SlideShare a Scribd company logo
1 of 3
CIS 554 Week 10 Term Paper – Strayer New
Click on The Link Below To Purchase A+ Graded Material
Instant Download
http://budapp.net/CIS-554-Week-10-Term-Paper-Strayer-New-CIS554TP.htm
Term Paper: Managing a Telecom Project
Due Week 10 and worth 200 points
This assignment consists of two (2) sections: a written project plan, and a Gantt chart
that is created through the use of MS Project. You must submit the two (2) sections
as separate files for the completion of this assignment. Label each file name
according to the section of the assignment it is written for. Additionally, you may
create and / or assume all necessary assumptions needed for the completion of this
assignment.
Due to your extensive ability and knowledge of project management, you have been
promoted as a senior project manager for a national telecom organization. For this
role, you will be responsible in managing the launch of a new telecom service that
will attract new customers. This project will require:
 Updating cloud-based systems that interface with customers. This effort
requires programmers to update databases and Web interfaces that will include
new telecom service details.
 Performing billing configurations to financial information systems. This effort
includes modifying the back-end programs that calculate billing and financial
reports data and include new telecom service rates.
 Providing training on the new service for the company’s customer service
staff. This effort includes developing an online training manual, conducting
training for customer service staff, and updating an internal Website with a
Frequently Asked Questions section for new telecom service.
Your job is to assist in the development of each described deliverable.
Your team is composed of three (3) Web-based developers, one (1) database manager,
one (1) network specialist, two (2) technical trainers, and one (1) technical writer.
They are devoted to operational management duties 30% of the time. One of the Web-
based developers has recently joined the team and has minimal experience with
configuring cloud-based systems.
The service product launch must be completed within six (6) months. Upper
management is available to supply the necessary funding required to complete this
project.
Section 1: Written Project Plan
1. Write a ten to twelve (10-12) page paper in which you:
a. Select a project management framework / methodology that could be
used to develop this project and ensure that project objectives are met.
Provide the rationale for your selection.
b. Evaluate the possibility of using agile project management for any
deliverables of the project.
c. Develop a WBS that meets the project scope. Provide details at the
activity level for the efforts required to achieve each deliverable. Note:
WBS must be in indented format as shown in Figure 5.5B in Chapter 5
of the text.
d. List all possible resources that would be required for completing this
project. Assign resources to each activity. Describe each resource’s
role and the level of experience each activity would require.
e. Utilize estimation techniques to generate estimates of costs, resources,
and durations for each activity. Determine the constraints that must be
observed and the basis for each estimate.
f. Determine the monitoring and control process that will be utilized for
the project. Include discussion on how you would perform earned
value analysis to provide details on project status. Determine the
values that could be utilized to calculate planned costs, actual costs,
and earned value.
g. Develop a quality management plan that will minimize defects for
project deliverables. Determine the frequency and metrics that will be
utilized for inspections.
h. Determine the techniques that could be used to enumerate the various
risks that may exist within the project. Recommend risk management
practices that will mitigate ongoing risks throughout the project.
i. Use at least six (6) quality resources in this assignment. Note:
Wikipedia and similar Websites do not qualify as quality resources.
Section 1 of your assignment must follow these formatting requirements:
 Be typed, double spaced, using Times New Roman font (size 12), with one-
inch margins on all sides; citations and references must follow APA or school-
specific format. Check with your professor for any additional instructions.
 Include a cover page containing the title of the assignment, the student’s
name, the professor’s name, the course title, and the date. The cover page and
the reference page are not included in the required assignment page length.
 Include charts or diagrams created in Excel, Visio, MS Project, or one of their
equivalents such as Open Project, Dia, and OpenOffice. The completed
diagrams/charts must be imported into the Word document before the paper is
submitted.
Section 2: Gantt Chart
Use Microsoft project to:
2. Create a Gantt chart in which you:
a. Record the data generated from the estimation process.
b. Describe your assumptions and declare the dependencies for the
logical succession of each activity.

