Section 5:
Reticular canal system for
interlinking Indian rivers;
Chapter 16: Flat Primary canal
(FPC1) WE & EE Lengths:
559
Topic series: 446.Topic 1: FPC1 WE Lengths and approximate capacity:
FPC1WE Lengths, total length and the approximate capacity are as follows:
SN. Description. Length in kms.
1.FPC1WEStart to FPC1WE Luni 500. 278.21 560
Topic series: 446.Topic 1: FPC1 WE Lengths and approximate capacity:
2.FPC1WE Luni to FPC1WE Bandi 500.
176.56 561
Topic series: 446.Topic 1: FPC1 WE Lengths and approximate capacity:
3.FPC1WE Bandi to FPC1WE Sucri 500
80.32 562
Topic series: 446.Topic 1: FPC1 WE Lengths and approximate capacity:
4.FPC1WE Sucri to FPC1WE Jawai 500.
114.24 563
Topic series: 446.Topic 1: FPC1 WE Lengths and approximate capacity:
5.FPC1WE Jawai to FPC1WE Sabarmathi 500.
148.19 564
Topic series: 446.Topic 1: FPC1 WE Lengths and approximate capacity:
6.FPC1WE Sabarmathi to FPC1WE Som 500.
229.55 565
Topic series: 446.Topic 1: FPC1 WE Lengths and approximate capacity:
7.FPC1WE Som to FPC1WE End 500.
83.74 566
Topic series: 446.Topic 1: FPC1 WE Lengths and approximate capacity:
Total FPC1 WE CRL Length in Kms is 1110.81
Total canal length we are going to save with CE, RE,
DCC, BD in Kms.
145.49
Total length of the CE, RE, DCC, BD put together in Kms 2.54
The Length (Actual) of the probable FPC1WE in Kms. 967.86
The capacity (Volume) of storable water (with the
canal width of 200 mts, depth of 25 mts, but the
maximum level maintained will be 20 mts) in the
FPC1WE (3871.44 million cubic meters) in TMC. (This
volume can be filled and discharged any number of
times.)
142.93 TMC
567
Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:
FPC1EE Lengths, total length and the approximate capacity :
SN. Description. Length in kms
1.FPC1EE Heran to FPC1EE Mahanadhi 500. 106.74 568
Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:
2.FPC1EE Mahanadhi to FPC1EE Son 500.
274.90 569
Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:
3.FPC1EE Son to FPC1EE Hasdo 500. 63.19 kms. There is an elevated area between FPC1EE Son to
FPC1EE Hasdo 500 path and the maximum level we get in this path is 524 mts AMSL at (23005โ€™2.40โ€N)
(82001โ€™50.03โ€E). DCC is required.
570
Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:
4.FPC1EE Hasdo to FPC1EE Mand 500.
266.49 571
Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:
5.FPC1EE Mand to FPC1EE Lb 500.
75.36 572
Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:
6.FPC1EE Lb to FPC1EE Sankh 500.
168.50 573
Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:
7.FPC1EE Sankh to FPC1EE South Koel 500.
147.26 574
Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:
8.FPC1EE South koel to FPC1EE Subarnarekha 500.
207.47 575
Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:
9.FPC1EE Subarnarekha to FPC1EE Damodhar 500.
166.82 576
Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:
10.FPC1EE Damodhar to FPC1EE Rihand 500.
594.64 577
Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:
11.FPC1EE Rihand to FPC1EE Hasdo Mand path 500. 55.70kms
There is an elevated area between FPC1EE Rihand to FPC1EE Hasdo Mand path 500 path
and the maximum level we get in this path is 562 mts AMSL at (230014โ€™8.85โ€N)
(820039โ€™37.29โ€E). DCC is required.
The FPC1EE which originates from Rihand 500 will Join the Hasdo Mand path of canal at
the point (230010โ€™52.99โ€N) (820037โ€™26.56โ€E) encircling the Hazaribagh Range of hills. 578
Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:
FPC1 EE SB 500 starts at the FPC1EE Son to Hasdo canal path at the
point (23005โ€™25.60โ€N) (82008โ€™30.06โ€E). 579
Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:
12.FPC1EE SB Start to FPC1EE SB Seonath 500.
553.78 580
Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:
Lowest point between FPC1EE SB Start to FPC1EE SB Seonath 500
path is 366mts AMSL at (200055โ€™3.52โ€N) (800034โ€™8.53โ€E). We have
to do BD or U tube to by pass this depression. 581
Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:
13.FPC1EE SB Seonath to FPC1EE SB Mahanadhi 500. 171.54
Lowest point between FPC1EE SB Seonath to FPC1EE SB Mahanadhi 500 path is 403mts
AMSL at (200023โ€™21.93โ€N) (81005โ€™50.98โ€E). We have to do BD or U tube to by pass this
depression. 582
Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:
14.FPC1EE SB Mahanadhi to FPC1EE SB Tel500. 94.09
There is an elevated area between FPC1EE SB Mahanadhi to FPC1EE SB Tel500 path and
the maximum level we get in this path is 564 mts AMSL at (20005โ€™0.87โ€N)
(820012โ€™35.49โ€E). DCC is required. 583
Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:
15.FPC1EE SB Tel to FPC1EE SB Sabari 500.
981.82 584
Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:
16.FPC1EE SB Sabari to FPC1EE SB Indravathi 500.
237.99 585
Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:
Total FPC1 WE CRL Length in Kms is 4166.29
Total canal length we are going to save with CE, RE,
DCC, BD in Kms.
292.43
Total length of the CE, RE, DCC, BD put together in
Kms
15.21
The Length (Actual) of the probable FPC1EE in Kms. 3889.07
The capacity (Volume) of storable water (with the
canal width of 200 mts, depth of 25 mts, but the
maximum level maintained will be 20 mts) in the
FPC1WE (15556.28 million cubic meters) in TMC.
(This volume can be filled and discharged any
number of times.)
574.33 TMC
586
Section 5:
Reticular canal system for
interlinking Indian rivers;
Chapter 17: Flat Primary canal
(FPC1) โ€“ RE, CE, DCC, BD and others:
587
Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others:
FPC1 โ€“ RE, CE, DCC, BD and others:
S. N.( FPC1 RE, CE, DCC, BD point) (Latitude) (Longitude)
FPC1 Narmada 500 RE 588
Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others:
FPC1 Narmada 500 RE
1(FPC1 Narmada 500 RE Start) (220050โ€™8.24โ€N)
(800027โ€™31.88โ€E)
2(FPC1 Narmada RE 465 Bottom) (220050โ€™9.69โ€N)
(800028โ€™5.49โ€E)
3(FPC1 Narmada 500 RE End) (220050โ€™15.89โ€N)
(800029โ€™8.93โ€E)
Length of FPC1Narmada 500 RE: 2.78kms. We will save 45
Kms of FPC1 creation.
589
Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others:
FPC1 Pennar500 to Papagni500 DCC1
1(FPC1 Pennar to Papagni DCC1
Start500)
(140015โ€™23.06โ€N)
(780011โ€™29.58โ€E)
2(FPC1 Pennar to Papagni DCC1
Top)
(140015โ€™15.00โ€N)
(780012โ€™31.70โ€E)
3(FPC1 Pennar to Papagni DCC1
End 500)
(140015โ€™13.69โ€N)
(780012โ€™40.29โ€E)
Length of Pennar to Papagni DCC: 2.13kms. We will save
74.76Kms of FPC1 creation.
590
Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others:
FPC1 Ponniyar500 to Kaveri 500DCC1
591
Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others:
FPC1 Ponniyar500 to Kaveri 500DCC1
1(FPC1 Ponniyar500 to Kaveri
500DCC1 Start)
(120017โ€™20.90โ€N)
(78004โ€™40.28โ€E)
2(FPC1 Ponniyar500 to Kaveri500
DCC1 Top 510)
(120017โ€™3.85โ€N)
(78004โ€™1.53โ€E)
3(FPC1 Ponniyar500 to Kaveri
500DCC1 End)
(120016โ€™17.40โ€N)
(78002โ€™15.56โ€E)
Length of FPC1 Ponniyar500 to Kaveri 500DCC1: 4.79 kms.
We will save 30Kms of FPC1 creation.
592
Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others:
FPC1 Ponniyar500 to Kaveri 500 CE1
593
Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others:
FPC1 Ponniyar500 to Kaveri 500 CE1
1(FPC1 Ponniyar500 to Kaveri 500
CE1Start)
(120014โ€™5.03โ€N)
(770041โ€™30.29โ€E)
2(FPC1 Ponniyar500 to Kaveri
500CE1 Bottom320)
(120014โ€™21.55โ€N)
(770040โ€™50.96โ€E)
3(FPC1 Ponniyar500 to Kaveri
500CE1 End)
(120014โ€™31.23โ€N)
(770040โ€™26.40โ€E)
Length of FPC1 Ponniyar500 to Kaveri 500 CE1: 2.07kms.
We will save 32Kms of FPC1 creation.
594
Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others:
FPC1 Ponniyar500 to Kaveri 500CE2
595
Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others:
FPC1 Ponniyar500 to Kaveri 500CE2
1(FPC1 Ponniyar500 to Kaveri
500CE2Start)
(120017โ€™0.33โ€N)
(770027โ€™2.97โ€E)
2(FPC1 Ponniyar500 to Kaveri
500CE2Bottom380)
(120017โ€™32.03โ€N)
(770026โ€™16.66โ€E)
3(FPC1 Ponniyar500 to Kaveri
500CE2End)
(120017โ€™58.41โ€N)
(770025โ€™36.44โ€E)
Length of FPC1 Ponniyar500 to Kaveri 500CE2: 3.28kms. We
will save 13Kms of FPC1 creation.
596
Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others:
FPC1 Ponniyar500 to Kaveri 500CE3
597
Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others:
FPC1 Ponniyar500 to Kaveri 500CE3
1(FPC1 Ponniyar500 to Kaveri
500CE3Start)
(120019โ€™40.03โ€N)
(770013โ€™53.39โ€E)
2(FPC1 Ponniyar500 to Kaveri
500CE3Bottom413)
(120019โ€™31.71โ€N)
(770013โ€™48.79โ€E)
3(FPC1 Ponniyar500 to Kaveri
500CE3End)
(120019โ€™22.50โ€N)
(770013โ€™43.66โ€E)
Length of FPC1 Ponniyar500 to Kaveri 500CE3: 0.61kms. We
will save 15.2Kms of FPC1 creation.
598
Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others:
FPC1 Ponniyar500 to Kaveri 500CE4
599
Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others:
FPC1 Ponniyar500 to Kaveri 500CE4
1(FPC1 Ponniyar500 to Kaveri
500CE4Start)
(120018โ€™36.84โ€N)
(770011โ€™8.21โ€E)
2(FPC1 Ponniyar500 to Kaveri
500CE4Bottom466)
(120018โ€™31.68โ€N)
(770011โ€™7.72โ€E)
3(FPC1 Ponniyar500 to Kaveri
500CE4End)
(120018โ€™26.00โ€N)
(770011โ€™7.22โ€E)
Length of FPC1 Ponniyar500 to Kaveri 500CE4:0.24 kms. We
will save 7.34Kms of FPC1 creation.
600
Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others:
FPC1 Kaveri 500 RE:
601
Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others:
FPC1 Kaveri 500 RE:
1(FPC1 Kaveri 500 RE Start) (120011โ€™35.31โ€N)
(770043โ€™16.46โ€E)
2(FPC1 Kaveri RE Bottom266) (120010โ€™57.01โ€N)
(770042โ€™36.30โ€E)
3(FPC1 Kaveri 500 RE End) (120010โ€™7.23โ€N)
(770041โ€™43.64โ€E)
Length of FPC1 Kaveri 500 RE: 3.95kms. We will save(FPC1
Ponniyar to Kaveri80.54+Kaveri to Moyar117.04) 197Kms
of FPC1 creation.
602
Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others:
FPC1 Kaveri 500 โ€“ Moyar500 CE1:
603
Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others:
FPC1 Kaveri 500 โ€“ Moyar500 CE1:
1(FPC1 Kaveri โ€“ Moyar CE1
Start)
(12003โ€™46.54โ€N)
(770036โ€™41.11โ€E)
2(FPC1 Kaveri โ€“ Moyar CE1
Bottom)
(12003โ€™35.57โ€N)
(770036โ€™46.55โ€E)
3(FPC1 Kaveri โ€“ Moyar CE1 End) (12003โ€™25.13โ€N)
(770036โ€™51.86โ€E)
Length of FPC1 Kaveri โ€“ Moyar CE1: 0.75kms. We
will save 9.13Kms of FPC1 creation.
604
Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others:
FPC1 Kaveri 500 โ€“ Moyar 500 CE2:
605
Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others:
FPC1 Kaveri 500 โ€“ Moyar 500 CE2:
1(FPC1 Kaveri โ€“ Moyar CE2:Start) (110056โ€™39.35โ€N)
(770035โ€™33.05โ€E)
2(FPC1 Kaveri โ€“ Moyar CE2
Bottom287)
(110056โ€™23.07โ€N)
(770035โ€™31.55โ€E)
3(FPC1 Kaveri โ€“ Moyar CE2 End) (110055โ€™40.42โ€N)
(770035โ€™28.79โ€E)
Length of FPC1 Kaveri โ€“ Moyar CE2: 1.84kms. We will save
114.29Kms of FPC1 creation.
606
Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others:
FPC1 Kaveri 500 โ€“ Moyar 500 CE3:
1(FPC1 Kaveri โ€“ Moyar CE3Start) (110032โ€™28.51โ€N)
(770022โ€™30.41โ€E)
2(FPC1 Kaveri โ€“ Moyar CE3 Bottom) (110032โ€™19.53โ€N)
(770021โ€™53.73โ€E)
3(FPC1 Kaveri โ€“ Moyar CE3 End) (110032โ€™1.13โ€N)
(770020โ€™32.78โ€E)
Length of FPC1 Kaveri โ€“ Moyar CE3: 3.66kms. We will save
25.84Kms of FPC1 creation.
607
Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others:
FPC1 Moyar 500 RE
608
Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others:
FPC1 Moyar 500 RE
1(FPC1 Moyar RE Start500) (110033โ€™25.21โ€N)
(77001โ€™8.34โ€E)
2(FPC1 Moyar RE Bottom308) (110032โ€™49.26โ€N)
(760059โ€™56.56โ€E)
3(FPC1 Moyar RE End500) (110032โ€™11.82โ€N)
(760058โ€™42.84โ€E)
Length of FPC1 Moyar RE: 4.99kms. We will save (Kaveri to
Moyar 39.72+ Moyar to Bhavani 42.60) 82.32Kms of FPC1
creation.
609
Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others:
FPC1 Bhavani RE
610
Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others:
FPC1 Bhavani RE
1(FPC1 Bhavani RE Start) (110017โ€™8.93โ€N)
(760050โ€™31.56โ€E)
2(FPC1 Bhavani RE Bottom338) (110016โ€™25.92โ€N)
(760050โ€™54.91โ€E)
3(FPC1 Bhavani RE End) (110016โ€™6.03โ€N)
(760051โ€™6.08โ€E)
Length of FPC1 Bhavani RE: 2.2kms. We will save
(Moyar to Bhavani 26.06 + Bhavani to Noyil 31.19)
57.25Kms FPC1 creation.
611
Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others:
FPC1 WE Sabarmati RE 500:
612
Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others:
FPC1 WE Sabarmati RE 500:
1(FPC1WE Sabarmati RE Start
500)
(240017โ€™31.35โ€N)
(730015โ€™18.89โ€E)
2(FPC1WE Sabarmati RE
Bottom 338)
(240016โ€™51.03โ€N)
(730014โ€™26.52โ€E)
3(FPC1WE Sabarmati RE 500) (240016โ€™38.14โ€N)
(730014โ€™10.16โ€E)
Length of FPC1 WE Sabarmati RE: 2.54kms. We will
save 145.49Kms FPC1 creation.
613
Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others:
SN (FPC1EE Damodhar to Rihand500 DCC1)
614
Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others:
SN (FPC1EE Damodhar to Rihand500 DCC1)
1(FPC1EE Damodhar to
Rihand500 DCC1Start500)
(230040โ€™28.99โ€N)
(840046โ€™17.09โ€E)
2(FPC1EE Damodhar to
Rihand500 DCC1 Top 526)
(230041โ€™29.66โ€N)
(840042โ€™46.97โ€E)
3(FPC1EE Damodhar to
Rihand500 DCC1 End500)
(230040โ€™40.76โ€N)
(840038โ€™7.28โ€E)
Length of FPC1EE Damodhar 500 to EE Rihand 500
DCC1: 15.21 kms. We will save 292.43Kms of FPC1
creation.
615
Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others:
All these lengths are with the major curves on
the surface, in the same level in case of FPC, and
in declining fashion in case of PC and other
canals.
616
Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others:
Minor curves that come in the canal paths are not
focused and it is not possible by me alone.
So the exact length of the canal will be known only
after doing the micro survey of different segments
of the canal by different teams.
617
Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others:
My effort is to guide them in this way to
make the things easy and understandable, so
that there will be less errors in the future
with the satellite based survey.
618

