SlideShare a Scribd company logo
1 of 3
Erwin Valencia Caldona
288 Sgt. Mabagos St., Tondo, Manila
Handyphone no: +(63) 929-3507925 or +(63) 927-5354127
E-mail addresses: erwincaldona1914@gmail.com, erwincaldona@hotmail.com
QUALIFICATION PROFILE:
 Installation supervision and acceptance of SMC/Belltel IBS project.
 Nokia LTE( BC13 & BC17) and 2G installation, commissioning and integration.
 ALU 7705 router installation and commissioning
 Motorola Wi-MAX equipment installation, commissioning and integration.
 Dragonwave Microwave installation, commissioning and integration.
 Nokia Flexi WCDA BTS Installation, Commissioning, Integration. Completed and passed FLX005-Flexi WCDMA BTS Boot
Camp Level 2.
 Installation , commissioning, integration of Motorola CDMA/CDMA 1X base stations Packet and Circuit BTS(SC4812T,
SC4812ET, SC4812MC, SC300) using HP8935 testset,Agilent testset and WinLMF.
 CDMA 1X-EvDO upgrade. Carrier upgrade. SC4812T-MC frame expansion.
 Installation and commissioning of Packet BTS with GLI3 IBR.
 Site survey and site selection for radio room/facility.
 Site acceptance
 EVDO Drivetesting
 Wi –max drivetesting
 Literate on most computer office software such as MS Windows, MS Office and AutoCAD.
 Knowledge on Motorola RF planning tool, NetPlan. Experience on analysis of coverage plots for Analog and CDMA system.
 Experience on BATE, HP and Motorola test equipment for testing and commissioning of Motorola Cellular Analog , CDMA BTS
(SC9600, SC2400, HDII 10 channels,HDII MicroCITE).