More Related Content

What's hot

Status reports
Status reportsStatus reports
Status reports
Samir Sami
 
Microsoft Project 2013 Quickstart
Microsoft Project 2013 QuickstartMicrosoft Project 2013 Quickstart
Microsoft Project 2013 Quickstart
comatsg
 
Project management by MS Project 2010
Project management by MS Project 2010Project management by MS Project 2010
Project management by MS Project 2010
Wadhwani Foundation
 

What's hot (15)

One page effective project status report
One page effective project status reportOne page effective project status report
One page effective project status report
 
Applying Monte Carlo Simulation to Microsoft Project Schedules
Applying Monte Carlo Simulation to Microsoft Project SchedulesApplying Monte Carlo Simulation to Microsoft Project Schedules
Applying Monte Carlo Simulation to Microsoft Project Schedules
 
MS Project 2010 Getting Started
MS Project 2010 Getting StartedMS Project 2010 Getting Started
MS Project 2010 Getting Started
 
Cpmgt 303 cpmgt303
Cpmgt 303 cpmgt303Cpmgt 303 cpmgt303
Cpmgt 303 cpmgt303
 
Duration - The Holy Grail of MS Project?
Duration - The Holy Grail of MS Project?Duration - The Holy Grail of MS Project?
Duration - The Holy Grail of MS Project?
 
Project status reporting with Confluence
Project status reporting with ConfluenceProject status reporting with Confluence
Project status reporting with Confluence
 
Stayercis 518-week-9-assignment-4-software-developer-development-and-improvem...
Stayercis 518-week-9-assignment-4-software-developer-development-and-improvem...Stayercis 518-week-9-assignment-4-software-developer-development-and-improvem...
Stayercis 518-week-9-assignment-4-software-developer-development-and-improvem...
 
Practical Use of Microsoft Project for Project Managers
Practical Use of Microsoft Project for Project ManagersPractical Use of Microsoft Project for Project Managers
Practical Use of Microsoft Project for Project Managers
 
Status reports
Status reportsStatus reports
Status reports
 
Ms Project 2010 Application For PMP
Ms Project 2010 Application For PMPMs Project 2010 Application For PMP
Ms Project 2010 Application For PMP
 
This assignment consists of three
This assignment consists of threeThis assignment consists of three
This assignment consists of three
 
Microsoft Project 2013 Quickstart
Microsoft Project 2013 QuickstartMicrosoft Project 2013 Quickstart
Microsoft Project 2013 Quickstart
 
Project 2013 - 4 Simple & Practical Steps to Mastering Reporting Basics in un...
Project 2013 - 4 Simple & Practical Steps to Mastering Reporting Basics in un...Project 2013 - 4 Simple & Practical Steps to Mastering Reporting Basics in un...
Project 2013 - 4 Simple & Practical Steps to Mastering Reporting Basics in un...
 
Project management by MS Project 2010
Project management by MS Project 2010Project management by MS Project 2010
Project management by MS Project 2010
 
Product Management Training - MS Project Training
Product Management Training - MS Project TrainingProduct Management Training - MS Project Training
Product Management Training - MS Project Training
 

Viewers also liked

Viewers also liked (16)

Cis 513 week 10 term paper – strayer new
Cis 513 week 10 term paper – strayer newCis 513 week 10 term paper – strayer new
Cis 513 week 10 term paper – strayer new
 
Acc 563 week 10 quiz – strayer new
Acc 563 week 10 quiz – strayer newAcc 563 week 10 quiz – strayer new
Acc 563 week 10 quiz – strayer new
 
Bus 505 assignment 5 – strayer new
Bus 505 assignment 5 – strayer newBus 505 assignment 5 – strayer new
Bus 505 assignment 5 – strayer new
 
Bus 499 week 10 assignment 5 – strayer new
Bus 499 week 10 assignment 5 – strayer newBus 499 week 10 assignment 5 – strayer new
Bus 499 week 10 assignment 5 – strayer new
 
Mkt 505 week 10 assignment 3 – strayer
Mkt 505 week 10 assignment 3 – strayerMkt 505 week 10 assignment 3 – strayer
Mkt 505 week 10 assignment 3 – strayer
 
Eco 405 week 10 quiz strayer
Eco 405 week 10 quiz   strayerEco 405 week 10 quiz   strayer
Eco 405 week 10 quiz strayer
 
Cis 555 week 10 term paper – strayer new
Cis 555 week 10 term paper – strayer newCis 555 week 10 term paper – strayer new
Cis 555 week 10 term paper – strayer new
 
