog Box of the Activities Page ...................................717
Create Portfolio Page.............................................................................717
Create Portfolio View/Portfolio View Details Page ..........................................719
Critical Activities Behind Schedule Portlet of the Workspace Page .......................722
Currencies Page ...................................................................................723
Currency Section of Global Tab of the My Preferences Page ...............................725
Current Bar Options Dialog Box .................................................................725
Curve Definition Detail Window of the Resource Curves Page..............................727
Custom Field Mapping Tab of the Modify Template Dialog Box of the Import/Export Project
Dialog Box ..........................................................................................727
Custom Portlet of the Dashboards or Workspace Page ......................................728
Custom Portlet Section of the Content Tab of the Workspace Page.......................729
Custom Portlets Section of the Content Tab of the Customize Dashboard Page.........731
Customize Activity List for WBS Dialog Box ...................................................732
Customize Activity Network Dialog Box or Activity Network Tab of the Activities Page732
Customize Activity View Dialog Box ............................................................734
Customize Capacity Planning Chart Tab .......................................................735
Customize Capacity Planning Columns Tab....................................................736
Customize Capacity Planning Dialog Box.......................................................737
Customize Capacity Planning Grouping Tab...................................................738
Customize Capacity Planning Waterline Tab ..................................................739
Customize Chart Dialog Box of the Resource Analysis Chart Portlet.......................740
Customize Chart Dialog Box of the Resource Analysis Tab of the Analysis Page .........741
Customize Columns Dialog Box of the Assignments Detail Window ........................742
Customize Columns Dialog Box or Columns Tab of the Activities Page....................743
Customize Columns Dialog Box or Columns Tab of the Assignments Page ................744
Customize Columns Dialog Box or Columns Tab of the EPS Page...........................745
Customize Cost Worksheet Dialog Box .........................................................746
Customize Dashboard Page ......................................................................747
Customize Detail Windows Dialog Box of the Activities Page...............................748
Customize Detail Windows Dialog Box of the EPS Page......................................748
Customize Dialog Box of the Portfolio View Portlet..........................................749
Customize Dialog Box of the Team Usage Page...............................................751
Customize EPS View Dialog Box .................................................................753
Customize Filters Dialog Box or Filters Tab of the Activities Page.........................754
Customize Filters Dialog Box or Filters Tab of the Assignments Page .....................755
Customize Filters Dialog Box or Filters Tab of the EPS Page................................756
Customize Gantt Chart Options Dialog Box of the Activities Page .........................757
Customize Gantt Chart Options Dialog Box of the Assignments Page......................757
Customize Gantt Chart Options Dialog Box of the EPS Page ................................758
Customize Groupings Dialog Box or Grouping Tab of the Activities Page .................758
P6 Help
26
Customize Groupings Dialog Box or Grouping Tab of the Assignments Page..............760
Customize Groupings Dialog Box or Grouping Tab of the EPS Page ........................762
Customize Project Issues Dialog Box ...........................................................764
Customize Project Score Dialog Box of the Project Score Section of the Global Tab of the My
Preferences Page..................................................................................765
Customize Project Statistics Dialog Box .......................................................766
Customize Resource Assignments View Dialog Box of the Assignments Page.............766
Customize Risks Dialog Box ......................................................................767
Customize Scorecard Columns Tab .............................................................768
Customize Scorecard Dialog Box ................................................................769
Customize Scorecard Dialog Box of the Portfolio Views Section of the Customize Dashboard
Page.................................................................................................769
Customize Scorecard Group Tab ................................................................770
Customize Scorecard Waterline Tab............................................................771
Customize Spreadsheet Dialog Box of the Planning Page....................................773
Customize Spreadsheet or Histogram Dialog Box of the Analysis Page....................773
Customize Toolbar Items Dialog Box ...........................................................775
Customize Toolbar Items Dialog Box of the Assignments Page .............................775
Customize Usage Options or Usage Tab of the Assignments Page..........................776
Dashboards Page ..................................................................................778
Data Limits Page ..................................................................................779
Date Format Section of the Global Tab of the My Preferences Page ......................780
Day View Detail Window of the Calendar View of the Activities Page ....................781
Defaults Page of the Project Preferences Dialog Box........................................782
Definition Tab of the Create Filter Dialog Box of the Assignments Page..................785
Definition Tab of the Create or Modify Filter Dialog Box....................................787
Description Detail Window of the Cost Accounts Page ......................................789
Description Detail Window of the EPS Page ...................................................790
Description Detail Window of the Funding Sources Page....................................790
Description Detail Window of the OBS Page...................................................791
Description Detail Window of the Reports Page ..............................................791
Description Detail Window of the Risk Scoring Matrices Page ..............................792
Description Detail Window of the Risks Page .................................................792
Description Detail Window of the Roles Tab of the Administration Page .................793
Description Tab of the Document Details Page (with content repository)................793
Description Tab of the Documents Details Page or Dialog Box (without content repository)
.......................................................................................................794
Document Categories Page ......................................................................795
Document Details Dialog Box ....................................................................796
Document Details Section of the Documents Page (with content repository)............797
Document Review Details Dialog Box...........................................................798
Document Reviews Portlet of the Dashboards Page..........................................799
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012
Primavera help 2012

More Related Content

What's hot

120posig i spplr implmntn guide
120posig i spplr implmntn guide120posig i spplr implmntn guide
120posig i spplr implmntn guideVikram Reddy
 
oracle finance E13422
oracle finance E13422oracle finance E13422
oracle finance E13422Vijay Kumar
 
Oracle database 12c 2 day developer's guide 123
Oracle database 12c 2 day developer's guide 123Oracle database 12c 2 day developer's guide 123
Oracle database 12c 2 day developer's guide 123bupbechanhgmail
 
Shipping execution user guide r12
Shipping execution user guide r12Shipping execution user guide r12
Shipping execution user guide r12aruna777
 
Sales userguide121asnug
Sales userguide121asnugSales userguide121asnug
Sales userguide121asnugG Selvam Guru
 
Oracle data guard broker 12c
Oracle data guard broker 12cOracle data guard broker 12c
Oracle data guard broker 12cFemi Adeyemi
 
P6 analytics install_and_config_guide
P6 analytics install_and_config_guideP6 analytics install_and_config_guide
P6 analytics install_and_config_guidevishaalkumar11
 
underground-php-oracle-manual
underground-php-oracle-manualunderground-php-oracle-manual
underground-php-oracle-manualtutorialsruby
 
Oracle® Trading Community Architecture
Oracle® Trading Community ArchitectureOracle® Trading Community Architecture
Oracle® Trading Community ArchitectureOracle Groups
 
Oracle database 12c client installation overview
Oracle database 12c client installation overviewOracle database 12c client installation overview
Oracle database 12c client installation overviewbupbechanhgmail
 
Engineering user guide
Engineering user guideEngineering user guide
Engineering user guideRajesh Kumar
 
Security Guide for Oracle Fusion - E10543
Security Guide for Oracle Fusion - E10543Security Guide for Oracle Fusion - E10543
Security Guide for Oracle Fusion - E10543aakash2meet
 

What's hot (18)

120posig i spplr implmntn guide
120posig i spplr implmntn guide120posig i spplr implmntn guide
120posig i spplr implmntn guide
 
oracle finance E13422
oracle finance E13422oracle finance E13422
oracle finance E13422
 
Oracle database 12c 2 day developer's guide 123
Oracle database 12c 2 day developer's guide 123Oracle database 12c 2 day developer's guide 123
Oracle database 12c 2 day developer's guide 123
 
Shipping execution user guide r12
Shipping execution user guide r12Shipping execution user guide r12
Shipping execution user guide r12
 
Sales userguide121asnug
Sales userguide121asnugSales userguide121asnug
Sales userguide121asnug
 
Oracle data guard broker 12c
Oracle data guard broker 12cOracle data guard broker 12c
Oracle data guard broker 12c
 
P6 analytics install_and_config_guide
P6 analytics install_and_config_guideP6 analytics install_and_config_guide
P6 analytics install_and_config_guide
 
Obiee11g on ipad
Obiee11g on ipadObiee11g on ipad
Obiee11g on ipad
 
B28370 - PL-SQL - Oracle Reference
B28370 - PL-SQL - Oracle ReferenceB28370 - PL-SQL - Oracle Reference
B28370 - PL-SQL - Oracle Reference
 
A73074 01
A73074 01A73074 01
A73074 01
 
underground-php-oracle-manual
underground-php-oracle-manualunderground-php-oracle-manual
underground-php-oracle-manual
 
Oracle® Trading Community Architecture
Oracle® Trading Community ArchitectureOracle® Trading Community Architecture
Oracle® Trading Community Architecture
 
Oracle database 12c client installation overview
Oracle database 12c client installation overviewOracle database 12c client installation overview
Oracle database 12c client installation overview
 
