SlideShare a Scribd company logo
1 of 23
CFT Review Presentation
!YLP MT’14
26th
of September, 2014
Presented by : Dharamveer Gupta
Jan 13, 2015 2
Dharamveer Gupta
Role in the organization Basic Information
• Understanding of different
functions at Idea
Educational Background
•PGDM – Xavier Institute of Management, Bhubaneswar
•BBA (Marketing) - Smt. J.D.Birla Inst., Kolkata in 2009
Work experience
•Internship Deloitte Consulting India Pvt Ltd (April, May
2014)
•Managed Family Business M/s Jai Kiran Onion
Company for 33 months
Interests
•Reading
•Playing outdoor sports like volleyball and basketball
•Passionate about cooking
INTRODUCTION
• Sales Stint
• Marketing Stint
• Service Delivery Stint
• Q & A
Agenda
SALES
(July 2014)
Objective - Communication in Postpaid in Indore 1; Realities & Challenges
and methods to improve it
Mentors : Mr. Bhuvneshwar S Chauhan
Mr. Rajeev Bhardawaj
Mr. Dhiraj Sharma
5
Postpaid at IDEA in
MPCG
Survey of MY IDEA outlets
and Analysis
Observations
Analysis
POSTPAID in
MPCG circle
FY 2014 Annual
revenues at 162.7
Crores
Q1 FY15 – 44,792
new connections
Q1, FY15 – 6642
MNP activations
achieved
5634 Data Packs
and Combo Sales
in Q1 FY15
FY 2014 Annual
revenues at 52.4
Crores
Q1, FY15 – 15,012
New connections
Q1, FY15 – 1950
MNP activations
achieved
2486 Data Packs
and Combo Sales
in Q1 FY15
POSTPAID
in INDORE-1
32.2%
33.51%
29.36%
44.1%
Engagement Outcome
Postpaid at IDEA in
MPCG
Survey of MY IDEA outlets
and Analysis
Observations
Analysis
Engagement Outcome
Survey Questionnaire
1. Sales
10.53
%
47.37
%
31.58
%
10.53
%
< 100> 200
100 - 150
Cat B
Category of Outlets
Average Walkin
When do you get the targets?
– 100% responded beginning of
the month
Do you get the Achievement status of Sales Targets? –
100% responded as YES
Oral by
TSM/ASM
10.5%
Mail by
TSM/ASM
15.8%
73.7%
Mail & Oral by
TSM/ASM
Mode of Communication Achievability of Targets
Score = 3.82 out of 5
Current mode of
communication
Satisfaction Score = 3.5
out of 5
42.1 %
57.9 %
MI Survey.htm
Cat C
150 - 200
Observations
Analysis
Engagement Outcome
3. FOS (Fleet on Street) & Infrastructure2. Commission Structure
Commission
Calculation Complexity
Index = 1.99
Commission Structure
Understandability
Index = 3.5
Commission Payout
Satisfaction
Index = 3.2
Commission Policies
Satisfaction Index = 3
** Note – All the scores above are out of 5 with 1 being the least and 5
being the maximum
Average FOS Size = 3.8
Required Average FOS
Size = 4.6
FOS Satisfaction
Score = 2.86
Postpaid at IDEA in
MPCG
Survey of MY IDEA outlets
and Analysis
Observations
Analysis
Engagement Outcome
Sales
• No notification system for CAF
rejections and resons for it
• Duplicate Bill cannot be printed
with the existing software and
hence a lot of pety complaints
which could have been avoided
• Escalation of problems is time
consuming
• Pospaid problem handling is
slower as compared to Prepaid
Commission Structure
• Target setting is a one-way
process. Lack of discussions
with franchisee owner w.r.t
setting of targets and justification
for it
• Complex Commission Policy
structure. The commission paid
is distributed in 8 heads as
compared to 3 heads before
• Variable days of Payouts as
compared to that of prepaid
• Disatisfaction because of unfair
incentivisation as compared to
smaller outlets
FOS & Infrastructure
• Basic Salary is less
• Customers sometimes do not
trust the authenticity of FOS
because of lack of identity cards
• Frequency of training is less
• Lack of Direct incentives
• Negligent engagement activities
from the organisation
Postpaid at IDEA in
MPCG
Survey of MY IDEA outlets
and Analysis
• Real Time Notification System to be incorporated
in the existing software
• This system will notify the MY IDEA outlet with the
reason for rejection of CAF
CAF
Notification
Tab
• The factility to print duplicate bills from the
prefalent software should be incorporated which
was not before.
.
Duplicate Bill
• Speeden up the New
Customer Acquisition
Process
• Better Communication
This will decrease BNR
complaints, late
payments, and improve
the communication
process
FOS Connect
