SlideShare a Scribd company logo
EnvironmentFirst
“Let the Environment be your first Inspiration”
Registered Office: EnvironmentFirst Energy Services (P) Ltd.; Prakrati Corporate, 405 – Block A; Y N Road, Indore – 452001 (M.P.)
info@environmentfirst.in +91 731 6007860 www.environmentfirst.in
Representative Locations: Mumbai, Delhi, Chennai, Ahmedabad, Jaipur, Panchkula
NIT Haryana Power Purchase Centre (HPPC) on behalf of UHBVN and DHBVN Proposal of
Procurement of 150 MW Power from Grid Connected Solar Power Project
Objective: Haryana Power Purchase Centre on behalf of Uttar Haryana Bijli Vitran Nigam Limited
(UHBVN) & Dakshin Haryana Bijli Vitran Nigam Limited( DHBVN) hereinafter referred to as HPPC acting
through Chief Engineer, HPPC, Shakti Bhawan, Sector 6, Panchkula, Haryana invites interested Bidders to
purchase the NIT to participate in the bidding process for the selection of Bidder(s) for procurement of
150 MW solar power for long term from Grid Connected Solar PV Power Projects through tariff based
competitive bidding process for meeting its Renewable Purchase Obligations. The responsibility of the
Successful Bidder(s) shall be to supply power to the Procurer(s) as per the terms and conditions of the
NIT.
Bid must be submitted to the address as given in the table below on or before 13.00 hours(IST) on
25.06.2015 .The techno-commercial bid will be opened at 15.00 hours on 25.06.2015 (on the same day)
in presence of such bidders or their authorized representatives who would like to attend the bid
opening. If it is a public holiday on the last date for submission of the Bid, the submission and the receipt
of the Bid shall be on the next working day at the place of submission of Bid. The date of opening of
Financial bid will be intimated later on.
The Bid submitted by the bidder shall remain valid up to one hundred and eighty (180) days after the Bid
Deadline (“Bid Validity”).
SUMMARY of NIT/BID DOCUMENT
Bid Inviting Company HPPC on Behalf of Uttar Haryana Bijli Vitran Nigam
(UHBVN) and Dakshin Haryana Bijli Vitran Nigam
(DHBVN)
Document Description NIT for procurement of 150 MW solar power for
long term from grid connected Solar PV power
projects through tariff based competitive bidding
process
Contract Period 25 Years
Total Capacity of The Bid 150 MW
Method of Procurement Bidding
Maximum Capacity to Bid 150 MW
Minimum Capacity to Bid 1 MW
NIT No.& Date 54 /CE/HPPC/LTP Dtd: 26.05.2015
Pre-bid Conference / Clarification 10.06.2015 at 11.30 A.M
Last date & Time of Submission of tender 25.06.2015 (13.00 Hrs)
EnvironmentFirst
“Let the Environment be your first Inspiration”
Registered Office: EnvironmentFirst Energy Services (P) Ltd.; Prakrati Corporate, 405 – Block A; Y N Road, Indore – 452001 (M.P.)
info@environmentfirst.in +91 731 6007860 www.environmentfirst.in
Representative Locations: Mumbai, Delhi, Chennai, Ahmedabad, Jaipur, Panchkula
Date and time of Bid Opening
(Tecno-Commercial)
25.06.2015 ( 15.00 Hrs)
Cost of NIT Document Rs. 5000/- (to be submitted in the form of (non-
refundable) Demand Draft in favour of “Accounts
Officer/Cash, UHBVN, Shakti Bhawan, Sector- 6,
Panchkula”
EMD/ Bid Bond Earnest Money @ Rs. 10 Lakh / MW / Project is to
be submitted in the form of Bank Guarantee along
with the tender documents
Contract Performance Guarantee Rs. 3O Lakh/ MW within 30 Days of award of LOI
Net Worth requirement 2 Crore per MW
Name, Designation, Address and other
details (For Submission of tender)
Chief Engineer ( HPPC)
Shakti Bhawan, Sector 6 Panchkula,
Haryana
Tel No.0172-2583728, Tele Fax No. 0172-2586836
Website: www.uhbvn.com
E-mail : cehppc@gmail.com
PENALTIES IN CASE OF DELAYED COMMISSIONING
The Commissioning / Scheduled Delivery Date of Solar PV Power Plant shall be within one Year from the
date of signing of PPA
For not achieving Scheduled Delivery Date, HPPC shall encash the Bank Guarantee (BG) in the following
manner:
1. Delay up to one(1) month - 10% of the total Contract Performance bank guarantee.
2. Delay of more than One (1) month and up to two (2) months - 20% of the total Performance
Bank Guarantee in addition to BG in clause-i above.
3. Delay of more than Two (2) months and up to three (3) months - 30% of the total Performance
Bank Guarantee in addition to BG in clause- i & ii above.
4. Delay of more than four (4) months - the remaining Performance Bank Guarantees. v. Delay in
the timelines for over and above four (4) months will lead to create the necessary grounds for
HPPC for termination of PPA.
5. If Schedule Delivery Date is delayed due to construction of transmission line by Government of
Haryana, then no penalty shall be imposed on the developer.
Method of Submission
Bids are to be submitted in a single closed cover envelope containing Envelope I (Non-Financial Bid) and
Envelope II (Financial Bid) each one duly closed separately. Envelope I (Non-Financial Bid) and Envelope
II (Financial Bid) should be transcript in the following way;
A. Envelope I (Non-Financial Bid) Superscript as:
EnvironmentFirst
“Let the Environment be your first Inspiration”
Registered Office: EnvironmentFirst Energy Services (P) Ltd.; Prakrati Corporate, 405 – Block A; Y N Road, Indore – 452001 (M.P.)
info@environmentfirst.in +91 731 6007860 www.environmentfirst.in
Representative Locations: Mumbai, Delhi, Chennai, Ahmedabad, Jaipur, Panchkula
Envelope I: Non-Financial Bid for “Selection of Bidders(s) for Procurement of 150 MW
Power from Grid Connected Solar PV Power Projects through Tariff Based Competitive Bidding
Process”
Name of the Bidder:
________________________
________________________
________________________
Due for opening on 25.06.2015
B. Envelope II (Financial Bid) Superscript as:
Envelope II: Financial Bid for “Selection of Bidder(s) for Procurement of 150 MW Power from
Grid Connected Solar PV Power Projects through Tariff Based Competitive Bidding Process”
Name of the Bidder:
________________________
________________________
________________________
In Case the Bidder is offering capacity from more than one generation source, the financial bid
from different sources should be sealed in separate envelopes mentioning the location in terms
of district and state in India and capacity of project applied for and shall be placed in Envelope II.
C. EVALUATION CRITERIA
Bid Evaluation The evaluation process comprises the following four steps:
• Step I – Responsiveness check
• Step II – Bid Evaluation of Non-Financial Bid
• Step III – Evaluation of Financial Bid • Step IV – Successful Bidder(s) selection
For Further Details you can reach us at
EnvironmentFirst Energy Services (P) Ltd.
405 A I Prakrati Corporate I Y N Road I Indore 452001
Branches- Mumbai, Delhi, Jaipur, Panchkula,Chennai
Phone- 0731 6007860, 2970493
E-mail- info@environmentfirst.in
Web- www.environmentfirst.in