BOM & WIP
BOM & WIPBOM & WIP
BOM & WIP
 
Engineering user guide
Engineering user guideEngineering user guide
Engineering user guide
 
Security Guide for Oracle Fusion - E10543
Security Guide for Oracle Fusion - E10543Security Guide for Oracle Fusion - E10543
Security Guide for Oracle Fusion - E10543
 
Cdh user guider12.2
Cdh user guider12.2Cdh user guider12.2
Cdh user guider12.2
 
120xlaig
120xlaig120xlaig
120xlaig
 

Viewers also liked

Iri machine international roughness index of asphalte surface
Iri machine international roughness index of asphalte surfaceIri machine international roughness index of asphalte surface
Iri machine international roughness index of asphalte surfaceDr Ezzat Mansour
 
معدلات إنتاجية المعدات
معدلات إنتاجية المعداتمعدلات إنتاجية المعدات
معدلات إنتاجية المعداتDr Ezzat Mansour
 
Agile and earned value management
Agile and earned value management  Agile and earned value management
Agile and earned value management Dr Ezzat Mansour
 
Measurement of the_international_roughness_index_iri_using_an_autonomous_robo...
Measurement of the_international_roughness_index_iri_using_an_autonomous_robo...Measurement of the_international_roughness_index_iri_using_an_autonomous_robo...
Measurement of the_international_roughness_index_iri_using_an_autonomous_robo...Dr Ezzat Mansour
 
Application of value engineering in construction
Application of value engineering in constructionApplication of value engineering in construction
Application of value engineering in constructionDr Ezzat Mansour
 
The analysis and valuation of disruption
The analysis and valuation of disruptionThe analysis and valuation of disruption
The analysis and valuation of disruptionDr Ezzat Mansour
 
كتاب شرح الكود الامريكى بالعربى
كتاب شرح الكود الامريكى بالعربى كتاب شرح الكود الامريكى بالعربى
كتاب شرح الكود الامريكى بالعربى Dr Ezzat Mansour
 

Viewers also liked (13)

Iri machine international roughness index of asphalte surface
Iri machine international roughness index of asphalte surfaceIri machine international roughness index of asphalte surface
Iri machine international roughness index of asphalte surface
 
معدلات إنتاجية المعدات
معدلات إنتاجية المعداتمعدلات إنتاجية المعدات
معدلات إنتاجية المعدات
 
Agile and earned value management
Agile and earned value management  Agile and earned value management
Agile and earned value management
 
Measurement of the_international_roughness_index_iri_using_an_autonomous_robo...
Measurement of the_international_roughness_index_iri_using_an_autonomous_robo...Measurement of the_international_roughness_index_iri_using_an_autonomous_robo...
Measurement of the_international_roughness_index_iri_using_an_autonomous_robo...
 
Application of value engineering in construction
Application of value engineering in constructionApplication of value engineering in construction
Application of value engineering in construction
 
Pmp formula pocket guide
Pmp formula pocket guidePmp formula pocket guide
Pmp formula pocket guide
 
اعداد المشروع
اعداد المشروعاعداد المشروع
اعداد المشروع
 
المشروع
المشروعالمشروع
المشروع
 
Earned value
Earned valueEarned value
Earned value
 
Methods of delay analysis
Methods of delay analysisMethods of delay analysis
Methods of delay analysis
 
Pmp formulas v5
Pmp formulas v5Pmp formulas v5
Pmp formulas v5
 
The analysis and valuation of disruption
The analysis and valuation of disruptionThe analysis and valuation of disruption
The analysis and valuation of disruption
 
كتاب شرح الكود الامريكى بالعربى
كتاب شرح الكود الامريكى بالعربى كتاب شرح الكود الامريكى بالعربى
كتاب شرح الكود الامريكى بالعربى
 

Similar to Primavera help 2012

Similar to Primavera help 2012 (20)

Opm costing
Opm costingOpm costing
Opm costing
 
Getting Started on PeopleSoft InstallationJuly 2014.docx
Getting Started on PeopleSoft InstallationJuly 2014.docxGetting Started on PeopleSoft InstallationJuly 2014.docx
Getting Started on PeopleSoft InstallationJuly 2014.docx
 
Instalacion de apex
Instalacion de apexInstalacion de apex
Instalacion de apex
 
Backup and recovery basics
Backup and recovery basicsBackup and recovery basics
Backup and recovery basics
 
Oracle® application server
Oracle® application serverOracle® application server
Oracle® application server
 
Oracle® business intelligence
Oracle® business intelligenceOracle® business intelligence
Oracle® business intelligence
 
Guia implementacion seguridad oracle 12c
Guia implementacion seguridad oracle 12cGuia implementacion seguridad oracle 12c
Guia implementacion seguridad oracle 12c
 
using-advanced-controls (1).pdf
using-advanced-controls (1).pdfusing-advanced-controls (1).pdf
using-advanced-controls (1).pdf
 
Fastformular
FastformularFastformular
Fastformular
 
Demantra12
Demantra12Demantra12
Demantra12
 
120cseug asset tracking user guide
120cseug asset tracking user guide120cseug asset tracking user guide
120cseug asset tracking user guide
 
Oatbi
OatbiOatbi
Oatbi
 
E13882== ORACLE SOA COOK BOOK
E13882== ORACLE SOA COOK BOOKE13882== ORACLE SOA COOK BOOK
E13882== ORACLE SOA COOK BOOK
 
Oracle 10g release 1
Oracle 10g release  1Oracle 10g release  1
Oracle 10g release 1
 
Oracle9
Oracle9Oracle9
Oracle9
 
Opm inv user guide
Opm inv user guideOpm inv user guide
Opm inv user guide
 
122gopug.pdf
122gopug.pdf122gopug.pdf
122gopug.pdf
 
Manufacturing scheduling user guide
Manufacturing scheduling user guideManufacturing scheduling user guide
Manufacturing scheduling user guide
 
120ocmug
120ocmug120ocmug
120ocmug
 
Downloadattachmentprocessor
DownloadattachmentprocessorDownloadattachmentprocessor
Downloadattachmentprocessor
 

More from Dr Ezzat Mansour

PERFORMANCE MONITORING USING EVM INDICATOR
PERFORMANCE MONITORING USING EVM INDICATORPERFORMANCE MONITORING USING EVM INDICATOR
PERFORMANCE MONITORING USING EVM INDICATORDr Ezzat Mansour
 
The Earned Value Matutity Management Model
The Earned Value Matutity Management ModelThe Earned Value Matutity Management Model
The Earned Value Matutity Management ModelDr Ezzat Mansour
 
Using CMMI to Improve Earned Value Management
Using CMMI to Improve Earned Value ManagementUsing CMMI to Improve Earned Value Management
Using CMMI to Improve Earned Value ManagementDr Ezzat Mansour
 
Ray stratton aace presentation
Ray stratton aace presentationRay stratton aace presentation
Ray stratton aace presentationDr Ezzat Mansour
 
Evm implementation handbook_sti13-059
Evm implementation handbook_sti13-059Evm implementation handbook_sti13-059
Evm implementation handbook_sti13-059Dr Ezzat Mansour
 
Nasa+evm+reference+card nov+2015
Nasa+evm+reference+card nov+2015Nasa+evm+reference+card nov+2015
Nasa+evm+reference+card nov+2015Dr Ezzat Mansour
 
Module 3 lecture 1 planning and scheduling(1)
Module 3 lecture 1   planning and scheduling(1)Module 3 lecture 1   planning and scheduling(1)
Module 3 lecture 1 planning and scheduling(1)Dr Ezzat Mansour
 

More from Dr Ezzat Mansour (11)

delay protocol
delay protocoldelay protocol
delay protocol
 
E o t
E o tE o t
E o t
 
PERFORMANCE MONITORING USING EVM INDICATOR
PERFORMANCE MONITORING USING EVM INDICATORPERFORMANCE MONITORING USING EVM INDICATOR
PERFORMANCE MONITORING USING EVM INDICATOR
 
The Earned Value Matutity Management Model
The Earned Value Matutity Management ModelThe Earned Value Matutity Management Model
The Earned Value Matutity Management Model
 
EARNED VALUE MANAGEMENT
EARNED VALUE MANAGEMENTEARNED VALUE MANAGEMENT
EARNED VALUE MANAGEMENT
 
Pm value
Pm valuePm value
Pm value
 
Using CMMI to Improve Earned Value Management
Using CMMI to Improve Earned Value ManagementUsing CMMI to Improve Earned Value Management
Using CMMI to Improve Earned Value Management
 
Ray stratton aace presentation
Ray stratton aace presentationRay stratton aace presentation
Ray stratton aace presentation
 
Evm implementation handbook_sti13-059
Evm implementation handbook_sti13-059Evm implementation handbook_sti13-059
Evm implementation handbook_sti13-059
 