• Accessory kit and Identity Card to FOS
• FOS Engagement meets to be held where top
performers are appreciated
 Increase in connect
with Idea
 Motivated employees
perform better
Recommendations What is it? BENEFIT to IDEA
Observations
Analysis
Engagement Outcome
Postpaid at IDEA in
MPCG
Survey of MY IDEA outlets
and Analysis
Week 3 Week 4Week 1 Week 2
Current FOS
Required FOS
Gap (FOS)
Action plan to cover gap
Last 3 months Avg Sales
Present month Target
MNP
Pre to Post
Fresh Acquisitions
Action Plan
Weak wise Target Split
MNP
Pre to Post
Fresh Acquisitions
Special Support
ASM (Signature) TSM (Signature) Channel Partner (Signature)
“MY IDEA Monthly Plan Sheet”
Month -
Franchisee Name
Observations
Analysis
Engagement Outcome
Postpaid at IDEA in
MPCG
Survey of MY IDEA outlets
and Analysis
MARKETING
(August 2014)
Objectives:
1.Competition Analysis of VAS across MPCG.
2.Increasing VAS penetration across DND customers
Mentors : Mrs. Nilofer Khan
Mr. Ajay Tripathi
Idea Music Station
Rs 36/ 30 days for 360
mins
IVR, SMS, OBD, WAP
543213
MUSIC
Standard Price Points
Communication modes
Short Code
Airtel Music
Rs 30/ 30 days for 300
mins
IVR, SMS, OBD
543213
Vodafone Music
Rs 30/ 30 days for 300
mins
IVR, SMS, OBD, WAP
543213
Dialer Tone
Rs 15/song charges for
90 days, Rs 36/ 30 days
subscription
IVR, SIVR, OBD
56789
RING BACK TONE
Standard Price Points
Communication modes
Short Code
CRICKET
Standard Price Points
Communication modes
Short Code
HelloTune
Rs 15/song charges for
90 days, Rs 36/ 30 days
subscription
IVR, SMS, USSD
Caller Tune
Rs 15/song charges for
90 days, Rs 36/ 30 days
subscription
IVR, SMS, USSD
Match Day – Rs 6/match
day
Monthly pack – Rs 60
SIVR, OBD, IVR
12137
Match Day – Rs 5/match
day
Monthly pack – Rs 30
SIVR, OBD, SMS
Match Day – Rs 5/match
day
Monthly pack – Rs 30
SIVR, OBD, SMS
1. Product analysis of VAS across competitors (MPCG)
ASTROLOGY
Standard Price Points
Communication modes
Short Code
MCI (Missed Call
Information)
Standard Price Points
Communication modes
Short Code
PPU – Rs 9/minute
Subscription based –
Rs.36/ 30 days and
Rs.3.99/minute
IVR, USSD, SMS, OBD
53300
PPU – Rs 1/ transaction
Subscription based –
Rs 36/ 30 days
SIVR, OBD
12136
PPU – Rs 1/ transaction
Subscription based –
Rs 30/ 30 days
SMS
PPU – Rs 3/ transaction
Subscription based –
Rs 30/ 30 days
SMS
PPU – Rs 9/minute
Subscription based –
Rs.30/ 30 days and
Rs.3/minute
IVR, USSD, SMS, OBD
PPU – Rs 9/minute
Subscription based –
Rs.30/ 30 days and
Rs.3/minute
IVR, USSD, SMS, OBD
1. Product analysis of VAS across competitors (MPCG)
** Note – PPU is Pay Per Usage
2. Increasing VAS penetration across DND customers (MPCG)
DND BASE
48,93,933
Prepaid
46,71,113
Postpaid
2,22,820
Non-VAS
43,75,237
VAS users
2,95,876
Non-VAS
2,07,819
VAS users
15,001
3.97%
27.95%
65.70%
2.38%
Prepaid OSCC
IVR
Others DND in CAF
DND - Mode of Activation
Highlights
** Note – OSCC stands for Outbound Service Call Centre
IVR , SIVR
MY IDEA
Mobile Bills
• DND customers use IVR, SIVR portals
• The first voice here would be that of informing the customer to
activate the Partial DND and the line would be directed towards
1901
• A lot of customers visit MY Idea outlets
• Awareness of benefits of Partial DND by the front end
executives.
RATIONALE
•The DND base in MPCG is 26.87% of EOP (End of Period) base.
•The main objective would be that of converting them from “Complete DND” to “Partial DND”.
•This would in turn increase the communication and highly segmented products would be promoted
based on their RPU
Recommendations
• Mobile bills sent to Postpaid customers can be used as a
communication tool.
• Partial DND Service can be promoted on the right hand side
corner of the bill
SERVICE DELIVERY
(September 2014)
Objective – Postpaid Activation Turnaround Time (TAT) reduction for new
connections and Prepaid to Postpaid conversions
Mentors : Mrs. Rashi Saxena
Mr. Jitendra Sharma
Mr. Amit Hardia
CAF Activation Process in Postpaid in Indore
Customer submits
documents to
Channel partner
Offline entry by
Channel partner in
CRYSTAL
CPV ClosureOffline to Online Waiver
ONICRA a Third Party Agency collects the
