Earthing System Of Switchyards
Lightning Protection Of Switchyards
Protection Design For Substation
Switchyard Control And Interlocking
Switchyard-Facility Planning
1. E-mail: eit@eit.edu.au Website: www.eit.edu.au
AUSTRALIA CANADA INDIA IRELAND NEW ZEALAND SOUTH AFRICA UNITED KINGDOM UNITED STATES
20th
December 2016
LETTER OF CONGRATULATIONS
Dear Edgar,
On behalf of all of us here at the EIT, I would like to congratulate you on successfully
completing this course.
You have shown a great deal of determination and dedication in your efforts to complete this
course and you deserve to be very proud of yourself.
My most sincere hope is that your studies have and will assist you in your career and that they
have in some way contributed to your personal development.
We all wish you everything of the best and hope to see you back at the EIT before long.
Yours sincerely,
Jacqui Veness
eLearning Coordinator
Engineering Institute of Technology
2. E-mail: eit@eit.edu.au Website: www.eit.edu.au
AUSTRALIA CANADA INDIA IRELAND NEW ZEALAND SOUTH AFRICA UNITED KINGDOM UNITED STATES
RECORD OF RESULTS
STUDENT NAME: Edgar Rodrigo Carvalho Martins
STUDENT NUMBER: 1614796
COURSE: Professional Certificate of Competency in Substation Design
(Control, Protection & Facility Planning)
COURSE CODE: CEY203 PERIOD OF STUDY: August 2016 – November 2016
MODULES COMPLETED GRADES ATTAINED
Module 1:
Module 2:
Earthing System Of Switchyards
Example Of Switchyard Earthing System Design
A 99%
Module 3:
Module 4:
Lightning Protection Of Switchyards
Example Of Switchyard Lightning And Surge Protection Design
A 90%
Module 5:
Module 6:
Protection Design For Substation-1
Examples/Case Studies Of MV Substation Protection
B 70%
Module 7:
Module 8:
Protection Design For Substation-2
Examples/Case Studies Of HV Substation Protection
A 95%
Module 9:
Module 10:
Switchyard Control And Interlocking
Example Case Study Of Design Of HV Substation Control And
Auxiliary Systems
A 99%
Module 11:
Module 12:
Switchyard-Facility Planning
Gas Insulated Switchgear (GIS) As An Alternative To Outdoor
Switchyard
A 99%
OVERALL: A 92%
20th
December 2016
On Behalf of the Engineering Institute of Technology Date
3. E-mail: eit@eit.edu.au Website: www.eit.edu.au
AUSTRALIA CANADA INDIA IRELAND NEW ZEALAND SOUTH AFRICA UNITED KINGDOM UNITED STATES
Edgar Rodrigo Carvalho Martins
Substation Design (Control, Protection & Facility Planning)
1614796CEY203
20th
December 2016