Nasa+evm+reference+card nov+2015
Nasa+evm+reference+card nov+2015Nasa+evm+reference+card nov+2015
Nasa+evm+reference+card nov+2015
 
Module 3 lecture 1 planning and scheduling(1)
Module 3 lecture 1   planning and scheduling(1)Module 3 lecture 1   planning and scheduling(1)
Module 3 lecture 1 planning and scheduling(1)
 

Recently uploaded

CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
EduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIEduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIkoyaldeepu123
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 

Recently uploaded (20)

CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
EduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIEduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AI
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 

Primavera help 2012

  • 2. 2 Oracle Primavera P6 Help for Print First Half Copyright © 1997, 2012, Oracle and/or its affiliates. All rights reserved. Oracle and Java are registered trademarks of Oracle and/or its affiliates. Other names may be trademarks of their respective owners. The Programs (which include both the software and documentation) contain proprietary information; they are provided under a license agreement containing restrictions on use and disclosure and are also protected by copyright, patent, and other intellectual and industrial property laws. Reverse engineering, disassembly, or decompilation of the Programs, except to the extent required to obtain interoperability with other independently created software or as specified by law, is prohibited. The information contained in this document is subject to change without notice. If you find any problems in the documentation, please report them to us in writing. This document is not warranted to be error-free. Except as may be expressly permitted in your license agreement for these Programs, no part of these Programs may be reproduced or transmitted in any form or by any means, electronic or mechanical, for any purpose. The platform-specific hardware and software requirements included in this document were current when this document was published. However, because new platforms and operating system software versions might be certified after this document is published, review the certification matrix on the My Oracle Support Web site for the most up-to-date list of certified hardware platforms and operating system versions. The My Oracle Support Web site is available at the following URL: http://support.oracle.com/ If the Programs are delivered to the United States Government or anyone licensing or using the Programs on behalf of the United States Government, the following notice is applicable: U.S. GOVERNMENT RIGHTS Programs, software, databases, and related documentation and technical data delivered to U.S. Government customers are "commercial computer software" or "commercial technical data" pursuant to the applicable Federal Acquisition Regulation and agency-specific supplemental regulations. As such, use, duplication, disclosure, modification, and adaptation of the Programs, including documentation and technical data, shall be subject to the licensing restrictions set forth in the applicable Oracle license agreement, and, to the extent applicable, the additional rights set forth in FAR 52.227-19, Commercial Computer Software -- Restricted Rights (June 1987). Oracle USA, Inc., 500 Oracle Parkway, Redwood City, CA 94065. Copyright
  • 3. Copyright 3 The Programs are not intended for use in any nuclear, aviation, mass transit, medical, or other inherently dangerous applications. It shall be the licensee's responsibility to take all appropriate fail-safe, backup, redundancy and other measures to ensure the safe use of such applications if the Programs are used for such purposes, and we disclaim liability for any damages caused by such use of the Programs. The Programs may provide links to Web sites and access to content, products, and services from third parties. Oracle is not responsible for the availability of, or any content provided on, third-party Web sites. You bear all risks associated with the use of such content. If you choose to purchase any products or services from a third party, the relationship is directly between you and the third party. Oracle is not responsible for: (a) the quality of third-party products or services; or (b) fulfilling any of the terms of the agreement with the third party, including delivery of products or services and warranty obligations related to purchased products or services. Oracle is not responsible for any loss or damage of any sort that you may incur from dealing with any third party. To view the list of third party technology disclosures related to this product, please see the Commercial Notices and Disclosures document for the release.
  • 4.
  • 5. 5 Contents Copyright ................................................................................................ 2 Preface ................................................................................................. 41 Where to Get Documentation .................................................................... 41 Where To Get Training ............................................................................ 44 Where to Get Support ............................................................................. 44 Documentation Accessibility...................................................................... 45 Introduction............................................................................................ 47 About Oracle Primavera P6 Enterprise Project Portfolio Management..................... 47 Working with the Oracle Primavera P6 EPPM Suite ........................................... 48 About P6 ......................................................................................... 51 About P6 Team Member Applications........................................................ 52 About P6 Progress Reporter ................................................................... 53 About Oracle Universal Content Management .............................................. 54 About P6 Professional .......................................................................... 54 About Oracle BI Publisher and the OBIEE Platform ........................................ 55 About P6 Reporting Database ................................................................. 55 About P6 Analytics.............................................................................. 55 About the Oracle Business Process Management Suite .................................... 57 About the P6 Integration API.................................................................. 57 About P6 EPPM Web Services ................................................................. 58 What's New in P6 EPPM............................................................................ 58 P6 Overview ........................................................................................... 59 Working with P6 .................................................................................... 59 Customizing the P6 User Experience ............................................................ 61 About Industry-Specific Field Names......................................................... 62 About the User Interface.......................................................................... 63 Working with the P6 User Interface.......................................................... 63 About Screen Controls....................................................................... 65 Working with the Main Menus.............................................................. 66 About the Most Recently Used List........................................................ 67 Working with Tables ......................................................................... 68 About Columns (Fields)...................................................................... 69 Showing or Hiding Columns in a Table ................................................... 69 Selecting Items from a List of Available Items.......................................... 70 Working with Toolbars ...................................................................... 71 Customizing Toolbars........................................................................ 72 Working with "Select a Value" Dialog Boxes ............................................. 72 Selecting Values from "Select a Value" Dialog Boxes .................................. 74 Working with Data in P6 .................................................................... 75 Working with Detail Windows.............................................................. 76
  • 6. P6 Help 6 About Portlets ................................................................................ 78 About Data Entry Controls.................................................................. 78 About Security ...................................................................................... 78 Printing Pages Using P6 Printing Tools .......................................................... 79 Printing Pages Using Your Web Browser ........................................................ 80 About E-Mail Notifications ........................................................................ 80 Working with E-Mail Notifications ............................................................ 81 Sending Activity Views by E-Mail .......................................................... 82 Sending E-Mail about Documents.......................................................... 82 Sending E-Mail about Issues ................................................................ 83 Sending E-Mail about Milestones .......................................................... 83 Sending E-Mail about Timesheets to Resources......................................... 84 Sending E-Mail Notifications about Resource Assignments ........................... 84 Sending E-Mail to a Project Manager ..................................................... 85 Sending E-Mail to Activity Resources ..................................................... 86 Sending E-Mail to Project Resources...................................................... 86 Sending E-Mail to Resource Teams........................................................ 87 Updating the Progress of Activities Using E-mail....................................... 88 About Grouping and Sorting ...................................................................... 88 Working with Group and Sort Features ...................................................... 89 Grouping and Sorting Information ............................................................ 90 About Find, Search, and Filter Features ........................................................ 91 Working with Find, Search, and Filter Features............................................ 91 Finding Entries................................................................................ 92 Searching for Entries ........................................................................ 92 About Filters .................................................................................. 93 Working with Filters ......................................................................... 93 Filtering Data ................................................................................. 95 Pages Supporting Filters .................................................................... 96 Creating, Modifying, Saving, and Deleting Data ............................................... 97 Cutting, Copying, and Pasting Data .......................................................... 97 About Removing and Deleting Data .......................................................... 98 Deleting Entries .............................................................................. 99 Undoing Mistakes ............................................................................... 99 About Metrics and Calculations .................................................................100 Using Visual Indicators ........................................................................100 About Importing and Exporting Data ...........................................................101 About Importing and Exporting Projects ...................................................102 About P6 Help......................................................................................102 Viewing Help Content .........................................................................102 Working with P6 Help Topics.................................................................104 About Timesheets .................................................................................106 Working with Timesheets.....................................................................106 Approving or Rejecting Timesheets .........................................................107 Sending E-Mail about Timesheets to Resources ...........................................108 Assigning a Project Manager Delegate for Timesheets ...................................109
  • 7. Contents 7 Assigning a Resource Manager Delegate for Timesheets .................................110 Dashboards and Workspaces...................................................................... 113 About Dashboards, Workspaces, and Workgroups ............................................113 About Dashboards .................................................................................113 Working with Dashboards.....................................................................114 Creating Dashboards...........................................................................117 Customizing Dashboards ......................................................................117 Configuring Dashboard Content ..........................................................118 Configuring Dashboard Access ............................................................118 Configuring Dashboard Filters ............................................................119 Configuring Dashboard Layout ............................................................119 Showing and Hiding Dashboards ..........................................................120 Working with Workflows in P6 ...............................................................120 About Project Workspaces .......................................................................123 Working with Project Workspaces...........................................................124 Customizing Project Workspace .............................................................124 Configuring Workspace Content ..........................................................124 Configuring Workspace Layout............................................................125 Sending E-Mail to Project Resources........................................................126 About Project Performance Metrics.........................................................127 Assessing Project Performance ...........................................................127 Assessing Project Health...................................................................127 Customizing Project Statistics ............................................................128 Identifying Critical Activities Behind Schedule ........................................129 About Performance Thresholds ...........................................................129 Working with Performance Thresholds ..................................................130 About Milestones ............................................................................130 Sending E-Mail about Milestones .........................................................131 About Cost Performance Index (CPI) ....................................................131 About Schedule Performance Index (SPI) ...............................................132 About To-Complete Performance Index (TCPI) ........................................132 About Contract Management.................................................................132 Working with Contract Management.....................................................133 Opening the Contract Management Control Center...................................133 Linking P6 and Contract Management Projects........................................134 Linking P6/P6 Professional and Contract Management Applications...............135 About Project Workgroups .......................................................................135 Working with Workgroups ....................................................................135 Assigning Documents to Projects .........................................................135 Creating Workgroups .......................................................................136 Customizing Workgroups...................................................................137 Assigning Workgroup Activities ...........................................................138 Creating Workgroup Issues ................................................................138 Sending E-Mail to Activity Resources ....................................................139 About Portlets .....................................................................................140 Working with Portlets .........................................................................140 List of Portlets...............................................................................143 Customizing Portlets........................................................................145
