DEPARTMENT OF ELECTRICAL ENGINEERING
KIPM-COLLEGE OF ENGINEERING AND TECHNOLOGY, GIDA,GKP
INDUSTRIAL SUMMER TRAINING 220/132 KV SUBSTATION
BARAHUWA
ASHUTOSH SRIVASTAVA
(1375120016)
B.TECH (IV YEAR)
(EE)
TABLE OF CONTENT
 Introduction
 Single Line Diagram
 220 KV Sub-Station
 Panel Section
 Yard Section
 Battery Room
 Components of Substation
 Conclusion
 References
INTRODUCTION
Uttar Pradesh Power Corporation Limited
(UPPCL) is the company responsible for electricity
transmission and distribution within the Indian state of
Uttar Pradesh .Its chairman is Mr. Sanjay Agarwal.
UPPCL Barahuwa 220 KV substation was
established in 1979.
UPPCL Barahuwa substation is basically
contains two substation one of 220/132 KV & other
one of 132/33 KV.
Single line diagram
There are three sections of substation:
• One incoming section of 220 KV
• Two outgoing sections of 132 & 33 KV
• 220 KV INCOMMING SECTION:
There are four incoming lines of 220 KV-
* GKP CKT-1(MOTIRAM ADDA)
* GKP CKT-2(MOTIRAM ADDA)
* PGCIL SAHJANWA(INDIAN GOV.)
* NTPC TANDA(INDIAN GOV.)
• 132 KV OUTGOING SECTION:
There are seven outgoing lines of 132 KV-
*MOHADDIPUR
*MAU-1
*MAU-2(KAUDI RAM)
*FCI-1
*FCI-2
*ANAND NAGAR
*GIDA
• 33 KV OUTGOING SECTION:
There are ten outgoing lines of 33 KV-
*RUSTAMPUR
*PGCIL SAHJANWA
*LAL-DIGGI
*NAUSAD
*HARPUR GANGTAHI
*STATION TRANSFORMER-1
*STATION TRANSFORMER-2(COLONY)
*SAHJANWA
*GIDA
*SPARE
220 KV SUB-STATION:
IT IS DEVIDED INTO THREE PARTS:
TWO MAIN PART IS-
1.PANEL SECTION
-CONTROL PANEL
-RELAYAND PROTECTION PANEL
2. YARD SECTION
-220 KV SECTION
-132 KV SECTION
-33 KV SECTION
ONE OTHER PART IS-
1.BATTERY ROOM
PANEL SECTION
 it is a room which contains all type of panels.
 it has two sections:
 Control Panel Section:
It contain panels related to controlling of
instruments. E.g. feeder panel, X-mer
panel, etc.
 Relay and Protection Panel Section:
It contains panel related to relay system and
protection systems. E.g. relay panel, line
protection panel, etc.
YARD SECTION
220 KV SECTION…
• IT WORKS ON 220 KV.
• THERE ARE THREE BUS BARS IN WHICH TWO
IS MAIN BUS AND OTHER ONE IS TRANFER
BUS.
• IT HAS FOUR INCOMMING FEEDERS I.E.
FROM PGCIL SAHJANWA, NTPC TANDA,GKP
CKT-1 & GKP CKT-2.
132 KV…
• IT WORKS ON 132 KV.
•THERE ARE THREE BUS BARS IN WHICH TWO
IS MAIN BUS AND OTHER ONE IS TRANFER
BUS.
•220 KV VOLTAGE IS CONVERTED TO 132 KV
VOLTAGE USING FOUR TRANSFORMERS IN
WHICH ONE OF 160 MVA & OTHER THREE ARE
100 MVA.
• IN OTHER WORDS IT IS 220 KV/132KV
SUBSTATION.
•THIS LINE IS DIRECTLY FEDED TO MANY
OTHER SUBSTATIONS LIKE
MOHADDIPUR,GIDA ETC.
33 KV SECTION…
• THIS SECTION WORKS ON 33 KV.
• IT HAS TWO FEEDERS OF 33 KV.
• ONE FROM 63 MVA TRANSFORMER & ONE
FROM 40 MVA TRANSFORMER.
• THESE TWO TRANSFORMERS CONVERTS
132 KV/33 KV.
• IN OTHER WORDS IT IS 132 KV/33 KV
SUSTATION.
• THIS LINE IS DIRECTLY FEDED TO MANY
INDUSTRIES AND DISTRIBUTORS LIKE
GIDA,PGCIL ETC.
BATTERY ROOM
110 DC SUPPLY REQUIRED FOR OPERATION
OF CIRCUIT BREAKERS-
•55 BATTERIES OF 2V , 300AH (TAURUS-HBL
POWER SYSTEM LTD.){FOR REGULER USE}
•55 BATTERIES OF 2V , 300AH(HBL POWER
SYSTEM LTD.){FOR BACKUP}
DC SUPPLY REQUIRED FOR OPERATION IN
CONTROL ROOM-
