13-114
C4: Tools for Improving Regional Travel Demand Models
A TALE OF TWO FORECASTS
David Hyder (Author)
Parsons Corporation
Yanbu, Saudi Arabia
Stacey Bricka (Corresponding Presenter)
Research Scientist
Texas A&M Transportation Institute
505 E. Huntland Dr., Ste 455
Austin, TX 78752
Tel: 512-407-1123
Fax: 512-467-8952
The transportation project development cycle is very long. Many of today’s transportation projects started
before the financial crisis of 2008. The sharp drop in travel demand and the slow recovery from the
recession triggered by the financial crisis have caused some states, North Carolina among them, to
reevaluate demand forecasts for projects already in project development. If the second traffic forecast is
similar to the first then all is well and good. However, when the second traffic forecast is different from the
original traffic forecast it can call into question the need for the project, and undermine much of the effort
put into developing the project to that point. The agency sponsors then must choose which forecast to
use and which to discard. In turn, this can leave the sponsor open to charges of arbitrary decision-
making if the project is at all controversial.
In such cases, the project sponsor is often left with three undesirable, and possibly costly options. The
sponsor may cancel the project. The sponsor may, based on judgment, choose which forecast to use.
The sponsor may commission yet another traffic forecast, or if the forecast is based on a travel demand
model the sponsor may perform an arbitrary sensitivity analysis to help inform the decision. Essentially,
the project sponsor has the choice of using or discarding one, or more, forecasts. This is not the only, or
perhaps even the best, option.
Over the past twenty years, the transportation planning profession has become familiar with the concept
that traffic forecasts have a considerable amount of uncertainty built in to them. In fact there is significant
variation in traffic demand on a day to day, month to month, and year to year basis. For years,
researchers have been pointing out the uncertainty in travel models, and demand forecasts for toll roads,
transit facilities, and mega-projects. In general, transportation researchers, and researchers on
forecasting have learned several things: (1) at the regional level travel models are fairly good, but at the
project level their output may vary greatly, (2) optimism bias exists in traffic demand forecasts, (3)
different forecasters will produce different forecasts even when looking at the same information and (4)
the average of several independent forecasts is more accurate than its component forecasts. This paper
takes these lessons and applies them to a real project in North Carolina. It discusses how to improve the
forecast by averaging forecasts together, and provides a few visual tools to show how to communicate
the uncertainty or risk associated with the forecast to decision-makers.
Hyder
Page no. 2
A TALE OF TWO FORECASTS
INTRODUCTION
NCDOT’s project R-2568C is intended to relieve congestion and improve safety on NC 109 between I-40,
on the north end of the project and Old Greensboro Road (SR 1756) to the south. FHWA and NCDOT
issued the Draft Environmental Impact Statement (EIS) on the project on September 7, 2010 (NCDOT-
PDEA, 2010). The traffic forecast in the Draft EIS estimated that traffic along the NC 109 corridor would
grow at 2.4% per year. The result was the determination that traffic would double by 2035, and thus, to
accommodate the expected traffic a much improved NC 109 would be needed. In 2012, NCDOT
reviewed and revised the project traffic forecast. The new traffic forecast estimates that traffic will grow at
0.9% per year, which will double traffic on NC 109 around 2090. If the revised traffic forecast is the better
estimate of future conditions a much different roadway is needed.
Figure 1: Map of Study Area and NC 109 Alternatives
Source: http://www.journalnow.com/news/local/nc-dot-selects-route-for-new-stretch-of-n-
c/article_0e5a627f-66b5-5a33-bd5e-afe05a9ead64.html?mode=image&photo=0
Historically, it was assumed that the traffic forecast was a good predictor of the demand for a facility
twenty or thirty years in the future. However, beginning in the 1990’s researchers began to question this
assumption. These researchers began by comparing demand forecasts for fixed guideway transit
systems (Pickerel) and toll roads (Flyvberg) with traffic counts shortly after opening. Bain found that, for
toll roads, the actual volume was approximately 77% of the forecasted volume with a standard deviation
of 26%. Although this is based on opening year forecasts, in further research he found that this
relationship holds for the life to the project. Specifically, he believes that the error in the design year may
be ±40%. Other research has shown that opening volumes on ‘free’ facilities area approximately 91% of
forecasted base year volume (Bent Flyvberg, Nils Bruzelius, Werner Rothengatter, 2003).