More Related Content

Similar to Interlinking rivers 12 - 7. chapter 16 & 17 7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

3 ej fccrf legnaro 2014-10-06
3   ej fccrf legnaro 2014-10-063   ej fccrf legnaro 2014-10-06
3 ej fccrf legnaro 2014-10-06
thinfilmsworkshop
ย 
Design of a 400kv Transmission network
Design of a 400kv Transmission networkDesign of a 400kv Transmission network
Design of a 400kv Transmission network
Isaac Muyinza
ย 
Presentation Fatehpur Substation TL Final 22.09.2021.pptx
Presentation Fatehpur Substation  TL Final 22.09.2021.pptxPresentation Fatehpur Substation  TL Final 22.09.2021.pptx
Presentation Fatehpur Substation TL Final 22.09.2021.pptx
abhishek357916
ย 
ECGR-4121_DisconeAntenna_Rprt1-edited
ECGR-4121_DisconeAntenna_Rprt1-editedECGR-4121_DisconeAntenna_Rprt1-edited
ECGR-4121_DisconeAntenna_Rprt1-edited
Joshua LaPlant
ย 
NMML1 Power supply and traction Presentation.pptx
NMML1 Power supply and traction Presentation.pptxNMML1 Power supply and traction Presentation.pptx
NMML1 Power supply and traction Presentation.pptx
aj3456843
ย 
Power system slide notes
Power system slide notesPower system slide notes
Power system slide notes
michaeljmack
ย 

Similar to Interlinking rivers 12 - 7. chapter 16 & 17 7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube (20)

S5c16 chapter 16-flat primary canal (fpc1) we & ee lengths.
S5c16 chapter 16-flat primary canal (fpc1) we & ee lengths.S5c16 chapter 16-flat primary canal (fpc1) we & ee lengths.
S5c16 chapter 16-flat primary canal (fpc1) we & ee lengths.
ย 
S5c18 chapter 18-flat primary canal 2 (fpc2) river points and lengths.
S5c18 chapter 18-flat primary canal 2 (fpc2) river points and lengths.S5c18 chapter 18-flat primary canal 2 (fpc2) river points and lengths.
S5c18 chapter 18-flat primary canal 2 (fpc2) river points and lengths.
ย 
Interlinking rivers 11 - 6. chapter 14 5 flat primary canal1 west extension...
Interlinking rivers 11 - 6. chapter 14   5 flat primary canal1 west extension...Interlinking rivers 11 - 6. chapter 14   5 flat primary canal1 west extension...
Interlinking rivers 11 - 6. chapter 14 5 flat primary canal1 west extension...
ย 
S5c14 chapter 14-flat primary canal (fpc1) we & ee river points.
S5c14 chapter 14-flat primary canal (fpc1) we & ee river points.S5c14 chapter 14-flat primary canal (fpc1) we & ee river points.
S5c14 chapter 14-flat primary canal (fpc1) we & ee river points.
ย 
S5c13 chapter 13-flat primary canal (fpc1) river points.
S5c13 chapter 13-flat primary canal (fpc1) river points.S5c13 chapter 13-flat primary canal (fpc1) river points.
S5c13 chapter 13-flat primary canal (fpc1) river points.
ย 
numericals_examples.pdf
numericals_examples.pdfnumericals_examples.pdf
numericals_examples.pdf
ย 
3 ej fccrf legnaro 2014-10-06
3   ej fccrf legnaro 2014-10-063   ej fccrf legnaro 2014-10-06
3 ej fccrf legnaro 2014-10-06
ย 
Nfoec Submission 100 G Submarine Trial Final
Nfoec Submission   100 G Submarine Trial FinalNfoec Submission   100 G Submarine Trial Final
Nfoec Submission 100 G Submarine Trial Final
ย 
2014 11 14-15_t-unrepeatered-transmission-over-409-6-km-acp-2014-af4b-4-post-...
2014 11 14-15_t-unrepeatered-transmission-over-409-6-km-acp-2014-af4b-4-post-...2014 11 14-15_t-unrepeatered-transmission-over-409-6-km-acp-2014-af4b-4-post-...
2014 11 14-15_t-unrepeatered-transmission-over-409-6-km-acp-2014-af4b-4-post-...
ย 
PT Eigen Network - Network Planning & Overview
PT Eigen Network - Network Planning & OverviewPT Eigen Network - Network Planning & Overview
PT Eigen Network - Network Planning & Overview
ย 
1_DFC.pdf
1_DFC.pdf1_DFC.pdf
1_DFC.pdf
ย 
Design of a 400kv Transmission network
Design of a 400kv Transmission networkDesign of a 400kv Transmission network
Design of a 400kv Transmission network
ย 
Presentation Fatehpur Substation TL Final 22.09.2021.pptx
Presentation Fatehpur Substation  TL Final 22.09.2021.pptxPresentation Fatehpur Substation  TL Final 22.09.2021.pptx
Presentation Fatehpur Substation TL Final 22.09.2021.pptx
ย 
Overhead railway traction
Overhead railway tractionOverhead railway traction
Overhead railway traction
ย 
TL Group Fatehpur.pptx
TL Group Fatehpur.pptxTL Group Fatehpur.pptx
TL Group Fatehpur.pptx
ย 
ECGR-4121_DisconeAntenna_Rprt1-edited
ECGR-4121_DisconeAntenna_Rprt1-editedECGR-4121_DisconeAntenna_Rprt1-edited
ECGR-4121_DisconeAntenna_Rprt1-edited
ย 
3M cable and electrical products catalogue and 3M Cable Price List - Shopelect
3M cable and electrical products catalogue and 3M Cable Price List - Shopelect3M cable and electrical products catalogue and 3M Cable Price List - Shopelect
3M cable and electrical products catalogue and 3M Cable Price List - Shopelect
ย 
NMML1 Power supply and traction Presentation.pptx
NMML1 Power supply and traction Presentation.pptxNMML1 Power supply and traction Presentation.pptx
NMML1 Power supply and traction Presentation.pptx
ย 
Power system slide notes
Power system slide notesPower system slide notes
Power system slide notes
ย 
SOFT2018 poster LTCalcoli CNR IFP
SOFT2018 poster LTCalcoli CNR IFPSOFT2018 poster LTCalcoli CNR IFP
SOFT2018 poster LTCalcoli CNR IFP
ย 

