SlideShare a Scribd company logo
1 of 35
Download to read offline
Customers
Rio Tinto
ABB Australia
Rockwell Automation
Adani
Schneider Electric
QGC
Origin Energy
Anglo Coal
John Hollands
Monadelphous
Thiess 
Coles
BMA
Gold Coast City Council
Bechtel
Sanitarium
Arnott’s Biscuits
Cargill Beef
Projects
‐ Treatment Plant Upgrades
‐ Pump Station Upgrades
‐ Water Gathering Ponds
‐ De‐Watering Systems
‐ RTU Changeovers
‐ Remote Communication 
Systems
‐ Water Monitoring Systems
‐ Diesel Driven Regional Ponds
Spiral Systems
Safety Systems
HV Kiosks
Shiploader Upgrades
Dam Upgrades
Fully Packaged Switchrooms
Automated Line upgrades
Solar Systems
PTAS Capabilities
‐ Project Management
‐ Packaged Designs
Engineering Design Software 
& Studies
‐ Quality/Document Control
‐ Complete 
Integration/Software     
Development
‐ SCADA/HMI Interface
‐ Manufacturing & Assembly 
‐ Factory Testing Crew
‐ Installation Crew
‐ Site Commissioning Crew
‐ Operational onsite Training
– Engineering
– Single Line Diagrams, Schematics
– General Arrangements, Termination 
Diagrams, Block Diagrams
– Cable Schedules
– Project Management
– System Integration
– SCADA Packages
Company Capabilities
– Manufacturing
– Switchboard & Motor Control Centre 
– DB’s, LCS’s, JB’s, PLC’s, VSD’s, UPS Systems
– Custom Busbar Fabrication
– Internal/External Labelling 
– Complete Installations
– Switchroom Supply/Fit out & Delivery to Site
PTAS can provide upto 7000A 100kA Form 4b 
type tested, arc fault containment 
switchboards
‐ Cubic Modular System (Fixed, Demountable & 
Withdrawable) in mild steel
‐ B&R Signature (Fixed & Demountable) in mild steel
‐ Custom type tested switchboards (Fixed & 
Demountable) in mild steel, aluminium & stainless 
steel
Switchboard/MCC Capabilities 
LV, MV, HV Capabilities
PTAS Can Supply LV, MV & HV Solutions 
Transformer – Schneider / ABB / Tyree / NHP
HV Switchgear ‐ Rockwell / ABB / Schneider / 
Toshiba / NHP
MV Switchgear– Rockwell / ABB / Schneider / 
Toshiba / NHP
6.6kV, 11kV & 33kV Solutions
Manufacturing Capabilities 
‐1100m2 Undercover Workshop Area
‐Storage Area/Job Shelves
‐ Busbar fabrication machinery 
‐ Identification labelling machinery
‐ Cable/wire labelling machinery
‐ Automatic strip/crimp machinery
‐ Automatic duct/din cutting machinery
‐ Welding Machinery
‐ Milling Machine
‐Testing Equipment
Project Management/Engineering 
Capabilities 
‐ Fully Packaged Electrical Design Packages ‐ SLD’s, GA’s, 
Schematics, Termination Diagrams, Block Diagrams, Bill of 
materials
‐ Power systems analysis ‐ Load flow calculations, Harmonic 
Studies, Arc Flash, Short Circuit, Earthing Studies, Motor 
Protection, Curve diagrams, Energy Management, System 
Optimization
‐ In house REPQ sign‐off/verification
‐ Experienced Project Management
‐ Quality Assurance Manager
‐ Programming/SCADA Packages – RSLogix, Siemens, Modicon, 
RS View, Citec WinCC, IFix, Mitsubishi, Digital
Installation Capabilities 
PT Automation Solutions have specially trained & certified installation team 
that are certified to work on open cut mining & coal seam gas projects as 
well as building sites throughout Australia and around the globe