More Related Content

More from Harish Sharma

MNRE recomendations to States for the Solar Street Lighting Systems
MNRE recomendations to States for the Solar Street Lighting SystemsMNRE recomendations to States for the Solar Street Lighting Systems
MNRE recomendations to States for the Solar Street Lighting Systems
Harish Sharma
 
MNRE Clarification on the capacity with respect to inverter and eligibility o...
MNRE Clarification on the capacity with respect to inverter and eligibility o...MNRE Clarification on the capacity with respect to inverter and eligibility o...
MNRE Clarification on the capacity with respect to inverter and eligibility o...
Harish Sharma
 
MNRE Guidelines for off-grid and grid connected Solar DC System
MNRE Guidelines for off-grid and grid connected Solar DC SystemMNRE Guidelines for off-grid and grid connected Solar DC System
MNRE Guidelines for off-grid and grid connected Solar DC System
Harish Sharma
 
Future of solar Power Projects in India
Future of solar Power Projects in IndiaFuture of solar Power Projects in India
Future of solar Power Projects in India
Harish Sharma
 
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IVRfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
Harish Sharma
 
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
Harish Sharma
 
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-IIIRfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
Harish Sharma
 
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESHRfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
Harish Sharma
 
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Harish Sharma
 
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
Harish Sharma
 
PPA draft for the development of solar power project in the state of Karnataka
PPA draft for the development of solar power project in the state of KarnatakaPPA draft for the development of solar power project in the state of Karnataka
PPA draft for the development of solar power project in the state of Karnataka
Harish Sharma
 