  • 8. P6 Help 8 Customizing the My Risks Portlet.........................................................145 Customizing the Resource Analysis Chart Portlet .....................................145 Customizing the Open Requests for Resources Portlet ...............................146 Customizing Portfolio View Portlets .....................................................146 Customizing Scorecard Portfolio View Portlets ........................................147 Analyzing Resource Team Usage in the Resource Team Summary Portlet ........147 Creating Portfolio View Portlets..........................................................148 Document Review and Workflow Portlets ..............................................148 Participating in Document Reviews ......................................................149 Terminating Document Reviews ..........................................................149 About Workflows ............................................................................150 Working with Workflows in P6 ............................................................150 Participating in Workflows ................................................................153 Linking the Cost Worksheet to Contract Management................................154 Opening Projects from Dashboard Portlets.............................................155 Sending E-Mail to Resource Teams.......................................................155 Sending E-Mail Notifications about Resource Assignments ..........................156 Creating Custom Portlets ..................................................................156 Portfolios ............................................................................................. 159 About Portfolios ...................................................................................159 Working with Portfolios ..........................................................................159 Opening Portfolios .............................................................................160 Creating Portfolios.............................................................................160 Creating Projects While Working with Portfolios .........................................161 Creating Projects in a Portfolio View Scorecard Portlet .................................161 Creating Projects on the Portfolio Analysis Page .........................................162 Assigning Projects to a Portfolio.............................................................163 Defining Performance Thresholds ...........................................................163 Portfolio Views ....................................................................................165 About Portfolio Views .........................................................................165 Working with Portfolio Views ................................................................165 Creating Portfolio Views ...................................................................166 Working with Portfolio View Scorecards....................................................167 Working with Portfolio View Bubble Charts................................................169 Working with Portfolio View Pie Charts ....................................................171 Working with Portfolio View Histograms ...................................................173 Portfolio Scenarios ................................................................................175 About Portfolio Scenarios.....................................................................175 About What-if Analysis ........................................................................175 Working with Portfolio Scenarios............................................................176 Creating Portfolio Scenarios ..............................................................176 Sending E-Mail About Scenarios...........................................................176 Capacity Planning .................................................................................177 About Capacity Planning......................................................................177 Working with the Capacity Planning Page..................................................177
  • 9. Contents 9 Analyzing Role Allocation (Capacity Planning).........................................179 Projects............................................................................................... 181 About Projects.....................................................................................181 Working with Projects.........................................................................181 Creating Projects ..............................................................................182 Assigning Locations to Projects..............................................................182 Opening Projects or Templates..............................................................183 Opening Dependent Projects.................................................................184 Importing and Exporting Projects ...........................................................185 Working with Primavera XML Project Import...........................................185 Working with Primavera XML Project Export...........................................187 Working with Microsoft Project Import .................................................189 Working with Microsoft Project Export..................................................191 About Opening a Project Exclusively........................................................192 Opening Projects Exclusively..............................................................192 Removing the Exclusive Lock on Projects...............................................193 Working with Oracle ERP, Fusion PPM Bridge, and Other Integrated Solutions.......195 Sending Project Data to an ERP System.................................................196 Sending Project Data to Fusion...........................................................197 About Project Templates ........................................................................198 Working with Project Templates ............................................................198 Creating Project Templates..................................................................199 The EPS .............................................................................................200 About the Enterprise Project Structure (EPS) .............................................200 Working with the EPS.......................................................................200 Creating EPS Elements .....................................................................202 Configuring the EPS.........................................................................203 Opening Projects or Templates in the EPS .............................................203 About Projects .................................................................................204 Creating Projects............................................................................204 Creating Projects from Existing Projects or Templates ..............................205 Deleting Projects or EPS Elements .......................................................205 Customizing Detail Windows ..............................................................206 Configuring Project Preferences .........................................................207 Configuring History Settings for P6 Analytics ..........................................207 Configuring Project Calculations .........................................................207 Linking P6 and Contract Management Projects ........................................208 Configuring Project Defaults ..............................................................208 Configuring General Project Preferences...............................................209 Configuring P6 Progress Reporter ........................................................209 Configuring Project Summarization and Publication Services.......................210 Configuring P6 Team Member Status Update Reviews................................210 Configuring P6 Team Member Application View Preferences .......................211 Opening Projects or Templates...........................................................213 About Gantt Charts ............................................................................214 Working with the Activity Gantt Chart ..................................................214
  • 10. P6 Help 10 Configuring Gantt Charts ..................................................................215 About Baselines ................................................................................216 Working with Baselines.....................................................................216 Creating Baselines ..........................................................................218 About Summary Data ..........................................................................219 Working with the Summarizer Service ..................................................220 Summarizing Projects ......................................................................220 About Importing and Exporting Projects ...................................................221 Importing and Exporting Projects ........................................................222 Exporting Projects using Microsoft Project XML .......................................222 Configuring Microsoft Project Templates ...............................................222 Exporting Projects using Primavera XML Format ......................................223 Importing Projects using Microsoft Project XML .......................................223 Importing Projects using Primavera XML Format ......................................224 Exporting Projects to Excel ...............................................................225 About Budgets..................................................................................225 Working with Budgets ......................................................................226 Establishing Budgets ........................................................................228 Creating Budget Change Requests .......................................................228 Approving or Denying Budget Change Requests .......................................229 About Spending and Benefit Plans .......................................................230 Working with Spending and Benefit Plans ..............................................231 Configuring Spending and Benefit Plans ................................................233 About Return on Investment (ROI) .......................................................233 About Project Views...........................................................................234 Configuring EPS Views......................................................................234 Configuring EPS View Columns............................................................234 Configuring EPS View Grouping ...........................................................235 Configuring EPS View Filters ..............................................................236 Applying Filters..............................................................................236 Creating Filters ..............................................................................237 Configuring Filters ..........................................................................238 Configuring EPS View Gantt Chart Bars .................................................239 Configuring EPS View Gantt Chart .......................................................240 Configuring EPS View Access ..............................................................240 About Columns (Fields) ....................................................................240 About Grouping and Sorting ...............................................................241 About Filters .................................................................................241 About Funding Sources........................................................................241 Working with Funding Sources ............................................................241 Assigning Project Funding Sources .......................................................244 About Gantt Charts ............................................................................244 Configuring Gantt Charts ..................................................................244 About Bars....................................................................................245 About Project Codes ..........................................................................246 Assigning Project Codes....................................................................247 About P6 Progress Reporter ..................................................................247 About Contract Management.................................................................248
  • 11. Contents 11 Linking P6/P6 Professional and Contract Management Applications...............248 About Notebooks ..................................................................................248 About Notebook Topics .......................................................................249 Working with Notebooks ......................................................................249 Assigning Notebook Topics ...................................................................249 Activities ...........................................................................................250 About Activities ................................................................................250 Working with Activities ....................................................................250 Creating Activities ..........................................................................251 Configuring General Activity Information...............................................252 Assigning Locations to Activities .........................................................253 Recalculating Assignment Costs ..........................................................254 Sending Project Data to an ERP System.................................................254 Customizing Detail Windows ..............................................................255 About Activity Types........................................................................256 About WBS Summary Activities ...........................................................256 About Suspending and Resuming Activities.............................................257 About the Activity Table...................................................................257 About Activity Networks ...................................................................257 Working with the Activity Network ......................................................258 About Calendar View .......................................................................259 Working with the Activity Calendar......................................................260 About Activity Views ..........................................................................261 Working with Activity Views ..............................................................261 Creating Activity or EPS Views............................................................262 Configuring Activity Views.................................................................262 Configuring Activity View Columns.......................................................263 Configuring Activity View Grouping......................................................264 Configuring Activity View Filters .........................................................265 Applying Filters..............................................................................266 Creating Filters ..............................................................................266 Configuring Filters ..........................................................................267 Configuring Activity View Gantt Chart Bars ............................................268 Configuring Activity View Gantt Chart ..................................................269 Configuring Activity Network .............................................................270 Configuring Activity View Access.........................................................270 Sending Activity Views by E-Mail .........................................................271 About Columns (Fields) ....................................................................271 About Filters .................................................................................272 About Grouping and Sorting ...............................................................272 About Activity Codes ..........................................................................272 Creating Activity Code Values for Activities ...........................................272 Assigning Activity Code Values to Activities............................................273 About Gantt Charts ............................................................................274 Working with the Activity Gantt Chart ..................................................274 Configuring Gantt Charts ..................................................................274 About Progress Spotlight...................................................................275 About Bars....................................................................................276