‐ X2 20 foot containers fully kitted out work benches and storage
‐ X2 Customised Trailers fully kitted out with work benches and storage
‐ Cable pulling systems 
‐ Jacks/Lifting equipment
‐ Cable labelling machinery 
Recently completed installation projects
‐ Coal Seam Gas – X18 sites including Ruby Jo, David, Orana 1
‐ Mining ‐ Acland Coal Mine, Mount Isa Mine, Middlemount Mine,  
Whitehaven Coal
‐ Food & Beverage ‐ Smith snack foods, Arnott’s Biscuits, Cargill 
Beef, Castlemaine XXXX, Top‐cuts, 
‐ Infrastructure – Gold Coast Council, Logan Council, Seq Water, Wet 
N Wild, Seaworld, Visy, Hinze Dam, 
In House Bus Bar Fabrication
PT Automation Solutions have experienced bus bar fabricators in 
house for all cutting/bending/punching all copper bars upto a 
capacity of 7000Amps in house.
‐ MCC’s, Feeder Panels
‐Metering, MCCB Tags, Earthing
‐ACB section’s
PTAS provided Fully Packaged Modular 
Switchrooms
Adani Abbot Point SL1
LV Switchroom
Boyne Smelters CBF4 
LV&HV Switchroom
GD Pipeline (QGC) – Water 
Monitoring System 
‐ X15 Remote DC Operated (Solar) System
‐PTAS Scope ‐ Design, Manufacture, Integration, 
Factory Acceptance Test, Deliver to site, Installation & 
Commissioning 
Custom Outdoor Enclosure IP66
PLC Section
Solar System
Battery Back‐up (5 days)
Distribution Section
HMI
Rockwell Automation (WICETS  Stage 1 
Upgrade)
‐ 400+ Communication Panels, LCS’s, PLC Panels, Console Panels IP66
‐PTAS Scope ‐ Design, Manufacture, Factory Acceptance Test, Deliver 
to site
PLC Panels
Local Control Stations
Console Panels
Junction Boxes
Distribution Panels
Communication Panels
Rio Tinto – Boyne Smelter CBF4 Project
– 26m Transportable Modular Switchroom
• Separate LV & HV Switchrooms
• 3500A Unlimited Arc Containment SWB 
• 160 Fully Withdrawable Motor Starters
• 40 Feeders
• 3 Incoming ACB’s with Bus Tie
• Vamp Arc Flash Detection System
• 22 Wall Mounted VSD’s
• PLC & Safety Panels
• UPS System
• 3 x 2000KVA 11KV/415V Transformers
• 50m of VASS Weather Proof Bus Duct
• Fault Study & Protection Scheme Design
• All Engineering by PTAS
Rio Tinto – Boyne Smelter CBF4 Project
Wier Minerals (QGC) – Water Gathering Ponds; 
Orana 1, Ruby Jo & David
‐ PTAS Scope ‐ Design, Manufacture, Integrate, Factory 
Acceptance Test, Deliver to site, Installation & 
Commissioning
‐ Fully Packaged Switchroom
‐ Type Tested Form 3b Motor Control Centre IP54
‐ Packaged Kiosk 6.6kV
‐ 350kW VSD Cabinets
‐ Communication Enclosures/Distribution Enclosure
Cassette Enclosure per pump
‐ PLC Enclosure/Marshalling Enclosure
‐ UPS System
‐ Marashel Pluggable Systems
Wier Minerals (QGC) – Water Gathering Ponds; 
Orana 1, Ruby Jo & David
Gold Coast Council – Merrimac 
Treatment Plant & Various other 
sites
‐ X2 Type Tested Form 3b Motor Control Centre IP54
‐ 70+ Motor power/control cubicles supplied
‐PTAS Scope ‐ Design, Manufacture, Integration, Factory 
Acceptance Test, Deliver to site, Installation & Commissioning
Incoming Section
Metering
Variable Speed Drives
Soft Starters
DOLs
UPS System 
PLC Section
Distribution Section
Gold Coast Council – Merrimac 
Treatment Plant & Various other 
sites
‐ X12 Pump Station Switchboards IP66