form from Channel Partner and delivers it
to the Zone Activation Office
Account gets
activated
CRM Activities
Offline entry by
Channel Partner
Reaches CAF Activation
Centre
CAF Indexing/Barcoding
CAF Activation Officer –
Physical check
L1 AUDIT
(Barcode, Doc Count,
Accept/Reject)
L2 AUDIT - CAF Activation
Officer (Compares offline
entry with Form Hardcopy)
Make it ONLINE
4 - 5
hrs
120
mins
30 mins
60 mins
30 mins
30 mins
Observations
CHANNEL PARTNER
•Rejected CAF are expected to be returned the same day for reftification.
•1st level audit to be in place to control CAF rejection post submition to
runner.
•Arranging new CAFs pertains to L1 audit will lead to delay in activation
•CPV in Process – Detailed reasons not available in Crystal
•Offline entry done to block special numbers too where actual customer not
present
CAF Collection Agency – ONICRA
•List of CAFs to be collected from respective Channel Partner are not
carried by runner
CAF Activation Centre
•Offline Correction rights are not extended to SPA level
•Offline entry made but forms do not reache the same day
•Too many phone calls from Channel Partners concerning activation of
CAFs which decreases their productivity.
** Note - time taken is an estimated avg for 50
CAF
Offline to Online
Offline entry by
Channel Partner
CPV Allocation by SD to
PEARL (CPV Agency)
Pearl Executive uploads the
excel sheet on their software
Beat wise allocation by Pearl
Backend Executive to Field
Agents
Field Agents do the CPV
and give their feedback on
Pearl Handheld device
Pearl executive updates
the CPV outcome on
Crystal
MIS report sent to
concerned managers at
Idea by EOD
Max 6
hrs
1-2
hrs
5 mins
20 mins
2-3 hrs
30 mins
Observations
ALLOCATION for CPV
•CPV Manually allocated to Agency
•Incorporate pending CPV daily in the CPV list sent to Agency
•Real Time allocation not happening
CPV Agency
•CPV process followed by Agency is automated post receiving data from
Idea
Others
•Numbers remain offline in the system for upto 15 days which decreases the
TAT
•Lack of consolidated reports in Crystal with repect to all the beneficiaries
involved
•Lack of Automation in some activities
`
CPV Process
11.36%
1.12%
1.23% 10.1%
20.77%
0.36%
2.06%
CAF not received, Validation
Pending – 35.31%
Waiver Approval Pending
– 4.77%
CPV in Process
– 30.29%
Analysis
`
TAT analysis for August 2014 – New and Pre to Post conversions
Analysis – 24hrs Activations
Top Channel types contributing to CAF delay
Channel type CAF Delay CAF received Grand Total Contribution Delay Weighted
MY IDEA 1470 2802 4272 30% 34.41% 10.44%
DSA 764 1077 1841 13% 41.50% 5.43%
EBU DST 749 1607 2356 17% 31.79% 5.32%
ICSL 555 1357 1912 14% 29.03% 3.94%
TDSA 323 960 1283 9% 25.18% 2.29%
Top Zones contributing to CPV delay
Zone < 24 Hrs > 24 Hrs Grand Total Contribution Delay Weighted
INDORE-1 2899 1395 4294 31% 32.49% 9.91%
BHOPAL 2122 916 3038 22% 30.15% 6.51%
RAIPUR-1 1179 442 1621 12% 27.27% 3.14%
GWALIOR 572 439 1011 7% 43.42% 3.12%
BILASPUR 796 364 1160 8% 31.38% 2.59%
Top contributors of each channel type towards CAF delayMicrosoft Excel
Worksheet
** Note – All the figures above are for the month of August
OTHERS
Entries which are Offline for
more than 5 days to be removed
and the respective number to be
released in Open Market
How – Functional
Improvements in CRYSTAL
CAF Activation Centre
Instant update of CAF rejection
on Crystal which then sends a
notification/ mailer on Channel
Partner’s screen
How – Automation/Flash
through CRYSTAL to channel
partner by a CAF tracking system
CHANNEL PARTNER
Major contributors to delay and
rejections of CAF should be
checked upon and constantly
monitored
** 55% offline entries are done
within 5pm and 45% are done
after 5pm
CAF Collection Agency
Provide a consolidated list to
CAF Collection Agents
regarding the details of the
CAFs to be collected from
respective Channel Partner
How – Enhancements in
CRYSTAL
CPV Third Party Agency
Allignment of Pearl’s software
-reasons for rejection of CAF or
In-Process with remarks in
CRYSTAL
How – Reasons for rejection or
In-Process to be the same in
both
Recommendations
Thank You

