SlideShare a Scribd company logo
1 of 7
CURRICULUM VITEA
INDUSTRIAL ANALYST/OFC ROLE OUT/FIBER ENGR.FIBER SPLICER AND INSTALLER, O & M PLAN AND PROJECT (OSP)
No.08 Aruove Street, Afiesere town,
Ughelli Delta State,
Nigeria
Email: fidelis4vision@gmail.com, erhiyojare_f@yahoo.com
Phone: +2348067586884, +2349095701518
ERHINYOJARE O. FIDELIS
OBJECTIVE
To obtain a challenging position that will allow me to use my knowledge/Experience in the area of IP
and fiber optics Technology to further the ambitions of a growing organization while improving my own training
and experience in management, project and development planning.
Date of Birth 19th
September 1987
Gender/Marit
al Status Male /married
State of
Origin
Delta State (Ughelli North L.G.A)
Personal
Attributes
Ability to work under no or less supervision
Willingness to accept responsibility
Good communication skills
Creative and Innovative
Time management ability
A good team player that’s always ready to learn
Innovative and proactive
Diligent and honesty
Education &
Award
Kwara State polytechnic Ilorin
ND /ARCHITECTURAL Technology 2013-2016
Afiesere Secondary School , Ughelli ,Delta State 2002-2006
Senior Secondary certificate Examination ----- WAEC 2006
City Comprehensive High school Ogidi ,Anambra State
Senior Secondary certificate examination ------Neco 2012
Junior secondary school certificate examination 2001
U. N. A Primary school Ode IYANSAN, Irele L.G.A Ondo state
Primary school leaving Testimonial / certificate …………………… 1996- 1999
Training
attended
&
Professi
onal
Qualifica
tion
Certified fiber Optics Technician (in view) …………………………………….…...2016
Diploma in certified Broadband Networks (in view) SIIT Global ……………….2016
Auto CAD training ALIM CONSULT Ilorin -……………………………………………………………….2015
Seminar on developing a career in ICT winners worldwide ……………………….2014
Diploma in Computer Engineering &Networking (Csharp Institute ILORIN) ……………2014
WOFBI living faith church ILORIN 2013
Fiber technician training exercise. (Concept point Onitsha, Anambra state) …2011-2012
Proficien
cy, Work
Experien
ce
& Job
Descripti
on
WORK EXPERIENCE
ORGANIZATION: POSITION: DATE:
Aunty suzzy schools Mathematic/physics classroom teacher 2004-2007
Precpearl Nigeria Limited: 2013 till date
19, Tokunbo street, off Hughes Avenue
Alagomeji, Yaba, Lagos.
POSITION: Fiber Optic Engr. Team Lead
Optical Network operations
Use of Optical Splicing Equipment: (Fitel, swift, Fujikura FSM) on fiber core to acceptable attenuation.
Use of optical fiber testing equipment: OTDR (shineway,exfo,JDSU), Light source and power meter,
VFL (Visual Fault Locator) to troubleshoot and make error correction on cores.
Profound Knowledge of Optical Fiber- Installation, splicing and testing,MAN,LAN and WAN installation
Good understanding of Telecommunications Principle, use of single mode, multimodel fiber, cable design,
cable Termination, Site Surveying.
GRADUATE TRAINEE ENGINEER
Undergo a well design fiber optics training ranging from basic principles of the following:
Preventive maintenance
Corrective maintenance
Proficien
cy, Work
Experien
Fiber installation
Trouble shooting
FIBER OPTICS TECHNICIAN ( TEAM LEAD) 2015
PROJECTS/SEGMENTS MAINTAINED
Maintenace Airtel fiber (Ilorin-Jebba-Mokwa-Paki) 320km ……………… 2013 - 2015
Maintenace of Aitel fiber (Ilorin/Ogbomoso) …………………………….. 2013-2015
Maintenace MTN Ilorin-jebba-Kpaki & Ilorin-Ogbomoso Feberary……….. 2013- july 2013
Before handing over to Bell-x Nigeria Ltd