•BATTERIES OF 2V , 500 AH (EXIDE
INDUSTRIAL)
COMPONENTS OF SUB-STATION –
•RELAY
•CIRCUIT BREAKER
•ISOLATOR
•TRANSFORMER
•CURRENT TRANSFORMER (CT)
•POTENTIAL TRANFORMER (PT)
•CAPACITOR VOLTAGE TRANSFORMER (CVT)
•LIGHTENING ARRESTER( LA )
•FEEDER
•BUS-BAR
•INSULATOR
•CAPACITOR BANK
•WAVE TRAP
RELAY
A relay is an electrically operated switch.
A relay is a sensing device which sense the abnormal
condition and then produce an alarm or open the
breaker contact.
CIRCUIT BREAKER
A circuit breaker is an automatically operated
electrical switch designed to protect an electrical
circuit from damage caused by over-current or
overload or short circuit.
ISOLATOR
Isolator is used to ensure that an electrical circuit is
completely de-energized for service or maintenance.
TRANSFORMER
A transformer is an electrical device that transfers
electrical energy between two or more circuits through
electromagnetic induction.
There are eight step down transformer at substation:
220/132 KV TRANSFORMER-
1. 160 MVA(AREVA)
2. 100 MVA(MISTIBUSHI)
3. 100 MVA(MISTIBUSHI)
4. 100 MVA(TELK-TRANFORMERS & ELECTRICLS LIMITED KERALA) (NOT
INSTALLED BUT UNDER PROCESS)
132/33 KV TRANSFORMER-
1. 63 MVA(ADITYA VIDYUT APPLIANCES LTD.)
2. 40 MVA(AREVA)
33000/400 VOLT TRANSFORMER-
1. 250 KVA(FOR SUB-STATION)(SWASTIK COPPER JAIPUR)
2. 250 KVA(FOR COLONY)(NGEF)
CURRENT TRANSFORMER
It is a step up transformer which is used to measure the
current, by stepping up the voltage level.
POTENTIAL TRANSFORMER
It is a step down transformer which is used to measure
the voltage, by stepping up the voltage level.
CAPACITOR VOLTAGE TRANSFORMER
A capacitor voltage transformer (CVT) is a
transformer used to step down extra high voltage
signals and provide a low voltage signal for voltage
measurement & It also forms a carrier communication
network through the transmission network.
LIGHTENING ARRESTER
It provides low impedance path for high frequency and
high current supply.
FEEDER
A set of conductors that originate at a primary
distribution centre and supply power to one or more
secondary distribution centre.
BUS-BAR
An assembly of conductors for collecting electric
currents and distributing them to outgoing feeders.
INSULATOR
A material of such low conductivity that the flow of
current through it is negligible.
CAPACITOR BANK
It is used to componsate the power factor from lagging
to leading nature.
WAVETRAP
Tripping the high frequency communication signal
sent on the line from the remote substation and
diverting them to the telecom panel in the substation
control room.
CONCLUSION
An engineer needs to have not just theoretical
but practical as well as and so every student is
supposed to undergo practical training session
after 3rd year where I have imbibed the
knowledge about transmission, distribution and
maintenance with economical issues related to
it.
At last I would like to say that practical training
taken at 220 KV substation barahuwa has
broadened my knowledge and widened my
thinking as a professional.
REFERENCES
 www.slideshare.net
 www.seminarprojects.org
 www.scribd.com
 www.projectsreport.org
 www.fullreports.net
At last i would say……
SAVE ENERGY,SAVE FUTURE
THANK YOU..

