SlideShare a Scribd company logo
1 of 6
Download to read offline
airsight
Wind Turbines & Aviation Safety
Wind Turbines & Aviation Safety
airsight supports wind farm developers to resolve complex wind farm planning issues related to aviation. As expert in
aerodrome operations and air traffic control, airsight provide its expertise to make complex wind turbine projects pos-
sible and to optimise assets allocation.
Introduction
Thegrowthofwindenergyleadstomoreandmoreturbines
being constructed near aerodromes. With a height of 150 m
or more wind turbines can represent a serious obstacle for
aircraft. In addition, in the vicinity of smaller airports where
flight operations are conducted under visual flight rules,
wind plants may represent a serious hazard to airport
operations. Turbines can further have adverse effects on
radar signals (e.g. reflection, distortion) which affect the
safety of flight operations.
Therefore, when wind turbines are placed nearby airfields,
it is necessary to consider all possible impacts on the
safety of flight operations during planning and approval
procedures.
International aviation regulations state that: „objects
which extend to a height of 150 m or more above
ground elevation shall be regarded as obstacles,
unless an aeronautical study indicates that they do
not constitute a hazard to aeroplanes.”
ICAO Annex 14
airsightanditspartnersassistsprojectdevelopersplanning
new wind farms or single wind turbines in considering all
aeronautical related aspects and in obtaining required
authorisations.
Services
■■ Determination of possible constructible areas, and opti-
misation of the positionning of wind turbines
■■ Compliance verification of proposed facilities against
applicable aviation regulations
■■ Obstacle clearance examination for approach and
departure procedures for instrument, as well as visual
flight conditions
■■ Compatibility assessments with aviation‘s Communica-
tion, Navigation and Surveillance equipment
■■ Development of mitigation measures (e.g. adaptation of
existing flight procedures)
■■ Assisting in obtaining required authorisations from
authorities and Air Navigation Service Providers
Wind Turbines & Aviation Safety
Selected Experience
■■ Stadtlohn: 15 WEA, 200 Meter über Grund, ca. 3,5 km
Wind Turbines and Aerodrome Operations
Wind turbines represent a physical obstacle to air
operations. To minimise the risk of collision, the
International Civil Aviation Organisation (ICAO) developed
a set of regulations related to obstacles in the vicinity of
aerodromes. These requirements are very complex, and
represent a major restriction to new constructions of wind
farms.
airsight’s core competence is to deliver specialised
expertise in the assessment of potential aeronautical
obstacles. As demonstrated in numerous projects, airsight
can assist project developers in defining the possible
constructible area at an early project stage, as well as to
evaluate and mitigate the impact of wind turbines on air
operations - while taking into account diverging external
stakeholders’ interests (aerodromes, aviation/military
authorities, air navigation service providers).
Most project developers only consider ICAO Annex 14 Obstacle Limitations Surfaces (OLS) when planning a wind farm in
the vicinity of an aerodrome. This approach has a lot of limitations: it may greatly restrict the constructible area, and leave
safety aspects unconsidered – possibly resulting in an objection of the project by the authorities.
airsight, as an expert in both airport operations and air traffic control, uses a more detailed approach enabling project
developers to maximise their constructible areas and take all parameters into account. airsight assessments consider
not only ICAO OLS criteria, but also ICAO PANS-OPS assessment surfaces and principles: these surfaces are generally less
conservative as the simplified OLS models – but require in-depth expertise and tools in this subject area.
Visual Flight Rules Patterns and Routes
The assessment of Visual Flight Rules (VFR) procedures is often
neglected by project developers or non-experienced consultants.
If not properly considered, it may result in a rejection or objection
by the authorities after months of planning!
A simple example, as illustrated on the left, is that ICAO OLS
may not always protect VFR operations. To further complexify
the problem – these procedures are not always published or
accordingly regulated at a national level.
Optimisation of existing flight procedures
A conflict of interest often exists between wind farm developers
and airspace users: existing routes greatly restrict the installation
of wind turbines. Nevertheless, these conflicts may be resolved
by redesigning existing procedures in collaboration with the
stakeholders.
airsight has the capabilities to liaise with the affected aerodromes
and adapt flight procedures to facilitate the feasibility of a wind
farm installation. In this analysis, all factors are considered such
as airspace restrictions, general obstacle environment, IFR flight
procedures of other aerodromes nearby or noise issues.
Wind Turbines & Aviation Safety
Selected Experience
Wind Turbines and CNS Compability
Wind turbines may cause interferences on Communication
Navigation Surveillance (CNS) equipment (radar,
Instrument Landing System, VOR/DME/NDB, etc.) and