Survey & Supervision of 2.5km Airtel relocation (Ilorin – Jebba ) -……………………2014
Survey & implementation of 4.5km GLO NETWOK (Oyo-Ogbomoso-Osogbo/isehin)…2015
Survey & Supervision of 10KM GLOBALCOM Network (saki-igbeti / isehin)…………2015
Survey & Supervision of 17km GLOBACOM network AKURE – OWO-IFON…………..2015
ENGR. /TEAM LEAD (AREA MANAGER) …………………………………JANUARY 2016
PREVENTIVE MAINTENANCE
Maintainace of glo to fiber on (Ibadan-Ijebu ode 98km & Ibadan- Oyo, Ibadan Metro respectively.
Manage saki -isehin 92km, Saki- Igbeti 98km)/ OYO- Iseyin, OYO- Ogbomosho 65km team respectively
for glo to fiber maintenance ,corrective project. August 1st
2016 – March 3rd
2016
Run bi-directional OTDR test on the field to ensure continuity of the link and prepare closure before splicing.
Splice all 96 core fiber to acceptable attenuation (0.03dB).
Submit all analyses report and modified As-built drawing after fiber cut permanent repairs
And fix up link with SLA/MTTR.
Cable pulling where necessary to bypass any trouble span within fiber route.
CORRECTIVE MAINTENANCE
Inspect all core status of the link using OTDR and Power meter test and calculate the loss budget in dB/km
Re-install all minor eroded points along fiber segment exposing the fiber ducts.
Inspect all pending jobs, check the status of all route markers in each segment
And replace all damaged route markers.
Record maintenance activities and send weekly reports of the route maintenance activities of my segment
to my back office in Lagos
COMPANY: Kkon Tech:
Position: Regional co-coordinator [fiber FTTH Installer]
ce
&
Job
Descripti
on
Duties: site supervision, network maintenance, core status reporting,
Fiber testing end to end cable pulling/installation of network, routes survey
/project implementation, supervision of projects, Quality control
and team coordinator… November 19, 2014 - February 19, 2015
COMPANY: Precpearl Nig. Ltd Headquarter Located Lagos Nigeria
DATE STARTED WORK HERE: FEBUARY 10TH, 2013 - November 2014
Position: Fiber Optics Technician / Team Coordinator
OFC Backbone project mentainance
OSP Implementation of Glo Network Ogbomosho – Oshogbo 32km
COMPANT : CONCEPT POINT Nig. LTD : January 2008 – November 2012
POSITION: PROJECT QUALITY CONTROL OFFICER (SITE SUPERVISOR)
Site supervisor for trenching , cable blowing, HH casting, low dept. casting fiber cable pulling etc.
OFC Implementation of 167km MTLK network Gombe –Maiduguri, New Ring Node and Ring Installation.
OFC Backbone implementation – delegating work to local contractors such as; Trenching, Ducting,
Backfilling and supervision of the work to ensure quality is delivered 48km Potiscum – Azere MTN 2009
OFC Networking Planning / Route Survey 87km ENUGU METRO 2009 & As-built Drawing
Delegation of work to subordinate
Low dept casting/ supervision of Trust -boring
Pulling of duct inside PVC (Ducting)/ OFC cable hand pulling
Fiber splicing, termination/ fiber testing by OTDR (JDSU-6000ms)
RE- APOINTMENT POSITION: Fiber optics technician (OFC TECH.) January 2011
Fiber splicer/ OTDR Operation system
Preventive /incidence restoring officer
Maintenance of 129.8km & 38.5km Agbor-Onitsha-ENUGU Airtel network
Monthly OTDR Trace (CSR) Reporting
Maintenance of 32km & 87km Glo Network Asaba metro & Asaba- Agbor respectively MATCH
2012- September 2012
ORGANISATION
AUNTI SUZZY SECONDARY SCHOOL UGHELLI
Proficien
cy, Work
Experien
ce
&
Job
Descripti
on
PERSONA
L Etics:
Position: MATHEMATICS/PHYSICS CLASS TEACHER