More from Shivu P

S13c16 chapter 16-facts and figures on urbanisation.
S13c16 chapter 16-facts and figures on urbanisation.S13c16 chapter 16-facts and figures on urbanisation.
S13c16 chapter 16-facts and figures on urbanisation.
Shivu P
ย 
S13c15 chapter 15-facts and figures on unemployment.
S13c15 chapter 15-facts and figures on unemployment.S13c15 chapter 15-facts and figures on unemployment.
S13c15 chapter 15-facts and figures on unemployment.
Shivu P
ย 
S13c10 chapter 10-facts and figures on poverty.
S13c10 chapter 10-facts and figures on poverty.S13c10 chapter 10-facts and figures on poverty.
S13c10 chapter 10-facts and figures on poverty.
Shivu P
ย 
S13c8 chapter 8-facts and figures on life style practices.
S13c8 chapter 8-facts and figures on life style practices.S13c8 chapter 8-facts and figures on life style practices.
S13c8 chapter 8-facts and figures on life style practices.
Shivu P
ย 
S13c7 Chapter 7-facts and figures on infrastructure.
S13c7 Chapter 7-facts and figures on infrastructure.S13c7 Chapter 7-facts and figures on infrastructure.
S13c7 Chapter 7-facts and figures on infrastructure.
Shivu P
ย 

More from Shivu P (20)

Impact of Environment on Health of humans
Impact of Environment on Health of humansImpact of Environment on Health of humans
Impact of Environment on Health of humans
ย 
Comments on NWDA's (National Water Development Authority) methodology of ILR ...
Comments on NWDA's (National Water Development Authority) methodology of ILR ...Comments on NWDA's (National Water Development Authority) methodology of ILR ...
Comments on NWDA's (National Water Development Authority) methodology of ILR ...
ย 
Save earth
Save earth Save earth
Save earth
ย 
Sustaining breast feeding together
Sustaining breast feeding togetherSustaining breast feeding together
Sustaining breast feeding together
ย 
Breast feeding week
Breast feeding weekBreast feeding week
Breast feeding week
ย 
Method matters in inter linking rivers
Method matters in inter linking rivers  Method matters in inter linking rivers
Method matters in inter linking rivers
ย 
Summary of the book 'views to make this world developed'
Summary of the book 'views to make this world developed'Summary of the book 'views to make this world developed'
Summary of the book 'views to make this world developed'
ย 
Preface to this book
Preface to this bookPreface to this book
Preface to this book
ย 
The author dr shivu
The author dr shivuThe author dr shivu
The author dr shivu
ย 
Contents of this book - section chapter (Includes all the chapters)
Contents of this book - section   chapter (Includes all the chapters)Contents of this book - section   chapter (Includes all the chapters)
Contents of this book - section chapter (Includes all the chapters)
ย 
Abbreviations used in this book
Abbreviations used in this bookAbbreviations used in this book
Abbreviations used in this book
ย 
S13c18 chapter 18-different blocks in the model village (auto cad drawings).
S13c18 chapter 18-different blocks in the model village (auto cad drawings).S13c18 chapter 18-different blocks in the model village (auto cad drawings).
S13c18 chapter 18-different blocks in the model village (auto cad drawings).
ย 
S13c17 chapter 17-facts and figures on waste management.
S13c17 chapter 17-facts and figures on waste management.S13c17 chapter 17-facts and figures on waste management.
S13c17 chapter 17-facts and figures on waste management.
ย 
S13c16 chapter 16-facts and figures on urbanisation.
S13c16 chapter 16-facts and figures on urbanisation.S13c16 chapter 16-facts and figures on urbanisation.
S13c16 chapter 16-facts and figures on urbanisation.
ย 
S13c15 chapter 15-facts and figures on unemployment.
S13c15 chapter 15-facts and figures on unemployment.S13c15 chapter 15-facts and figures on unemployment.
S13c15 chapter 15-facts and figures on unemployment.
ย 
S13c13 chapter 13-facts and figures on some statistics.
S13c13 chapter 13-facts and figures on some statistics.S13c13 chapter 13-facts and figures on some statistics.
S13c13 chapter 13-facts and figures on some statistics.
ย 
S13c10 chapter 10-facts and figures on poverty.
S13c10 chapter 10-facts and figures on poverty.S13c10 chapter 10-facts and figures on poverty.
S13c10 chapter 10-facts and figures on poverty.
ย 
S13c8 chapter 8-facts and figures on life style practices.
S13c8 chapter 8-facts and figures on life style practices.S13c8 chapter 8-facts and figures on life style practices.
S13c8 chapter 8-facts and figures on life style practices.
ย 
S13c7 Chapter 7-facts and figures on infrastructure.
S13c7 Chapter 7-facts and figures on infrastructure.S13c7 Chapter 7-facts and figures on infrastructure.
S13c7 Chapter 7-facts and figures on infrastructure.
ย 
S13c6 chapter 6- facts and figures on health
S13c6 chapter 6- facts and figures on healthS13c6 chapter 6- facts and figures on health
S13c6 chapter 6- facts and figures on health
ย 

Recently uploaded

Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Anamikakaur10
ย 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
SUHANI PANDEY
ย 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
ย 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995
garthraymundo123
ย 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
SUHANI PANDEY
ย 
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
MOHANI PANDEY
ย 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
SUHANI PANDEY
ย 

Recently uploaded (20)

NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
ย 
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
ย 
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
ย 
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
ย 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
ย 
Green Marketing
Green MarketingGreen Marketing
Green Marketing
ย 
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
ย 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
ย 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995
ย 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
ย 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
ย 
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
ย 
CSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENCSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -EN
ย 
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
ย 
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
ย 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
ย 
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
ย 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
ย 
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
ย 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
ย 

Interlinking rivers 12 - 7. chapter 16 & 17 7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