  • 12. P6 Help 12 About Work Breakdown Structures (WBS) ..................................................277 Working with WBS Elements ..............................................................277 About Siblings and Children ...............................................................279 Creating a WBS ..............................................................................279 Creating a WBS from a Template.........................................................280 Configuring General WBS Information ...................................................280 Defining Earned Value Calculations for WBS Elements ...............................281 Working with WBS Milestones .............................................................282 Working with WBS Categories.............................................................283 About Baselines ................................................................................284 Working with Baselines.....................................................................285 Creating Baselines ..........................................................................287 About Scheduling Projects....................................................................288 Scheduling Projects.........................................................................288 Configuring General Scheduling Options ................................................289 Configuring Advanced Scheduling Options..............................................289 About Float .....................................................................................290 About Critical Path Activities ................................................................290 Working with Critical Activities ..........................................................291 Creating Baselines ..........................................................................295 About Schedule Preview ......................................................................296 Enabling Schedule Preview ................................................................296 About Resource Leveling......................................................................297 Configuring Resource Leveling Options and Priorities ................................297 Leveling Project Resources................................................................299 About Activity Progress .......................................................................300 About Updating Progress...................................................................300 Working with Updating Progress in a Browser Running P6 ...........................300 Updating the Progress of Activities Using P6...........................................301 About The Apply Actuals Feature ........................................................301 Working with the Apply Actuals Feature................................................301 Applying Actuals to a Project .............................................................303 Working with Activity Updates by E-mail using E-mail Statusing Service .........304 Supporting E-mail Updates with E-mail Statusing Service ...........................308 Updating the Progress of Activities Using E-mail ......................................309 Updating the Progress of Activities Using P6 Team Member Web ..................310 Updating the Progress of Activities Using the P6 Team Member for iPhone App 310 About P6 Team Member Status Updates....................................................310 Working with P6 Team Member Status Updates .......................................311 Assigning a Status Reviewer to a WBS ...................................................313 Selecting an Activity for Review .........................................................313 Reviewing Team Member Status Updates...............................................314 Sending E-mail to a Team Member About a Status Update ..........................315 Viewing Team Member Status Updates History ........................................315 About the Auto Compute Actuals Feature..................................................316 Working with the Auto-Compute Actuals Feature.....................................316 Applying Auto Compute Actuals to Activities ..........................................317 About Store Period Performance ............................................................318 Storing Period Performance ...............................................................318
  • 13. Contents 13 About Importing and Exporting Data........................................................319 Importing Activities.........................................................................319 Exporting Activities to Excel ..............................................................320 Creating Import Templates for Importing Activities ..................................320 About Relationship Lines .....................................................................322 About Progress Lines ..........................................................................322 About Resources ...............................................................................322 Assigning Resources to an Activity .......................................................322 Assigning a Resource to Multiple Activities.............................................323 Configuring Activity Resources ...........................................................324 Adding Activity Resource Estimates .....................................................324 Requesting Resources for Activities .....................................................325 Specifying Resource Assignment Rates ..................................................325 Assigning Resource Curves to Resource or Role Assignments from the Activities Page .................................................................................................326 Assigning Resources to Unstaffed Activities ............................................326 Searching Resources ........................................................................327 About the Recalculate Assignment Costs Feature.....................................328 Recalculating Assignment Costs ..........................................................329 Configuring Resource Leveling Options and Priorities ................................330 Leveling Project Resources................................................................331 About the Check Resource Overallocation Service....................................332 Working with the Check Resource Overallocation Service...........................333 Checking for and Resolving Overallocated Resources ................................334 About Roles .....................................................................................335 Assigning Roles to an Activity .............................................................336 Assigning a Role to Multiple Activities...................................................336 Configuring Activity Roles .................................................................337 About Activity Owners ........................................................................337 Assigning an Activity Owner to an Activity .............................................337 About Documents ..............................................................................338 Assigning Documents to Activities........................................................338 About Expenses ................................................................................339 Creating Expenses...........................................................................339 Configuring Expenses .......................................................................339 Configuring Auto Compute Actuals for Expenses ......................................340 About Feedback................................................................................340 Adding Feedback ............................................................................341 Adding the New Feedback Column.......................................................341 Acknowledging Feedback ..................................................................342 About Duration Types .........................................................................342 Working with Duration Types .............................................................343 About Constraints..............................................................................343 Working with Activity Constraints........................................................344 About Issues ....................................................................................345 Creating Activity Issues ....................................................................345 Configuring Activity Issues.................................................................346 About Notebooks...............................................................................346 Working with Notebooks ...................................................................346 About Notebook Topics .......................................................................347
  • 14. P6 Help 14 Assigning Notebook Topics ................................................................347 About Relationships ...........................................................................347 Creating Activity Relationships ...........................................................348 Configuring Activity Relationships .......................................................349 Assigning Predecessor Relationships .....................................................349 Configuring Predecessor Relationships ..................................................350 Assigning Successor Relationships ........................................................351 Configuring Successor Relationships .....................................................351 About Risks .....................................................................................352 Working with Project Risks ................................................................352 Assigning a Risk to an Activity ............................................................354 About Steps.....................................................................................355 Working with Activity Steps ...............................................................355 Creating Activity Steps.....................................................................356 Configuring Activity Steps .................................................................356 About Step Templates.........................................................................357 Adding Activity Steps from a Step Template...........................................357 About Trace Logic .............................................................................358 Viewing Relationships with Trace Logic.................................................358 About Budgets..................................................................................359 Creating Budget Change Requests .......................................................359 Approving or Denying Budget Change Requests .......................................360 About Earned Value ...........................................................................361 Configuring WBS Earned Value............................................................361 About Milestones...............................................................................362 Creating WBS Milestones...................................................................362 Team Usage ........................................................................................363 About Team Usage.............................................................................363 Customizing Team Usage ..................................................................363 Assigning Resources to Unstaffed Activities ............................................364 Exporting Team Usage Spreadsheets ....................................................364 Searching Resources ........................................................................365 Sending E-Mail to a Project Manager ....................................................366 Issues................................................................................................367 About Issues ....................................................................................367 Working with Issues.........................................................................367 Creating Project Issues.....................................................................368 Configuring Project Issues .................................................................369 Customizing Project Issues ................................................................369 Assigning Related Items to Issues ........................................................370 Sending E-Mail about Issues ...............................................................371 About Issue Codes .............................................................................371 Assigning Issue Codes.......................................................................372 About Issue Forms .............................................................................372 Creating Issue Forms .......................................................................372 Assigning Projects to Issue Forms ........................................................373 Risks.................................................................................................374 About Risks .....................................................................................374 Risk Enterprise Data...........................................................................374 Working with Risks Enterprise Data......................................................374