PRECPEARL NIGERIALIMITED………………………………………………………2016
Position: Site Engr.
Maintenance Benin to Umunede/Asaba 84.7km & 77.5km respectively globacom network 2016
Maintenance of Benin – Ekpoma 77.9km glo network
Maintenance of Benin – Ore 104km glo netwok
Maintenance of Benin Sapele 55km glo network
Maintenance 31 Sites in Benin metro eg Ben901-Ben018 14.6km etc glo network.
Daily preventive and corrective activities report to back office with proof of pictures
Monthly AUDITH REPORT OF CSR ,OTDR TRACE BOTH BIDIRECTIONAL
I am a natural facilitator focus and pragmatic team player,
with a sound analytical background, excellent verbal and
Written communication skills. I am challenge driven,
Pro-active, lateral thinker with an unperturbed approach to achieving set targets.
I have developed a strong eye for detail, strong and quality assurance skills.
I have good commercial exposure with over six years’ experience,
interpersonal and telecommunication skill from project implementations,
Maintenance and termination up to acceptance level.
I am a self-starter with a strong drive for quality, I am able to take
on responsibility with little or no supervision and I am always conscious
Of my obligations and responsibilities. I am hard working and will
Never compromise my morals and work ethics in discharging my duties.
 COMPUTER RELATEDSKILLS
 Operating System: Windows Workstation
 Ms Office suite Ms Word
 Microsoft power point
 Microsoft office Excel
 Maintenance,system Repair/Installation(Hard ware)
 Assemble of new computer systems,
 Computer networking, LAN, WAN
 Knowledge of AUTO CAD & ARCHI CAD,
 GPRS Operation and analyst
 Google map
NETWORKING CORE FOCUS
1. IP networking
2.Fibre Termination / Networking
4. Structural cabling
5.Network design and architecture
6. fiber cable Hand pulling, etc
MANAGERIAL CORE FOCUS:
1. Strategic project management
2. Strategic planning
3. Strategic reasoning
4. Quality Assurance work
 Leadership Skills
 Presentation Skills
 Organizing Training
 Report Writing
 Supervision of Project
 Ability to manage people effectively
NATIONAL YOUTH SERVICE CORPS (NYSC)
Not yet applicable
INDUSTRIAL ATTACHMENT 2016-2017
PBX Maintenance Engineer (Private Branch Exchange)
Hobbies
and
Interest
Singing music
Reading
Exploring fiberoptics software’s, web surfing, and research
PRACTICAL ON AUTO CAD DESIGN
Referees REFEREES:
1. Mr. Basil
R. M GlobacomLtd Benin Region
2. Mr. Aasim Alvi
R. M GlobacomLtd Ibadan Region 08055571170,
Comment:Fidelisisquite smart,resourceful andproductive.Hasahighniche for result.Ican vouchfor him.He is alsohumble....View
3. MR. Abiodun
08055579047, 07067616212
GLOBACOM NIG. LTD Ibadan Region
Comment:He is extremelypassionateanddedicatedabouthiswork.He isalwayswasa perfectteammemberand
I couldalwaysrelyuponhimon anytask assignedtohimAs coordinatorandothers.
4. Mr. Daniel Yiadom Boaky
07065475452, 08089268040
Qc Huawei TechnologiesIbadanRegion
Comment:: HavingworkedwithFidelisErhiyojare forovertwoyearsat Precpearl Nig.LTD,
I can attestto his deepknowledgeandexperience inthe fieldof structuredcabling, andfibre opticsnetworks
. FidelisisalsoexperiencedinProjectmanagementhavingsupervisedmillionsbackhaul projectsforGLOBACOM AIRTEL and MTN Networkonbehalf of Precpearl.
5. Aaron – Ozero O.
Qc Huawei TechnologiesAuchi Region
08035045459
6. Mr. KamalakarJahdav
Site ManagerJOBODE Nig. Ltd.
08132310001, 009919224118099
Best Regard.
Erhiyojare Fidelis
24/10/2016