More Related Content

Similar to industrialsummertrainingon220kvsubstationppt-170413134021.pdf

Summer Training Report Ntpc barh (ajeet)
Summer Training Report Ntpc barh (ajeet)Summer Training Report Ntpc barh (ajeet)
Summer Training Report Ntpc barh (ajeet)Ajeet Chaurasia
 
INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG
INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG  INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG
INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG Muneeb Amin Khan
 
ppt on summer training on uppcl
ppt on summer training on uppclppt on summer training on uppcl
ppt on summer training on uppclSunny Daksh
 
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxRajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxsohaib268827
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training pptShubham Patel
 
Vocational training
Vocational trainingVocational training
Vocational trainingSuraj prasad
 
Trainingreport 132 KV
Trainingreport 132 KVTrainingreport 132 KV
Trainingreport 132 KVAbrar Ahamed
 
A PPT ON 220 KV GSS HINDAUN CITY
A PPT ON 220 KV GSS HINDAUN CITYA PPT ON 220 KV GSS HINDAUN CITY
A PPT ON 220 KV GSS HINDAUN CITYRohitashav Goyal
 
internship report of 220/132 kV substation
internship report of 220/132 kV substationinternship report of 220/132 kV substation
internship report of 220/132 kV substationShivamUpadhyay86734
 
DLW Varanasi Training report
DLW Varanasi Training reportDLW Varanasi Training report
DLW Varanasi Training reportGyanendra Prakash
 
220kv gss pindwara(sirohi)
220kv gss pindwara(sirohi)220kv gss pindwara(sirohi)
220kv gss pindwara(sirohi)Pankaj Rawal
 
400 kv Heerapura gss ppt by ishan pdf
400 kv Heerapura gss ppt by ishan pdf 400 kv Heerapura gss ppt by ishan pdf
400 kv Heerapura gss ppt by ishan pdf Ishan Khandelwal
 
220kv sub station kishangarh bas, alwar
220kv sub station kishangarh bas, alwar220kv sub station kishangarh bas, alwar
220kv sub station kishangarh bas, alwarDevendra khairiya
 
400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPURsahid raja khan
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substationIshank Ranjan
 

Similar to industrialsummertrainingon220kvsubstationppt-170413134021.pdf (20)

Summer Training Report Ntpc barh (ajeet)
Summer Training Report Ntpc barh (ajeet)Summer Training Report Ntpc barh (ajeet)
Summer Training Report Ntpc barh (ajeet)
 
INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG
INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG  INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG
INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG
 
ppt on summer training on uppcl
ppt on summer training on uppclppt on summer training on uppcl
ppt on summer training on uppcl
 
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxRajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt
 
Vocational training
Vocational trainingVocational training
Vocational training
 
132 kV uppcl
132 kV uppcl132 kV uppcl
132 kV uppcl
 
Trainingreport 132 KV
Trainingreport 132 KVTrainingreport 132 KV
Trainingreport 132 KV
 
A PPT ON 220 KV GSS HINDAUN CITY
A PPT ON 220 KV GSS HINDAUN CITYA PPT ON 220 KV GSS HINDAUN CITY
A PPT ON 220 KV GSS HINDAUN CITY
 
internship report of 220/132 kV substation
internship report of 220/132 kV substationinternship report of 220/132 kV substation
internship report of 220/132 kV substation
 
220 kv gss
220 kv gss220 kv gss
220 kv gss
 
DLW Varanasi Training report
DLW Varanasi Training reportDLW Varanasi Training report
DLW Varanasi Training report
 
220kv gss pindwara(sirohi)
220kv gss pindwara(sirohi)220kv gss pindwara(sirohi)
220kv gss pindwara(sirohi)
 