consequently can affect the safety of air operations.
Therefore, project developers must either comply with very
restrictive requirements, or demonstrate that proposed
developments do not interfere with CNS equipment.
airsight assist project developers in the planning phase in
minimising interference issues with CNS equipment while
avoiding costly measures (design revisions, relocation,
or reorientation) as well as in obtaining the relevant
approvals from relevant stakeholders (aerodromes,
aviation authorities, air navigation service providers).
airsightanditspartnersconductsitespecificassessmentssupportedbynumericalsimulationstoverifytheavailability
or quality of CNS signals, and demonstrate to the authorities the feasibility of the proposed project.
European guidance is provided by ICAO EUR Doc 015
(managing building restricted areas). This document is
internationally recognised and defines basic surfaces for
the protection of CNS facilities.
These surfaces are often considered as arbitrary and
very restrictive, resulting in major limitations for project
developers, e.g. no wind turbine can be installed within
a 15km radius from a radar antenna.
Nevertheless, case-by-case analysis can be conducted
in collaboration with the local air navigation service
providers, and in many cases simple and cost efficient
mitigating measures can be investigated.
Such investigation considers numerous factors, such as the flight procedures, the redundancy of systems, the exact
topographical situation, the signal characteristics, as well as new technological development (e.g. satellite based
navigation, filtering and signal processing). These assessments enables more flexibility in the planning of wind farms,
while fulfilling the interests of all stakeholders.
Headline Mengentext
Unterzeile Mengentext
Mengentext. The International Civil Aviation Organisation
(ICAO) Annex 14 contains the Standards and Recommen-
ded Practices (specifications) that prescribe the physical
Wind Turbines & Aviation Safety
Why airsight?
■■ Detailed knowledge of national and international regulations through many years of experiences in aviation projects,
consulting and teaching activities
■■ Dedicated and highly qualified team of experts with extensive references on safety assessments, flight operations/
procedures as well as obstacle assessments
■■ Worldwide experience in dealing with National Aviation Authorities (incl. military) as well as projects involving
stakeholders with diverging interests (airports, airlines, air navigation service providers, project developers)
■■ Highlyefficientevaluationsofspecificareas(e.g.assessmentofobstacles)throughtheuseofspecializedsoftwaresolutions
References
■■ airsight methodologies for the safety assessment at aerodromes are recognised by Civil Aviation Authorities in e.g.
Germany, Austria, Switzerland, Ireland, Luxembourg, Belgium, Turkey, United Arab Emirates, New Zealand, etc.
■■ airsight has assessed in the last three years the installation of more than wind 70 turbines in 15 individual projects,
involving complex requirements, such as installation up to 1.5 km from aerodromes with heights 200m above ground.
airsight GmbH
Gustav-Meyer-Allee 25
13355 Berlin
Germany
Tel: 	 +49 30 45 80 31 77
Fax: 	 +49 30 45 80 31 88
Email: 	 info@airsight.de
Web: 	 www.airsight.de
airsight is an experienced and well-established company providing airports, air navigation service providers as well as civil
aviation authorities and organisations with consulting and engineering services, training and software.
The airsight portfolio includes topics such as aerodrome design and operations, airport capacity and simulation, flight
procedure design and obstacles assessment, aircraft noise, safety regulations and oversight, safety assessment and safety
management systems supported by airsight’s A-SMS software. airsight has an excellent track record, as the company
conducted more than 400 consulting projects at 45 international airports since year 1999, including Bahrain, Brussels,
Doha, Dubai, Dublin, Luxembourg, Malta, Warsaw, Vienna, Vilnius, Zurich, as well as most major German airports (e.g.
Berlin, Dusseldorf, Frankfurt Main and Munich Airports).
Case Study - Safety Assessment of non-compliant wind-turbine lighting systems
Under Visual Flight Rules, pilots navigate under the principle
“see and avoid”. In night conditions, wind turbines therefore
have to be equipped with appropriate lighting, defined by
international and national regulations. As of today, some very
largewindturbines(heightaround200m)lightingsystemsmay
deviate from these regulations. For instance, some turbines
may be compliant with international regulations (ICAO) – but
not with the national regulations of the countries they will
be installed. In case such standards cannot be met, e.g. for
technical or economical reasons, a Safety Assessment can
determine if such non compliances can be tolerated, or define
alternative means or mitigating measures to ensure safe air
operations. airsight successfully conducted such assessments,
enabling wind turbines’ manufacturers and project developers
to provide their solutions with less restrictions.
airsight GmbH
Gustav-Meyer-Allee 25
13355 Berlin
Germany
Tel +49 30 45 80 31 77
Fax +49 30 45 80 31 88
info@airsight.de
www.airsight.de
2016-03