More Related Content

What's hot

What's hot (20)

Telecom Engineer Cv
Telecom Engineer CvTelecom Engineer Cv
Telecom Engineer Cv
 
RESUME
RESUMERESUME
RESUME
 
Sanjoy_Resume (1)
Sanjoy_Resume (1)Sanjoy_Resume (1)
Sanjoy_Resume (1)
 
CV LUTFI DESTIAN
CV LUTFI DESTIANCV LUTFI DESTIAN
CV LUTFI DESTIAN
 
Irfan Telecom new
Irfan Telecom newIrfan Telecom new
Irfan Telecom new
 
Muhammad khalid cv
Muhammad khalid cvMuhammad khalid cv
Muhammad khalid cv
 
Resume-RNO
Resume-RNOResume-RNO
Resume-RNO
 
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
 
Shahid Ali Telecom CV
Shahid Ali Telecom CVShahid Ali Telecom CV
Shahid Ali Telecom CV
 
Milind Jangale1
Milind Jangale1Milind Jangale1
Milind Jangale1
 
Bharath R-CV
Bharath R-CVBharath R-CV
Bharath R-CV
 
BSS Updated cv
BSS Updated cvBSS Updated cv
BSS Updated cv
 
Illyas-latest_v.3.2
Illyas-latest_v.3.2Illyas-latest_v.3.2
Illyas-latest_v.3.2
 
CV_Nitin Rao
CV_Nitin RaoCV_Nitin Rao
CV_Nitin Rao
 
Manoj cv
Manoj cvManoj cv
Manoj cv
 
Bashir_cv
Bashir_cvBashir_cv
Bashir_cv
 
ARSHAD cv with pic
ARSHAD cv with picARSHAD cv with pic
ARSHAD cv with pic
 
Resume_Suvankar_UPDATED
Resume_Suvankar_UPDATEDResume_Suvankar_UPDATED
Resume_Suvankar_UPDATED
 
telecom engineer cv-1
telecom engineer cv-1telecom engineer cv-1
telecom engineer cv-1
 
Er. Navdeep Thaman-Resume
Er. Navdeep Thaman-ResumeEr. Navdeep Thaman-Resume
Er. Navdeep Thaman-Resume
 

Similar to ERHINYOJARE O. FIDELIS

Similar to ERHINYOJARE O. FIDELIS (20)

resume
resumeresume
resume
 
Debasis Mondal
Debasis MondalDebasis Mondal
Debasis Mondal
 
Ganesh Wankhede CV
Ganesh Wankhede CVGanesh Wankhede CV
Ganesh Wankhede CV
 
new resume
new resumenew resume
new resume
 
Yogesh_2015
Yogesh_2015Yogesh_2015
Yogesh_2015
 
vimal resume
vimal resumevimal resume
vimal resume
 
Alaba Adedayo CV
Alaba Adedayo CVAlaba Adedayo CV
Alaba Adedayo CV
 
Rakesh cv updated
Rakesh cv updatedRakesh cv updated
Rakesh cv updated
 
Jallo CV
Jallo CVJallo CV
Jallo CV
 
Rohit Kumar Jaswal_CV
Rohit Kumar Jaswal_CV Rohit Kumar Jaswal_CV
Rohit Kumar Jaswal_CV
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
REYAD el badry 2015 Fiber Optics Operation Manager
REYAD el badry 2015 Fiber Optics Operation ManagerREYAD el badry 2015 Fiber Optics Operation Manager
REYAD el badry 2015 Fiber Optics Operation Manager
 
Reyad el badry 2015 fiber optics operation manager
Reyad el badry 2015 fiber optics operation managerReyad el badry 2015 fiber optics operation manager
Reyad el badry 2015 fiber optics operation manager
 
Resume
ResumeResume
Resume
 
Afsar_CW FTTH & OSP Senior Engineer-Resume
Afsar_CW  FTTH & OSP Senior Engineer-ResumeAfsar_CW  FTTH & OSP Senior Engineer-Resume
Afsar_CW FTTH & OSP Senior Engineer-Resume
 
Afsar_CW FTTH & OSP Senior Engineer-Resume
Afsar_CW  FTTH & OSP Senior Engineer-ResumeAfsar_CW  FTTH & OSP Senior Engineer-Resume
Afsar_CW FTTH & OSP Senior Engineer-Resume
 