400 kv Heerapura gss ppt by ishan pdf
400 kv Heerapura gss ppt by ishan pdf 400 kv Heerapura gss ppt by ishan pdf
400 kv Heerapura gss ppt by ishan pdf
 
Bharat singh 1
Bharat singh 1Bharat singh 1
Bharat singh 1
 
Gss ppt by kanhaiya
Gss ppt  by kanhaiyaGss ppt  by kanhaiya
Gss ppt by kanhaiya
 
220kv sub station kishangarh bas, alwar
220kv sub station kishangarh bas, alwar220kv sub station kishangarh bas, alwar
220kv sub station kishangarh bas, alwar
 
400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substation
 
132 KV GSS CHAMBAL JAIPUR
132 KV GSS CHAMBAL JAIPUR132 KV GSS CHAMBAL JAIPUR
132 KV GSS CHAMBAL JAIPUR
 

Recently uploaded

如何办理(UCI毕业证)加州大学欧文分校毕业证毕业证成绩单原版一比一
如何办理(UCI毕业证)加州大学欧文分校毕业证毕业证成绩单原版一比一如何办理(UCI毕业证)加州大学欧文分校毕业证毕业证成绩单原版一比一
如何办理(UCI毕业证)加州大学欧文分校毕业证毕业证成绩单原版一比一ypfy7p5ld
 
Ethics of Animal Research Laika mission.ppt
Ethics of Animal Research Laika mission.pptEthics of Animal Research Laika mission.ppt
Ethics of Animal Research Laika mission.pptShafqatShakeel1
 
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证nhjeo1gg
 
定制(SCU毕业证书)南十字星大学毕业证成绩单原版一比一
定制(SCU毕业证书)南十字星大学毕业证成绩单原版一比一定制(SCU毕业证书)南十字星大学毕业证成绩单原版一比一
定制(SCU毕业证书)南十字星大学毕业证成绩单原版一比一z xss
 
Application deck- Cyril Caudroy-2024.pdf
Application deck- Cyril Caudroy-2024.pdfApplication deck- Cyril Caudroy-2024.pdf
Application deck- Cyril Caudroy-2024.pdfCyril CAUDROY
 
Kindergarten-DLL-MELC-Q3-Week 2 asf.docx
Kindergarten-DLL-MELC-Q3-Week 2 asf.docxKindergarten-DLL-MELC-Q3-Week 2 asf.docx
Kindergarten-DLL-MELC-Q3-Week 2 asf.docxLesterJayAquino
 
Drawing animals and props.pptxDrawing animals and props.pptxDrawing animals a...
Drawing animals and props.pptxDrawing animals and props.pptxDrawing animals a...Drawing animals and props.pptxDrawing animals and props.pptxDrawing animals a...
Drawing animals and props.pptxDrawing animals and props.pptxDrawing animals a...RegineManuel2
 
Issues in the Philippines (Unemployment and Underemployment).pptx
Issues in the Philippines (Unemployment and Underemployment).pptxIssues in the Philippines (Unemployment and Underemployment).pptx
Issues in the Philippines (Unemployment and Underemployment).pptxJenniferPeraro1
 
NPPE STUDY GUIDE - NOV2021_study_104040.pdf
NPPE STUDY GUIDE - NOV2021_study_104040.pdfNPPE STUDY GUIDE - NOV2021_study_104040.pdf
NPPE STUDY GUIDE - NOV2021_study_104040.pdfDivyeshPatel234692
 
Ioannis Tzachristas Self-Presentation for MBA.pdf
Ioannis Tzachristas Self-Presentation for MBA.pdfIoannis Tzachristas Self-Presentation for MBA.pdf
Ioannis Tzachristas Self-Presentation for MBA.pdfjtzach
 
Escorts Service Near Surya International Hotel, New Delhi |9873777170| Find H...
Escorts Service Near Surya International Hotel, New Delhi |9873777170| Find H...Escorts Service Near Surya International Hotel, New Delhi |9873777170| Find H...
Escorts Service Near Surya International Hotel, New Delhi |9873777170| Find H...nitagrag2
 