More Related Content

What's hot

Call Center Statistics or Performance Metrics
Call Center Statistics or Performance MetricsCall Center Statistics or Performance Metrics
Call Center Statistics or Performance Metricsguest14c061
 
Call center management system ppt
Call center management system pptCall center management system ppt
Call center management system pptSameer Bhatt
 
Rod Jones MasterClass - World Class Call Centres - The Key Strategic Issues -...
Rod Jones MasterClass - World Class Call Centres - The Key Strategic Issues -...Rod Jones MasterClass - World Class Call Centres - The Key Strategic Issues -...
Rod Jones MasterClass - World Class Call Centres - The Key Strategic Issues -...C3Africa
 
Making Your Call Center the Heart of Your Strategy
Making Your Call Center the Heart of Your StrategyMaking Your Call Center the Heart of Your Strategy
Making Your Call Center the Heart of Your StrategyArt Hall
 
Inbound Call Center Services & Outbound Call Center Services
Inbound Call Center Services & Outbound Call Center ServicesInbound Call Center Services & Outbound Call Center Services
Inbound Call Center Services & Outbound Call Center ServicesMax BPO
 
Call Center India
Call Center IndiaCall Center India
Call Center Indiayantram
 
Talkdesk Call Center KPI & Benchmarking Report
Talkdesk Call Center KPI & Benchmarking ReportTalkdesk Call Center KPI & Benchmarking Report
Talkdesk Call Center KPI & Benchmarking ReportTalkdeskInc
 
Sathish 2016- Resume
Sathish 2016- ResumeSathish 2016- Resume
Sathish 2016- ResumeSathish Kumar
 
Ayan kar ttl
Ayan kar ttlAyan kar ttl
Ayan kar ttlAyan Kar
 
How to Improve call center metrics
How to Improve call center metricsHow to Improve call center metrics
How to Improve call center metricskatherine077
 
Call center management System
Call center management SystemCall center management System
Call center management SystemRaju Kumar
 
How to Reduce Costs in a Call Center
How to Reduce Costs in a Call CenterHow to Reduce Costs in a Call Center
How to Reduce Costs in a Call CenterInvensis
 

What's hot (20)

New updated C.V
New updated C.VNew updated C.V
New updated C.V
 
Anuja Resume
Anuja ResumeAnuja Resume
Anuja Resume
 
Call Center Statistics or Performance Metrics
Call Center Statistics or Performance MetricsCall Center Statistics or Performance Metrics
Call Center Statistics or Performance Metrics
 
Call center management system ppt
Call center management system pptCall center management system ppt
Call center management system ppt
 
Call Center
Call CenterCall Center
Call Center
 
Rod Jones MasterClass - World Class Call Centres - The Key Strategic Issues -...
Rod Jones MasterClass - World Class Call Centres - The Key Strategic Issues -...Rod Jones MasterClass - World Class Call Centres - The Key Strategic Issues -...
Rod Jones MasterClass - World Class Call Centres - The Key Strategic Issues -...
 
Call Center Life 101 v3
Call Center Life 101 v3Call Center Life 101 v3
Call Center Life 101 v3
 
Making Your Call Center the Heart of Your Strategy
Making Your Call Center the Heart of Your StrategyMaking Your Call Center the Heart of Your Strategy
Making Your Call Center the Heart of Your Strategy
 
Inbound Call Center Services & Outbound Call Center Services
Inbound Call Center Services & Outbound Call Center ServicesInbound Call Center Services & Outbound Call Center Services
Inbound Call Center Services & Outbound Call Center Services
 
Call Center India
Call Center IndiaCall Center India
Call Center India
 
Talkdesk Call Center KPI & Benchmarking Report
Talkdesk Call Center KPI & Benchmarking ReportTalkdesk Call Center KPI & Benchmarking Report
Talkdesk Call Center KPI & Benchmarking Report
 
Call Center Management & KPI Metrics
Call Center Management & KPI MetricsCall Center Management & KPI Metrics
Call Center Management & KPI Metrics
 
Sathish 2016- Resume
Sathish 2016- ResumeSathish 2016- Resume
Sathish 2016- Resume
 
Ayan kar ttl
Ayan kar ttlAyan kar ttl
Ayan kar ttl
 
IVR Best Practices: Is your IVR Good? Bad? or Ugly
IVR Best Practices: Is your IVR Good? Bad? or UglyIVR Best Practices: Is your IVR Good? Bad? or Ugly
IVR Best Practices: Is your IVR Good? Bad? or Ugly
 
How to Improve call center metrics
How to Improve call center metricsHow to Improve call center metrics
How to Improve call center metrics
 
Reducing AHT
Reducing AHTReducing AHT
Reducing AHT
 
Call center management System
Call center management SystemCall center management System
Call center management System
 
Call center
Call centerCall center
Call center
 
How to Reduce Costs in a Call Center
How to Reduce Costs in a Call CenterHow to Reduce Costs in a Call Center
How to Reduce Costs in a Call Center
 

Viewers also liked

The Invaluable Fundamentals of Prepaid
The Invaluable Fundamentals of PrepaidThe Invaluable Fundamentals of Prepaid
The Invaluable Fundamentals of PrepaidVivastream
 
MT 2015 Progress Review- Abhishek Jha (1)
MT 2015 Progress Review- Abhishek Jha (1)MT 2015 Progress Review- Abhishek Jha (1)
MT 2015 Progress Review- Abhishek Jha (1)Abhishek Jha
 
Unlocking Customer Behavior Insights To Boost Pricing Performance - cVidya We...
Unlocking Customer Behavior Insights To Boost Pricing Performance - cVidya We...Unlocking Customer Behavior Insights To Boost Pricing Performance - cVidya We...
Unlocking Customer Behavior Insights To Boost Pricing Performance - cVidya We...cVidya Networks
 
Prepaid Vs Post-paid Energy
Prepaid Vs Post-paid EnergyPrepaid Vs Post-paid Energy
Prepaid Vs Post-paid Energyphil_Brook
 
Statistics Assignments 090427
Statistics Assignments 090427Statistics Assignments 090427
Statistics Assignments 090427amykua
 

Viewers also liked (6)

The Invaluable Fundamentals of Prepaid
The Invaluable Fundamentals of PrepaidThe Invaluable Fundamentals of Prepaid
The Invaluable Fundamentals of Prepaid
 
MT 2015 Progress Review- Abhishek Jha (1)
MT 2015 Progress Review- Abhishek Jha (1)MT 2015 Progress Review- Abhishek Jha (1)
MT 2015 Progress Review- Abhishek Jha (1)
 
Unlocking Customer Behavior Insights To Boost Pricing Performance - cVidya We...
Unlocking Customer Behavior Insights To Boost Pricing Performance - cVidya We...Unlocking Customer Behavior Insights To Boost Pricing Performance - cVidya We...
Unlocking Customer Behavior Insights To Boost Pricing Performance - cVidya We...
 
