1. Erwin Valencia Caldona
288 Sgt. Mabagos St., Tondo, Manila
Handyphone no: +(63) 929-3507925 or +(63) 927-5354127
E-mail addresses: erwincaldona1914@gmail.com, erwincaldona@hotmail.com
QUALIFICATION PROFILE:
Installation supervision and acceptance of SMC/Belltel IBS project.
Nokia LTE( BC13 & BC17) and 2G installation, commissioning and integration.
ALU 7705 router installation and commissioning
Motorola Wi-MAX equipment installation, commissioning and integration.
Dragonwave Microwave installation, commissioning and integration.
Nokia Flexi WCDA BTS Installation, Commissioning, Integration. Completed and passed FLX005-Flexi WCDMA BTS Boot
Camp Level 2.
Installation , commissioning, integration of Motorola CDMA/CDMA 1X base stations Packet and Circuit BTS(SC4812T,
SC4812ET, SC4812MC, SC300) using HP8935 testset,Agilent testset and WinLMF.
CDMA 1X-EvDO upgrade. Carrier upgrade. SC4812T-MC frame expansion.
Installation and commissioning of Packet BTS with GLI3 IBR.
Site survey and site selection for radio room/facility.
Site acceptance
EVDO Drivetesting
Wi –max drivetesting
Literate on most computer office software such as MS Windows, MS Office and AutoCAD.
Knowledge on Motorola RF planning tool, NetPlan. Experience on analysis of coverage plots for Analog and CDMA system.
Experience on BATE, HP and Motorola test equipment for testing and commissioning of Motorola Cellular Analog , CDMA BTS
(SC9600, SC2400, HDII 10 channels,HDII MicroCITE).
WORK EXPERIENCES:
DMN Installations Aug 2013 – June 2015
Contractor to SMC/Belltel IBS project, TI/BTS Supervisor
Installation supervision and Acceptance of SMC/Belltel IBS roll out project.
Contractor to NSN Philippines, Belltel 2G and NCTI LTE project(Aug 2013 – Oct 2014)
Installation, commissioning and integration of Nokia BC13 LTE.
Installation, commissioning and integration of Nokia 2G equipment.
Acceptance and Troubleshooting of Nokia BC13, BC17 and 2G equipment.
WAVSYS LLC Jun 2008 - Mar 2012
Contractor to Nokia T-Mobile Phoenix Market (Jan 2012 – Mar 2012)
ALU 7705 Router installation and commissioning.
ALU 7705 hotcuts for 2G
Contractor to Nokia T-Mobile Denver Market (Nov 2011 - Jan 2012)
Nokia Flexi BTS UMTS installation.
Nokia Flexi BTS UMTS commissioning
Nokia Flexi BTS UMTS integration
Nokia Flexi BTS UMTS troubleshooting
Contractor to Nokia T-Mobile Seattle and Portland Market (Feb 2011 – Oct 2011)
Nokia Flexi BTS UMTS installation.
Nokia Flexi BTS UMTS commissioning
Nokia Flexi BTS UMTS integration
Nokia Flexi BTS UMTS troubleshooting
Contractor to Clearwire Wi-Max, Houston, Las Vegas, Salt Lake, Minneapolis and California Market (Dec 2009 – Jan 2011)
2. Motorola Wi-Max BCU II installation, commissioning, integration.
Motorola Wi-Max troubleshooting
Dragonwave Microwave equipment configuration, commissioning.
Dragonwave Microwave troubleshooting
Wi-Max sector augments.
BCU I to BCU II upgrades
Wi-Max drivetesting using WIIT.
Huawei Wi-Max installation, commissioning, integration and troubleshooting.
Contractor to Nokia T-Mobile Indianapolis, Chicago, Cincinatti (May 2009 – Dec 2009)
Nokia Flexi UMTS installation.
Nokia Flexi BTS UMTS commissioning
Nokia Flexi BTS UMTS integration
Nokia Flexi BTS UMTS troubleshooting
Contractor to Nokia T-Mobile Phoenix Market (Apr 2009 – May 2009)
Nokia Flexi UMTS installation.
Nokia Flexi BTS UMTS commissioning
Nokia Flexi BTS UMTS integration
Nokia Flexi BTS UMTS troubleshooting
Contractor to T-Mobile Miami Market (June 2008 – Dec 2008)
T1 testing and troubleshooting.
Nokia Flexi UMTS installation.