More Related Content

What's hot

20140211 critical-electronics-for-aircraft
20140211 critical-electronics-for-aircraft20140211 critical-electronics-for-aircraft
20140211 critical-electronics-for-aircraftCISEC
 
Airside Ops & Ntm
Airside Ops & NtmAirside Ops & Ntm
Airside Ops & NtmAiDY
 
Carolina Rius Alarco - liabilities and automation in aviation - rpas
Carolina Rius Alarco - liabilities and automation in aviation - rpasCarolina Rius Alarco - liabilities and automation in aviation - rpas
Carolina Rius Alarco - liabilities and automation in aviation - rpasALIAS Network
 
A Look at the Emerging Security Threats to the Aviation Industry
A Look at the Emerging Security Threats to the Aviation IndustryA Look at the Emerging Security Threats to the Aviation Industry
A Look at the Emerging Security Threats to the Aviation IndustryDominic_White
 
General Aviation Security
General Aviation SecurityGeneral Aviation Security
General Aviation SecurityERAUWebinars
 
Everest Events - EASA & Continuing Airworthiness Seminar - 29 apr 2014
Everest Events - EASA & Continuing Airworthiness Seminar - 29 apr 2014Everest Events - EASA & Continuing Airworthiness Seminar - 29 apr 2014
Everest Events - EASA & Continuing Airworthiness Seminar - 29 apr 2014Cranfield University
 
Management of Change 22.4.15
Management of Change 22.4.15Management of Change 22.4.15
Management of Change 22.4.15SANJIV SONI
 
Emergency procedure at height
Emergency procedure at heightEmergency procedure at height
Emergency procedure at heightMECandPMV
 
Aircraft safety-systems-in-the-spotlight-thematic-report
Aircraft safety-systems-in-the-spotlight-thematic-reportAircraft safety-systems-in-the-spotlight-thematic-report
Aircraft safety-systems-in-the-spotlight-thematic-reportAranca
 
Aircraft Safety Systems: In The Spotlight - An Aranca Report
Aircraft Safety Systems: In The Spotlight - An Aranca ReportAircraft Safety Systems: In The Spotlight - An Aranca Report
Aircraft Safety Systems: In The Spotlight - An Aranca ReportAranca
 