Prepaid Vs Post-paid Energy
Prepaid Vs Post-paid EnergyPrepaid Vs Post-paid Energy
Prepaid Vs Post-paid Energy
 
Statistics Assignments 090427
Statistics Assignments 090427Statistics Assignments 090427
Statistics Assignments 090427
 
prepaid energy meter
prepaid energy meterprepaid energy meter
prepaid energy meter
 

Similar to MT 2014 Review Presentation - Dharamveer Gupta

Supercharge Your Subscription Lifecycle by AutomatingOperations: Reed Busines...
Supercharge Your Subscription Lifecycle by AutomatingOperations: Reed Busines...Supercharge Your Subscription Lifecycle by AutomatingOperations: Reed Busines...
Supercharge Your Subscription Lifecycle by AutomatingOperations: Reed Busines...Zuora, Inc.
 
Customer Email Activation & Retention
Customer Email Activation & RetentionCustomer Email Activation & Retention
Customer Email Activation & RetentionKiyan Foroughi
 
Jm voc 12 jan 17 ver1.0
Jm voc 12 jan 17  ver1.0Jm voc 12 jan 17  ver1.0
Jm voc 12 jan 17 ver1.0Swati Mathur
 
Copy of Resume_ Pushkaraj.Joshi doc PVJ upd
Copy of Resume_ Pushkaraj.Joshi doc PVJ updCopy of Resume_ Pushkaraj.Joshi doc PVJ upd
Copy of Resume_ Pushkaraj.Joshi doc PVJ updPushkaraj Joshi
 
shiwan__resume 23-12-15
shiwan__resume 23-12-15shiwan__resume 23-12-15
shiwan__resume 23-12-15Shiwan Khare
 
62282053 group-presentation-caterpillar-smkt-ppt
62282053 group-presentation-caterpillar-smkt-ppt62282053 group-presentation-caterpillar-smkt-ppt
62282053 group-presentation-caterpillar-smkt-pptanuj taneja
 
Marketing Automation at Mobify - Luke Starbuck
Marketing Automation at Mobify - Luke StarbuckMarketing Automation at Mobify - Luke Starbuck
Marketing Automation at Mobify - Luke StarbuckMarketo
 
B2B Marketing Automation Case Study - Marketo implementation at Mobify
B2B Marketing Automation Case Study - Marketo implementation at MobifyB2B Marketing Automation Case Study - Marketo implementation at Mobify
B2B Marketing Automation Case Study - Marketo implementation at MobifyLuke Starbuck
 
Output for the network gip
Output for the network   gip Output for the network   gip
Output for the network gip Camila Soares
 
CV of Furqan Masood (2)
CV of Furqan Masood (2)CV of Furqan Masood (2)
CV of Furqan Masood (2)Furqan Masood
 
Excelling in Customer Experience Management using Analytics
Excelling in Customer Experience Management using AnalyticsExcelling in Customer Experience Management using Analytics
Excelling in Customer Experience Management using AnalyticsBSP Media Group
 
Resume -pd 241020106 (2)
Resume -pd 241020106 (2)Resume -pd 241020106 (2)
Resume -pd 241020106 (2)Pankaj Dass
 

Similar to MT 2014 Review Presentation - Dharamveer Gupta (20)

Service Management Excellence
Service Management ExcellenceService Management Excellence
Service Management Excellence
 
Supercharge Your Subscription Lifecycle by AutomatingOperations: Reed Busines...
Supercharge Your Subscription Lifecycle by AutomatingOperations: Reed Busines...Supercharge Your Subscription Lifecycle by AutomatingOperations: Reed Busines...
Supercharge Your Subscription Lifecycle by AutomatingOperations: Reed Busines...
 
Gagan's_Resume
Gagan's_ResumeGagan's_Resume
Gagan's_Resume
 
Snehil Shreya
Snehil ShreyaSnehil Shreya
Snehil Shreya
 
Customer Email Activation & Retention
Customer Email Activation & RetentionCustomer Email Activation & Retention
Customer Email Activation & Retention
 
Jm voc 12 jan 17 ver1.0
Jm voc 12 jan 17  ver1.0Jm voc 12 jan 17  ver1.0
Jm voc 12 jan 17 ver1.0
 
Copy of Resume_ Pushkaraj.Joshi doc PVJ upd
Copy of Resume_ Pushkaraj.Joshi doc PVJ updCopy of Resume_ Pushkaraj.Joshi doc PVJ upd
Copy of Resume_ Pushkaraj.Joshi doc PVJ upd
 