  • 15. Contents 15 Configuring Risk Enterprise Data .........................................................375 Risk Thresholds ..............................................................................375 About Risk Thresholds ......................................................................375 Working with Risk Thresholds .............................................................376 Creating Risk Thresholds...................................................................377 Modifying Risk Thresholds .................................................................378 Risk Scoring Matrices .......................................................................379 About Risk Scoring Matrices ...............................................................379 Working with Risk Scoring Matrices ......................................................380 Creating Risk Scoring Matrices............................................................383 Assigning a Risk Scoring Matrix to a Project............................................384 Assigning a Risk Scoring Matrix to a Project from the Enterprise Data Pane .....384 Assigning a Risk Scoring Matrix to a Project from the EPS Page ....................385 Assigning a Risk Scoring Matrix to a Project from the Portfolios Section .........385 Risk Categories ..............................................................................386 About Risk Categories ......................................................................386 Creating Risk Categories ...................................................................386 Risk UDFs .....................................................................................387 About Risk User Defined Fields ...........................................................387 Creating Risk UDFs ..........................................................................387 Project Risks....................................................................................387 Working with Project Risks ................................................................387 Managing Project Risks.....................................................................389 Creating Project Risks......................................................................389 Adding Detailed Project-Level Risks .....................................................390 Adding Project Risks to Activities ........................................................391 Adding High-Level Project Risks..........................................................392 Assigning a Risk to an Activity ............................................................393 Risk Response Plans.........................................................................393 About Risk Response Plans.................................................................393 Working with Risk Response Plans .......................................................394 Developing a Risk Response Plan .........................................................395 Adding Risk Response Plans ...............................................................395 Adding Risk Response Plan Action Items ................................................396 Assigning Activities to Risk Response Plan Action Items .............................397 Exporting Risk Data .........................................................................397 About Documents..................................................................................398 Working with Documents without the Content Repository ..............................398 Adding Documents to a Project without the Content Repository ..................399 Configuring Document Details without the Content Repository ....................399 Assigning Related Items to Documents without the Content Repository ..........400 Sending E-Mail about Documents without the Content Repository.................400 Working with Documents with a Content Repository .....................................401 About the Document Content Repository...............................................402 Creating Document Templates ...........................................................403 Copying Documents from Existing Templates ..........................................404 Adding Documents to a Project and Storing Them in the Content Repository ...404 Adding Documents to a Project from the Content Repository ......................405
  • 16. P6 Help 16 Configuring Document Details ............................................................406 Assigning Related Items to Documents ..................................................407 Checking Out Documents ..................................................................407 Checking In Documents ....................................................................408 Sending E-Mail about Documents.........................................................409 Assigning Documents to Workgroups.....................................................409 Creating Document Folders ...............................................................410 About Document Reviews..................................................................410 Working With Document Reviews ........................................................411 Reviewing Documents ......................................................................412 Creating Document Reviews ..............................................................413 Participating in Document Reviews ......................................................414 Terminating Document Reviews ..........................................................414 Searching for Documents ..................................................................415 Searching for Documents (Advanced Search) ..........................................415 Searching for Documents (Quick Search) ...............................................416 Viewing Documents .........................................................................417 Downloading Documents ...................................................................417 About Project Scheduled Services ..............................................................418 Creating Project Scheduled Services........................................................418 Configuring Project Scheduled Services ....................................................418 About Publication Services and Reporting.....................................................419 Working with Publication Services for Reporting..........................................420 Publishing P6 Data for Reports ...........................................................423 Defining Publication Periods ..............................................................423 Enabling Automatic Publishing of P6 Project Data for Reports .....................424 Enabling Automatic Publishing of P6 Global Data for Reports ......................426 Configuring Publication Service Settings for Projects ................................426 Manually Publishing P6 Project Data for Reports......................................427 Manually Publishing P6 Global Data for Reports .......................................428 Resources ............................................................................................ 429 Roles ................................................................................................429 About Roles .....................................................................................429 Creating Roles..................................................................................429 Assigning a Resource to a Role...............................................................430 Assigning a Role Team to a Role.............................................................431 Assigning Rates to Roles ......................................................................432 Assigning Work Limits to Roles...............................................................432 Role Teams.........................................................................................433 About Role Teams .............................................................................433 Creating Role Teams ..........................................................................433 Assigning a Role to a Role Team.............................................................433 Resources...........................................................................................434
  • 17. Contents 17 About Resources ...............................................................................434 Adding Resources ..............................................................................434 Assigning a Role to a Resource...............................................................435 Assigning a Resource Team to a Resource .................................................436 Configuring Resource Settings ...............................................................437 Assigning Calendars to Resources ...........................................................437 Assigning Locations to Resources............................................................438 Configuring Timesheet Reporting for Resources ..........................................439 Configuring Resource Settings for Timesheet Reporting .............................439 Assigning Resource Codes.....................................................................440 Assigning Resource Rates .....................................................................441 Creating Import Templates for Importing Resources .....................................441 Importing Resource Data .....................................................................442 Deleting Resources ............................................................................443 Resource Teams ...................................................................................444 About Resource Teams........................................................................444 Creating Resource Teams.....................................................................444 Assigning a Resource to a Resource Team .................................................445 Resource Assignments ............................................................................445 About Resource Assignments.................................................................445 Working with Resource Assignments in the Gantt Chart .................................445 Viewing Resource Assignments in a Gantt Chart ......................................446 Configuring the Resources Assignments Gantt Chart Bars ...........................446 Setting the Resources Detailed Assignments Gantt Chart Timescale ..............447 Modifying Resource Assignment Dates in the Gantt Chart ...........................448 Assigning a Resource to an Activity Assignment...........................................448 Viewing Assignment Unit and Cost Spreads ................................................449 Exporting Resource Assignment Data .......................................................450 Assigning Resource Curves to Resource or Role Assignments from the Resources Assignments Page ..............................................................................451 Applying the Progress Spotlight to the Resources Assignments View ..................451 Resource Planning.................................................................................452 About Resource Planning .....................................................................452 Customizing the Resource Planning Spreadsheet .........................................453 Assigning Projects or WBS Elements to Resources or Roles..............................454 Assigning Resources or Roles to Projects or WBS Elements..............................455 Modifying Resource or Role Assignment Dates.............................................456 Allocating Units or the Percentage of Available Units to Resources or Roles .........457 Synchronizing Resource Planning Dates ....................................................458 Splitting a Resource or Role Assignment ...................................................459 Categorizing Resource or Role Assignments using Status Codes ........................460 Exporting the Resource Planning Spreadsheet ............................................461 Resource Analysis .................................................................................461 About Resource Analysis ......................................................................461 Analyzing Resource Allocations ..............................................................462 Assigning Resources to Unstaffed Activities ...............................................463 Viewing Role Usage............................................................................464
  • 18. P6 Help 18 Viewing Resource Usage ......................................................................465 Exporting Resource or Role Usage Data ....................................................467 Exporting Resource Data .........................................................................468 Exporting Resource Administration Data ...................................................468 Exporting Resource Assignment Data .......................................................469 Exporting the Resource Planning Spreadsheet ............................................469 Exporting Resource or Role Usage Data ....................................................470 Reports ............................................................................................... 473 About Reports......................................................................................473 Working with Reports .........................................................................474 Scheduling Reports..........................................................................475 Running Reports On-Demand..............................................................476 Exporting a List of Reports ................................................................477 Viewing the Report Run History ..........................................................478 About Publication Services and Reporting.....................................................478 Working with Publication Services for Reporting..........................................479 Publishing P6 Data for Reports ...........................................................482 Defining Publication Periods ..............................................................482 Enabling Automatic Publishing of P6 Project Data for Reports .....................483 Enabling Automatic Publishing of P6 Global Data for Reports ......................485 Configuring Publication Service Settings for Projects ................................485 Manually Publishing P6 Project Data for Reports......................................486 Manually Publishing P6 Global Data for Reports .......................................487 Administration....................................................................................... 489 About Administration .............................................................................489 About My Preferences ............................................................................490 Working with My Preferences ................................................................490 Customizing My Preferences Global Preferences..........................................491 Customizing Global Currency Preferences..............................................491 Customizing Global Date Format Preferences .........................................492 Customizing Global General Preferences ...............................................492 Customizing Global Issues Preferences..................................................493 Customizing Global Performance Threshold Preferences ............................493 Customizing Global Project Score Preferences ........................................493 Customizing Global Resources Preferences ............................................494 Customizing Global Row Number Preferences .........................................494 Customizing Global Time Units Format Preferences..................................495 Sending E-Mail Notifications about Resource Assignments ..........................496 Customizing My Preferences View Preferences............................................496 Changing Your Own Password ................................................................497 About My Calendar ................................................................................498 Configuring My Calendar......................................................................498 Setting Work Hours Per Time Period for My Calendar ................................498 Configuring the Standard Work Week for My Calendar...............................499 Modifying Calendar Days on My Calendar ...............................................499 Importing Events to My Calendar.........................................................499