  • 1. Section 5: Reticular canal system for interlinking Indian rivers; Chapter 16: Flat Primary canal (FPC1) WE & EE Lengths: 559
  • 2. Topic series: 446.Topic 1: FPC1 WE Lengths and approximate capacity: FPC1WE Lengths, total length and the approximate capacity are as follows: SN. Description. Length in kms. 1.FPC1WEStart to FPC1WE Luni 500. 278.21 560
  • 3. Topic series: 446.Topic 1: FPC1 WE Lengths and approximate capacity: 2.FPC1WE Luni to FPC1WE Bandi 500. 176.56 561
  • 4. Topic series: 446.Topic 1: FPC1 WE Lengths and approximate capacity: 3.FPC1WE Bandi to FPC1WE Sucri 500 80.32 562
  • 5. Topic series: 446.Topic 1: FPC1 WE Lengths and approximate capacity: 4.FPC1WE Sucri to FPC1WE Jawai 500. 114.24 563
  • 6. Topic series: 446.Topic 1: FPC1 WE Lengths and approximate capacity: 5.FPC1WE Jawai to FPC1WE Sabarmathi 500. 148.19 564
  • 7. Topic series: 446.Topic 1: FPC1 WE Lengths and approximate capacity: 6.FPC1WE Sabarmathi to FPC1WE Som 500. 229.55 565
  • 8. Topic series: 446.Topic 1: FPC1 WE Lengths and approximate capacity: 7.FPC1WE Som to FPC1WE End 500. 83.74 566
  • 9. Topic series: 446.Topic 1: FPC1 WE Lengths and approximate capacity: Total FPC1 WE CRL Length in Kms is 1110.81 Total canal length we are going to save with CE, RE, DCC, BD in Kms. 145.49 Total length of the CE, RE, DCC, BD put together in Kms 2.54 The Length (Actual) of the probable FPC1WE in Kms. 967.86 The capacity (Volume) of storable water (with the canal width of 200 mts, depth of 25 mts, but the maximum level maintained will be 20 mts) in the FPC1WE (3871.44 million cubic meters) in TMC. (This volume can be filled and discharged any number of times.) 142.93 TMC 567
  • 10. Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity: FPC1EE Lengths, total length and the approximate capacity : SN. Description. Length in kms 1.FPC1EE Heran to FPC1EE Mahanadhi 500. 106.74 568
  • 11. Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity: 2.FPC1EE Mahanadhi to FPC1EE Son 500. 274.90 569
  • 12. Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity: 3.FPC1EE Son to FPC1EE Hasdo 500. 63.19 kms. There is an elevated area between FPC1EE Son to FPC1EE Hasdo 500 path and the maximum level we get in this path is 524 mts AMSL at (23005โ€™2.40โ€N) (82001โ€™50.03โ€E). DCC is required. 570
  • 13. Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity: 4.FPC1EE Hasdo to FPC1EE Mand 500. 266.49 571
  • 14. Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity: 5.FPC1EE Mand to FPC1EE Lb 500. 75.36 572
  • 15. Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity: 6.FPC1EE Lb to FPC1EE Sankh 500. 168.50 573
  • 16. Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity: 7.FPC1EE Sankh to FPC1EE South Koel 500. 147.26 574
  • 17. Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity: 8.FPC1EE South koel to FPC1EE Subarnarekha 500. 207.47 575
  • 18. Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity: 9.FPC1EE Subarnarekha to FPC1EE Damodhar 500. 166.82 576
  • 19. Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity: 10.FPC1EE Damodhar to FPC1EE Rihand 500. 594.64 577
  • 20. Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity: 11.FPC1EE Rihand to FPC1EE Hasdo Mand path 500. 55.70kms There is an elevated area between FPC1EE Rihand to FPC1EE Hasdo Mand path 500 path and the maximum level we get in this path is 562 mts AMSL at (230014โ€™8.85โ€N) (820039โ€™37.29โ€E). DCC is required. The FPC1EE which originates from Rihand 500 will Join the Hasdo Mand path of canal at the point (230010โ€™52.99โ€N) (820037โ€™26.56โ€E) encircling the Hazaribagh Range of hills. 578
  • 21. Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity: FPC1 EE SB 500 starts at the FPC1EE Son to Hasdo canal path at the point (23005โ€™25.60โ€N) (82008โ€™30.06โ€E). 579
  • 22. Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity: 12.FPC1EE SB Start to FPC1EE SB Seonath 500. 553.78 580
  • 23. Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity: Lowest point between FPC1EE SB Start to FPC1EE SB Seonath 500 path is 366mts AMSL at (200055โ€™3.52โ€N) (800034โ€™8.53โ€E). We have to do BD or U tube to by pass this depression. 581
  • 24. Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity: 13.FPC1EE SB Seonath to FPC1EE SB Mahanadhi 500. 171.54 Lowest point between FPC1EE SB Seonath to FPC1EE SB Mahanadhi 500 path is 403mts AMSL at (200023โ€™21.93โ€N) (81005โ€™50.98โ€E). We have to do BD or U tube to by pass this depression. 582
  • 25. Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity: 14.FPC1EE SB Mahanadhi to FPC1EE SB Tel500. 94.09 There is an elevated area between FPC1EE SB Mahanadhi to FPC1EE SB Tel500 path and the maximum level we get in this path is 564 mts AMSL at (20005โ€™0.87โ€N) (820012โ€™35.49โ€E). DCC is required. 583