RfP for tariff based competitive bidding by KREDL for the installation of 240...
RfP for tariff based competitive bidding by KREDL for the installation of 240...RfP for tariff based competitive bidding by KREDL for the installation of 240...
RfP for tariff based competitive bidding by KREDL for the installation of 240...
Harish Sharma
 
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
Harish Sharma
 
RfP for 1200 MW SOLAR POWER PROJECTS IN KARNATAKA
RfP for 1200 MW SOLAR  POWER PROJECTS IN KARNATAKARfP for 1200 MW SOLAR  POWER PROJECTS IN KARNATAKA
RfP for 1200 MW SOLAR POWER PROJECTS IN KARNATAKA
Harish Sharma
 
Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.
Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.
Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.
Harish Sharma
 
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...
Harish Sharma
 
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in PunjabScheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Harish Sharma
 
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...
Harish Sharma
 
Water Benefit Standard (WBS)
Water Benefit Standard (WBS) Water Benefit Standard (WBS)
Water Benefit Standard (WBS)
Harish Sharma
 
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Harish Sharma
 

More from Harish Sharma (20)

MNRE recomendations to States for the Solar Street Lighting Systems
MNRE recomendations to States for the Solar Street Lighting SystemsMNRE recomendations to States for the Solar Street Lighting Systems
MNRE recomendations to States for the Solar Street Lighting Systems
 
MNRE Clarification on the capacity with respect to inverter and eligibility o...
MNRE Clarification on the capacity with respect to inverter and eligibility o...MNRE Clarification on the capacity with respect to inverter and eligibility o...
MNRE Clarification on the capacity with respect to inverter and eligibility o...
 
MNRE Guidelines for off-grid and grid connected Solar DC System
MNRE Guidelines for off-grid and grid connected Solar DC SystemMNRE Guidelines for off-grid and grid connected Solar DC System
MNRE Guidelines for off-grid and grid connected Solar DC System
 
Future of solar Power Projects in India
Future of solar Power Projects in IndiaFuture of solar Power Projects in India
Future of solar Power Projects in India
 
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IVRfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
 
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
 
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-IIIRfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
 
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESHRfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
 
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
 
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
 
PPA draft for the development of solar power project in the state of Karnataka
PPA draft for the development of solar power project in the state of KarnatakaPPA draft for the development of solar power project in the state of Karnataka
PPA draft for the development of solar power project in the state of Karnataka
 
RfP for tariff based competitive bidding by KREDL for the installation of 240...
RfP for tariff based competitive bidding by KREDL for the installation of 240...RfP for tariff based competitive bidding by KREDL for the installation of 240...
RfP for tariff based competitive bidding by KREDL for the installation of 240...
 
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
 
RfP for 1200 MW SOLAR POWER PROJECTS IN KARNATAKA
RfP for 1200 MW SOLAR  POWER PROJECTS IN KARNATAKARfP for 1200 MW SOLAR  POWER PROJECTS IN KARNATAKA
RfP for 1200 MW SOLAR POWER PROJECTS IN KARNATAKA
 
Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.
Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.
Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.
 
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...
 
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in PunjabScheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
 
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...
 
Water Benefit Standard (WBS)
Water Benefit Standard (WBS) Water Benefit Standard (WBS)
Water Benefit Standard (WBS)
 
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
 

Recently uploaded

Characterization and the Kinetics of drying at the drying oven and with micro...
Characterization and the Kinetics of drying at the drying oven and with micro...Characterization and the Kinetics of drying at the drying oven and with micro...
Characterization and the Kinetics of drying at the drying oven and with micro...
Open Access Research Paper
 
Enhanced action and stakeholder engagement for sustainable peatland management
Enhanced action and stakeholder engagement for sustainable peatland managementEnhanced action and stakeholder engagement for sustainable peatland management
Enhanced action and stakeholder engagement for sustainable peatland management
Global Landscapes Forum (GLF)
 
Epcon is One of the World's leading Manufacturing Companies.
Epcon is One of the World's leading Manufacturing Companies.Epcon is One of the World's leading Manufacturing Companies.
Epcon is One of the World's leading Manufacturing Companies.
EpconLP
 
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
zm9ajxup
 
Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Improving the Management of Peatlands and the Capacities of Stakeholders in I...Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Global Landscapes Forum (GLF)
 