Cis 500 week 10 term paper – strayer new
Cis 500 week 10 term paper – strayer newCis 500 week 10 term paper – strayer new
Cis 500 week 10 term paper – strayer new
 
Cis 524 week 10 term paper
Cis 524 week 10 term paperCis 524 week 10 term paper
Cis 524 week 10 term paper
 
Cis 560 week 10 term paper – strayer new
Cis 560 week 10 term paper – strayer newCis 560 week 10 term paper – strayer new
Cis 560 week 10 term paper – strayer new
 
Pad 540 week 10 assignment 4 strayer
Pad 540 week 10 assignment 4   strayerPad 540 week 10 assignment 4   strayer
Pad 540 week 10 assignment 4 strayer
 
Bus 230 week 10 quiz
Bus 230 week 10 quizBus 230 week 10 quiz
Bus 230 week 10 quiz
 
Acc 401 advanced accounting week 10 quiz
Acc 401 advanced accounting week 10 quizAcc 401 advanced accounting week 10 quiz
Acc 401 advanced accounting week 10 quiz
 
Cis 518 week 10 term paper strayer
Cis 518 week 10 term paper   strayerCis 518 week 10 term paper   strayer
Cis 518 week 10 term paper strayer
 
Bus 325 global human resource management week 10 quiz
Bus 325 global human resource management week 10 quizBus 325 global human resource management week 10 quiz
Bus 325 global human resource management week 10 quiz
 
Hrm 530 week 10 assignment 5 – strayer new
Hrm 530 week 10 assignment 5 – strayer newHrm 530 week 10 assignment 5 – strayer new
Hrm 530 week 10 assignment 5 – strayer new
 

Similar to Cis 554 week 10 term paper – strayer new

Assignment 3Risk Management and Effective Communication Plannin.docx
Assignment 3Risk Management and Effective Communication Plannin.docxAssignment 3Risk Management and Effective Communication Plannin.docx
Assignment 3Risk Management and Effective Communication Plannin.docx
danielfoster65629
 
Imagine that you have been asked to participate as a project manager.docx
Imagine that you have been asked to participate as a project manager.docxImagine that you have been asked to participate as a project manager.docx
Imagine that you have been asked to participate as a project manager.docx
joyjonna282
 
Project Deliverable 2 Business RequirementsThis assignment co.docx
Project Deliverable 2 Business RequirementsThis assignment co.docxProject Deliverable 2 Business RequirementsThis assignment co.docx
Project Deliverable 2 Business RequirementsThis assignment co.docx
anitramcroberts
 

Similar to Cis 554 week 10 term paper – strayer new (10)

Assignment 3Risk Management and Effective Communication Plannin.docx
Assignment 3Risk Management and Effective Communication Plannin.docxAssignment 3Risk Management and Effective Communication Plannin.docx
Assignment 3Risk Management and Effective Communication Plannin.docx
 
Imagine that you have been asked to participate as a project manager.docx
Imagine that you have been asked to participate as a project manager.docxImagine that you have been asked to participate as a project manager.docx
Imagine that you have been asked to participate as a project manager.docx
 
CIS 554 Education Redefined / snaptutorial.com
CIS 554  Education Redefined / snaptutorial.comCIS 554  Education Redefined / snaptutorial.com
CIS 554 Education Redefined / snaptutorial.com
 
Cis 498 Believe Possibilities / snaptutorial.com
Cis 498    Believe Possibilities / snaptutorial.comCis 498    Believe Possibilities / snaptutorial.com
Cis 498 Believe Possibilities / snaptutorial.com
 
CIS 498 Effective Communication - snaptutorial.com
CIS 498 Effective Communication - snaptutorial.comCIS 498 Effective Communication - snaptutorial.com
CIS 498 Effective Communication - snaptutorial.com
 
Cis 498 Exceptional Education - snaptutorial.com
Cis 498  Exceptional Education - snaptutorial.comCis 498  Exceptional Education - snaptutorial.com
Cis 498 Exceptional Education - snaptutorial.com
 
Cis 498Education Specialist / snaptutorial.com
Cis 498Education Specialist / snaptutorial.comCis 498Education Specialist / snaptutorial.com
Cis 498Education Specialist / snaptutorial.com
 