WORK EXPERIENCES:
DMN Installations Aug 2013 – June 2015
Contractor to SMC/Belltel IBS project, TI/BTS Supervisor
 Installation supervision and Acceptance of SMC/Belltel IBS roll out project.
Contractor to NSN Philippines, Belltel 2G and NCTI LTE project(Aug 2013 – Oct 2014)
 Installation, commissioning and integration of Nokia BC13 LTE.
 Installation, commissioning and integration of Nokia 2G equipment.
 Acceptance and Troubleshooting of Nokia BC13, BC17 and 2G equipment.
WAVSYS LLC Jun 2008 - Mar 2012
Contractor to Nokia T-Mobile Phoenix Market (Jan 2012 – Mar 2012)
 ALU 7705 Router installation and commissioning.
 ALU 7705 hotcuts for 2G
Contractor to Nokia T-Mobile Denver Market (Nov 2011 - Jan 2012)
 Nokia Flexi BTS UMTS installation.
 Nokia Flexi BTS UMTS commissioning
 Nokia Flexi BTS UMTS integration
 Nokia Flexi BTS UMTS troubleshooting
Contractor to Nokia T-Mobile Seattle and Portland Market (Feb 2011 – Oct 2011)
 Nokia Flexi BTS UMTS installation.
 Nokia Flexi BTS UMTS commissioning
 Nokia Flexi BTS UMTS integration
 Nokia Flexi BTS UMTS troubleshooting
Contractor to Clearwire Wi-Max, Houston, Las Vegas, Salt Lake, Minneapolis and California Market (Dec 2009 – Jan 2011)
 Motorola Wi-Max BCU II installation, commissioning, integration.
 Motorola Wi-Max troubleshooting
 Dragonwave Microwave equipment configuration, commissioning.
 Dragonwave Microwave troubleshooting
 Wi-Max sector augments.
 BCU I to BCU II upgrades
 Wi-Max drivetesting using WIIT.
 Huawei Wi-Max installation, commissioning, integration and troubleshooting.
Contractor to Nokia T-Mobile Indianapolis, Chicago, Cincinatti (May 2009 – Dec 2009)
 Nokia Flexi UMTS installation.
 Nokia Flexi BTS UMTS commissioning
 Nokia Flexi BTS UMTS integration
 Nokia Flexi BTS UMTS troubleshooting
Contractor to Nokia T-Mobile Phoenix Market (Apr 2009 – May 2009)
 Nokia Flexi UMTS installation.
 Nokia Flexi BTS UMTS commissioning
 Nokia Flexi BTS UMTS integration
 Nokia Flexi BTS UMTS troubleshooting
Contractor to T-Mobile Miami Market (June 2008 – Dec 2008)
 T1 testing and troubleshooting.
 Nokia Flexi UMTS installation.
 Nokia Flexi BTS UMTS commissioning
 Nokia Flexi BTS UMTS integration
 Nokia Flexi BTS UMTS troubleshooting
 Remote electrical tilts for Andrew and RFS antenna systems
AVION SYSTEMS Inc. Jan 2006 – May 2008
Contractor to Motorola ALLTEL project, Georgia, Arizona and, Minnesota Market(Jun 2007 - May 2008)
 Carrier Adds and Calibration(SC4812)
 Carrier upgrade and calibration(SC4812)
 EVDO upgrade
 Installation of EVDO Kits for SC4812
 SC4812T/MC/ET frame expansion
 New site turn ups(install, commission, integrate)
 Drive testing
Contractor to Nokia Siemens Network, Sprint Austin, Texas (Apr 2007- May 2007)
 Wi-Max coverage test and drive testing using Gator transmitter and Cayote receiver.
Contractor to Motorola, ALLTEL Phoenix, Minnesota and Arkansas Market (Jun 2006 – Dec 2006)
 Carrier Adds and calibration(SC4812)
 Carrier upgrade and calibration(SC4812).
 Circuit BTS to Packet BTS conversion.
 EVDO upgrade
 Installation of EVDO Kits
 SC4812 frame expansion
 Drivetesting
Contractor Cingular Dual Band project, Alabama and Louisiana (Jan – May 2006)
 Installation, commissioning and integration of Nokia Ultrasite EDGE.
 T1 preparation, testing and troubleshooting.
CONSISTEL Philippines Inc., Implementation Engineer Aug 2004 – Jan 2006
 Implementation/Supervision of civil/telecomm works up to Integration of Sun Cellular,
Digitel-Alcatel GSM Project and Globe IBS and Greenfield GSM project.
 Responsible in technical issues and troubleshooting.
INFRACELL Nusutama Indonesia, Bangkok project Apr 2002 - Jan 2003
 Performed Post Integration Call testing Motorola Thailand, Ltd.-BFKT/Hutchison Project.
 Site Surveys, Verifications and Site Audits of BFKT/Hutchison Project.
 Installation, ATP/commissioning, integration, upgrade, of Motorola CDMA 1xEVDO Base Station (SC4812T/SC300)
MSI Philippines-Marconi Company, Consultant Apr 2001 - Feb 2002
 Performed CQB (Call Quality Benchmarking) project for Maxis in Malaysia
 Perform CQB (Call Quality Benchmarking) project for Globe Telecoms.
 Support IBS (In-Building Solutions) project for Globe Telecoms projects.
MOTOROLA Philippines, Systems Engineer Sep 1996 – Mar 2001
 Responsible for new systems proposaldocumentation and implementation.
 Perform BTS optimization/ATP and commissioning and responsible in technical issues.
 Provide technical support in RF engineering for Motorola’s project in Australia and Guam, USA.
 Responsible in technical issues, project activities/monitoring, testing and Coordination meeting for Extelcom flooded
equipment testing.
 Provide AutoCAD support to all groups of different Mototorla projects.
 Prepares installation documentations such as proposed install docs,as-built docs,ATP & other documents of the said project.
 Conducts equipment inventory of all cell sites and EMX’s.
 Responsible for the control, inventory,issuance of tools, materials, and test equipment.
EDUCATION:
New Era University, Quezon City BS Industrial Engineering 1991-1996
Jose Abad Santos,Manila Secondary 1987-1991
Isabelo Delos Reyes, Manila Primary 1981-1987
TRAININGS ATTENDED:
1. NOKIA Flexi 005 Boot Camp NSN, Atlanta GA March 24-28, 2008
2. NOKIA FlexiBTS Site Survey Nokia Siemens, GA May 14-18 2007
3. UMTS (3G) Motorola Singapore January 9-12, 2001
4. CDMA 1x Motorola Hong Kong November 29-30,2000
5. TCP/IP Mis NET (MCTC) August 21-25, 2000
6. Windows NT 4.0 Core Technologies Mis NET (MCTC) August 14-18,2000
7. Inventory Planning and Control Motorola Philippines March 21-22, 2000
8. SwitchMATE Operation Motorola Philippines August 16-21, 1999
9. Cellsite Installation and Grounding Motorola Philippines August 10-13, 1999
10. iDEN Systems Course Motorola Philippines May 24-28, 1999
11. Advanced AutoCAD, R13 CIM Technologies November 1996
12. Basic AutoCAD, R13 CIM Technologies October 1996
13. Commscope Nokia, BGC November 2014