Altered Terrain: Colonial Encroachment and Environmental Changes in Cachar, A...
Altered Terrain: Colonial Encroachment and Environmental Changes in Cachar, A...Altered Terrain: Colonial Encroachment and Environmental Changes in Cachar, A...
Altered Terrain: Colonial Encroachment and Environmental Changes in Cachar, A...
PriyankaKilaniya
 
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for..."Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
MMariSelvam4
 
Peatland Management in Indonesia, Science to Policy and Knowledge Education
Peatland Management in Indonesia, Science to Policy and Knowledge EducationPeatland Management in Indonesia, Science to Policy and Knowledge Education
Peatland Management in Indonesia, Science to Policy and Knowledge Education
Global Landscapes Forum (GLF)
 
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business VenturesWillie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
greendigital
 
Peatlands of Latin America and the Caribbean
Peatlands of Latin America and the CaribbeanPeatlands of Latin America and the Caribbean
Peatlands of Latin America and the Caribbean
Global Landscapes Forum (GLF)
 
Wildlife-AnIntroduction.pdf so that you know more about our environment
Wildlife-AnIntroduction.pdf so that you know more about our environmentWildlife-AnIntroduction.pdf so that you know more about our environment
Wildlife-AnIntroduction.pdf so that you know more about our environment
amishajha2407
 
Global Peatlands Map and Hotspot Explanation Atlas
Global Peatlands Map and Hotspot Explanation AtlasGlobal Peatlands Map and Hotspot Explanation Atlas
Global Peatlands Map and Hotspot Explanation Atlas
Global Landscapes Forum (GLF)
 
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdfUNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
JulietMogola
 
Top 8 Strategies for Effective Sustainable Waste Management.pdf
Top 8 Strategies for Effective Sustainable Waste Management.pdfTop 8 Strategies for Effective Sustainable Waste Management.pdf
Top 8 Strategies for Effective Sustainable Waste Management.pdf
Jhon Wick
 
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptxAGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
BanitaDsouza
 
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian AmazonAlert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
CIFOR-ICRAF
 
Climate Change All over the World .pptx
Climate Change All over the World  .pptxClimate Change All over the World  .pptx
Climate Change All over the World .pptx
sairaanwer024
 
Artificial Reefs by Kuddle Life Foundation - May 2024
Artificial Reefs by Kuddle Life Foundation - May 2024Artificial Reefs by Kuddle Life Foundation - May 2024
Artificial Reefs by Kuddle Life Foundation - May 2024
punit537210
 
Celebrating World-environment-day-2024.pdf
Celebrating  World-environment-day-2024.pdfCelebrating  World-environment-day-2024.pdf
Celebrating World-environment-day-2024.pdf
rohankumarsinghrore1
 
Daan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like itDaan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like it
a0966109726
 

Recently uploaded (20)

Characterization and the Kinetics of drying at the drying oven and with micro...
Characterization and the Kinetics of drying at the drying oven and with micro...Characterization and the Kinetics of drying at the drying oven and with micro...
Characterization and the Kinetics of drying at the drying oven and with micro...
 
Enhanced action and stakeholder engagement for sustainable peatland management
Enhanced action and stakeholder engagement for sustainable peatland managementEnhanced action and stakeholder engagement for sustainable peatland management
Enhanced action and stakeholder engagement for sustainable peatland management
 
Epcon is One of the World's leading Manufacturing Companies.
Epcon is One of the World's leading Manufacturing Companies.Epcon is One of the World's leading Manufacturing Companies.
Epcon is One of the World's leading Manufacturing Companies.
 
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
 
Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Improving the Management of Peatlands and the Capacities of Stakeholders in I...Improving the Management of Peatlands and the Capacities of Stakeholders in I...
Improving the Management of Peatlands and the Capacities of Stakeholders in I...
 
Altered Terrain: Colonial Encroachment and Environmental Changes in Cachar, A...
Altered Terrain: Colonial Encroachment and Environmental Changes in Cachar, A...Altered Terrain: Colonial Encroachment and Environmental Changes in Cachar, A...
Altered Terrain: Colonial Encroachment and Environmental Changes in Cachar, A...
 