  • 19. Contents 19 About Application Settings.......................................................................500 Working with Application Settings ..........................................................501 Configuring Data Limits Settings.............................................................502 Configuring Earned Value Settings ..........................................................502 Defining Earned Value Calculations for WBS Elements ...............................503 Configuring General Settings.................................................................503 Configuring ID Lengths Settings..............................................................504 Configuring Summarization Periods .........................................................505 Configuring General Settings.................................................................505 Configuring Timesheets Settings.............................................................506 Configuring Time Periods Settings...........................................................506 About Enterprise Data ............................................................................507 Working with Enterprise Data................................................................508 About Baseline Types..........................................................................509 Creating Baseline Types....................................................................509 About Funding Sources........................................................................510 Creating Funding Sources..................................................................510 About Notebook Topics .......................................................................510 Creating Notebook Topics .................................................................511 About Calendars ...............................................................................511 Working with Calendars....................................................................511 Creating Global Calendars.................................................................512 Configuring Global Calendars .............................................................513 Setting Work Hours Per Time Period for Global Calendars ..........................513 Configuring the Standard Work Week for Global Calendars .........................513 Modifying Calendar Days on Global Calendars .........................................513 Setting the Default Global Calendar.....................................................514 Creating Project Calendars................................................................514 Configuring Project Calendars ............................................................515 Assigning a Base Calendar to a Project Calendar......................................515 Setting Work Hours Per Period for a Project Calendar ...............................516 Configuring the Standard Work Week for Project Calendars ........................516 Modifying Calendar Days on Project Calendars ........................................517 Changing a Project Calendar to a Global Calendar ...................................517 Creating Resource Calendars..............................................................518 Configuring Resource Calendars ..........................................................518 Assigning a Base Calendar to a Resource Calendar....................................519 Assigning a Resource to a Resource Calendar ..........................................519 Setting Work Hours Per Time Period for a Resource Calendar ......................520 Configuring the Standard Work Week for Resource Calendars ......................520 Modifying Calendar Days ...................................................................521 Changing the Calendar Type ..............................................................521 About Locations................................................................................522 Creating Locations ..........................................................................522
  • 20. P6 Help 20 Importing Locations.........................................................................523 Creating Import Templates for Importing Locations..................................523 About Project Codes ..........................................................................524 Creating Project Codes.....................................................................524 Creating Project Code Values.............................................................524 Configuring Project Codes .................................................................525 Configuring Project Code Values .........................................................526 About User Defined Fields ....................................................................526 Working with User Defined Fields ........................................................526 Creating Project UDFs......................................................................527 Defining Formulas for User Defined Fields..............................................528 Defining Indicators for User Defined Fields ............................................528 Defining Statements for User Defined Fields...........................................529 Creating WBS UDFs..........................................................................530 Creating Activity UDFs .....................................................................531 Creating Expense UDFs.....................................................................531 Creating Step UDFs .........................................................................531 Creating Risk UDFs ..........................................................................532 Creating Issue UDFs.........................................................................532 Creating Document UDFs ..................................................................532 Creating Assignment UDFs .................................................................533 Creating Resource UDFs....................................................................533 About Work Breakdown Structures (WBS) ..................................................533 Working with WBS Categories.............................................................534 Creating WBS Categories...................................................................536 About Activity Codes ..........................................................................536 Working with Activity Codes ..............................................................537 Creating Activity Codes ....................................................................538 Creating Activity Code Values ............................................................539 Configuring Activity Code Values.........................................................540 About Cost Accounts ..........................................................................541 Creating Cost Accounts ....................................................................541 About Expenses ................................................................................542 Creating Expense Categories..............................................................542 About Step Templates.........................................................................543 Creating Step Templates ..................................................................543 Configuring Step Templates...............................................................543 About Risks .....................................................................................544 Working with Risks Enterprise Data......................................................544 Configuring Risk Enterprise Data .........................................................545 About Risk Scoring Matrices ...............................................................545 Working with Risk Scoring Matrices ......................................................546 Creating Risk Scoring Matrices............................................................549 Assigning a Risk Scoring Matrix to a Project............................................550 Assigning a Risk Scoring Matrix to a Project from the Enterprise Data Pane .....550 Assigning a Risk Scoring Matrix to a Project from the EPS Page ....................551 Assigning a Risk Scoring Matrix to a Project from the Portfolios Section .........551 About Risk Thresholds ......................................................................552 Working with Risk Thresholds .............................................................552
  • 21. Contents 21 Creating Risk Thresholds...................................................................554 Modifying Risk Thresholds .................................................................555 About Risk Categories ......................................................................556 Creating Risk Categories ...................................................................556 About Issues ....................................................................................556 Creating Issue Codes........................................................................557 Creating Issue Code Values................................................................557 About Document Categories and Statuses..................................................558 Creating Document Categories ...........................................................558 Creating Document Statuses ..............................................................558 About Currencies...............................................................................559 Adding a Currency ..........................................................................559 Defining a Base Currency ..................................................................560 About Financial Periods.......................................................................560 Creating Financial Periods.................................................................560 Creating a Financial Period Batch........................................................561 About Overhead Codes........................................................................562 Creating Overhead Codes..................................................................562 About Timesheet Periods .....................................................................563 Creating Timesheet Periods ...............................................................563 About Resource and Role Rate Types .......................................................563 Configuring Resource and Role Rate Types.............................................564 About Resource Codes ........................................................................564 Creating Resource Codes ..................................................................564 Creating Resource Code Values...........................................................565 About Resource Curves........................................................................565 Defining Resource Curves..................................................................565 About Units of Measure .......................................................................566 Creating Units of Measure .................................................................566 About User Access.................................................................................567 About Users.....................................................................................567 The Default Admin Superuser.............................................................568 Creating User Accounts for P6 EPPM.....................................................568 Adding Users in Native Authentication Mode...........................................569 Adding Users in LDAP or SSO Authentication Mode....................................570 Configuring User Access....................................................................571 Assigning Associated Resources...........................................................572 Assigning Global Security Profiles ........................................................572 Assigning Module Access ...................................................................573 Assigning OBS Elements to Users .........................................................573 Assigning Resource Access.................................................................574 Assigning User Interface Views ...........................................................575 Changing Passwords.........................................................................575 Changing User Passwords ..................................................................575 Counting Users...............................................................................576 Deactivating User Accounts ...............................................................576
  • 22. P6 Help 22 Deleting User Accounts ....................................................................577 About the OBS..................................................................................577 Creating an OBS .............................................................................577 Assigning Users to an OBS..................................................................578 About Security Profiles........................................................................579 Working with Security Profiles............................................................580 Creating Global Security Profiles.........................................................581 Creating Project Security Profiles........................................................582 About User Interface Views......................................................................583 Working with User Interface Views..........................................................583 Creating User Interface Views ...............................................................584 Configuring User Interface Views............................................................586 About User Sessions...............................................................................587 Resetting User Sessions .......................................................................587 About Publication Services and Reporting.....................................................588 Working with Publication Services for Reporting..........................................589 Publishing P6 Data for Reports ...........................................................592 Defining Publication Periods ..............................................................592 Enabling Automatic Publishing of P6 Project Data for Reports .....................593 Enabling Automatic Publishing of P6 Global Data for Reports ......................595 Configuring Publication Service Settings for Projects ................................595 Manually Publishing P6 Project Data for Reports......................................596 Manually Publishing P6 Global Data for Reports .......................................597 CSH .................................................................................................... 598 Access Tab of the Create Filter Dialog Box of the Assignments Page......................598 Access Tab of the Create or Modify Filter Dialog Box........................................598 Access Tab of the Customize Activity View Dialog Box ......................................599 Access Tab of the Customize Dashboard Page ................................................599 Access Tab of the Customize EPS View Dialog Box ...........................................600 Access Tab of the Customize Resources Assignments View Dialog Box of the Assignments Page .......................................................................................................600 Access Tab of the Issue Forms Page ............................................................601 Action Required Tab of the Document Reviews Portlet of the Dashboards Page ........602 Action Required Tab of the Workflows Portlet of the Dashboards Page ..................603 Activities Detail Window of the Project Security Profiles Page ............................606 Activities Detail Window of the Risks Page....................................................607 Activities Page.....................................................................................611 Activities Portlet of the Workgroup Workspace Page ........................................613 Activities Work Area of the Timesheet Approval Page.......................................614 Activity Calendar Format of the Activities Page..............................................617 Activity Codes - EPS Page ........................................................................619 Activity Codes - Global Page.....................................................................620 Activity Codes - Project Page ...................................................................621