The digital revolution comes to Aircraft Maintenance, Repair and Overhaul (MRO)
The digital revolution comes to Aircraft Maintenance, Repair and Overhaul (MRO)The digital revolution comes to Aircraft Maintenance, Repair and Overhaul (MRO)
The digital revolution comes to Aircraft Maintenance, Repair and Overhaul (MRO)PMI-Montréal
 
HFDM Best Practices Document_V1.1
HFDM Best Practices Document_V1.1HFDM Best Practices Document_V1.1
HFDM Best Practices Document_V1.1Mike Pilgrim
 
Cybersecurity - Dominic Nessi, Former CIO, Los Angeles World Airports
Cybersecurity - Dominic Nessi, Former CIO, Los Angeles World AirportsCybersecurity - Dominic Nessi, Former CIO, Los Angeles World Airports
Cybersecurity - Dominic Nessi, Former CIO, Los Angeles World AirportsSITA
 
airsight - UAV airport pavement inspections
airsight - UAV airport pavement inspectionsairsight - UAV airport pavement inspections
airsight - UAV airport pavement inspectionsairsight GmbH
 
White Card Update: Most Common Construction Site Accidents
White Card Update: Most Common Construction Site AccidentsWhite Card Update: Most Common Construction Site Accidents
White Card Update: Most Common Construction Site Accidentswhitecardcourse
 
Garfield Dean - Acas x overview
Garfield Dean - Acas x overviewGarfield Dean - Acas x overview
Garfield Dean - Acas x overviewALIAS Network
 

What's hot (17)

20140211 critical-electronics-for-aircraft
20140211 critical-electronics-for-aircraft20140211 critical-electronics-for-aircraft
20140211 critical-electronics-for-aircraft
 
Airside Ops & Ntm
Airside Ops & NtmAirside Ops & Ntm
Airside Ops & Ntm
 
Carolina Rius Alarco - liabilities and automation in aviation - rpas
Carolina Rius Alarco - liabilities and automation in aviation - rpasCarolina Rius Alarco - liabilities and automation in aviation - rpas
Carolina Rius Alarco - liabilities and automation in aviation - rpas
 
A Look at the Emerging Security Threats to the Aviation Industry
A Look at the Emerging Security Threats to the Aviation IndustryA Look at the Emerging Security Threats to the Aviation Industry
A Look at the Emerging Security Threats to the Aviation Industry
 
General Aviation Security
General Aviation SecurityGeneral Aviation Security
General Aviation Security
 
Everest Events - EASA & Continuing Airworthiness Seminar - 29 apr 2014
Everest Events - EASA & Continuing Airworthiness Seminar - 29 apr 2014Everest Events - EASA & Continuing Airworthiness Seminar - 29 apr 2014
Everest Events - EASA & Continuing Airworthiness Seminar - 29 apr 2014
 
Management of Change 22.4.15
Management of Change 22.4.15Management of Change 22.4.15
Management of Change 22.4.15
 
Emergency procedure at height
Emergency procedure at heightEmergency procedure at height
Emergency procedure at height
 
Aircraft safety-systems-in-the-spotlight-thematic-report
Aircraft safety-systems-in-the-spotlight-thematic-reportAircraft safety-systems-in-the-spotlight-thematic-report
Aircraft safety-systems-in-the-spotlight-thematic-report
 
Aircraft Safety Systems: In The Spotlight - An Aranca Report
Aircraft Safety Systems: In The Spotlight - An Aranca ReportAircraft Safety Systems: In The Spotlight - An Aranca Report
Aircraft Safety Systems: In The Spotlight - An Aranca Report
 
The digital revolution comes to Aircraft Maintenance, Repair and Overhaul (MRO)
The digital revolution comes to Aircraft Maintenance, Repair and Overhaul (MRO)The digital revolution comes to Aircraft Maintenance, Repair and Overhaul (MRO)
The digital revolution comes to Aircraft Maintenance, Repair and Overhaul (MRO)
 