T2 EKUN RAPHAEL OSHIOBODE1
T2 EKUN RAPHAEL OSHIOBODE1T2 EKUN RAPHAEL OSHIOBODE1
T2 EKUN RAPHAEL OSHIOBODE1
 
JADE SANTOS CV
JADE SANTOS CVJADE SANTOS CV
JADE SANTOS CV
 
Rashid Mahmood
Rashid MahmoodRashid Mahmood
Rashid Mahmood
 
omer daraz cv
omer daraz cvomer daraz cv
omer daraz cv
 

ERHINYOJARE O. FIDELIS

  • 1. CURRICULUM VITEA INDUSTRIAL ANALYST/OFC ROLE OUT/FIBER ENGR.FIBER SPLICER AND INSTALLER, O & M PLAN AND PROJECT (OSP) No.08 Aruove Street, Afiesere town, Ughelli Delta State, Nigeria Email: fidelis4vision@gmail.com, erhiyojare_f@yahoo.com Phone: +2348067586884, +2349095701518 ERHINYOJARE O. FIDELIS OBJECTIVE To obtain a challenging position that will allow me to use my knowledge/Experience in the area of IP and fiber optics Technology to further the ambitions of a growing organization while improving my own training and experience in management, project and development planning. Date of Birth 19th September 1987 Gender/Marit al Status Male /married State of Origin Delta State (Ughelli North L.G.A) Personal Attributes Ability to work under no or less supervision Willingness to accept responsibility Good communication skills Creative and Innovative Time management ability A good team player that’s always ready to learn Innovative and proactive Diligent and honesty Education & Award Kwara State polytechnic Ilorin ND /ARCHITECTURAL Technology 2013-2016 Afiesere Secondary School , Ughelli ,Delta State 2002-2006 Senior Secondary certificate Examination ----- WAEC 2006 City Comprehensive High school Ogidi ,Anambra State Senior Secondary certificate examination ------Neco 2012
  • 2. Junior secondary school certificate examination 2001 U. N. A Primary school Ode IYANSAN, Irele L.G.A Ondo state Primary school leaving Testimonial / certificate …………………… 1996- 1999 Training attended & Professi onal Qualifica tion Certified fiber Optics Technician (in view) …………………………………….…...2016 Diploma in certified Broadband Networks (in view) SIIT Global ……………….2016 Auto CAD training ALIM CONSULT Ilorin -……………………………………………………………….2015 Seminar on developing a career in ICT winners worldwide ……………………….2014 Diploma in Computer Engineering &Networking (Csharp Institute ILORIN) ……………2014 WOFBI living faith church ILORIN 2013 Fiber technician training exercise. (Concept point Onitsha, Anambra state) …2011-2012 Proficien cy, Work Experien ce & Job Descripti on WORK EXPERIENCE ORGANIZATION: POSITION: DATE: Aunty suzzy schools Mathematic/physics classroom teacher 2004-2007 Precpearl Nigeria Limited: 2013 till date 19, Tokunbo street, off Hughes Avenue Alagomeji, Yaba, Lagos. POSITION: Fiber Optic Engr. Team Lead Optical Network operations Use of Optical Splicing Equipment: (Fitel, swift, Fujikura FSM) on fiber core to acceptable attenuation. Use of optical fiber testing equipment: OTDR (shineway,exfo,JDSU), Light source and power meter, VFL (Visual Fault Locator) to troubleshoot and make error correction on cores. Profound Knowledge of Optical Fiber- Installation, splicing and testing,MAN,LAN and WAN installation Good understanding of Telecommunications Principle, use of single mode, multimodel fiber, cable design, cable Termination, Site Surveying. GRADUATE TRAINEE ENGINEER Undergo a well design fiber optics training ranging from basic principles of the following: Preventive maintenance Corrective maintenance