  • 26. Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity: 15.FPC1EE SB Tel to FPC1EE SB Sabari 500. 981.82 584
  • 27. Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity: 16.FPC1EE SB Sabari to FPC1EE SB Indravathi 500. 237.99 585
  • 28. Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity: Total FPC1 WE CRL Length in Kms is 4166.29 Total canal length we are going to save with CE, RE, DCC, BD in Kms. 292.43 Total length of the CE, RE, DCC, BD put together in Kms 15.21 The Length (Actual) of the probable FPC1EE in Kms. 3889.07 The capacity (Volume) of storable water (with the canal width of 200 mts, depth of 25 mts, but the maximum level maintained will be 20 mts) in the FPC1WE (15556.28 million cubic meters) in TMC. (This volume can be filled and discharged any number of times.) 574.33 TMC 586
  • 29. Section 5: Reticular canal system for interlinking Indian rivers; Chapter 17: Flat Primary canal (FPC1) โ€“ RE, CE, DCC, BD and others: 587
  • 30. Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others: FPC1 โ€“ RE, CE, DCC, BD and others: S. N.( FPC1 RE, CE, DCC, BD point) (Latitude) (Longitude) FPC1 Narmada 500 RE 588
  • 31. Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others: FPC1 Narmada 500 RE 1(FPC1 Narmada 500 RE Start) (220050โ€™8.24โ€N) (800027โ€™31.88โ€E) 2(FPC1 Narmada RE 465 Bottom) (220050โ€™9.69โ€N) (800028โ€™5.49โ€E) 3(FPC1 Narmada 500 RE End) (220050โ€™15.89โ€N) (800029โ€™8.93โ€E) Length of FPC1Narmada 500 RE: 2.78kms. We will save 45 Kms of FPC1 creation. 589
  • 32. Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others: FPC1 Pennar500 to Papagni500 DCC1 1(FPC1 Pennar to Papagni DCC1 Start500) (140015โ€™23.06โ€N) (780011โ€™29.58โ€E) 2(FPC1 Pennar to Papagni DCC1 Top) (140015โ€™15.00โ€N) (780012โ€™31.70โ€E) 3(FPC1 Pennar to Papagni DCC1 End 500) (140015โ€™13.69โ€N) (780012โ€™40.29โ€E) Length of Pennar to Papagni DCC: 2.13kms. We will save 74.76Kms of FPC1 creation. 590
  • 33. Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others: FPC1 Ponniyar500 to Kaveri 500DCC1 591
  • 34. Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others: FPC1 Ponniyar500 to Kaveri 500DCC1 1(FPC1 Ponniyar500 to Kaveri 500DCC1 Start) (120017โ€™20.90โ€N) (78004โ€™40.28โ€E) 2(FPC1 Ponniyar500 to Kaveri500 DCC1 Top 510) (120017โ€™3.85โ€N) (78004โ€™1.53โ€E) 3(FPC1 Ponniyar500 to Kaveri 500DCC1 End) (120016โ€™17.40โ€N) (78002โ€™15.56โ€E) Length of FPC1 Ponniyar500 to Kaveri 500DCC1: 4.79 kms. We will save 30Kms of FPC1 creation. 592
  • 35. Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others: FPC1 Ponniyar500 to Kaveri 500 CE1 593
  • 36. Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others: FPC1 Ponniyar500 to Kaveri 500 CE1 1(FPC1 Ponniyar500 to Kaveri 500 CE1Start) (120014โ€™5.03โ€N) (770041โ€™30.29โ€E) 2(FPC1 Ponniyar500 to Kaveri 500CE1 Bottom320) (120014โ€™21.55โ€N) (770040โ€™50.96โ€E) 3(FPC1 Ponniyar500 to Kaveri 500CE1 End) (120014โ€™31.23โ€N) (770040โ€™26.40โ€E) Length of FPC1 Ponniyar500 to Kaveri 500 CE1: 2.07kms. We will save 32Kms of FPC1 creation. 594
  • 37. Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others: FPC1 Ponniyar500 to Kaveri 500CE2 595
  • 38. Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others: FPC1 Ponniyar500 to Kaveri 500CE2 1(FPC1 Ponniyar500 to Kaveri 500CE2Start) (120017โ€™0.33โ€N) (770027โ€™2.97โ€E) 2(FPC1 Ponniyar500 to Kaveri 500CE2Bottom380) (120017โ€™32.03โ€N) (770026โ€™16.66โ€E) 3(FPC1 Ponniyar500 to Kaveri 500CE2End) (120017โ€™58.41โ€N) (770025โ€™36.44โ€E) Length of FPC1 Ponniyar500 to Kaveri 500CE2: 3.28kms. We will save 13Kms of FPC1 creation. 596
  • 39. Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others: FPC1 Ponniyar500 to Kaveri 500CE3 597
  • 40. Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others: FPC1 Ponniyar500 to Kaveri 500CE3 1(FPC1 Ponniyar500 to Kaveri 500CE3Start) (120019โ€™40.03โ€N) (770013โ€™53.39โ€E) 2(FPC1 Ponniyar500 to Kaveri 500CE3Bottom413) (120019โ€™31.71โ€N) (770013โ€™48.79โ€E) 3(FPC1 Ponniyar500 to Kaveri 500CE3End) (120019โ€™22.50โ€N) (770013โ€™43.66โ€E) Length of FPC1 Ponniyar500 to Kaveri 500CE3: 0.61kms. We will save 15.2Kms of FPC1 creation. 598
  • 41. Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others: FPC1 Ponniyar500 to Kaveri 500CE4 599
  • 42. Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others: FPC1 Ponniyar500 to Kaveri 500CE4 1(FPC1 Ponniyar500 to Kaveri 500CE4Start) (120018โ€™36.84โ€N) (770011โ€™8.21โ€E) 2(FPC1 Ponniyar500 to Kaveri 500CE4Bottom466) (120018โ€™31.68โ€N) (770011โ€™7.72โ€E) 3(FPC1 Ponniyar500 to Kaveri 500CE4End) (120018โ€™26.00โ€N) (770011โ€™7.22โ€E) Length of FPC1 Ponniyar500 to Kaveri 500CE4:0.24 kms. We will save 7.34Kms of FPC1 creation. 600