More Related Content

What's hot

NBader_2014_Resume
NBader_2014_ResumeNBader_2014_Resume
NBader_2014_ResumeNadhir Bader
 
Signalwing 5g das and 5g distribute small cell introduction
Signalwing 5g das and 5g distribute small cell introductionSignalwing 5g das and 5g distribute small cell introduction
Signalwing 5g das and 5g distribute small cell introductionStone Wen Zhi Liu
 
CV E Atienza new 2 - Copy
CV E Atienza new 2 - CopyCV E Atienza new 2 - Copy
CV E Atienza new 2 - CopyEdgar Atienza
 
J_Resume_CA_112015
J_Resume_CA_112015J_Resume_CA_112015
J_Resume_CA_112015John Nguyen
 
Belco presentation november 2014
Belco presentation november 2014Belco presentation november 2014
Belco presentation november 2014belcoproducts
 
Thai Tran Resume
Thai Tran ResumeThai Tran Resume
Thai Tran Resumethai tran
 
5G technical_overview_training_sec_1
5G technical_overview_training_sec_15G technical_overview_training_sec_1
5G technical_overview_training_sec_1Sajal Kumar Das
 
Konstantinos Valvis CV 17.08.2016
Konstantinos Valvis  CV 17.08.2016Konstantinos Valvis  CV 17.08.2016
Konstantinos Valvis CV 17.08.2016Konstantinos Valvis
 
2013 datwyler training 2 product overview - info tech middle east
2013 datwyler training 2   product overview - info tech middle east2013 datwyler training 2   product overview - info tech middle east
2013 datwyler training 2 product overview - info tech middle eastAli Shoaee
 
5G Network: Requirements, Design Principles, Architectures, and Enabling Tech...
5G Network: Requirements, Design Principles, Architectures, and Enabling Tech...5G Network: Requirements, Design Principles, Architectures, and Enabling Tech...
5G Network: Requirements, Design Principles, Architectures, and Enabling Tech...Sayed Chhattan Shah
 
jon_sawyer_cv-Oct2015.doc
jon_sawyer_cv-Oct2015.docjon_sawyer_cv-Oct2015.doc
jon_sawyer_cv-Oct2015.docJonathan Sawyer
 

What's hot (16)

Alaa hady
Alaa hadyAlaa hady
Alaa hady
 
C.V
C.VC.V
C.V
 
NBader_2014_Resume
NBader_2014_ResumeNBader_2014_Resume
NBader_2014_Resume
 
New carlton resume1
New carlton resume1New carlton resume1
New carlton resume1
 
Signalwing 5g das and 5g distribute small cell introduction
Signalwing 5g das and 5g distribute small cell introductionSignalwing 5g das and 5g distribute small cell introduction
Signalwing 5g das and 5g distribute small cell introduction
 
ZUBAIR BAIG
ZUBAIR BAIGZUBAIR BAIG
ZUBAIR BAIG
 
CV E Atienza new 2 - Copy
CV E Atienza new 2 - CopyCV E Atienza new 2 - Copy
CV E Atienza new 2 - Copy
 
J_Resume_CA_112015
J_Resume_CA_112015J_Resume_CA_112015
J_Resume_CA_112015
 
Belco presentation november 2014
Belco presentation november 2014Belco presentation november 2014
Belco presentation november 2014
 