Project Deliverable 2 Business RequirementsThis assignment co.docx
Project Deliverable 2 Business RequirementsThis assignment co.docxProject Deliverable 2 Business RequirementsThis assignment co.docx
Project Deliverable 2 Business RequirementsThis assignment co.docx
 
Cis 498 Enhance teaching / snaptutorial.com
Cis 498   Enhance teaching / snaptutorial.comCis 498   Enhance teaching / snaptutorial.com
Cis 498 Enhance teaching / snaptutorial.com
 
Cis 498 Education Organization-snaptutorial.com
Cis 498 Education Organization-snaptutorial.comCis 498 Education Organization-snaptutorial.com
Cis 498 Education Organization-snaptutorial.com
 

Recently uploaded

Abortion pills in Doha {{ QATAR }} +966572737505) Get Cytotec
Abortion pills in Doha {{ QATAR }} +966572737505) Get CytotecAbortion pills in Doha {{ QATAR }} +966572737505) Get Cytotec
Abortion pills in Doha {{ QATAR }} +966572737505) Get Cytotec
Abortion pills in Riyadh +966572737505 get cytotec
 
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...
Klinik kandungan
 
Abortion pills in Riyadh Saudi Arabia| +966572737505 | Get Cytotec, Unwanted Kit
Abortion pills in Riyadh Saudi Arabia| +966572737505 | Get Cytotec, Unwanted KitAbortion pills in Riyadh Saudi Arabia| +966572737505 | Get Cytotec, Unwanted Kit
Abortion pills in Riyadh Saudi Arabia| +966572737505 | Get Cytotec, Unwanted Kit
Abortion pills in Riyadh +966572737505 get cytotec
 
Huawei Ransomware Protection Storage Solution Technical Overview Presentation...
Huawei Ransomware Protection Storage Solution Technical Overview Presentation...Huawei Ransomware Protection Storage Solution Technical Overview Presentation...
Huawei Ransomware Protection Storage Solution Technical Overview Presentation...
LuisMiguelPaz5
 
Simplify hybrid data integration at an enterprise scale. Integrate all your d...
Simplify hybrid data integration at an enterprise scale. Integrate all your d...Simplify hybrid data integration at an enterprise scale. Integrate all your d...
Simplify hybrid data integration at an enterprise scale. Integrate all your d...
varanasisatyanvesh
 
如何办理(UPenn毕业证书)宾夕法尼亚大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(UPenn毕业证书)宾夕法尼亚大学毕业证成绩单本科硕士学位证留信学历认证如何办理(UPenn毕业证书)宾夕法尼亚大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(UPenn毕业证书)宾夕法尼亚大学毕业证成绩单本科硕士学位证留信学历认证
acoha1
 
Abortion Clinic in Kempton Park +27791653574 WhatsApp Abortion Clinic Service...
Abortion Clinic in Kempton Park +27791653574 WhatsApp Abortion Clinic Service...Abortion Clinic in Kempton Park +27791653574 WhatsApp Abortion Clinic Service...
Abortion Clinic in Kempton Park +27791653574 WhatsApp Abortion Clinic Service...
mikehavy0
 
原件一样(UWO毕业证书)西安大略大学毕业证成绩单留信学历认证
原件一样(UWO毕业证书)西安大略大学毕业证成绩单留信学历认证原件一样(UWO毕业证书)西安大略大学毕业证成绩单留信学历认证
原件一样(UWO毕业证书)西安大略大学毕业证成绩单留信学历认证
pwgnohujw
 
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi ArabiaIn Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
ahmedjiabur940
 

Recently uploaded (20)

SAC 25 Final National, Regional & Local Angel Group Investing Insights 2024 0...
SAC 25 Final National, Regional & Local Angel Group Investing Insights 2024 0...SAC 25 Final National, Regional & Local Angel Group Investing Insights 2024 0...
SAC 25 Final National, Regional & Local Angel Group Investing Insights 2024 0...
 
Abortion pills in Doha {{ QATAR }} +966572737505) Get Cytotec
Abortion pills in Doha {{ QATAR }} +966572737505) Get CytotecAbortion pills in Doha {{ QATAR }} +966572737505) Get Cytotec
Abortion pills in Doha {{ QATAR }} +966572737505) Get Cytotec
 
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...
 