CV Shankar Goyal
CV Shankar GoyalCV Shankar Goyal
CV Shankar Goyal
 
Shreyas Biwalkar Profile
Shreyas Biwalkar ProfileShreyas Biwalkar Profile
Shreyas Biwalkar Profile
 
Prism
PrismPrism
Prism
 
shiwan__resume 23-12-15
shiwan__resume 23-12-15shiwan__resume 23-12-15
shiwan__resume 23-12-15
 
62282053 group-presentation-caterpillar-smkt-ppt
62282053 group-presentation-caterpillar-smkt-ppt62282053 group-presentation-caterpillar-smkt-ppt
62282053 group-presentation-caterpillar-smkt-ppt
 
Marketing Automation at Mobify - Luke Starbuck
Marketing Automation at Mobify - Luke StarbuckMarketing Automation at Mobify - Luke Starbuck
Marketing Automation at Mobify - Luke Starbuck
 
B2B Marketing Automation Case Study - Marketo implementation at Mobify
B2B Marketing Automation Case Study - Marketo implementation at MobifyB2B Marketing Automation Case Study - Marketo implementation at Mobify
B2B Marketing Automation Case Study - Marketo implementation at Mobify
 
Places for People - Web Strategy Presentation
Places for People - Web Strategy PresentationPlaces for People - Web Strategy Presentation
Places for People - Web Strategy Presentation
 
Output for the network gip
Output for the network   gip Output for the network   gip
Output for the network gip
 
CV of Furqan Masood (2)
CV of Furqan Masood (2)CV of Furqan Masood (2)
CV of Furqan Masood (2)
 
Excelling in Customer Experience Management using Analytics
Excelling in Customer Experience Management using AnalyticsExcelling in Customer Experience Management using Analytics
Excelling in Customer Experience Management using Analytics
 
Resume- Ravneet
Resume- RavneetResume- Ravneet
Resume- Ravneet
 
Resume -pd 241020106 (2)
Resume -pd 241020106 (2)Resume -pd 241020106 (2)
Resume -pd 241020106 (2)
 

