This document discusses early-age cracking in concrete, which can occur within the first 60 days after placement. It focuses on the types, causes, and factors influencing early cracks. Early cracks can affect structure appearance and raise safety concerns. Long-term maintenance issues may also result if cracks are not addressed. The document then provides methods to minimize early cracking, such as limiting temperature differences, using shrinkage-reducing admixtures, and selecting appropriate mix designs and construction sequences. It proposes studying early-age stresses and strains, mix parameters, and environmental conditions to reduce cracking.