Nokia Flexi BTS UMTS commissioning
Nokia Flexi BTS UMTS integration
Nokia Flexi BTS UMTS troubleshooting
Remote electrical tilts for Andrew and RFS antenna systems
AVION SYSTEMS Inc. Jan 2006 – May 2008
Contractor to Motorola ALLTEL project, Georgia, Arizona and, Minnesota Market(Jun 2007 - May 2008)
Carrier Adds and Calibration(SC4812)
Carrier upgrade and calibration(SC4812)
EVDO upgrade
Installation of EVDO Kits for SC4812
SC4812T/MC/ET frame expansion
New site turn ups(install, commission, integrate)
Drive testing
Contractor to Nokia Siemens Network, Sprint Austin, Texas (Apr 2007- May 2007)
Wi-Max coverage test and drive testing using Gator transmitter and Cayote receiver.
Contractor to Motorola, ALLTEL Phoenix, Minnesota and Arkansas Market (Jun 2006 – Dec 2006)
Carrier Adds and calibration(SC4812)
Carrier upgrade and calibration(SC4812).
Circuit BTS to Packet BTS conversion.
EVDO upgrade
Installation of EVDO Kits
SC4812 frame expansion
Drivetesting
Contractor Cingular Dual Band project, Alabama and Louisiana (Jan – May 2006)
Installation, commissioning and integration of Nokia Ultrasite EDGE.
T1 preparation, testing and troubleshooting.
3. CONSISTEL Philippines Inc., Implementation Engineer Aug 2004 – Jan 2006
Implementation/Supervision of civil/telecomm works up to Integration of Sun Cellular,
Digitel-Alcatel GSM Project and Globe IBS and Greenfield GSM project.
Responsible in technical issues and troubleshooting.
INFRACELL Nusutama Indonesia, Bangkok project Apr 2002 - Jan 2003
Performed Post Integration Call testing Motorola Thailand, Ltd.-BFKT/Hutchison Project.
Site Surveys, Verifications and Site Audits of BFKT/Hutchison Project.
Installation, ATP/commissioning, integration, upgrade, of Motorola CDMA 1xEVDO Base Station (SC4812T/SC300)
MSI Philippines-Marconi Company, Consultant Apr 2001 - Feb 2002
Performed CQB (Call Quality Benchmarking) project for Maxis in Malaysia
Perform CQB (Call Quality Benchmarking) project for Globe Telecoms.
Support IBS (In-Building Solutions) project for Globe Telecoms projects.
MOTOROLA Philippines, Systems Engineer Sep 1996 – Mar 2001
Responsible for new systems proposaldocumentation and implementation.
Perform BTS optimization/ATP and commissioning and responsible in technical issues.
Provide technical support in RF engineering for Motorola’s project in Australia and Guam, USA.
Responsible in technical issues, project activities/monitoring, testing and Coordination meeting for Extelcom flooded
equipment testing.
Provide AutoCAD support to all groups of different Mototorla projects.
Prepares installation documentations such as proposed install docs,as-built docs,ATP & other documents of the said project.
Conducts equipment inventory of all cell sites and EMX’s.
Responsible for the control, inventory,issuance of tools, materials, and test equipment.
EDUCATION:
New Era University, Quezon City BS Industrial Engineering 1991-1996
Jose Abad Santos,Manila Secondary 1987-1991
Isabelo Delos Reyes, Manila Primary 1981-1987
TRAININGS ATTENDED:
1. NOKIA Flexi 005 Boot Camp NSN, Atlanta GA March 24-28, 2008
2. NOKIA FlexiBTS Site Survey Nokia Siemens, GA May 14-18 2007
3. UMTS (3G) Motorola Singapore January 9-12, 2001
4. CDMA 1x Motorola Hong Kong November 29-30,2000
5. TCP/IP Mis NET (MCTC) August 21-25, 2000
6. Windows NT 4.0 Core Technologies Mis NET (MCTC) August 14-18,2000
7. Inventory Planning and Control Motorola Philippines March 21-22, 2000
8. SwitchMATE Operation Motorola Philippines August 16-21, 1999
9. Cellsite Installation and Grounding Motorola Philippines August 10-13, 1999
10. iDEN Systems Course Motorola Philippines May 24-28, 1999
11. Advanced AutoCAD, R13 CIM Technologies November 1996
12. Basic AutoCAD, R13 CIM Technologies October 1996
13. Commscope Nokia, BGC November 2014