Aviation Audit
 Aviation Audit Aviation Audit
Aviation Audit
 
HFDM Best Practices Document_V1.1
HFDM Best Practices Document_V1.1HFDM Best Practices Document_V1.1
HFDM Best Practices Document_V1.1
 
Cybersecurity - Dominic Nessi, Former CIO, Los Angeles World Airports
Cybersecurity - Dominic Nessi, Former CIO, Los Angeles World AirportsCybersecurity - Dominic Nessi, Former CIO, Los Angeles World Airports
Cybersecurity - Dominic Nessi, Former CIO, Los Angeles World Airports
 
airsight - UAV airport pavement inspections
airsight - UAV airport pavement inspectionsairsight - UAV airport pavement inspections
airsight - UAV airport pavement inspections
 
White Card Update: Most Common Construction Site Accidents
White Card Update: Most Common Construction Site AccidentsWhite Card Update: Most Common Construction Site Accidents
White Card Update: Most Common Construction Site Accidents
 
Garfield Dean - Acas x overview
Garfield Dean - Acas x overviewGarfield Dean - Acas x overview
Garfield Dean - Acas x overview
 

Similar to airsight - Wind Turbines & Aviation Safety

airsight GmbH - Selected Projects
airsight GmbH - Selected Projectsairsight GmbH - Selected Projects
airsight GmbH - Selected Projectsairsight GmbH
 
Challenges to airport
Challenges to airportChallenges to airport
Challenges to airportAnshu Nair
 
cyber security-in_civil_aviation_2012 august_CPNI
cyber security-in_civil_aviation_2012 august_CPNIcyber security-in_civil_aviation_2012 august_CPNI
cyber security-in_civil_aviation_2012 august_CPNIfEngel
 
Cat iii presentation
Cat iii presentationCat iii presentation
Cat iii presentationAmit Kumar
 
Air Traffic Control Database Management System for Seamless Transit
Air Traffic Control Database Management System for Seamless TransitAir Traffic Control Database Management System for Seamless Transit
Air Traffic Control Database Management System for Seamless TransitIRJET Journal
 
CONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAM
CONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAMCONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAM
CONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAMiQHub
 
Maurizio Mancini - the ansp perspective
Maurizio Mancini - the ansp perspectiveMaurizio Mancini - the ansp perspective
Maurizio Mancini - the ansp perspectiveALIAS Network
 
Avlite brochure-complete-heliport-solutions-faa-v2-2016-individual-pages lett...
Avlite brochure-complete-heliport-solutions-faa-v2-2016-individual-pages lett...Avlite brochure-complete-heliport-solutions-faa-v2-2016-individual-pages lett...
Avlite brochure-complete-heliport-solutions-faa-v2-2016-individual-pages lett...ssusere5d717
 
Batangas Airport.pdf
Batangas Airport.pdfBatangas Airport.pdf
Batangas Airport.pdfssuser553bbc
 
Batangas Airport Philippines.pdf
Batangas Airport Philippines.pdfBatangas Airport Philippines.pdf
Batangas Airport Philippines.pdfssuser553bbc
 
airside operation 3
airside operation 3airside operation 3
airside operation 3AiDY
 
AIRSEDE OPERATION
AIRSEDE OPERATIONAIRSEDE OPERATION
AIRSEDE OPERATIONAiDY
 
Report on airport engineering
Report on airport engineeringReport on airport engineering
Report on airport engineeringAbhishekChavan63
 
IRJET- Construction Planning and management of Airport
IRJET-  	  Construction Planning and management of AirportIRJET-  	  Construction Planning and management of Airport
IRJET- Construction Planning and management of AirportIRJET Journal
 
Managing_Airport_Construction_Projects
Managing_Airport_Construction_ProjectsManaging_Airport_Construction_Projects
Managing_Airport_Construction_ProjectsDr. Anders Adrem
 

Similar to airsight - Wind Turbines & Aviation Safety (20)

airsight GmbH - Selected Projects
airsight GmbH - Selected Projectsairsight GmbH - Selected Projects
airsight GmbH - Selected Projects
 
