SlideShare a Scribd company logo
1 of 2
Edward Guardado Jr.
Materials Manager / Asst. Department Manager WCQ Silicon
5613 Aspen Ct
Riverbank CA, 95367
(408) 667-3467
eguardadojr@gmail.com
EmploymentHistory
WCQ Silicon, Fremont Ca — Materials Manager/Asst Dept
Manager
March 2001 - PRESENT
Uni Sil Corp, Mountain View Ca — Dept Supervisor
February 1994 - March 2001
Experience / Resposibilities
Material Management , 2014-present
As material manager I am responsible for keeping all ofour machines running
and maintained.
This includes working with procurementto keep minmax inventory levels , cycle
counting, vendor interactions, pricing and negotiations.
I generate usage reports, new designengineering change forms, spending and
costreports, costreductionthrough multiple vendor bids.
Raw material managementresponsibilitiesinclude vendor site visits and audits,
specificationaudits,cycle counts and annual planning and usage budgets.
Weekly meeting with CEO/CFO with analysis updates and requests.
Department Management/ sales , 2013-present
Silicondepartmentmanagementresponsibilities include, 14 operators and 2
supervisors reportdirectly to me. Along with material managementI will
generate monthly productiontotals, sales totals, costtotals, profitmargin,
yields. All daily operations decisions will be made by me and I reportto the
director ofsiliconoperations.
Sales- all siliconP/O will go through me and I will make productionplanand
budgetbi-annually, generate the sales orders, planand track until shipped.
Planning - I am responsible for all productionplanning and scheduling
for siliconoperations. This is basedoncustomer usage and custom delivery plan.
I will work closly with customers and be flexible to keep them up and running.
MFG Operations , 1994-2013
Operations - I am a crystal grower first and foremost, I am fully trained in
advanced siliconCZ growth and process engineering.
Engineering- Responsible for newcustomer specs, ISO audits, machine
programming , technical writing and work instructions.
Supervisory - I Have overseensmall shifts and large department sizes. Handling
all personnel issues planning and scheduling.
My Story
I am a Crystal grower at
heart, but have beenin
manufacturing since 94’ at
Unisil, i was hired as machine
operator in the semiconductor
industry. In no time I became a
lead and then supervisor. After a
few years i was moved to the
engineering departmentand
became the scheduler and
planner.
In 2001 I was recruited
to WestCoast Quartz as a start up
for their siliconbusiness. Iwent
in as a senior process engineer,
then supervisor,manager,
engineer and now back as
Materials
Manager/Manager/Sales/Plannin
g… I do it all , in other words.
NowI am ready to move
on , hopefully for another small
start up. I am hoping your
company considers me for a
managementposition. Thank you
for your consideration.
Education
LincolnHS graduate 91’ (sanJose
CA)
EvergreenValley College 93’ (san
Jose CA) 2yrs
Materials Manager with 20+ years experience in silicon manufacturing

More Related Content

What's hot

Charles Spoelstra Resume Nov 2015
Charles Spoelstra Resume Nov 2015Charles Spoelstra Resume Nov 2015
Charles Spoelstra Resume Nov 2015Chuck Spoelstra
 
Project management resume 2016
Project management resume 2016Project management resume 2016
Project management resume 2016Chad Brown
 
Rolf Sabo_Networking Presentation
Rolf Sabo_Networking PresentationRolf Sabo_Networking Presentation
Rolf Sabo_Networking PresentationRolf Sabo
 
jimmy hsyan chung
jimmy hsyan chungjimmy hsyan chung
jimmy hsyan chungJimmy Chung
 
Christopher Kite Resume
Christopher Kite Resume Christopher Kite Resume
Christopher Kite Resume Chris Kite
 
Eric Lake's Resumes
Eric Lake's ResumesEric Lake's Resumes
Eric Lake's ResumesEric Lake
 

What's hot (14)

Charles Spoelstra Resume Nov 2015
Charles Spoelstra Resume Nov 2015Charles Spoelstra Resume Nov 2015
Charles Spoelstra Resume Nov 2015
 
ResumeAbraham2016
ResumeAbraham2016ResumeAbraham2016
ResumeAbraham2016
 
Magdalena
MagdalenaMagdalena
Magdalena
 
Alberto Agostini Resume 6
Alberto Agostini Resume 6Alberto Agostini Resume 6
Alberto Agostini Resume 6
 
Project management resume 2016
Project management resume 2016Project management resume 2016
Project management resume 2016
 
Kai Matthews
Kai MatthewsKai Matthews
Kai Matthews
 
Michael Hebert
Michael HebertMichael Hebert
Michael Hebert
 
PAUL DOC CV
PAUL DOC CVPAUL DOC CV
PAUL DOC CV
 
New Resume
New ResumeNew Resume
New Resume
 
New Resume
New ResumeNew Resume
New Resume
 
Rolf Sabo_Networking Presentation
Rolf Sabo_Networking PresentationRolf Sabo_Networking Presentation
Rolf Sabo_Networking Presentation
 
jimmy hsyan chung
jimmy hsyan chungjimmy hsyan chung
jimmy hsyan chung
 
Christopher Kite Resume
Christopher Kite Resume Christopher Kite Resume
Christopher Kite Resume
 