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Service
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts ServiceCall Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Service
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Servicejennyeacort
 
Outsmarting the Attackers A Deep Dive into Threat Intelligence.docx
Outsmarting the Attackers A Deep Dive into Threat Intelligence.docxOutsmarting the Attackers A Deep Dive into Threat Intelligence.docx
Outsmarting the Attackers A Deep Dive into Threat Intelligence.docxmanas23pgdm157
 
Storytelling, Ethics and Workflow in Documentary Photography
Storytelling, Ethics and Workflow in Documentary PhotographyStorytelling, Ethics and Workflow in Documentary Photography
Storytelling, Ethics and Workflow in Documentary PhotographyOrtega Alikwe
 
VIP High Profile Call Girls Jamshedpur Aarushi 8250192130 Independent Escort ...
VIP High Profile Call Girls Jamshedpur Aarushi 8250192130 Independent Escort ...VIP High Profile Call Girls Jamshedpur Aarushi 8250192130 Independent Escort ...
VIP High Profile Call Girls Jamshedpur Aarushi 8250192130 Independent Escort ...Suhani Kapoor
 
VIP Call Girls Service Saharanpur Aishwarya 8250192130 Independent Escort Ser...
VIP Call Girls Service Saharanpur Aishwarya 8250192130 Independent Escort Ser...VIP Call Girls Service Saharanpur Aishwarya 8250192130 Independent Escort Ser...
VIP Call Girls Service Saharanpur Aishwarya 8250192130 Independent Escort Ser...Suhani Kapoor
 
Call Girl in Low Price Delhi Punjabi Bagh 9711199012
Call Girl in Low Price Delhi Punjabi Bagh  9711199012Call Girl in Low Price Delhi Punjabi Bagh  9711199012
Call Girl in Low Price Delhi Punjabi Bagh 9711199012sapnasaifi408
 
定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一
 定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一 定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一
定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一Fs sss
 
Gray Gold Clean CV Resume2024tod (1).pdf
Gray Gold Clean CV Resume2024tod (1).pdfGray Gold Clean CV Resume2024tod (1).pdf
Gray Gold Clean CV Resume2024tod (1).pdfpadillaangelina0023
 
Preventing and ending sexual harassment in the workplace.pptx
Preventing and ending sexual harassment in the workplace.pptxPreventing and ending sexual harassment in the workplace.pptx
Preventing and ending sexual harassment in the workplace.pptxGry Tina Tinde
 

Recently uploaded (20)

如何办理(UCI毕业证)加州大学欧文分校毕业证毕业证成绩单原版一比一
如何办理(UCI毕业证)加州大学欧文分校毕业证毕业证成绩单原版一比一如何办理(UCI毕业证)加州大学欧文分校毕业证毕业证成绩单原版一比一
如何办理(UCI毕业证)加州大学欧文分校毕业证毕业证成绩单原版一比一
 
Ethics of Animal Research Laika mission.ppt
Ethics of Animal Research Laika mission.pptEthics of Animal Research Laika mission.ppt
Ethics of Animal Research Laika mission.ppt
 
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
 
定制(SCU毕业证书)南十字星大学毕业证成绩单原版一比一
定制(SCU毕业证书)南十字星大学毕业证成绩单原版一比一定制(SCU毕业证书)南十字星大学毕业证成绩单原版一比一
定制(SCU毕业证书)南十字星大学毕业证成绩单原版一比一
 
Application deck- Cyril Caudroy-2024.pdf
Application deck- Cyril Caudroy-2024.pdfApplication deck- Cyril Caudroy-2024.pdf
Application deck- Cyril Caudroy-2024.pdf
 
Kindergarten-DLL-MELC-Q3-Week 2 asf.docx
Kindergarten-DLL-MELC-Q3-Week 2 asf.docxKindergarten-DLL-MELC-Q3-Week 2 asf.docx
Kindergarten-DLL-MELC-Q3-Week 2 asf.docx
 
Drawing animals and props.pptxDrawing animals and props.pptxDrawing animals a...
Drawing animals and props.pptxDrawing animals and props.pptxDrawing animals a...Drawing animals and props.pptxDrawing animals and props.pptxDrawing animals a...
Drawing animals and props.pptxDrawing animals and props.pptxDrawing animals a...
 