MT 2014 Review Presentation - Dharamveer Gupta

  • 1. CFT Review Presentation !YLP MT’14 26th of September, 2014 Presented by : Dharamveer Gupta
  • 2. Jan 13, 2015 2 Dharamveer Gupta Role in the organization Basic Information • Understanding of different functions at Idea Educational Background •PGDM – Xavier Institute of Management, Bhubaneswar •BBA (Marketing) - Smt. J.D.Birla Inst., Kolkata in 2009 Work experience •Internship Deloitte Consulting India Pvt Ltd (April, May 2014) •Managed Family Business M/s Jai Kiran Onion Company for 33 months Interests •Reading •Playing outdoor sports like volleyball and basketball •Passionate about cooking INTRODUCTION
  • 3. • Sales Stint • Marketing Stint • Service Delivery Stint • Q & A Agenda
  • 4. SALES (July 2014) Objective - Communication in Postpaid in Indore 1; Realities & Challenges and methods to improve it Mentors : Mr. Bhuvneshwar S Chauhan Mr. Rajeev Bhardawaj Mr. Dhiraj Sharma
  • 5. 5 Postpaid at IDEA in MPCG Survey of MY IDEA outlets and Analysis Observations Analysis POSTPAID in MPCG circle FY 2014 Annual revenues at 162.7 Crores Q1 FY15 – 44,792 new connections Q1, FY15 – 6642 MNP activations achieved 5634 Data Packs and Combo Sales in Q1 FY15 FY 2014 Annual revenues at 52.4 Crores Q1, FY15 – 15,012 New connections Q1, FY15 – 1950 MNP activations achieved 2486 Data Packs and Combo Sales in Q1 FY15 POSTPAID in INDORE-1 32.2% 33.51% 29.36% 44.1% Engagement Outcome
  • 6. Postpaid at IDEA in MPCG Survey of MY IDEA outlets and Analysis Observations Analysis Engagement Outcome Survey Questionnaire 1. Sales 10.53 % 47.37 % 31.58 % 10.53 % < 100> 200 100 - 150 Cat B Category of Outlets Average Walkin When do you get the targets? – 100% responded beginning of the month Do you get the Achievement status of Sales Targets? – 100% responded as YES Oral by TSM/ASM 10.5% Mail by TSM/ASM 15.8% 73.7% Mail & Oral by TSM/ASM Mode of Communication Achievability of Targets Score = 3.82 out of 5 Current mode of communication Satisfaction Score = 3.5 out of 5 42.1 % 57.9 % MI Survey.htm Cat C 150 - 200
  • 7. Observations Analysis Engagement Outcome 3. FOS (Fleet on Street) & Infrastructure2. Commission Structure Commission Calculation Complexity Index = 1.99 Commission Structure Understandability Index = 3.5 Commission Payout Satisfaction Index = 3.2 Commission Policies Satisfaction Index = 3 ** Note – All the scores above are out of 5 with 1 being the least and 5 being the maximum Average FOS Size = 3.8 Required Average FOS Size = 4.6 FOS Satisfaction Score = 2.86 Postpaid at IDEA in MPCG Survey of MY IDEA outlets and Analysis
  • 8. Observations Analysis Engagement Outcome Sales • No notification system for CAF rejections and resons for it • Duplicate Bill cannot be printed with the existing software and hence a lot of pety complaints which could have been avoided • Escalation of problems is time consuming • Pospaid problem handling is slower as compared to Prepaid Commission Structure • Target setting is a one-way process. Lack of discussions with franchisee owner w.r.t setting of targets and justification for it • Complex Commission Policy structure. The commission paid is distributed in 8 heads as compared to 3 heads before • Variable days of Payouts as compared to that of prepaid • Disatisfaction because of unfair incentivisation as compared to smaller outlets FOS & Infrastructure • Basic Salary is less • Customers sometimes do not trust the authenticity of FOS because of lack of identity cards • Frequency of training is less • Lack of Direct incentives • Negligent engagement activities from the organisation Postpaid at IDEA in MPCG Survey of MY IDEA outlets and Analysis
  • 9. • Real Time Notification System to be incorporated in the existing software • This system will notify the MY IDEA outlet with the reason for rejection of CAF CAF Notification Tab • The factility to print duplicate bills from the prefalent software should be incorporated which was not before. . Duplicate Bill • Speeden up the New Customer Acquisition Process • Better Communication This will decrease BNR complaints, late payments, and improve the communication process FOS Connect • Accessory kit and Identity Card to FOS • FOS Engagement meets to be held where top performers are appreciated  Increase in connect with Idea  Motivated employees perform better Recommendations What is it? BENEFIT to IDEA Observations Analysis Engagement Outcome Postpaid at IDEA in MPCG Survey of MY IDEA outlets and Analysis
  • 10. Week 3 Week 4Week 1 Week 2 Current FOS Required FOS Gap (FOS) Action plan to cover gap Last 3 months Avg Sales Present month Target MNP Pre to Post Fresh Acquisitions Action Plan Weak wise Target Split MNP Pre to Post Fresh Acquisitions Special Support ASM (Signature) TSM (Signature) Channel Partner (Signature) “MY IDEA Monthly Plan Sheet” Month - Franchisee Name Observations Analysis Engagement Outcome Postpaid at IDEA in MPCG Survey of MY IDEA outlets and Analysis
  • 11. MARKETING (August 2014) Objectives: 1.Competition Analysis of VAS across MPCG. 2.Increasing VAS penetration across DND customers Mentors : Mrs. Nilofer Khan Mr. Ajay Tripathi
  • 12. Idea Music Station Rs 36/ 30 days for 360 mins IVR, SMS, OBD, WAP 543213 MUSIC Standard Price Points Communication modes Short Code Airtel Music Rs 30/ 30 days for 300 mins IVR, SMS, OBD 543213 Vodafone Music Rs 30/ 30 days for 300 mins IVR, SMS, OBD, WAP 543213 Dialer Tone Rs 15/song charges for 90 days, Rs 36/ 30 days subscription IVR, SIVR, OBD 56789 RING BACK TONE Standard Price Points Communication modes Short Code CRICKET Standard Price Points Communication modes Short Code HelloTune Rs 15/song charges for 90 days, Rs 36/ 30 days subscription IVR, SMS, USSD Caller Tune Rs 15/song charges for 90 days, Rs 36/ 30 days subscription IVR, SMS, USSD Match Day – Rs 6/match day Monthly pack – Rs 60 SIVR, OBD, IVR 12137 Match Day – Rs 5/match day Monthly pack – Rs 30 SIVR, OBD, SMS Match Day – Rs 5/match day Monthly pack – Rs 30 SIVR, OBD, SMS 1. Product analysis of VAS across competitors (MPCG)