  • 23. Contents 23 Activity Codes Details Page of the Activity Form Page ......................................622 Activity Codes Page ...............................................................................622 Activity Details Dialog Box .......................................................................623 Activity Details Dialog Box of the Resource Staffing Dialog Box............................624 Activity Details of the Resources Dialog Box ..................................................625 Activity Editing Tab of the User Interface View Details Page...............................626 Activity Form Page................................................................................626 Activity Gantt Chart Format of the Activities Page ..........................................628 Activity List for WBS Dialog Box.................................................................630 Activity Network Format of the Activities Page ..............................................631 Activity Tab of the Modify Template Dialog Box of the Import/Export Project Dialog Box632 Activity Table Format of the Activities Page..................................................634 Activity UDFs Page ................................................................................636 Add Activity Expenses Page of the Activity Form Page ......................................636 Add Folder Dialog Box ............................................................................637 Add Issue Page.....................................................................................638 Add Location Dialog Box of the Locations Page...............................................640 Add or Edit Service Dialog Box of the Project Scheduled Services Page ..................642 Add Steps Page of the Activity Form Page.....................................................643 Add User Dialog Box...............................................................................644 Add Users from LDAP Dialog Box of the Users Page ..........................................645 Administration Detail Window of the Global Security Profiles Page.......................647 Administration Page ..............................................................................648 Advanced Tab of the Add Project Dialog Box .................................................648 Advanced Tab of the Add Project Template Dialog Box.....................................650 Advanced Tab of the Scheduling Options Dialog Box.........................................652 Analysis Page.......................................................................................653 Analytics Page of the Project Preferences Dialog Box.......................................654 Application Settings Pane ........................................................................654 Apply Actuals Dialog Box of the Activities Page ..............................................655 Approve Document Review Dialog Box .........................................................656 Assign by Search Dialog Box of the Planning Page............................................657 Assign Project Manager Delegate Dialog Box of the Timesheet Approval Page ..........659 Assign Resource Manager Delegate Dialog Box of the Timesheet Approval Page ........660 Assignment UDFs Page............................................................................660 Assignments Detail Window of the Activities Page ...........................................661 Assignments Page .................................................................................663 Bars Tab of the Customize Activity View or Gantt Chart Options Dialog Box ............664 Bars Tab of the Customize EPS View or Gantt Chart Options Dialog Box .................666 Bars Tab of the Customize Resource Assignments View or Gantt Chart Options Dialog Box of the Assignments Page.............................................................................667 Baseline Types Page ..............................................................................669
  • 24. P6 Help 24 Baselines Dialog Box ..............................................................................669 BEI - Activities with No Project Baseline Finish Date Section of the Schedule Check Report Dialog Box ..........................................................................................670 Calculations Page of the Project Preferences Dialog Box ...................................671 Calendar Tab of the Global Calendars Page...................................................673 Calendar Tab of the Project Calendars Page..................................................674 Calendar Tab of the Resource Calendars Page................................................676 Calendar Tab of the View Calendar Dialog Box ...............................................677 Cause Detail Window of the Risks Page ........................................................679 Change Password Dialog Box of the Users Page...............................................680 Chart Tab of the Customize Project Issues Dialog Box.......................................680 Check Schedule Dialog Box ......................................................................683 Check Summary Section of the Schedule Check Report Dialog Box........................685 Codes Detail Window of the Activities Page...................................................686 Codes Detail Window of the EPS Page..........................................................687 Codes Detail Window of the Global Security Profiles Page .................................687 Codes Detail Window of the Project Security Profiles Page ................................690 Codes Detail Window of the Resources Tab of the Administration Page ..................691 Codes Section of the Activity Form Page ......................................................692 Columns Tab of the Customize Cost Worksheet Dialog Box .................................693 Columns Tab of the Customize Project Issues Dialog Box ...................................694 Columns Tab of the Customize Project Statistics Dialog Box ...............................695 Columns Tab of the Customize Risks Portlet Dialog Box.....................................695 Columns Tab of the Customize Scorecards Dialog Box of the Portfolio Views Section of the Customize Dashboard Page ......................................................................697 Columns Tab of the Customize Spreadsheet Dialog Box of the Planning Page ...........698 Common Screen Elements for Customizing Columns or Values.............................699 Communication Center Portlet of the Dashboards and Workspace Page..................699 Content Tab of the Customize Dashboard Page ..............................................700 Content Tab of the Customize Workgroup Workspace Page ................................701 Content Tab of the User Interface View Details Page .......................................702 Content Tab of the Workspace Details Page ..................................................707 Contract Documents Portlet of the Workspace Page ........................................708 Contract Issues Portlet of the Workspace Page...............................................708 Contract Management Page of the Project Preferences Dialog Box .......................709 Contract Management Section of the Content Tab of the Customize Dashboard Page .709 Contract Management Section of the Content Tab of the Customize Workspace Page .710 Contract Reports Portlet of the Workspace Page.............................................711 Copy Project Options Dialog Box................................................................712 Cost Accounts Page ...............................................................................714 Cost Worksheet Portlet of the Dashboards or Workspace Page ............................715 Count Dialog Box of the Users Page ............................................................715
  • 25. Contents 25 Create Filter Dialog Box of the Assignments Page............................................716 Create or Modify Filter Dialog Box of the Activities Page ...................................717 Create Portfolio Page.............................................................................717 Create Portfolio View/Portfolio View Details Page ..........................................719 Critical Activities Behind Schedule Portlet of the Workspace Page .......................722 Currencies Page ...................................................................................723 Currency Section of Global Tab of the My Preferences Page ...............................725 Current Bar Options Dialog Box .................................................................725 Curve Definition Detail Window of the Resource Curves Page..............................727 Custom Field Mapping Tab of the Modify Template Dialog Box of the Import/Export Project Dialog Box ..........................................................................................727 Custom Portlet of the Dashboards or Workspace Page ......................................728 Custom Portlet Section of the Content Tab of the Workspace Page.......................729 Custom Portlets Section of the Content Tab of the Customize Dashboard Page.........731 Customize Activity List for WBS Dialog Box ...................................................732 Customize Activity Network Dialog Box or Activity Network Tab of the Activities Page732 Customize Activity View Dialog Box ............................................................734 Customize Capacity Planning Chart Tab .......................................................735 Customize Capacity Planning Columns Tab....................................................736 Customize Capacity Planning Dialog Box.......................................................737 Customize Capacity Planning Grouping Tab...................................................738 Customize Capacity Planning Waterline Tab ..................................................739 Customize Chart Dialog Box of the Resource Analysis Chart Portlet.......................740 Customize Chart Dialog Box of the Resource Analysis Tab of the Analysis Page .........741 Customize Columns Dialog Box of the Assignments Detail Window ........................742 Customize Columns Dialog Box or Columns Tab of the Activities Page....................743 Customize Columns Dialog Box or Columns Tab of the Assignments Page ................744 Customize Columns Dialog Box or Columns Tab of the EPS Page...........................745 Customize Cost Worksheet Dialog Box .........................................................746 Customize Dashboard Page ......................................................................747 Customize Detail Windows Dialog Box of the Activities Page...............................748 Customize Detail Windows Dialog Box of the EPS Page......................................748 Customize Dialog Box of the Portfolio View Portlet..........................................749 Customize Dialog Box of the Team Usage Page...............................................751 Customize EPS View Dialog Box .................................................................753 Customize Filters Dialog Box or Filters Tab of the Activities Page.........................754 Customize Filters Dialog Box or Filters Tab of the Assignments Page .....................755 Customize Filters Dialog Box or Filters Tab of the EPS Page................................756 Customize Gantt Chart Options Dialog Box of the Activities Page .........................757 Customize Gantt Chart Options Dialog Box of the Assignments Page......................757 Customize Gantt Chart Options Dialog Box of the EPS Page ................................758 Customize Groupings Dialog Box or Grouping Tab of the Activities Page .................758
  • 26. P6 Help 26 Customize Groupings Dialog Box or Grouping Tab of the Assignments Page..............760 Customize Groupings Dialog Box or Grouping Tab of the EPS Page ........................762 Customize Project Issues Dialog Box ...........................................................764 Customize Project Score Dialog Box of the Project Score Section of the Global Tab of the My Preferences Page..................................................................................765 Customize Project Statistics Dialog Box .......................................................766 Customize Resource Assignments View Dialog Box of the Assignments Page.............766 Customize Risks Dialog Box ......................................................................767 Customize Scorecard Columns Tab .............................................................768 Customize Scorecard Dialog Box ................................................................769 Customize Scorecard Dialog Box of the Portfolio Views Section of the Customize Dashboard Page.................................................................................................769 Customize Scorecard Group Tab ................................................................770 Customize Scorecard Waterline Tab............................................................771 Customize Spreadsheet Dialog Box of the Planning Page....................................773 Customize Spreadsheet or Histogram Dialog Box of the Analysis Page....................773 Customize Toolbar Items Dialog Box ...........................................................775 Customize Toolbar Items Dialog Box of the Assignments Page .............................775 Customize Usage Options or Usage Tab of the Assignments Page..........................776 Dashboards Page ..................................................................................778 Data Limits Page ..................................................................................779 Date Format Section of the Global Tab of the My Preferences Page ......................780 Day View Detail Window of the Calendar View of the Activities Page ....................781 Defaults Page of the Project Preferences Dialog Box........................................782 Definition Tab of the Create Filter Dialog Box of the Assignments Page..................785 Definition Tab of the Create or Modify Filter Dialog Box....................................787 Description Detail Window of the Cost Accounts Page ......................................789 Description Detail Window of the EPS Page ...................................................790 Description Detail Window of the Funding Sources Page....................................790 Description Detail Window of the OBS Page...................................................791 Description Detail Window of the Reports Page ..............................................791 Description Detail Window of the Risk Scoring Matrices Page ..............................792 Description Detail Window of the Risks Page .................................................792 Description Detail Window of the Roles Tab of the Administration Page .................793 Description Tab of the Document Details Page (with content repository)................793 Description Tab of the Documents Details Page or Dialog Box (without content repository) .......................................................................................................794 Document Categories Page ......................................................................795 Document Details Dialog Box ....................................................................796 Document Details Section of the Documents Page (with content repository)............797 Document Review Details Dialog Box...........................................................798 Document Reviews Portlet of the Dashboards Page..........................................799