Issues in the Philippines (Unemployment and Underemployment).pptx
Issues in the Philippines (Unemployment and Underemployment).pptxIssues in the Philippines (Unemployment and Underemployment).pptx
Issues in the Philippines (Unemployment and Underemployment).pptx
 
NPPE STUDY GUIDE - NOV2021_study_104040.pdf
NPPE STUDY GUIDE - NOV2021_study_104040.pdfNPPE STUDY GUIDE - NOV2021_study_104040.pdf
NPPE STUDY GUIDE - NOV2021_study_104040.pdf
 
Ioannis Tzachristas Self-Presentation for MBA.pdf
Ioannis Tzachristas Self-Presentation for MBA.pdfIoannis Tzachristas Self-Presentation for MBA.pdf
Ioannis Tzachristas Self-Presentation for MBA.pdf
 
Escorts Service Near Surya International Hotel, New Delhi |9873777170| Find H...
Escorts Service Near Surya International Hotel, New Delhi |9873777170| Find H...Escorts Service Near Surya International Hotel, New Delhi |9873777170| Find H...
Escorts Service Near Surya International Hotel, New Delhi |9873777170| Find H...
 
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Service
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts ServiceCall Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Service
Call Girls In Bhikaji Cama Place 24/7✡️9711147426✡️ Escorts Service
 
Outsmarting the Attackers A Deep Dive into Threat Intelligence.docx
Outsmarting the Attackers A Deep Dive into Threat Intelligence.docxOutsmarting the Attackers A Deep Dive into Threat Intelligence.docx
Outsmarting the Attackers A Deep Dive into Threat Intelligence.docx
 
Storytelling, Ethics and Workflow in Documentary Photography
Storytelling, Ethics and Workflow in Documentary PhotographyStorytelling, Ethics and Workflow in Documentary Photography
Storytelling, Ethics and Workflow in Documentary Photography
 
VIP High Profile Call Girls Jamshedpur Aarushi 8250192130 Independent Escort ...
VIP High Profile Call Girls Jamshedpur Aarushi 8250192130 Independent Escort ...VIP High Profile Call Girls Jamshedpur Aarushi 8250192130 Independent Escort ...
VIP High Profile Call Girls Jamshedpur Aarushi 8250192130 Independent Escort ...
 
VIP Call Girls Service Saharanpur Aishwarya 8250192130 Independent Escort Ser...
VIP Call Girls Service Saharanpur Aishwarya 8250192130 Independent Escort Ser...VIP Call Girls Service Saharanpur Aishwarya 8250192130 Independent Escort Ser...
VIP Call Girls Service Saharanpur Aishwarya 8250192130 Independent Escort Ser...
 
Call Girl in Low Price Delhi Punjabi Bagh 9711199012
Call Girl in Low Price Delhi Punjabi Bagh  9711199012Call Girl in Low Price Delhi Punjabi Bagh  9711199012
Call Girl in Low Price Delhi Punjabi Bagh 9711199012
 
定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一
 定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一 定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一
定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一
 
Gray Gold Clean CV Resume2024tod (1).pdf
Gray Gold Clean CV Resume2024tod (1).pdfGray Gold Clean CV Resume2024tod (1).pdf
Gray Gold Clean CV Resume2024tod (1).pdf
 