Thai Tran Resume
Thai Tran ResumeThai Tran Resume
Thai Tran Resume
 
5G technical_overview_training_sec_1
5G technical_overview_training_sec_15G technical_overview_training_sec_1
5G technical_overview_training_sec_1
 
Konstantinos Valvis CV 17.08.2016
Konstantinos Valvis  CV 17.08.2016Konstantinos Valvis  CV 17.08.2016
Konstantinos Valvis CV 17.08.2016
 
2013 datwyler training 2 product overview - info tech middle east
2013 datwyler training 2   product overview - info tech middle east2013 datwyler training 2   product overview - info tech middle east
2013 datwyler training 2 product overview - info tech middle east
 
5G Network: Requirements, Design Principles, Architectures, and Enabling Tech...
5G Network: Requirements, Design Principles, Architectures, and Enabling Tech...5G Network: Requirements, Design Principles, Architectures, and Enabling Tech...
5G Network: Requirements, Design Principles, Architectures, and Enabling Tech...
 
jon_sawyer_cv-Oct2015.doc
jon_sawyer_cv-Oct2015.docjon_sawyer_cv-Oct2015.doc
jon_sawyer_cv-Oct2015.doc
 
New TP
New TPNew TP
New TP
 

Similar to Caldona Erwin CV 2015

Similar to Caldona Erwin CV 2015 (20)

Wilmar Sibayan CV
Wilmar Sibayan CVWilmar Sibayan CV
Wilmar Sibayan CV
 
James Z White_Resume_2-9-17
James Z White_Resume_2-9-17James Z White_Resume_2-9-17
James Z White_Resume_2-9-17
 
A rosario resume_2013_a
A rosario resume_2013_aA rosario resume_2013_a
A rosario resume_2013_a
 
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
 
Thai Tran Resume
Thai Tran ResumeThai Tran Resume
Thai Tran Resume
 
Felix_Bonilla Resume
Felix_Bonilla ResumeFelix_Bonilla Resume
Felix_Bonilla Resume
 
Felix_Bonilla Resume
Felix_Bonilla ResumeFelix_Bonilla Resume
Felix_Bonilla Resume
 
Dennis A Santos
Dennis A SantosDennis A Santos
Dennis A Santos
 
Campbell michael resume mtli 7
Campbell michael resume mtli 7Campbell michael resume mtli 7
Campbell michael resume mtli 7
 
MTA
MTAMTA
MTA
 
RBB Tech+Bio-04162016
RBB Tech+Bio-04162016RBB Tech+Bio-04162016
RBB Tech+Bio-04162016
 
Lawrence Nellons present resume
Lawrence Nellons present resumeLawrence Nellons present resume
Lawrence Nellons present resume
 
Robert Clarizio Resume 4.2016
Robert Clarizio Resume 4.2016Robert Clarizio Resume 4.2016
Robert Clarizio Resume 4.2016
 
CV_Devesh
CV_DeveshCV_Devesh
CV_Devesh
 
Marvani Miller Estrella PMP Resume 2016
Marvani Miller Estrella PMP Resume 2016Marvani Miller Estrella PMP Resume 2016
Marvani Miller Estrella PMP Resume 2016
 
MARCOS SAMPLE2011
MARCOS SAMPLE2011MARCOS SAMPLE2011
MARCOS SAMPLE2011
 
Bashir_cv
Bashir_cvBashir_cv
Bashir_cv
 
New Carlton Resume1(1)
New Carlton Resume1(1)New Carlton Resume1(1)
New Carlton Resume1(1)
 