‐PTAS Scope ‐ Design, Manufacture, Integration, Factory 
Acceptance Test, Deliver to site, Installation & 
Commissioning
Incoming Section
Metering
Variable Speed Drives
Soft Starters
DOLs
Distribution Section
RTU System
Xstrata Technologies (Mipac)
‐ X25 DCS Cabinets (Siemens PLC) 
‐PTAS Scope ‐ Design, Manufacture, Factory 
Acceptance Test, Crate & deliver to Brisbane Port, 
DCS Cabinets (X3 combinations)
PLC Section
Distribution Section
Communication Section
Control Section
Marshalling Section
SEQ Water – Stones Road Pump Station
‐ Type Tested Form 3b Motor Control Centre IP54
‐PTAS Scope ‐ Design, Manufacture, Integration, Factory 
Acceptance Test, Deliver to site, Installation & Commissioning
Incoming Section
Metering
Soft Starters
DOLs
UPS System 
Marshalling Section
Distribution Section
Hirsch – Pallet Manufacturing Machine
• Motor Control Centre
• Control Panels
• HMI Operator Panel
• PLC Section
• 21 Servo Drives
• Complete Turn Key Solution
• Installation/Programming done by PTAS 
in Austria
Hirsch – Pallet Manufacturing Machine
John Holland – Abbott Point SL2
X40 ‐ IP66 Stainless Steel Panels
• Shiploader
• Marine Works
• Distribution Panels, Control Panels, Junction Box’s
John Holland – Abbott Point SL2
Gladstone Ports – Stockpile 22
X35 ‐ Stainless Steel IP66 Rated Boards
• Type Tested Limited Arc Containment MCC’s
• PLC Panels
• Control Panels
• Distribution Boards
• Local Control Stations
Gladstone Ports – Stockpile 22
Anglo American Coal – German Creek Mine MCC
16 metre Back to Back Type Tested Cubic MCC
• 2000A BusBar
• 2 Incomers & Bus Tie Section
• 70 Intelligent Motor Starters & Feeders on Device 
Net.
• ABB Arc Flash Detection System
• ABB Control Gear, MCCB’s & ACB’s.
• Dead Easy Safety System
• Full Design & Software by PTAS
• Completed in 8 Weeks from Order (including 
design)
Anglo American Coal – German Creek Mine MCC
Origin Energy/APLNG Spring Gully De‐Watering MCC
• IP 66 Solution –external shell mounted over the 
Switchboard with Ventilation 
• Complete Platform and Switchboard fitted out at 
PTAS Workshop
• Demountable and Withdrawable Switchboard
• PLC Section, UPS System, 6 off DOL’s 
(Withdrawable)
• Distribution Section, Metering & 3 off 22kW VSD’s
Origin Energy/APLNG Spring Gully De‐Watering MCC
Xstrata Zinc (Glencore) Mount Isa Mines
• Various VSD Panels (5.5kW – 630kW), Communication 
Panels, Local Control Stations & Control Panels
• PT Automation Solutions have built 150+ Enclosures 
for Xstrata Zinc Mount Isa & George Fisher Mines
Xstrata Zinc (Glencore) Mount Isa Mines
Adani Abbott Point SL1 
• 10.5 Metre Transportable Modular Switchroom
• Motor Control Centre
• Distribution Boards, PLC Panel, UPS System
• Inter‐Connections of Switchroom
• 50 + PLC Cabinets
• FAT Testing & Delivery to Abbot Point
Adani Abbott Point SL1 
Sage Automation (Origin Energy) Re‐Injection Skid
• Form 3b Type Tested (External Shell IP66)
• IP 66 Solution ‐ Achieved by custom external shell bolted 
onto the Cubic System
• 800A  Interlock 
• Pluggable Feeder System
• Distribution Section
• Feeder Section’s
• Marechal Plug System 
• PTAS completed two Re‐Injection Skid’s for separate 
Projects