Pentesting_AI and security challenges of AI
Pentesting_AI and security challenges of AIPentesting_AI and security challenges of AI
Pentesting_AI and security challenges of AI
 
Abortion pills in Riyadh Saudi Arabia| +966572737505 | Get Cytotec, Unwanted Kit
Abortion pills in Riyadh Saudi Arabia| +966572737505 | Get Cytotec, Unwanted KitAbortion pills in Riyadh Saudi Arabia| +966572737505 | Get Cytotec, Unwanted Kit
Abortion pills in Riyadh Saudi Arabia| +966572737505 | Get Cytotec, Unwanted Kit
 
Huawei Ransomware Protection Storage Solution Technical Overview Presentation...
Huawei Ransomware Protection Storage Solution Technical Overview Presentation...Huawei Ransomware Protection Storage Solution Technical Overview Presentation...
Huawei Ransomware Protection Storage Solution Technical Overview Presentation...
 
Ranking and Scoring Exercises for Research
Ranking and Scoring Exercises for ResearchRanking and Scoring Exercises for Research
Ranking and Scoring Exercises for Research
 
Simplify hybrid data integration at an enterprise scale. Integrate all your d...
Simplify hybrid data integration at an enterprise scale. Integrate all your d...Simplify hybrid data integration at an enterprise scale. Integrate all your d...
Simplify hybrid data integration at an enterprise scale. Integrate all your d...
 
DBMS UNIT 5 46 CONTAINS NOTES FOR THE STUDENTS
DBMS UNIT 5 46 CONTAINS NOTES FOR THE STUDENTSDBMS UNIT 5 46 CONTAINS NOTES FOR THE STUDENTS
DBMS UNIT 5 46 CONTAINS NOTES FOR THE STUDENTS
 
如何办理(UPenn毕业证书)宾夕法尼亚大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(UPenn毕业证书)宾夕法尼亚大学毕业证成绩单本科硕士学位证留信学历认证如何办理(UPenn毕业证书)宾夕法尼亚大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(UPenn毕业证书)宾夕法尼亚大学毕业证成绩单本科硕士学位证留信学历认证
 
Introduction to Statistics Presentation.pptx
Introduction to Statistics Presentation.pptxIntroduction to Statistics Presentation.pptx
Introduction to Statistics Presentation.pptx
 
Abortion Clinic in Kempton Park +27791653574 WhatsApp Abortion Clinic Service...
Abortion Clinic in Kempton Park +27791653574 WhatsApp Abortion Clinic Service...Abortion Clinic in Kempton Park +27791653574 WhatsApp Abortion Clinic Service...
Abortion Clinic in Kempton Park +27791653574 WhatsApp Abortion Clinic Service...
 
原件一样(UWO毕业证书)西安大略大学毕业证成绩单留信学历认证
原件一样(UWO毕业证书)西安大略大学毕业证成绩单留信学历认证原件一样(UWO毕业证书)西安大略大学毕业证成绩单留信学历认证
原件一样(UWO毕业证书)西安大略大学毕业证成绩单留信学历认证
 
社内勉強会資料_Object Recognition as Next Token Prediction
社内勉強会資料_Object Recognition as Next Token Prediction社内勉強会資料_Object Recognition as Next Token Prediction
社内勉強会資料_Object Recognition as Next Token Prediction
 
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi ArabiaIn Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
 
Northern New England Tableau User Group (TUG) May 2024
Northern New England Tableau User Group (TUG) May 2024Northern New England Tableau User Group (TUG) May 2024
Northern New England Tableau User Group (TUG) May 2024
 
Capstone in Interprofessional Informatic // IMPACT OF COVID 19 ON EDUCATION
Capstone in Interprofessional Informatic  // IMPACT OF COVID 19 ON EDUCATIONCapstone in Interprofessional Informatic  // IMPACT OF COVID 19 ON EDUCATION
Capstone in Interprofessional Informatic // IMPACT OF COVID 19 ON EDUCATION
 
Jual Obat Aborsi Bandung (Asli No.1) Wa 082134680322 Klinik Obat Penggugur Ka...
Jual Obat Aborsi Bandung (Asli No.1) Wa 082134680322 Klinik Obat Penggugur Ka...Jual Obat Aborsi Bandung (Asli No.1) Wa 082134680322 Klinik Obat Penggugur Ka...
Jual Obat Aborsi Bandung (Asli No.1) Wa 082134680322 Klinik Obat Penggugur Ka...
 