Challenges to airport
Challenges to airportChallenges to airport
Challenges to airport
 
cyber security-in_civil_aviation_2012 august_CPNI
cyber security-in_civil_aviation_2012 august_CPNIcyber security-in_civil_aviation_2012 august_CPNI
cyber security-in_civil_aviation_2012 august_CPNI
 
Cat iii presentation
Cat iii presentationCat iii presentation
Cat iii presentation
 
Air Traffic Control Database Management System for Seamless Transit
Air Traffic Control Database Management System for Seamless TransitAir Traffic Control Database Management System for Seamless Transit
Air Traffic Control Database Management System for Seamless Transit
 
CONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAM
CONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAMCONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAM
CONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAM
 
Nextgen
NextgenNextgen
Nextgen
 
Maurizio Mancini - the ansp perspective
Maurizio Mancini - the ansp perspectiveMaurizio Mancini - the ansp perspective
Maurizio Mancini - the ansp perspective
 
Training Report
Training ReportTraining Report
Training Report
 
Avlite brochure-complete-heliport-solutions-faa-v2-2016-individual-pages lett...
Avlite brochure-complete-heliport-solutions-faa-v2-2016-individual-pages lett...Avlite brochure-complete-heliport-solutions-faa-v2-2016-individual-pages lett...
Avlite brochure-complete-heliport-solutions-faa-v2-2016-individual-pages lett...
 
Batangas Airport.pdf
Batangas Airport.pdfBatangas Airport.pdf
Batangas Airport.pdf
 
Batangas Airport Philippines.pdf
Batangas Airport Philippines.pdfBatangas Airport Philippines.pdf
Batangas Airport Philippines.pdf
 
airside operation 3
airside operation 3airside operation 3
airside operation 3
 
AIRSEDE OPERATION
AIRSEDE OPERATIONAIRSEDE OPERATION
AIRSEDE OPERATION
 
Report on airport engineering
Report on airport engineeringReport on airport engineering
Report on airport engineering
 
IRJET- Construction Planning and management of Airport
IRJET-  	  Construction Planning and management of AirportIRJET-  	  Construction Planning and management of Airport
IRJET- Construction Planning and management of Airport
 
Circular Runway
Circular RunwayCircular Runway
Circular Runway
 
Final report on CNS
Final report on CNSFinal report on CNS
Final report on CNS
 
Managing_Airport_Construction_Projects
Managing_Airport_Construction_ProjectsManaging_Airport_Construction_Projects
Managing_Airport_Construction_Projects
 
Sesar General presentation
Sesar  General presentationSesar  General presentation
Sesar General presentation
 

Recently uploaded

OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 

Recently uploaded (20)

OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 

airsight - Wind Turbines & Aviation Safety

  • 1. airsight Wind Turbines & Aviation Safety
  • 2. Wind Turbines & Aviation Safety airsight supports wind farm developers to resolve complex wind farm planning issues related to aviation. As expert in aerodrome operations and air traffic control, airsight provide its expertise to make complex wind turbine projects pos- sible and to optimise assets allocation. Introduction Thegrowthofwindenergyleadstomoreandmoreturbines being constructed near aerodromes. With a height of 150 m or more wind turbines can represent a serious obstacle for aircraft. In addition, in the vicinity of smaller airports where flight operations are conducted under visual flight rules, wind plants may represent a serious hazard to airport operations. Turbines can further have adverse effects on radar signals (e.g. reflection, distortion) which affect the safety of flight operations. Therefore, when wind turbines are placed nearby airfields, it is necessary to consider all possible impacts on the safety of flight operations during planning and approval procedures. International aviation regulations state that: „objects which extend to a height of 150 m or more above ground elevation shall be regarded as obstacles, unless an aeronautical study indicates that they do not constitute a hazard to aeroplanes.” ICAO Annex 14 airsightanditspartnersassistsprojectdevelopersplanning new wind farms or single wind turbines in considering all aeronautical related aspects and in obtaining required authorisations. Services ■■ Determination of possible constructible areas, and opti- misation of the positionning of wind turbines ■■ Compliance verification of proposed facilities against applicable aviation regulations ■■ Obstacle clearance examination for approach and departure procedures for instrument, as well as visual flight conditions ■■ Compatibility assessments with aviation‘s Communica- tion, Navigation and Surveillance equipment ■■ Development of mitigation measures (e.g. adaptation of existing flight procedures) ■■ Assisting in obtaining required authorisations from authorities and Air Navigation Service Providers
  • 3. Wind Turbines & Aviation Safety Selected Experience ■■ Stadtlohn: 15 WEA, 200 Meter über Grund, ca. 3,5 km Wind Turbines and Aerodrome Operations Wind turbines represent a physical obstacle to air operations. To minimise the risk of collision, the International Civil Aviation Organisation (ICAO) developed a set of regulations related to obstacles in the vicinity of aerodromes. These requirements are very complex, and represent a major restriction to new constructions of wind farms. airsight’s core competence is to deliver specialised expertise in the assessment of potential aeronautical obstacles. As demonstrated in numerous projects, airsight can assist project developers in defining the possible constructible area at an early project stage, as well as to evaluate and mitigate the impact of wind turbines on air operations - while taking into account diverging external stakeholders’ interests (aerodromes, aviation/military authorities, air navigation service providers). Most project developers only consider ICAO Annex 14 Obstacle Limitations Surfaces (OLS) when planning a wind farm in the vicinity of an aerodrome. This approach has a lot of limitations: it may greatly restrict the constructible area, and leave safety aspects unconsidered – possibly resulting in an objection of the project by the authorities. airsight, as an expert in both airport operations and air traffic control, uses a more detailed approach enabling project developers to maximise their constructible areas and take all parameters into account. airsight assessments consider not only ICAO OLS criteria, but also ICAO PANS-OPS assessment surfaces and principles: these surfaces are generally less conservative as the simplified OLS models – but require in-depth expertise and tools in this subject area. Visual Flight Rules Patterns and Routes The assessment of Visual Flight Rules (VFR) procedures is often neglected by project developers or non-experienced consultants. If not properly considered, it may result in a rejection or objection by the authorities after months of planning! A simple example, as illustrated on the left, is that ICAO OLS may not always protect VFR operations. To further complexify the problem – these procedures are not always published or accordingly regulated at a national level. Optimisation of existing flight procedures A conflict of interest often exists between wind farm developers and airspace users: existing routes greatly restrict the installation of wind turbines. Nevertheless, these conflicts may be resolved by redesigning existing procedures in collaboration with the stakeholders. airsight has the capabilities to liaise with the affected aerodromes and adapt flight procedures to facilitate the feasibility of a wind farm installation. In this analysis, all factors are considered such as airspace restrictions, general obstacle environment, IFR flight procedures of other aerodromes nearby or noise issues.
