2. Contractor since 2010 representing
interest of both Prime Contractor and
Site Contractors.
Representation for ,
Industrial Construction Projects
Drilling Rigs
Service Rigs Plant Shut-Downs Pipeline Construction
Facility Construction Civil Earthworks Projects
Production Plant Safety Environmental Clean-up
Electrical Mitigation Commissioning
Industrial Deconstruction
3. WHY DO I CHOOSE SAFETY AS A
PROFESSION?
I enjoy giving people the skill set to make it home safe
each and every day
How do I achieve this goal?
Management Buy-in to the health management system
Worker Buy-in to the health management system
Field Training opportunities
Field Supervision training opportunities
Field Monitoring to correct “at risk” behaviors in real time
Working as a team to achieve a desired goal
“Give a man a fish and he eats for a day, teach a man to fish and he eats for a lifetime”
4. SPECIALIZED TRAINING
PRACTICAL LOSS CONTROL MANAGEMENT
INCIDENT COMMAND 100
ELECTRICAL ARC FLASH TRAINING, (ESTS)
GROUND DISTRUBANCE LEVEL 2
PRIME CONTRACTOR
PRINCIPLES OF HEALTH AND SAFETY MANAGEMENT
LEADERSHIP FOR SAFETY EXCELLENCE, (LSE)
BASIC INSTRUCTIONAL TECHNIQUE
DETECTION AND CONTROL OF FLAMMABLE SUBSTANCES
CONSTRUCTION ENVIROMENTAL AWARENESS
OCCUPATIONAL HEALTH AND SAFETY AWARENESS
WHMIS TRAIN THE TRAINER
CONSTRUCTION SAFETY ADMIN
CONFINED SPACE ENTRY
CONFINED SPACE MONITOR
CONFINED SPACE RESCUE
CSTS
PST
TDG
5. DUTIES PERFORMED
INCIDENT INVESTIGATION UTILIZING SCAT PROGRAM
GAP PROGRAM DESIGN AS REQUIRED
ORIENTATION DEVELOPMENT AND IMPLIMENTATION
TRENDING AND TRACKING MATRIX, DAILY, WEEKLY, MONTHLY
FIELD TRIANING OF PERSONELL AND SUPERVISION
SITE INSPECTIONS INVOLVING MANAGEMENT, WORKER AND HSE
DEVELOPMENT AND SUPERVISION OF JOSH COMMITTEE FORMATS
WEEKLY PROGRESS MEETING DATA COLLECTION AND PRESENTATION
DEVELOPMENT AND IMPLIMENTATION OF WEEKLY/SHIFTLY GENERAL SAFETY MEETINGS
MODIFIED WORK PROGRAM MANAGEMENT
CONVEYANCE AND MONITORING OF LEGISLATIVE REQUIRMENTS
COACHING OF ALL PERSONNEL TO ELIMINATE/REDUCE RISK TOLERANCES
FLEET MANAGEMENT/JOURNEY MANAGEMENT
OPEN DOOR APPROACH/TROUBLE SHOOTING/LIASE WITH OTHER CONTRACTORS
EMERGENCY PREPARDNESS