  • 43. Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others: FPC1 Kaveri 500 RE: 601
  • 44. Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others: FPC1 Kaveri 500 RE: 1(FPC1 Kaveri 500 RE Start) (120011โ€™35.31โ€N) (770043โ€™16.46โ€E) 2(FPC1 Kaveri RE Bottom266) (120010โ€™57.01โ€N) (770042โ€™36.30โ€E) 3(FPC1 Kaveri 500 RE End) (120010โ€™7.23โ€N) (770041โ€™43.64โ€E) Length of FPC1 Kaveri 500 RE: 3.95kms. We will save(FPC1 Ponniyar to Kaveri80.54+Kaveri to Moyar117.04) 197Kms of FPC1 creation. 602
  • 45. Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others: FPC1 Kaveri 500 โ€“ Moyar500 CE1: 603
  • 46. Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others: FPC1 Kaveri 500 โ€“ Moyar500 CE1: 1(FPC1 Kaveri โ€“ Moyar CE1 Start) (12003โ€™46.54โ€N) (770036โ€™41.11โ€E) 2(FPC1 Kaveri โ€“ Moyar CE1 Bottom) (12003โ€™35.57โ€N) (770036โ€™46.55โ€E) 3(FPC1 Kaveri โ€“ Moyar CE1 End) (12003โ€™25.13โ€N) (770036โ€™51.86โ€E) Length of FPC1 Kaveri โ€“ Moyar CE1: 0.75kms. We will save 9.13Kms of FPC1 creation. 604
  • 47. Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others: FPC1 Kaveri 500 โ€“ Moyar 500 CE2: 605
  • 48. Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others: FPC1 Kaveri 500 โ€“ Moyar 500 CE2: 1(FPC1 Kaveri โ€“ Moyar CE2:Start) (110056โ€™39.35โ€N) (770035โ€™33.05โ€E) 2(FPC1 Kaveri โ€“ Moyar CE2 Bottom287) (110056โ€™23.07โ€N) (770035โ€™31.55โ€E) 3(FPC1 Kaveri โ€“ Moyar CE2 End) (110055โ€™40.42โ€N) (770035โ€™28.79โ€E) Length of FPC1 Kaveri โ€“ Moyar CE2: 1.84kms. We will save 114.29Kms of FPC1 creation. 606
  • 49. Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others: FPC1 Kaveri 500 โ€“ Moyar 500 CE3: 1(FPC1 Kaveri โ€“ Moyar CE3Start) (110032โ€™28.51โ€N) (770022โ€™30.41โ€E) 2(FPC1 Kaveri โ€“ Moyar CE3 Bottom) (110032โ€™19.53โ€N) (770021โ€™53.73โ€E) 3(FPC1 Kaveri โ€“ Moyar CE3 End) (110032โ€™1.13โ€N) (770020โ€™32.78โ€E) Length of FPC1 Kaveri โ€“ Moyar CE3: 3.66kms. We will save 25.84Kms of FPC1 creation. 607
  • 50. Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others: FPC1 Moyar 500 RE 608
  • 51. Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others: FPC1 Moyar 500 RE 1(FPC1 Moyar RE Start500) (110033โ€™25.21โ€N) (77001โ€™8.34โ€E) 2(FPC1 Moyar RE Bottom308) (110032โ€™49.26โ€N) (760059โ€™56.56โ€E) 3(FPC1 Moyar RE End500) (110032โ€™11.82โ€N) (760058โ€™42.84โ€E) Length of FPC1 Moyar RE: 4.99kms. We will save (Kaveri to Moyar 39.72+ Moyar to Bhavani 42.60) 82.32Kms of FPC1 creation. 609
  • 52. Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others: FPC1 Bhavani RE 610
  • 53. Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others: FPC1 Bhavani RE 1(FPC1 Bhavani RE Start) (110017โ€™8.93โ€N) (760050โ€™31.56โ€E) 2(FPC1 Bhavani RE Bottom338) (110016โ€™25.92โ€N) (760050โ€™54.91โ€E) 3(FPC1 Bhavani RE End) (110016โ€™6.03โ€N) (760051โ€™6.08โ€E) Length of FPC1 Bhavani RE: 2.2kms. We will save (Moyar to Bhavani 26.06 + Bhavani to Noyil 31.19) 57.25Kms FPC1 creation. 611
  • 54. Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others: FPC1 WE Sabarmati RE 500: 612
  • 55. Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others: FPC1 WE Sabarmati RE 500: 1(FPC1WE Sabarmati RE Start 500) (240017โ€™31.35โ€N) (730015โ€™18.89โ€E) 2(FPC1WE Sabarmati RE Bottom 338) (240016โ€™51.03โ€N) (730014โ€™26.52โ€E) 3(FPC1WE Sabarmati RE 500) (240016โ€™38.14โ€N) (730014โ€™10.16โ€E) Length of FPC1 WE Sabarmati RE: 2.54kms. We will save 145.49Kms FPC1 creation. 613
  • 56. Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others: SN (FPC1EE Damodhar to Rihand500 DCC1) 614
  • 57. Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others: SN (FPC1EE Damodhar to Rihand500 DCC1) 1(FPC1EE Damodhar to Rihand500 DCC1Start500) (230040โ€™28.99โ€N) (840046โ€™17.09โ€E) 2(FPC1EE Damodhar to Rihand500 DCC1 Top 526) (230041โ€™29.66โ€N) (840042โ€™46.97โ€E) 3(FPC1EE Damodhar to Rihand500 DCC1 End500) (230040โ€™40.76โ€N) (840038โ€™7.28โ€E) Length of FPC1EE Damodhar 500 to EE Rihand 500 DCC1: 15.21 kms. We will save 292.43Kms of FPC1 creation. 615
  • 58. Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others: All these lengths are with the major curves on the surface, in the same level in case of FPC, and in declining fashion in case of PC and other canals. 616
  • 59. Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others: Minor curves that come in the canal paths are not focused and it is not possible by me alone. So the exact length of the canal will be known only after doing the micro survey of different segments of the canal by different teams. 617
  • 60. Topic series: 448. Topic 1: FPC1 โ€“ RE, CE, DCC, BD and others: My effort is to guide them in this way to make the things easy and understandable, so that there will be less errors in the future with the satellite based survey. 618