Las implicancias del memorándum de entendimiento entre Codelco y SQM según la...
Las implicancias del memorándum de entendimiento entre Codelco y SQM según la...Las implicancias del memorándum de entendimiento entre Codelco y SQM según la...
Las implicancias del memorándum de entendimiento entre Codelco y SQM según la...
 
Credit Card Fraud Detection: Safeguarding Transactions in the Digital Age
Credit Card Fraud Detection: Safeguarding Transactions in the Digital AgeCredit Card Fraud Detection: Safeguarding Transactions in the Digital Age
Credit Card Fraud Detection: Safeguarding Transactions in the Digital Age
 

Cis 554 week 10 term paper – strayer new

  • 1. CIS 554 Week 10 Term Paper – Strayer New Click on The Link Below To Purchase A+ Graded Material Instant Download http://budapp.net/CIS-554-Week-10-Term-Paper-Strayer-New-CIS554TP.htm Term Paper: Managing a Telecom Project Due Week 10 and worth 200 points This assignment consists of two (2) sections: a written project plan, and a Gantt chart that is created through the use of MS Project. You must submit the two (2) sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for. Additionally, you may create and / or assume all necessary assumptions needed for the completion of this assignment. Due to your extensive ability and knowledge of project management, you have been promoted as a senior project manager for a national telecom organization. For this role, you will be responsible in managing the launch of a new telecom service that will attract new customers. This project will require:  Updating cloud-based systems that interface with customers. This effort requires programmers to update databases and Web interfaces that will include new telecom service details.  Performing billing configurations to financial information systems. This effort includes modifying the back-end programs that calculate billing and financial reports data and include new telecom service rates.  Providing training on the new service for the company’s customer service staff. This effort includes developing an online training manual, conducting training for customer service staff, and updating an internal Website with a Frequently Asked Questions section for new telecom service. Your job is to assist in the development of each described deliverable. Your team is composed of three (3) Web-based developers, one (1) database manager, one (1) network specialist, two (2) technical trainers, and one (1) technical writer. They are devoted to operational management duties 30% of the time. One of the Web- based developers has recently joined the team and has minimal experience with configuring cloud-based systems. The service product launch must be completed within six (6) months. Upper management is available to supply the necessary funding required to complete this project. Section 1: Written Project Plan 1. Write a ten to twelve (10-12) page paper in which you:
  • 2. a. Select a project management framework / methodology that could be used to develop this project and ensure that project objectives are met. Provide the rationale for your selection. b. Evaluate the possibility of using agile project management for any deliverables of the project. c. Develop a WBS that meets the project scope. Provide details at the activity level for the efforts required to achieve each deliverable. Note: WBS must be in indented format as shown in Figure 5.5B in Chapter 5 of the text. d. List all possible resources that would be required for completing this project. Assign resources to each activity. Describe each resource’s role and the level of experience each activity would require. e. Utilize estimation techniques to generate estimates of costs, resources, and durations for each activity. Determine the constraints that must be observed and the basis for each estimate. f. Determine the monitoring and control process that will be utilized for the project. Include discussion on how you would perform earned value analysis to provide details on project status. Determine the values that could be utilized to calculate planned costs, actual costs, and earned value. g. Develop a quality management plan that will minimize defects for project deliverables. Determine the frequency and metrics that will be utilized for inspections. h. Determine the techniques that could be used to enumerate the various risks that may exist within the project. Recommend risk management practices that will mitigate ongoing risks throughout the project. i. Use at least six (6) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources. Section 1 of your assignment must follow these formatting requirements:  Be typed, double spaced, using Times New Roman font (size 12), with one- inch margins on all sides; citations and references must follow APA or school- specific format. Check with your professor for any additional instructions.  Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.  Include charts or diagrams created in Excel, Visio, MS Project, or one of their equivalents such as Open Project, Dia, and OpenOffice. The completed diagrams/charts must be imported into the Word document before the paper is submitted. Section 2: Gantt Chart Use Microsoft project to: 2. Create a Gantt chart in which you: a. Record the data generated from the estimation process.
  • 3. b. Describe your assumptions and declare the dependencies for the logical succession of each activity.