More Related Content

What's hot

What's hot (20)

Resume-Vispute_Prashant
Resume-Vispute_PrashantResume-Vispute_Prashant
Resume-Vispute_Prashant
 
DCS Migration Lessons Learned
DCS Migration Lessons LearnedDCS Migration Lessons Learned
DCS Migration Lessons Learned
 
Zero downtime upgrate for dcs migration Thermo Systems
Zero downtime upgrate for dcs migration Thermo SystemsZero downtime upgrate for dcs migration Thermo Systems
Zero downtime upgrate for dcs migration Thermo Systems
 
CURRENT PROFILE 1_2016
CURRENT PROFILE 1_2016CURRENT PROFILE 1_2016
CURRENT PROFILE 1_2016
 
Al Mutim Resume
Al Mutim ResumeAl Mutim Resume
Al Mutim Resume
 
Khubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan_CV Instrument
Khubaib Khan_CV Instrument
 
CV for Linkedin
CV for LinkedinCV for Linkedin
CV for Linkedin
 
Automation Engineer r3 2-2015
Automation Engineer r3 2-2015Automation Engineer r3 2-2015
Automation Engineer r3 2-2015
 
GRA16-8
GRA16-8GRA16-8
GRA16-8
 
CE Power - Capabilities General - Brian Wilson
CE Power - Capabilities General  - Brian WilsonCE Power - Capabilities General  - Brian Wilson
CE Power - Capabilities General - Brian Wilson
 
NAVEEN SUKUMAR PAKIRLA Resume1
NAVEEN SUKUMAR PAKIRLA Resume1NAVEEN SUKUMAR PAKIRLA Resume1
NAVEEN SUKUMAR PAKIRLA Resume1
 
Resume-Prashanth
Resume-PrashanthResume-Prashanth
Resume-Prashanth
 
Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)
 
Mrunal--CV Latest
Mrunal--CV LatestMrunal--CV Latest
Mrunal--CV Latest
 
Nagy_CV_Docx
Nagy_CV_DocxNagy_CV_Docx
Nagy_CV_Docx
 
RESUME
RESUMERESUME
RESUME
 
CV instrument (E&I) Engineer2
CV instrument (E&I) Engineer2CV instrument (E&I) Engineer2
CV instrument (E&I) Engineer2
 
RESUME2.doc
RESUME2.docRESUME2.doc
RESUME2.doc
 
Kdc Systems Overview
Kdc Systems OverviewKdc Systems Overview
Kdc Systems Overview
 
Resume-Prashanth
Resume-PrashanthResume-Prashanth
Resume-Prashanth
 

Similar to Customers and Projects in Mining, Infrastructure and Industry

Automation Engineering Services & Solutions - Offering A Globally Sustainable...
Automation Engineering Services & Solutions - Offering A Globally Sustainable...Automation Engineering Services & Solutions - Offering A Globally Sustainable...
Automation Engineering Services & Solutions - Offering A Globally Sustainable...Sunil Wadhwa -MIE, EPLM (IIMC)
 
iFluids Engienering Capability Presentation
iFluids Engienering Capability PresentationiFluids Engienering Capability Presentation
iFluids Engienering Capability PresentationJohn Kingsley
 
EAET Capabilities
EAET CapabilitiesEAET Capabilities
EAET CapabilitiesEAETech
 
01_CZ E-House Packaging Brochure 2015
01_CZ E-House Packaging Brochure 201501_CZ E-House Packaging Brochure 2015
01_CZ E-House Packaging Brochure 2015Jan Koleckar
 
BEC Controls & Automation
BEC Controls & AutomationBEC Controls & Automation
BEC Controls & Automationbjohnsonbec
 
Podium engineering srl a Pépinières Ouvertes 2014
Podium engineering srl a Pépinières Ouvertes 2014Podium engineering srl a Pépinières Ouvertes 2014
Podium engineering srl a Pépinières Ouvertes 2014Fabrizio Favre
 
Gaurav Dhawan_ Resume.doc
Gaurav Dhawan_ Resume.docGaurav Dhawan_ Resume.doc
Gaurav Dhawan_ Resume.docGaurav Dhawan
 