  • 3. Proficien cy, Work Experien Fiber installation Trouble shooting FIBER OPTICS TECHNICIAN ( TEAM LEAD) 2015 PROJECTS/SEGMENTS MAINTAINED Maintenace Airtel fiber (Ilorin-Jebba-Mokwa-Paki) 320km ……………… 2013 - 2015 Maintenace of Aitel fiber (Ilorin/Ogbomoso) …………………………….. 2013-2015 Maintenace MTN Ilorin-jebba-Kpaki & Ilorin-Ogbomoso Feberary……….. 2013- july 2013 Before handing over to Bell-x Nigeria Ltd Survey & Supervision of 2.5km Airtel relocation (Ilorin – Jebba ) -……………………2014 Survey & implementation of 4.5km GLO NETWOK (Oyo-Ogbomoso-Osogbo/isehin)…2015 Survey & Supervision of 10KM GLOBALCOM Network (saki-igbeti / isehin)…………2015 Survey & Supervision of 17km GLOBACOM network AKURE – OWO-IFON…………..2015 ENGR. /TEAM LEAD (AREA MANAGER) …………………………………JANUARY 2016 PREVENTIVE MAINTENANCE Maintainace of glo to fiber on (Ibadan-Ijebu ode 98km & Ibadan- Oyo, Ibadan Metro respectively. Manage saki -isehin 92km, Saki- Igbeti 98km)/ OYO- Iseyin, OYO- Ogbomosho 65km team respectively for glo to fiber maintenance ,corrective project. August 1st 2016 – March 3rd 2016 Run bi-directional OTDR test on the field to ensure continuity of the link and prepare closure before splicing. Splice all 96 core fiber to acceptable attenuation (0.03dB). Submit all analyses report and modified As-built drawing after fiber cut permanent repairs And fix up link with SLA/MTTR. Cable pulling where necessary to bypass any trouble span within fiber route. CORRECTIVE MAINTENANCE Inspect all core status of the link using OTDR and Power meter test and calculate the loss budget in dB/km Re-install all minor eroded points along fiber segment exposing the fiber ducts. Inspect all pending jobs, check the status of all route markers in each segment And replace all damaged route markers. Record maintenance activities and send weekly reports of the route maintenance activities of my segment to my back office in Lagos COMPANY: Kkon Tech: Position: Regional co-coordinator [fiber FTTH Installer]
  • 4. ce & Job Descripti on Duties: site supervision, network maintenance, core status reporting, Fiber testing end to end cable pulling/installation of network, routes survey /project implementation, supervision of projects, Quality control and team coordinator… November 19, 2014 - February 19, 2015 COMPANY: Precpearl Nig. Ltd Headquarter Located Lagos Nigeria DATE STARTED WORK HERE: FEBUARY 10TH, 2013 - November 2014 Position: Fiber Optics Technician / Team Coordinator OFC Backbone project mentainance OSP Implementation of Glo Network Ogbomosho – Oshogbo 32km COMPANT : CONCEPT POINT Nig. LTD : January 2008 – November 2012 POSITION: PROJECT QUALITY CONTROL OFFICER (SITE SUPERVISOR) Site supervisor for trenching , cable blowing, HH casting, low dept. casting fiber cable pulling etc. OFC Implementation of 167km MTLK network Gombe –Maiduguri, New Ring Node and Ring Installation. OFC Backbone implementation – delegating work to local contractors such as; Trenching, Ducting, Backfilling and supervision of the work to ensure quality is delivered 48km Potiscum – Azere MTN 2009 OFC Networking Planning / Route Survey 87km ENUGU METRO 2009 & As-built Drawing Delegation of work to subordinate Low dept casting/ supervision of Trust -boring Pulling of duct inside PVC (Ducting)/ OFC cable hand pulling Fiber splicing, termination/ fiber testing by OTDR (JDSU-6000ms) RE- APOINTMENT POSITION: Fiber optics technician (OFC TECH.) January 2011 Fiber splicer/ OTDR Operation system Preventive /incidence restoring officer Maintenance of 129.8km & 38.5km Agbor-Onitsha-ENUGU Airtel network Monthly OTDR Trace (CSR) Reporting Maintenance of 32km & 87km Glo Network Asaba metro & Asaba- Agbor respectively MATCH 2012- September 2012 ORGANISATION AUNTI SUZZY SECONDARY SCHOOL UGHELLI