This paper documents the use of averages to overcome disparate traffic volume forecasts, in an effort to
inform the NC 109 project as well as provide an example that others in a similar situation may find useful.
The analysis includes an evaluation of traffic growth along NC 109, a statistical evaluation of the traffic
forecasts, an estimation of the range of traffic volumes on the selected alternatives, and an assessment
of the probability of traffic volumes exceeding capacity for a two-lane arterial.
The results conform to current literature, which indicates that traffic forecasts are subject to high levels of
error, and that as the geography for the traffic forecast gets smaller, the error increases. A
Hyder
Page no. 3
recommendation is made that each project have at least two independently developed traffic forecasts.
These forecasts should use the same base and horizon years, but should be separated by several years
and should be performed by different staff or different contractors.
REVIEW EXISTING CONDITIONS
Between 2003 and 2011 traffic along the section of NC 109 included in this project had growth rates
below 1% per year and in four of six count locations traffic fell, as shown in Figure 1. The red bars on
Figure 1 show locations where traffic fell between 2003 and 2011. The whiskers show the highest and
lowest traffic count between 2003 and 2011. The 2011 count is posted on the graph. Traffic fell at either
end of the project but grew between Wallburg Road and Gumtree Road.
Figure 2: Study Area Traffic Counts
ANALYTIC APPROACH
There are two traffic forecasts for this project that appear to conflict with one another: the Draft EIS
forecast of 2.4% growth per annum (2010) and the 2012 revised NCDOT forecast of 0.9% growth per
annum. Given that the two traffic forecasts were developed using good professional practice, they can be
used to better understand what is likely to happen in the region, using the Central Limit Theorem of
statistics. The central limit theorem helps in two ways. First, it allows the combination of the two traffic
forecasts into average forecast. Second, it allows an estimation of the error in the average forecast (Frey,
2006). Since there are two traffic estimates for every road in the traffic forecast, this is accomplished
through taking the average of each forecast value. Getting the likely error is a little harder and uses the
following formula:
or in English, the error is the standard deviation of the sample divided by the square root of the number of
samples.
I-40 - Teague
Road
Union Cross
Road - Gumtree
Road
Gumtree Road -
Motsinger Road
Motsinger Road
- Wallburg Road
Shady Grove
Church Road -
Johnson Road
Jesse Green
Road - Old
Greensboro
Road
2003 17,0009,8007,7008,8008,2007,400
Highest ADT 17000100008600940088008100
Lowest ADT 1600096007200760076006600
2011 16,0009,7008,0009,2008,0007,200
16,000
9,700
8,000
9,200
8,0007,200
6,000
7,000
8,000
9,000
10,000
11,000
12,000
13,000
14,000
15,000
16,000
17,000
ADT
NC 109 Traffic Changes (2003 - 2011)
To Thomasville Wallburg To Winston-Salem
Hyder
Page no. 4
Assuming that the forecast is optimistic and that the standard deviation of a forecast is 26% (Bain, 2011)
of the forecasted value it is possible to estimate a range of likely volumes for NC 109 using the following
formula:
Where z is the number of standard deviations away from the mean a forecast is, δ is the standard
deviation, and E is 91% of the forecast value for that section of roadway.
AVERAGING THE TWO FORECASTS
Alternative 1 (Improve Existing)
Figure 3 shows the average forecasted traffic on each section of existing NC 109 for 2035 along with the
95 percent confidence interval for the forecasts. Based on the two traffic forecasts, if NCDOT does not
undertake other improvements traffic on the north end of the project will be near 23,000 vehicles per day
while traffic on the south end of the project will be near 13,000 vehicles per day. Using a 9% design
hourly volume and a 60% directional split (Paul S. Schroeder, 2013) the peak period traffic near I-40 will
be around 1200 vehicles per hour and while the peak period traffic at the south end of the project will be
around 700 vehicles per hour. Using an hourly vehicle capacity of 1000 vehicles per hour and assuming
that hourly volume should be below 80% of capacity much of NC 109 needs improvement and the section
of NC 109 between I-40 and Gumtree Road is a bottleneck that badly needs more capacity.