Rone resume 092420
Rone resume 092420Rone resume 092420
Rone resume 092420
 
Cv meynard
Cv meynardCv meynard
Cv meynard
 

Caldona Erwin CV 2015

  • 1. Erwin Valencia Caldona 288 Sgt. Mabagos St., Tondo, Manila Handyphone no: +(63) 929-3507925 or +(63) 927-5354127 E-mail addresses: erwincaldona1914@gmail.com, erwincaldona@hotmail.com QUALIFICATION PROFILE:  Installation supervision and acceptance of SMC/Belltel IBS project.  Nokia LTE( BC13 & BC17) and 2G installation, commissioning and integration.  ALU 7705 router installation and commissioning  Motorola Wi-MAX equipment installation, commissioning and integration.  Dragonwave Microwave installation, commissioning and integration.  Nokia Flexi WCDA BTS Installation, Commissioning, Integration. Completed and passed FLX005-Flexi WCDMA BTS Boot Camp Level 2.  Installation , commissioning, integration of Motorola CDMA/CDMA 1X base stations Packet and Circuit BTS(SC4812T, SC4812ET, SC4812MC, SC300) using HP8935 testset,Agilent testset and WinLMF.  CDMA 1X-EvDO upgrade. Carrier upgrade. SC4812T-MC frame expansion.  Installation and commissioning of Packet BTS with GLI3 IBR.  Site survey and site selection for radio room/facility.  Site acceptance  EVDO Drivetesting  Wi –max drivetesting  Literate on most computer office software such as MS Windows, MS Office and AutoCAD.  Knowledge on Motorola RF planning tool, NetPlan. Experience on analysis of coverage plots for Analog and CDMA system.  Experience on BATE, HP and Motorola test equipment for testing and commissioning of Motorola Cellular Analog , CDMA BTS (SC9600, SC2400, HDII 10 channels,HDII MicroCITE).  WORK EXPERIENCES: DMN Installations Aug 2013 – June 2015 Contractor to SMC/Belltel IBS project, TI/BTS Supervisor  Installation supervision and Acceptance of SMC/Belltel IBS roll out project. Contractor to NSN Philippines, Belltel 2G and NCTI LTE project(Aug 2013 – Oct 2014)  Installation, commissioning and integration of Nokia BC13 LTE.  Installation, commissioning and integration of Nokia 2G equipment.  Acceptance and Troubleshooting of Nokia BC13, BC17 and 2G equipment. WAVSYS LLC Jun 2008 - Mar 2012 Contractor to Nokia T-Mobile Phoenix Market (Jan 2012 – Mar 2012)  ALU 7705 Router installation and commissioning.  ALU 7705 hotcuts for 2G Contractor to Nokia T-Mobile Denver Market (Nov 2011 - Jan 2012)  Nokia Flexi BTS UMTS installation.  Nokia Flexi BTS UMTS commissioning  Nokia Flexi BTS UMTS integration  Nokia Flexi BTS UMTS troubleshooting Contractor to Nokia T-Mobile Seattle and Portland Market (Feb 2011 – Oct 2011)  Nokia Flexi BTS UMTS installation.  Nokia Flexi BTS UMTS commissioning  Nokia Flexi BTS UMTS integration  Nokia Flexi BTS UMTS troubleshooting Contractor to Clearwire Wi-Max, Houston, Las Vegas, Salt Lake, Minneapolis and California Market (Dec 2009 – Jan 2011)
  • 2.  Motorola Wi-Max BCU II installation, commissioning, integration.  Motorola Wi-Max troubleshooting  Dragonwave Microwave equipment configuration, commissioning.  Dragonwave Microwave troubleshooting  Wi-Max sector augments.  BCU I to BCU II upgrades  Wi-Max drivetesting using WIIT.  Huawei Wi-Max installation, commissioning, integration and troubleshooting. Contractor to Nokia T-Mobile Indianapolis, Chicago, Cincinatti (May 2009 – Dec 2009)  Nokia Flexi UMTS installation.  Nokia Flexi BTS UMTS commissioning  Nokia Flexi BTS UMTS integration  Nokia Flexi BTS UMTS troubleshooting Contractor to Nokia T-Mobile Phoenix Market (Apr 2009 – May 2009)  Nokia Flexi UMTS installation.  Nokia Flexi BTS UMTS commissioning  Nokia Flexi BTS UMTS integration  Nokia Flexi BTS UMTS troubleshooting Contractor to T-Mobile Miami Market (June 2008 – Dec 2008)  T1 testing and troubleshooting.  Nokia Flexi UMTS installation.  