  • 13. ASTROLOGY Standard Price Points Communication modes Short Code MCI (Missed Call Information) Standard Price Points Communication modes Short Code PPU – Rs 9/minute Subscription based – Rs.36/ 30 days and Rs.3.99/minute IVR, USSD, SMS, OBD 53300 PPU – Rs 1/ transaction Subscription based – Rs 36/ 30 days SIVR, OBD 12136 PPU – Rs 1/ transaction Subscription based – Rs 30/ 30 days SMS PPU – Rs 3/ transaction Subscription based – Rs 30/ 30 days SMS PPU – Rs 9/minute Subscription based – Rs.30/ 30 days and Rs.3/minute IVR, USSD, SMS, OBD PPU – Rs 9/minute Subscription based – Rs.30/ 30 days and Rs.3/minute IVR, USSD, SMS, OBD 1. Product analysis of VAS across competitors (MPCG) ** Note – PPU is Pay Per Usage
  • 14. 2. Increasing VAS penetration across DND customers (MPCG) DND BASE 48,93,933 Prepaid 46,71,113 Postpaid 2,22,820 Non-VAS 43,75,237 VAS users 2,95,876 Non-VAS 2,07,819 VAS users 15,001 3.97% 27.95% 65.70% 2.38% Prepaid OSCC IVR Others DND in CAF DND - Mode of Activation Highlights ** Note – OSCC stands for Outbound Service Call Centre
  • 15. IVR , SIVR MY IDEA Mobile Bills • DND customers use IVR, SIVR portals • The first voice here would be that of informing the customer to activate the Partial DND and the line would be directed towards 1901 • A lot of customers visit MY Idea outlets • Awareness of benefits of Partial DND by the front end executives. RATIONALE •The DND base in MPCG is 26.87% of EOP (End of Period) base. •The main objective would be that of converting them from “Complete DND” to “Partial DND”. •This would in turn increase the communication and highly segmented products would be promoted based on their RPU Recommendations • Mobile bills sent to Postpaid customers can be used as a communication tool. • Partial DND Service can be promoted on the right hand side corner of the bill
  • 16. SERVICE DELIVERY (September 2014) Objective – Postpaid Activation Turnaround Time (TAT) reduction for new connections and Prepaid to Postpaid conversions Mentors : Mrs. Rashi Saxena Mr. Jitendra Sharma Mr. Amit Hardia
  • 17. CAF Activation Process in Postpaid in Indore Customer submits documents to Channel partner Offline entry by Channel partner in CRYSTAL CPV ClosureOffline to Online Waiver ONICRA a Third Party Agency collects the form from Channel Partner and delivers it to the Zone Activation Office Account gets activated CRM Activities
  • 18. Offline entry by Channel Partner Reaches CAF Activation Centre CAF Indexing/Barcoding CAF Activation Officer – Physical check L1 AUDIT (Barcode, Doc Count, Accept/Reject) L2 AUDIT - CAF Activation Officer (Compares offline entry with Form Hardcopy) Make it ONLINE 4 - 5 hrs 120 mins 30 mins 60 mins 30 mins 30 mins Observations CHANNEL PARTNER •Rejected CAF are expected to be returned the same day for reftification. •1st level audit to be in place to control CAF rejection post submition to runner. •Arranging new CAFs pertains to L1 audit will lead to delay in activation •CPV in Process – Detailed reasons not available in Crystal •Offline entry done to block special numbers too where actual customer not present CAF Collection Agency – ONICRA •List of CAFs to be collected from respective Channel Partner are not carried by runner CAF Activation Centre •Offline Correction rights are not extended to SPA level •Offline entry made but forms do not reache the same day •Too many phone calls from Channel Partners concerning activation of CAFs which decreases their productivity. ** Note - time taken is an estimated avg for 50 CAF Offline to Online
  • 19. Offline entry by Channel Partner CPV Allocation by SD to PEARL (CPV Agency) Pearl Executive uploads the excel sheet on their software Beat wise allocation by Pearl Backend Executive to Field Agents Field Agents do the CPV and give their feedback on Pearl Handheld device Pearl executive updates the CPV outcome on Crystal MIS report sent to concerned managers at Idea by EOD Max 6 hrs 1-2 hrs 5 mins 20 mins 2-3 hrs 30 mins Observations ALLOCATION for CPV •CPV Manually allocated to Agency •Incorporate pending CPV daily in the CPV list sent to Agency •Real Time allocation not happening CPV Agency •CPV process followed by Agency is automated post receiving data from Idea Others •Numbers remain offline in the system for upto 15 days which decreases the TAT •Lack of consolidated reports in Crystal with repect to all the beneficiaries involved •Lack of Automation in some activities ` CPV Process
  • 20. 11.36% 1.12% 1.23% 10.1% 20.77% 0.36% 2.06% CAF not received, Validation Pending – 35.31% Waiver Approval Pending – 4.77% CPV in Process – 30.29% Analysis ` TAT analysis for August 2014 – New and Pre to Post conversions
  • 21. Analysis – 24hrs Activations Top Channel types contributing to CAF delay Channel type CAF Delay CAF received Grand Total Contribution Delay Weighted MY IDEA 1470 2802 4272 30% 34.41% 10.44% DSA 764 1077 1841 13% 41.50% 5.43% EBU DST 749 1607 2356 17% 31.79% 5.32% ICSL 555 1357 1912 14% 29.03% 3.94% TDSA 323 960 1283 9% 25.18% 2.29% Top Zones contributing to CPV delay Zone < 24 Hrs > 24 Hrs Grand Total Contribution Delay Weighted INDORE-1 2899 1395 4294 31% 32.49% 9.91% BHOPAL 2122 916 3038 22% 30.15% 6.51% RAIPUR-1 1179 442 1621 12% 27.27% 3.14% GWALIOR 572 439 1011 7% 43.42% 3.12% BILASPUR 796 364 1160 8% 31.38% 2.59% Top contributors of each channel type towards CAF delayMicrosoft Excel Worksheet ** Note – All the figures above are for the month of August
  • 22. OTHERS Entries which are Offline for more than 5 days to be removed and the respective number to be released in Open Market How – Functional Improvements in CRYSTAL CAF Activation Centre Instant update of CAF rejection on Crystal which then sends a notification/ mailer on Channel Partner’s screen How – Automation/Flash through CRYSTAL to channel partner by a CAF tracking system CHANNEL PARTNER Major contributors to delay and rejections of CAF should be checked upon and constantly monitored ** 55% offline entries are done within 5pm and 45% are done after 5pm CAF Collection Agency Provide a consolidated list to CAF Collection Agents regarding the details of the CAFs to be collected from respective Channel Partner How – Enhancements in CRYSTAL CPV Third Party Agency Allignment of Pearl’s software -reasons for rejection of CAF or In-Process with remarks in CRYSTAL How – Reasons for rejection or In-Process to be the same in both Recommendations