Figure 3: Forecasted Traffic on Existing NC 109 Showing Forecast Error
The next step is to estimate the traffic variability. The results of this step are shown in Table 1. The
values in the body of the table show possible daily travel demand along NC 109 and how often demand
will be above that level. The cells are color coded: blue cells show low demand and red cells have
higher demand. For example, the lowest demand shown is 4000 vehicles per day between Old
Greensboro Road and Jesse Green Road while the highest demand shown is 35,000 vehicles per day
23,000
21,000
18,000
15,000 15,000 16,000 15,000 14,000 14,000 13,000 13,000
5,000
10,000
15,000
20,000
25,000
30,000
No Build Alternative
Lower Bound of Forecast Average Forecast Upper Bound of Forecast
Hyder
Page no. 5
between Teague Road and I-40. Cells to the left of the heavy black line have hourly volumes below 800
vehicles per hour. Cells to the right of the black line have hourly volumes over 800 vehicles per hour.
The middle column of Table 1 shows the most likely travel demand on any given day in 2035. In the
middle column of the table only the section of NC 109 between I-40 and Gumtree Road have traffic
volumes over 800 vehicles per hour. However there is a good chance that the rest of NC 109 will be
congested for many days during a year.
Alternative 6 (Recommendation from the DEIS)
Figure 4 shows the average forecasted traffic on each section of Alternative 6 and the 95 percent
confidence interval for the forecasts. Much of Alternative 6 is on a different alignment than NC 109 and
the expected demand in the middle of the project reflects the new location. Using a 9% design hourly
volume and a 60% directional split (Paul S. Schroeder, 2013) the peak period traffic near I-40 will be
around 1600 vehicles per hour, and while the peak period traffic at the south end of the project will be
around 700 vehicles per hour. Using an hourly vehicle capacity of 1000 vehicles per hour and assuming
that hourly volume should be below 80% of capacity much of NC 109 needs improvement and the section
of NC 109 between I-40 and Gumtree Road is a bottleneck that badly needs more capacity.
Figure 4: Forecasted Traffic on Alternative 6 Showing Forecast Error
29,000
15,000 15,000 14,000 15,000
12,000 12,000 11,000
8,000
6,000
19,000
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
Alternative 6-Recommded
Lower Limit of Forecast Average Forecast Upper Limit of Forecast
Hyder
Page no. 6
Table 2 shows the expected demand distribution for Alternative 6 based on both traffic forecasts. The
values in the body of the table show possible daily travel demand on Alternative 6. The cells are color
coded: blue cells show low demand and red cells show higher demand. The lowest demand shown, for
this alternative, is 2,000 vehicles per day between Jesse Green Road and Shady Grove Church Road.
The highest volume shown is 44,000 vehicle per day between I-40 and Teague Road. Cells to the left of
the two heavy black lines in Table 2 are expected to have volumes less than 800 vehicles per hour.
Furthermore several sections of Alternative 6 are likely to have excess capacity until the design year.
FINDINGS
 Based on current literature, traffic forecasts are subject to high levels of error.
 As the geography of the traffic forecast gets smaller the error gets larger (Bain, 2011).
 Having two independent traffic forecasts available improves our ability to make recommendations
for the project. Averaging them provides a better position for planning purposes.
 Most of NC 109 needs to be improved, and the north end of the project needs additional capacity.
 There has been little growth in travel demand along NC 109 since 2003.
RECOMMENDATIONS
Each project should have at least two independently developed traffic forecasts. These forecasts should
use the same base and horizon years, but should be separated by several years and should be
performed by different staff or different contractors. Forecasting requires high levels of expertise and
judgment. Traffic forecasters should receive training in good forecasting methodology and statistical
analysis.
In addition, state Departments of Transportation should embark upon research, state specific research to
assess the error and variability of traffic forecasts over time for various types of transportation projects.
The author believes that in our current funding climate that it will be beneficial to better understanding of
the errors and accuracy of traffic forecasts and how traffic forecasts compare with volumes on different
types of projects.