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for..."Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
 
Peatland Management in Indonesia, Science to Policy and Knowledge Education
Peatland Management in Indonesia, Science to Policy and Knowledge EducationPeatland Management in Indonesia, Science to Policy and Knowledge Education
Peatland Management in Indonesia, Science to Policy and Knowledge Education
 
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business VenturesWillie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
 
Peatlands of Latin America and the Caribbean
Peatlands of Latin America and the CaribbeanPeatlands of Latin America and the Caribbean
Peatlands of Latin America and the Caribbean
 
Wildlife-AnIntroduction.pdf so that you know more about our environment
Wildlife-AnIntroduction.pdf so that you know more about our environmentWildlife-AnIntroduction.pdf so that you know more about our environment
Wildlife-AnIntroduction.pdf so that you know more about our environment
 
Global Peatlands Map and Hotspot Explanation Atlas
Global Peatlands Map and Hotspot Explanation AtlasGlobal Peatlands Map and Hotspot Explanation Atlas
Global Peatlands Map and Hotspot Explanation Atlas
 
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdfUNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
 
Top 8 Strategies for Effective Sustainable Waste Management.pdf
Top 8 Strategies for Effective Sustainable Waste Management.pdfTop 8 Strategies for Effective Sustainable Waste Management.pdf
Top 8 Strategies for Effective Sustainable Waste Management.pdf
 
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptxAGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
 
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian AmazonAlert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
 
Climate Change All over the World .pptx
Climate Change All over the World  .pptxClimate Change All over the World  .pptx
Climate Change All over the World .pptx
 
Artificial Reefs by Kuddle Life Foundation - May 2024
Artificial Reefs by Kuddle Life Foundation - May 2024Artificial Reefs by Kuddle Life Foundation - May 2024
Artificial Reefs by Kuddle Life Foundation - May 2024
 
Celebrating World-environment-day-2024.pdf
Celebrating  World-environment-day-2024.pdfCelebrating  World-environment-day-2024.pdf
Celebrating World-environment-day-2024.pdf
 
Daan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like itDaan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like it
 

Notice Inviting Tender (NIT) for the procurement of Power of 150 MW Solar Power in the state of Haryana