Preventing and ending sexual harassment in the workplace.pptx
Preventing and ending sexual harassment in the workplace.pptxPreventing and ending sexual harassment in the workplace.pptx
Preventing and ending sexual harassment in the workplace.pptx
 

industrialsummertrainingon220kvsubstationppt-170413134021.pdf

  • 1. DEPARTMENT OF ELECTRICAL ENGINEERING KIPM-COLLEGE OF ENGINEERING AND TECHNOLOGY, GIDA,GKP INDUSTRIAL SUMMER TRAINING 220/132 KV SUBSTATION BARAHUWA ASHUTOSH SRIVASTAVA (1375120016) B.TECH (IV YEAR) (EE)
  • 2. TABLE OF CONTENT  Introduction  Single Line Diagram  220 KV Sub-Station  Panel Section  Yard Section  Battery Room  Components of Substation  Conclusion  References
  • 3. INTRODUCTION Uttar Pradesh Power Corporation Limited (UPPCL) is the company responsible for electricity transmission and distribution within the Indian state of Uttar Pradesh .Its chairman is Mr. Sanjay Agarwal. UPPCL Barahuwa 220 KV substation was established in 1979. UPPCL Barahuwa substation is basically contains two substation one of 220/132 KV & other one of 132/33 KV.
  • 5. There are three sections of substation: • One incoming section of 220 KV • Two outgoing sections of 132 & 33 KV • 220 KV INCOMMING SECTION: There are four incoming lines of 220 KV- * GKP CKT-1(MOTIRAM ADDA) * GKP CKT-2(MOTIRAM ADDA) * PGCIL SAHJANWA(INDIAN GOV.) * NTPC TANDA(INDIAN GOV.)
  • 6. • 132 KV OUTGOING SECTION: There are seven outgoing lines of 132 KV- *MOHADDIPUR *MAU-1 *MAU-2(KAUDI RAM) *FCI-1 *FCI-2 *ANAND NAGAR *GIDA
  • 7. • 33 KV OUTGOING SECTION: There are ten outgoing lines of 33 KV- *RUSTAMPUR *PGCIL SAHJANWA *LAL-DIGGI *NAUSAD *HARPUR GANGTAHI *STATION TRANSFORMER-1 *STATION TRANSFORMER-2(COLONY) *SAHJANWA *GIDA *SPARE
  • 8. 220 KV SUB-STATION: IT IS DEVIDED INTO THREE PARTS: TWO MAIN PART IS- 1.PANEL SECTION -CONTROL PANEL -RELAYAND PROTECTION PANEL 2. YARD SECTION -220 KV SECTION -132 KV SECTION -33 KV SECTION ONE OTHER PART IS- 1.BATTERY ROOM
  • 9. PANEL SECTION  it is a room which contains all type of panels.  it has two sections:  Control Panel Section: It contain panels related to controlling of instruments. E.g. feeder panel, X-mer panel, etc.  Relay and Protection Panel Section: It contains panel related to relay system and protection systems. E.g. relay panel, line protection panel, etc.
  • 10. YARD SECTION 220 KV SECTION… • IT WORKS ON 220 KV. • THERE ARE THREE BUS BARS IN WHICH TWO IS MAIN BUS AND OTHER ONE IS TRANFER BUS. • IT HAS FOUR INCOMMING FEEDERS I.E. FROM PGCIL SAHJANWA, NTPC TANDA,GKP CKT-1 & GKP CKT-2.
  • 11. 132 KV… • IT WORKS ON 132 KV. •THERE ARE THREE BUS BARS IN WHICH TWO IS MAIN BUS AND OTHER ONE IS TRANFER BUS. •220 KV VOLTAGE IS CONVERTED TO 132 KV VOLTAGE USING FOUR TRANSFORMERS IN WHICH ONE OF 160 MVA & OTHER THREE ARE 100 MVA. • IN OTHER WORDS IT IS 220 KV/132KV SUBSTATION. •THIS LINE IS DIRECTLY FEDED TO MANY OTHER SUBSTATIONS LIKE MOHADDIPUR,GIDA ETC.
  • 12. 33 KV SECTION… • THIS SECTION WORKS ON 33 KV. • IT HAS TWO FEEDERS OF 33 KV. • ONE FROM 63 MVA TRANSFORMER & ONE FROM 40 MVA TRANSFORMER. • THESE TWO TRANSFORMERS CONVERTS 132 KV/33 KV. • IN OTHER WORDS IT IS 132 KV/33 KV SUSTATION. • THIS LINE IS DIRECTLY FEDED TO MANY INDUSTRIES AND DISTRIBUTORS LIKE GIDA,PGCIL ETC.