References
Bain, R. (2011, April 5). On the reasonableness of traffic forecasts. Traffic Engineering and Control, 52(5),
213-217. Retrieved July 9, 2013, from RB Consult:
http://www.robbain.com/TEC%20Bain%20Final.pdf
Bent Flyvberg, Nils Bruzelius, Werner Rothengatter. (2003). Megaprojects and Risk: An Anatomy of
Amibtion. Cambridge, UK: Cambridge University Press.
NCDOT-PDEA. (2010). Administrative Action Draft Environmental Impact Statement NC 109
Improvements Study. NCDOT, Program Develoopment Branch. Raleigh: NCDOT.
Paul S. Schroeder, PhD. PE. (2013, February 8). Traffic Forecast fore R-2568C. Raleigh, NC, USA:
NCDOT.
Table 1: Expected Demand Distribution for the No Build Case
Probability of Demand Above the Table Value 99% 90% 84% 50% 16% 10% 1%
# of Days/Year with higher demand 361 329 307 183 58 37 4
Z Value -2.33 -1.39 -1.00 0.00 1.00 1.39 2.33
% of Average Forecast 30.4% 54.9% 65.0% 91.0% 117.0% 127.1% 151.6%
NC 109 Segment Estimated Daily Traffic
I-40 - Teague Road 7,000 13,000 15,000 21,000 27,000 29,000 35,000
Teague Road - Union Cross Road 6,000 11,000 13,000 19,000 24,000 26,000 31,000
Union Cross Road - Gumtree Road 5,000 10,000 12,000 16,000 21,000 23,000 27,000
Gumtree Road - Motsinger Road 5,000 8,000 10,000 14,000 18,000 19,000 23,000
Motsinger Road - Wallburg Road 5,000 8,000 10,000 14,000 18,000 20,000 23,000
Wallburg Road - Georgetown Road 5,000 9,000 10,000 14,000 18,000 20,000 24,000
Georgetown Road - Wallburg-High Point Road 5,000 8,000 10,000 14,000 18,000 20,000 23,000
Wallburg-High Point Road - Shady Grove Church
Road
4,000 8,000 9,000 13,000 17,000 18,000 21,000
Shady Grove Church Road - Johnson Road 4,000 8,000 9,000 13,000 17,000 18,000 22,000
Johnson Road - Jesse Green Road 4,000 7,000 8,000 12,000 15,000 17,000 20,000
Jesse Green Road - Old Greensboro Road 4,000 7,000 9,000 12,000 16,000 17,000 20,000
Hyder
Page no. 8
Table 2: Expected Demand Distribution for Alternative 6
Probability of Demand Above the Table Value 99% 90% 84% 50% 16.00% 10% 1%
# of Days/Year with higher demand 361 329 307 183 58 37 4
Z Value -2.33 -1.39 -1.00 0.00 1.00 1.39 2.33
% of Average Forecast 30.4% 54.9% 65.0% 91.0% 117.0% 127.1% 151.6%
NC 109 Section Estimated Daily Traffic
I-40 - Teague Road 9,000 16,000 19,000 27,000 34,000 37,000 44,000
Teague Road - Union Cross Road 5,000 8,000 10,000 14,000 18,000 19,000 23,000
Union Cross Road - Gumtree Road 5,000 8,000 10,000 14,000 18,000 19,000 23,000
Gumtree Road - Motsinger Road 4,000 8,000 9,000 12,000 16,000 17,000 21,000
Motsinger Road - Wallburg Road 4,000 8,000 10,000 13,000 17,000 19,000 22,000
Wallburg Road - Georgetown Road 4,000 7,000 8,000 11,000 14,000 15,000 18,000
Georgetown Road - Wallburg-High Point Road 4,000 7,000 8,000 11,000 14,000 15,000 18,000
Wallburg-High Point Road - Shady Grove Church
Road
3,000 6,000 7,000 10,000 13,000 14,000 17,000
Shady Grove Church Road - Johnson Road 2,000 4,000 5,000 7,000 9,000 10,000 11,000
Johnson Road - Jesse Green Road 2,000 3,000 4,000 5,000 7,000 7,000 8,000
Jesse Green Road - Old Greensboro Road 6,000 10,000 12,000 17,000 22,000 24,000 29,000
Hyder
Page no. 9
Additional Tables
The following tables show additional analysis that support the information shown in the body of the report.