DTS Solution - SCADA Security Solutions
DTS Solution - SCADA Security SolutionsDTS Solution - SCADA Security Solutions
DTS Solution - SCADA Security SolutionsShah Sheikh
 
Resume_Atulnjadhav
Resume_AtulnjadhavResume_Atulnjadhav
Resume_AtulnjadhavAtul Jadhav
 
Oracle e-Business Suite - experience and competencies
Oracle e-Business Suite - experience and competenciesOracle e-Business Suite - experience and competencies
Oracle e-Business Suite - experience and competenciesRoman Havrylyak
 
IE Brochure-General_May2016
IE Brochure-General_May2016IE Brochure-General_May2016
IE Brochure-General_May2016Thomas Garvin
 
Engr.SaherCV (1)
Engr.SaherCV (1)Engr.SaherCV (1)
Engr.SaherCV (1)Saher Jehad
 

Similar to Customers and Projects in Mining, Infrastructure and Industry (20)

Automation Engineering Services & Solutions - Offering A Globally Sustainable...
Automation Engineering Services & Solutions - Offering A Globally Sustainable...Automation Engineering Services & Solutions - Offering A Globally Sustainable...
Automation Engineering Services & Solutions - Offering A Globally Sustainable...
 
iFluids Engienering Capability Presentation
iFluids Engienering Capability PresentationiFluids Engienering Capability Presentation
iFluids Engienering Capability Presentation
 
EAET Capabilities
EAET CapabilitiesEAET Capabilities
EAET Capabilities
 
Richmond Engineering Brochure
Richmond Engineering BrochureRichmond Engineering Brochure
Richmond Engineering Brochure
 
01_CZ E-House Packaging Brochure 2015
01_CZ E-House Packaging Brochure 201501_CZ E-House Packaging Brochure 2015
01_CZ E-House Packaging Brochure 2015
 
Plc & scada
Plc & scadaPlc & scada
Plc & scada
 
BEC Controls & Automation
BEC Controls & AutomationBEC Controls & Automation
BEC Controls & Automation
 
Podium engineering srl a Pépinières Ouvertes 2014
Podium engineering srl a Pépinières Ouvertes 2014Podium engineering srl a Pépinières Ouvertes 2014
Podium engineering srl a Pépinières Ouvertes 2014
 
RPresentation 2010
RPresentation 2010RPresentation 2010
RPresentation 2010
 
Al Mutim Resume
Al Mutim ResumeAl Mutim Resume
Al Mutim Resume
 
63089_SEKAR_01_12_14
63089_SEKAR_01_12_1463089_SEKAR_01_12_14
63089_SEKAR_01_12_14
 
Gaurav Dhawan_ Resume.doc
Gaurav Dhawan_ Resume.docGaurav Dhawan_ Resume.doc
Gaurav Dhawan_ Resume.doc
 
Resume McWhirterDerek
Resume McWhirterDerekResume McWhirterDerek
Resume McWhirterDerek
 
DTS Solution - SCADA Security Solutions
DTS Solution - SCADA Security SolutionsDTS Solution - SCADA Security Solutions
DTS Solution - SCADA Security Solutions
 
PSS_Profile 2014
PSS_Profile 2014PSS_Profile 2014
PSS_Profile 2014
 
Resume_Atulnjadhav
Resume_AtulnjadhavResume_Atulnjadhav
Resume_Atulnjadhav
 
Oracle e-Business Suite - experience and competencies
Oracle e-Business Suite - experience and competenciesOracle e-Business Suite - experience and competencies
Oracle e-Business Suite - experience and competencies
 
IE Brochure-General_May2016
IE Brochure-General_May2016IE Brochure-General_May2016
IE Brochure-General_May2016
 
Engr.SaherCV (1)
Engr.SaherCV (1)Engr.SaherCV (1)
Engr.SaherCV (1)
 
Profile mrugesh pawar goldfinch
Profile mrugesh pawar goldfinchProfile mrugesh pawar goldfinch
Profile mrugesh pawar goldfinch
 

Customers and Projects in Mining, Infrastructure and Industry