  • 1. EnvironmentFirst “Let the Environment be your first Inspiration” Registered Office: EnvironmentFirst Energy Services (P) Ltd.; Prakrati Corporate, 405 – Block A; Y N Road, Indore – 452001 (M.P.) info@environmentfirst.in +91 731 6007860 www.environmentfirst.in Representative Locations: Mumbai, Delhi, Chennai, Ahmedabad, Jaipur, Panchkula NIT Haryana Power Purchase Centre (HPPC) on behalf of UHBVN and DHBVN Proposal of Procurement of 150 MW Power from Grid Connected Solar Power Project Objective: Haryana Power Purchase Centre on behalf of Uttar Haryana Bijli Vitran Nigam Limited (UHBVN) & Dakshin Haryana Bijli Vitran Nigam Limited( DHBVN) hereinafter referred to as HPPC acting through Chief Engineer, HPPC, Shakti Bhawan, Sector 6, Panchkula, Haryana invites interested Bidders to purchase the NIT to participate in the bidding process for the selection of Bidder(s) for procurement of 150 MW solar power for long term from Grid Connected Solar PV Power Projects through tariff based competitive bidding process for meeting its Renewable Purchase Obligations. The responsibility of the Successful Bidder(s) shall be to supply power to the Procurer(s) as per the terms and conditions of the NIT. Bid must be submitted to the address as given in the table below on or before 13.00 hours(IST) on 25.06.2015 .The techno-commercial bid will be opened at 15.00 hours on 25.06.2015 (on the same day) in presence of such bidders or their authorized representatives who would like to attend the bid opening. If it is a public holiday on the last date for submission of the Bid, the submission and the receipt of the Bid shall be on the next working day at the place of submission of Bid. The date of opening of Financial bid will be intimated later on. The Bid submitted by the bidder shall remain valid up to one hundred and eighty (180) days after the Bid Deadline (“Bid Validity”). SUMMARY of NIT/BID DOCUMENT Bid Inviting Company HPPC on Behalf of Uttar Haryana Bijli Vitran Nigam (UHBVN) and Dakshin Haryana Bijli Vitran Nigam (DHBVN) Document Description NIT for procurement of 150 MW solar power for long term from grid connected Solar PV power projects through tariff based competitive bidding process Contract Period 25 Years Total Capacity of The Bid 150 MW Method of Procurement Bidding Maximum Capacity to Bid 150 MW Minimum Capacity to Bid 1 MW NIT No.& Date 54 /CE/HPPC/LTP Dtd: 26.05.2015 Pre-bid Conference / Clarification 10.06.2015 at 11.30 A.M Last date & Time of Submission of tender 25.06.2015 (13.00 Hrs)
  • 2. EnvironmentFirst “Let the Environment be your first Inspiration” Registered Office: EnvironmentFirst Energy Services (P) Ltd.; Prakrati Corporate, 405 – Block A; Y N Road, Indore – 452001 (M.P.) info@environmentfirst.in +91 731 6007860 www.environmentfirst.in Representative Locations: Mumbai, Delhi, Chennai, Ahmedabad, Jaipur, Panchkula Date and time of Bid Opening (Tecno-Commercial) 25.06.2015 ( 15.00 Hrs) Cost of NIT Document Rs. 5000/- (to be submitted in the form of (non- refundable) Demand Draft in favour of “Accounts Officer/Cash, UHBVN, Shakti Bhawan, Sector- 6, Panchkula” EMD/ Bid Bond Earnest Money @ Rs. 10 Lakh / MW / Project is to be submitted in the form of Bank Guarantee along with the tender documents Contract Performance Guarantee Rs. 3O Lakh/ MW within 30 Days of award of LOI Net Worth requirement 2 Crore per MW Name, Designation, Address and other details (For Submission of tender) Chief Engineer ( HPPC) Shakti Bhawan, Sector 6 Panchkula, Haryana Tel No.0172-2583728, Tele Fax No. 0172-2586836 Website: www.uhbvn.com E-mail : cehppc@gmail.com PENALTIES IN CASE OF DELAYED COMMISSIONING The Commissioning / Scheduled Delivery Date of Solar PV Power Plant shall be within one Year from the date of signing of PPA For not achieving Scheduled Delivery Date, HPPC shall encash the Bank Guarantee (BG) in the following manner: 1. Delay up to one(1) month - 10% of the total Contract Performance bank guarantee. 2. Delay of more than One (1) month and up to two (2) months - 20% of the total Performance Bank Guarantee in addition to BG in clause-i above. 3. Delay of more than Two (2) months and up to three (3) months - 30% of the total Performance Bank Guarantee in addition to BG in clause- i & ii above. 4. Delay of more than four (4) months - the remaining Performance Bank Guarantees. v. Delay in the timelines for over and above four (4) months will lead to create the necessary grounds for HPPC for termination of PPA. 5. If Schedule Delivery Date is delayed due to construction of transmission line by Government of Haryana, then no penalty shall be imposed on the developer. Method of Submission Bids are to be submitted in a single closed cover envelope containing Envelope I (Non-Financial Bid) and Envelope II (Financial Bid) each one duly closed separately. Envelope I (Non-Financial Bid) and Envelope II (Financial Bid) should be transcript in the following way; A. Envelope I (Non-Financial Bid) Superscript as:
  • 3. EnvironmentFirst “Let the Environment be your first Inspiration” Registered Office: EnvironmentFirst Energy Services (P) Ltd.; Prakrati Corporate, 405 – Block A; Y N Road, Indore – 452001 (M.P.) info@environmentfirst.in +91 731 6007860 www.environmentfirst.in Representative Locations: Mumbai, Delhi, Chennai, Ahmedabad, Jaipur, Panchkula Envelope I: Non-Financial Bid for “Selection of Bidders(s) for Procurement of 150 MW Power from Grid Connected Solar PV Power Projects through Tariff Based Competitive Bidding Process” Name of the Bidder: ________________________ ________________________ ________________________ Due for opening on 25.06.2015 B. Envelope II (Financial Bid) Superscript as: Envelope II: Financial Bid for “Selection of Bidder(s) for Procurement of 150 MW Power from Grid Connected Solar PV Power Projects through Tariff Based Competitive Bidding Process” Name of the Bidder: ________________________ ________________________ ________________________ In Case the Bidder is offering capacity from more than one generation source, the financial bid from different sources should be sealed in separate envelopes mentioning the location in terms of district and state in India and capacity of project applied for and shall be placed in Envelope II. C. EVALUATION CRITERIA Bid Evaluation The evaluation process comprises the following four steps: • Step I – Responsiveness check • Step II – Bid Evaluation of Non-Financial Bid • Step III – Evaluation of Financial Bid • Step IV – Successful Bidder(s) selection For Further Details you can reach us at EnvironmentFirst Energy Services (P) Ltd. 405 A I Prakrati Corporate I Y N Road I Indore 452001 Branches- Mumbai, Delhi, Jaipur, Panchkula,Chennai Phone- 0731 6007860, 2970493 E-mail- info@environmentfirst.in Web- www.environmentfirst.in