  • 13. BATTERY ROOM 110 DC SUPPLY REQUIRED FOR OPERATION OF CIRCUIT BREAKERS- •55 BATTERIES OF 2V , 300AH (TAURUS-HBL POWER SYSTEM LTD.){FOR REGULER USE} •55 BATTERIES OF 2V , 300AH(HBL POWER SYSTEM LTD.){FOR BACKUP} DC SUPPLY REQUIRED FOR OPERATION IN CONTROL ROOM- •BATTERIES OF 2V , 500 AH (EXIDE INDUSTRIAL)
  • 14. COMPONENTS OF SUB-STATION – •RELAY •CIRCUIT BREAKER •ISOLATOR •TRANSFORMER •CURRENT TRANSFORMER (CT) •POTENTIAL TRANFORMER (PT) •CAPACITOR VOLTAGE TRANSFORMER (CVT) •LIGHTENING ARRESTER( LA ) •FEEDER •BUS-BAR •INSULATOR •CAPACITOR BANK •WAVE TRAP
  • 15. RELAY A relay is an electrically operated switch. A relay is a sensing device which sense the abnormal condition and then produce an alarm or open the breaker contact. CIRCUIT BREAKER A circuit breaker is an automatically operated electrical switch designed to protect an electrical circuit from damage caused by over-current or overload or short circuit. ISOLATOR Isolator is used to ensure that an electrical circuit is completely de-energized for service or maintenance.
  • 16. TRANSFORMER A transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction. There are eight step down transformer at substation: 220/132 KV TRANSFORMER- 1. 160 MVA(AREVA) 2. 100 MVA(MISTIBUSHI) 3. 100 MVA(MISTIBUSHI) 4. 100 MVA(TELK-TRANFORMERS & ELECTRICLS LIMITED KERALA) (NOT INSTALLED BUT UNDER PROCESS) 132/33 KV TRANSFORMER- 1. 63 MVA(ADITYA VIDYUT APPLIANCES LTD.) 2. 40 MVA(AREVA) 33000/400 VOLT TRANSFORMER- 1. 250 KVA(FOR SUB-STATION)(SWASTIK COPPER JAIPUR) 2. 250 KVA(FOR COLONY)(NGEF)
  • 17. CURRENT TRANSFORMER It is a step up transformer which is used to measure the current, by stepping up the voltage level. POTENTIAL TRANSFORMER It is a step down transformer which is used to measure the voltage, by stepping up the voltage level. CAPACITOR VOLTAGE TRANSFORMER A capacitor voltage transformer (CVT) is a transformer used to step down extra high voltage signals and provide a low voltage signal for voltage measurement & It also forms a carrier communication network through the transmission network.
  • 18. LIGHTENING ARRESTER It provides low impedance path for high frequency and high current supply. FEEDER A set of conductors that originate at a primary distribution centre and supply power to one or more secondary distribution centre. BUS-BAR An assembly of conductors for collecting electric currents and distributing them to outgoing feeders.
  • 19. INSULATOR A material of such low conductivity that the flow of current through it is negligible. CAPACITOR BANK It is used to componsate the power factor from lagging to leading nature. WAVETRAP Tripping the high frequency communication signal sent on the line from the remote substation and diverting them to the telecom panel in the substation control room.
  • 20. CONCLUSION An engineer needs to have not just theoretical but practical as well as and so every student is supposed to undergo practical training session after 3rd year where I have imbibed the knowledge about transmission, distribution and maintenance with economical issues related to it. At last I would like to say that practical training taken at 220 KV substation barahuwa has broadened my knowledge and widened my thinking as a professional.
  • 21. REFERENCES  www.slideshare.net  www.seminarprojects.org  www.scribd.com  www.projectsreport.org  www.fullreports.net
  • 22. At last i would say…… SAVE ENERGY,SAVE FUTURE THANK YOU..