  • 5. Proficien cy, Work Experien ce & Job Descripti on PERSONA L Etics: Position: MATHEMATICS/PHYSICS CLASS TEACHER PRECPEARL NIGERIALIMITED………………………………………………………2016 Position: Site Engr. Maintenance Benin to Umunede/Asaba 84.7km & 77.5km respectively globacom network 2016 Maintenance of Benin – Ekpoma 77.9km glo network Maintenance of Benin – Ore 104km glo netwok Maintenance of Benin Sapele 55km glo network Maintenance 31 Sites in Benin metro eg Ben901-Ben018 14.6km etc glo network. Daily preventive and corrective activities report to back office with proof of pictures Monthly AUDITH REPORT OF CSR ,OTDR TRACE BOTH BIDIRECTIONAL I am a natural facilitator focus and pragmatic team player, with a sound analytical background, excellent verbal and Written communication skills. I am challenge driven, Pro-active, lateral thinker with an unperturbed approach to achieving set targets. I have developed a strong eye for detail, strong and quality assurance skills. I have good commercial exposure with over six years’ experience, interpersonal and telecommunication skill from project implementations, Maintenance and termination up to acceptance level. I am a self-starter with a strong drive for quality, I am able to take on responsibility with little or no supervision and I am always conscious Of my obligations and responsibilities. I am hard working and will Never compromise my morals and work ethics in discharging my duties.  COMPUTER RELATEDSKILLS  Operating System: Windows Workstation  Ms Office suite Ms Word  Microsoft power point  Microsoft office Excel  Maintenance,system Repair/Installation(Hard ware)  Assemble of new computer systems,  Computer networking, LAN, WAN
  • 6.  Knowledge of AUTO CAD & ARCHI CAD,  GPRS Operation and analyst  Google map NETWORKING CORE FOCUS 1. IP networking 2.Fibre Termination / Networking 4. Structural cabling 5.Network design and architecture 6. fiber cable Hand pulling, etc MANAGERIAL CORE FOCUS: 1. Strategic project management 2. Strategic planning 3. Strategic reasoning 4. Quality Assurance work  Leadership Skills  Presentation Skills  Organizing Training  Report Writing  Supervision of Project  Ability to manage people effectively NATIONAL YOUTH SERVICE CORPS (NYSC) Not yet applicable INDUSTRIAL ATTACHMENT 2016-2017 PBX Maintenance Engineer (Private Branch Exchange) Hobbies and Interest Singing music Reading Exploring fiberoptics software’s, web surfing, and research PRACTICAL ON AUTO CAD DESIGN Referees REFEREES: 1. Mr. Basil R. M GlobacomLtd Benin Region
  • 7. 2. Mr. Aasim Alvi R. M GlobacomLtd Ibadan Region 08055571170, Comment:Fidelisisquite smart,resourceful andproductive.Hasahighniche for result.Ican vouchfor him.He is alsohumble....View 3. MR. Abiodun 08055579047, 07067616212 GLOBACOM NIG. LTD Ibadan Region Comment:He is extremelypassionateanddedicatedabouthiswork.He isalwayswasa perfectteammemberand I couldalwaysrelyuponhimon anytask assignedtohimAs coordinatorandothers. 4. Mr. Daniel Yiadom Boaky 07065475452, 08089268040 Qc Huawei TechnologiesIbadanRegion Comment:: HavingworkedwithFidelisErhiyojare forovertwoyearsat Precpearl Nig.LTD, I can attestto his deepknowledgeandexperience inthe fieldof structuredcabling, andfibre opticsnetworks . FidelisisalsoexperiencedinProjectmanagementhavingsupervisedmillionsbackhaul projectsforGLOBACOM AIRTEL and MTN Networkonbehalf of Precpearl. 5. Aaron – Ozero O. Qc Huawei TechnologiesAuchi Region 08035045459 6. Mr. KamalakarJahdav Site ManagerJOBODE Nig. Ltd. 08132310001, 009919224118099 Best Regard. Erhiyojare Fidelis 24/10/2016