Eric Lake's Resumes
Eric Lake's ResumesEric Lake's Resumes
Eric Lake's Resumes
 

Similar to Materials Manager with 20+ years experience in silicon manufacturing

Similar to Materials Manager with 20+ years experience in silicon manufacturing (20)

Stephen Michael Lappin Resume
Stephen Michael Lappin ResumeStephen Michael Lappin Resume
Stephen Michael Lappin Resume
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
Wieck, mark
Wieck, mark Wieck, mark
Wieck, mark
 
Resume_Ravindra
Resume_RavindraResume_Ravindra
Resume_Ravindra
 
DUSTIN SHANE ROBINSON
DUSTIN SHANE ROBINSONDUSTIN SHANE ROBINSON
DUSTIN SHANE ROBINSON
 
Philip Mazur Resume - Copy
Philip Mazur Resume - CopyPhilip Mazur Resume - Copy
Philip Mazur Resume - Copy
 
Brian 2015
Brian 2015Brian 2015
Brian 2015
 
Resume complete December 2016
Resume complete December 2016Resume complete December 2016
Resume complete December 2016
 
Thiru CV 15 02 2016-FRP
Thiru CV 15 02 2016-FRPThiru CV 15 02 2016-FRP
Thiru CV 15 02 2016-FRP
 
Resume 12. 2017
Resume 12. 2017 Resume 12. 2017
Resume 12. 2017
 
Catherine M res
Catherine M resCatherine M res
Catherine M res
 
Master Resume
Master Resume Master Resume
Master Resume
 
Steve Larson Resume 1720
Steve Larson Resume 1720Steve Larson Resume 1720
Steve Larson Resume 1720
 
Raphael tasho tashev
Raphael tasho tashevRaphael tasho tashev
Raphael tasho tashev
 
HMcGee Resume_12-15-16
HMcGee Resume_12-15-16HMcGee Resume_12-15-16
HMcGee Resume_12-15-16
 
M Rearick Resume
M Rearick ResumeM Rearick Resume
M Rearick Resume
 
Khatri resume
Khatri resumeKhatri resume
Khatri resume
 
updated CV-Jan 2015
updated CV-Jan 2015updated CV-Jan 2015
updated CV-Jan 2015
 
Mark A resume 2015
Mark A resume 2015Mark A resume 2015
Mark A resume 2015
 
Boutin Marcel Resume (2)
Boutin Marcel Resume (2)Boutin Marcel Resume (2)
Boutin Marcel Resume (2)
 

Materials Manager with 20+ years experience in silicon manufacturing

  • 1. Edward Guardado Jr. Materials Manager / Asst. Department Manager WCQ Silicon 5613 Aspen Ct Riverbank CA, 95367 (408) 667-3467 eguardadojr@gmail.com EmploymentHistory WCQ Silicon, Fremont Ca — Materials Manager/Asst Dept Manager March 2001 - PRESENT Uni Sil Corp, Mountain View Ca — Dept Supervisor February 1994 - March 2001 Experience / Resposibilities Material Management , 2014-present As material manager I am responsible for keeping all ofour machines running and maintained. This includes working with procurementto keep minmax inventory levels , cycle counting, vendor interactions, pricing and negotiations. I generate usage reports, new designengineering change forms, spending and costreports, costreductionthrough multiple vendor bids. Raw material managementresponsibilitiesinclude vendor site visits and audits, specificationaudits,cycle counts and annual planning and usage budgets. Weekly meeting with CEO/CFO with analysis updates and requests. Department Management/ sales , 2013-present Silicondepartmentmanagementresponsibilities include, 14 operators and 2 supervisors reportdirectly to me. Along with material managementI will generate monthly productiontotals, sales totals, costtotals, profitmargin, yields. All daily operations decisions will be made by me and I reportto the director ofsiliconoperations. Sales- all siliconP/O will go through me and I will make productionplanand budgetbi-annually, generate the sales orders, planand track until shipped. Planning - I am responsible for all productionplanning and scheduling for siliconoperations. This is basedoncustomer usage and custom delivery plan. I will work closly with customers and be flexible to keep them up and running. MFG Operations , 1994-2013 Operations - I am a crystal grower first and foremost, I am fully trained in advanced siliconCZ growth and process engineering. Engineering- Responsible for newcustomer specs, ISO audits, machine programming , technical writing and work instructions. Supervisory - I Have overseensmall shifts and large department sizes. Handling all personnel issues planning and scheduling. My Story I am a Crystal grower at heart, but have beenin manufacturing since 94’ at Unisil, i was hired as machine operator in the semiconductor industry. In no time I became a lead and then supervisor. After a few years i was moved to the engineering departmentand became the scheduler and planner. In 2001 I was recruited to WestCoast Quartz as a start up for their siliconbusiness. Iwent in as a senior process engineer, then supervisor,manager, engineer and now back as Materials Manager/Manager/Sales/Plannin g… I do it all , in other words. NowI am ready to move on , hopefully for another small start up. I am hoping your company considers me for a managementposition. Thank you for your consideration. Education LincolnHS graduate 91’ (sanJose CA) EvergreenValley College 93’ (san Jose CA) 2yrs