Nokia Flexi BTS UMTS commissioning  Nokia Flexi BTS UMTS integration  Nokia Flexi BTS UMTS troubleshooting  Remote electrical tilts for Andrew and RFS antenna systems AVION SYSTEMS Inc. Jan 2006 – May 2008 Contractor to Motorola ALLTEL project, Georgia, Arizona and, Minnesota Market(Jun 2007 - May 2008)  Carrier Adds and Calibration(SC4812)  Carrier upgrade and calibration(SC4812)  EVDO upgrade  Installation of EVDO Kits for SC4812  SC4812T/MC/ET frame expansion  New site turn ups(install, commission, integrate)  Drive testing Contractor to Nokia Siemens Network, Sprint Austin, Texas (Apr 2007- May 2007)  Wi-Max coverage test and drive testing using Gator transmitter and Cayote receiver. Contractor to Motorola, ALLTEL Phoenix, Minnesota and Arkansas Market (Jun 2006 – Dec 2006)  Carrier Adds and calibration(SC4812)  Carrier upgrade and calibration(SC4812).  Circuit BTS to Packet BTS conversion.  EVDO upgrade  Installation of EVDO Kits  SC4812 frame expansion  Drivetesting Contractor Cingular Dual Band project, Alabama and Louisiana (Jan – May 2006)  Installation, commissioning and integration of Nokia Ultrasite EDGE.  T1 preparation, testing and troubleshooting.
  • 3. CONSISTEL Philippines Inc., Implementation Engineer Aug 2004 – Jan 2006  Implementation/Supervision of civil/telecomm works up to Integration of Sun Cellular, Digitel-Alcatel GSM Project and Globe IBS and Greenfield GSM project.  Responsible in technical issues and troubleshooting. INFRACELL Nusutama Indonesia, Bangkok project Apr 2002 - Jan 2003  Performed Post Integration Call testing Motorola Thailand, Ltd.-BFKT/Hutchison Project.  Site Surveys, Verifications and Site Audits of BFKT/Hutchison Project.  Installation, ATP/commissioning, integration, upgrade, of Motorola CDMA 1xEVDO Base Station (SC4812T/SC300) MSI Philippines-Marconi Company, Consultant Apr 2001 - Feb 2002  Performed CQB (Call Quality Benchmarking) project for Maxis in Malaysia  Perform CQB (Call Quality Benchmarking) project for Globe Telecoms.  Support IBS (In-Building Solutions) project for Globe Telecoms projects. MOTOROLA Philippines, Systems Engineer Sep 1996 – Mar 2001  Responsible for new systems proposaldocumentation and implementation.  Perform BTS optimization/ATP and commissioning and responsible in technical issues.  Provide technical support in RF engineering for Motorola’s project in Australia and Guam, USA.  Responsible in technical issues, project activities/monitoring, testing and Coordination meeting for Extelcom flooded equipment testing.  Provide AutoCAD support to all groups of different Mototorla projects.  Prepares installation documentations such as proposed install docs,as-built docs,ATP & other documents of the said project.  Conducts equipment inventory of all cell sites and EMX’s.  Responsible for the control, inventory,issuance of tools, materials, and test equipment. EDUCATION: New Era University, Quezon City BS Industrial Engineering 1991-1996 Jose Abad Santos,Manila Secondary 1987-1991 Isabelo Delos Reyes, Manila Primary 1981-1987 TRAININGS ATTENDED: 1. NOKIA Flexi 005 Boot Camp NSN, Atlanta GA March 24-28, 2008 2. NOKIA FlexiBTS Site Survey Nokia Siemens, GA May 14-18 2007 3. UMTS (3G) Motorola Singapore January 9-12, 2001 4. CDMA 1x Motorola Hong Kong November 29-30,2000 5. TCP/IP Mis NET (MCTC) August 21-25, 2000 6. Windows NT 4.0 Core Technologies Mis NET (MCTC) August 14-18,2000 7. Inventory Planning and Control Motorola Philippines March 21-22, 2000 8. SwitchMATE Operation Motorola Philippines August 16-21, 1999 9. Cellsite Installation and Grounding Motorola Philippines August 10-13, 1999 10. iDEN Systems Course Motorola Philippines May 24-28, 1999 11. Advanced AutoCAD, R13 CIM Technologies November 1996 12. Basic AutoCAD, R13 CIM Technologies October 1996 13. Commscope Nokia, BGC November 2014