  • 4. Wind Turbines & Aviation Safety Selected Experience Wind Turbines and CNS Compability Wind turbines may cause interferences on Communication Navigation Surveillance (CNS) equipment (radar, Instrument Landing System, VOR/DME/NDB, etc.) and consequently can affect the safety of air operations. Therefore, project developers must either comply with very restrictive requirements, or demonstrate that proposed developments do not interfere with CNS equipment. airsight assist project developers in the planning phase in minimising interference issues with CNS equipment while avoiding costly measures (design revisions, relocation, or reorientation) as well as in obtaining the relevant approvals from relevant stakeholders (aerodromes, aviation authorities, air navigation service providers). airsightanditspartnersconductsitespecificassessmentssupportedbynumericalsimulationstoverifytheavailability or quality of CNS signals, and demonstrate to the authorities the feasibility of the proposed project. European guidance is provided by ICAO EUR Doc 015 (managing building restricted areas). This document is internationally recognised and defines basic surfaces for the protection of CNS facilities. These surfaces are often considered as arbitrary and very restrictive, resulting in major limitations for project developers, e.g. no wind turbine can be installed within a 15km radius from a radar antenna. Nevertheless, case-by-case analysis can be conducted in collaboration with the local air navigation service providers, and in many cases simple and cost efficient mitigating measures can be investigated. Such investigation considers numerous factors, such as the flight procedures, the redundancy of systems, the exact topographical situation, the signal characteristics, as well as new technological development (e.g. satellite based navigation, filtering and signal processing). These assessments enables more flexibility in the planning of wind farms, while fulfilling the interests of all stakeholders.
  • 5. Headline Mengentext Unterzeile Mengentext Mengentext. The International Civil Aviation Organisation (ICAO) Annex 14 contains the Standards and Recommen- ded Practices (specifications) that prescribe the physical Wind Turbines & Aviation Safety Why airsight? ■■ Detailed knowledge of national and international regulations through many years of experiences in aviation projects, consulting and teaching activities ■■ Dedicated and highly qualified team of experts with extensive references on safety assessments, flight operations/ procedures as well as obstacle assessments ■■ Worldwide experience in dealing with National Aviation Authorities (incl. military) as well as projects involving stakeholders with diverging interests (airports, airlines, air navigation service providers, project developers) ■■ Highlyefficientevaluationsofspecificareas(e.g.assessmentofobstacles)throughtheuseofspecializedsoftwaresolutions References ■■ airsight methodologies for the safety assessment at aerodromes are recognised by Civil Aviation Authorities in e.g. Germany, Austria, Switzerland, Ireland, Luxembourg, Belgium, Turkey, United Arab Emirates, New Zealand, etc. ■■ airsight has assessed in the last three years the installation of more than wind 70 turbines in 15 individual projects, involving complex requirements, such as installation up to 1.5 km from aerodromes with heights 200m above ground. airsight GmbH Gustav-Meyer-Allee 25 13355 Berlin Germany Tel: +49 30 45 80 31 77 Fax: +49 30 45 80 31 88 Email: info@airsight.de Web: www.airsight.de airsight is an experienced and well-established company providing airports, air navigation service providers as well as civil aviation authorities and organisations with consulting and engineering services, training and software. The airsight portfolio includes topics such as aerodrome design and operations, airport capacity and simulation, flight procedure design and obstacles assessment, aircraft noise, safety regulations and oversight, safety assessment and safety management systems supported by airsight’s A-SMS software. airsight has an excellent track record, as the company conducted more than 400 consulting projects at 45 international airports since year 1999, including Bahrain, Brussels, Doha, Dubai, Dublin, Luxembourg, Malta, Warsaw, Vienna, Vilnius, Zurich, as well as most major German airports (e.g. Berlin, Dusseldorf, Frankfurt Main and Munich Airports). Case Study - Safety Assessment of non-compliant wind-turbine lighting systems Under Visual Flight Rules, pilots navigate under the principle “see and avoid”. In night conditions, wind turbines therefore have to be equipped with appropriate lighting, defined by international and national regulations. As of today, some very largewindturbines(heightaround200m)lightingsystemsmay deviate from these regulations. For instance, some turbines may be compliant with international regulations (ICAO) – but not with the national regulations of the countries they will be installed. In case such standards cannot be met, e.g. for technical or economical reasons, a Safety Assessment can determine if such non compliances can be tolerated, or define alternative means or mitigating measures to ensure safe air operations. airsight successfully conducted such assessments, enabling wind turbines’ manufacturers and project developers to provide their solutions with less restrictions.
  • 6. airsight GmbH Gustav-Meyer-Allee 25 13355 Berlin Germany Tel +49 30 45 80 31 77 Fax +49 30 45 80 31 88 info@airsight.de www.airsight.de 2016-03