Table 3: Hourly Demand for No Build 2035 Based Assuming 9% Peak and 60 % Directional Split
Probability of Demand Above the Table Value 99% 90% 84% 50% 16% 10% 1%
# of Days/Year with higher Demand 361 329 307 183 58 37 4
Z Value -2.33 -1.39 -1.00 0.00 1.00 1.39 2.33
% of Forecast Value 30.4% 54.9% 65.0% 91.0% 117.0% 127.1% 151.6%
NC 109 Segment Estimated Hourly Traffic Demand
I-40 - Teague Road 378 702 810 1134 1458 1566 1890
Teague Road - Union Cross Road 324 594 702 1026 1296 1404 1674
Union Cross Road - Gumtree Road 270 540 648 864 1134 1242 1458
Gumtree Road - Motsinger Road 270 432 540 756 972 1026 1242
Motsinger Road - Wallburg Road 270 432 540 756 972 1080 1242
Wallburg Road - Georgetown Road 270 486 540 756 972 1080 1296
Georgetown Road - Wallburg-High Point
Road
270 432 540 756 972 1080 1242
Wallburg-High Point Road - Shady Grove
Church Road
216 432 486 702 918 972 1134
Shady Grove Church Road - Johnson Road 216 432 486 702 918 972 1188
Johnson Road - Jesse Green Road 216 378 432 648 810 918 1080
Jesse Green Road - Old Greensboro Road 216 378 486 648 864 918 1080
Hyder
Page no. 10
Table 4: No Build 2035 Hourly Volume as a Percent of 1000 Vehicles per Hour
Probability of Demand Above the Table Value 99% 90% 84% 50% 16% 10% 1%
# of Days/Year with higher Demand 361 329 307 183 58 37 4
Z Value -2.33 -1.39 -1.00 0.00 1.00 1.39 2.33
% of Forecast Value 30.4% 54.9% 65.0% 91.0% 117.0% 127.1% 151.6%
NC 109 Segment Percent of 1000 VPH
I-40 - Teague Road 37.8% 70.2% 81.0% 113.4% 145.8% 156.6% 189.0%
Teague Road - Union Cross Road 32.4% 59.4% 70.2% 102.6% 129.6% 140.4% 167.4%
Union Cross Road - Gumtree Road 27.0% 54.0% 64.8% 86.4% 113.4% 124.2% 145.8%
Gumtree Road - Motsinger Road 27.0% 43.2% 54.0% 75.6% 97.2% 102.6% 124.2%
Motsinger Road - Wallburg Road 27.0% 43.2% 54.0% 75.6% 97.2% 108.0% 124.2%
Wallburg Road - Georgetown Road 27.0% 48.6% 54.0% 75.6% 97.2% 108.0% 129.6%
Georgetown Road - Wallburg-High Point
Road
27.0% 43.2% 54.0% 75.6% 97.2% 108.0% 124.2%
Wallburg-High Point Road - Shady Grove
Church Road
21.6% 43.2% 48.6% 70.2% 91.8% 97.2% 113.4%
Shady Grove Church Road - Johnson Road 21.6% 43.2% 48.6% 70.2% 91.8% 97.2% 118.8%
Johnson Road - Jesse Green Road 21.6% 37.8% 43.2% 64.8% 81.0% 91.8% 108.0%
Jesse Green Road - Old Greensboro Road 21.6% 37.8% 48.6% 64.8% 86.4% 91.8% 108.0%
Hyder
Page no. 11
Table 5: Hourly Demand for Alternative 6 2035 Based Assuming 9% Peak and 60 % Directional Split
Probability of Demand Above the Table Value 99% 90% 84% 50% 16.00% 10% 1%
# of Days/Year with Higher Demand 361 329 307 183 58 37 4
Z Value -2.33 -1.39 -1.00 0.00 1.00 1.39 2.33
% of Forecast Value 30.4% 54.9% 65.0% 91.0% 117.0% 127.1% 151.6%
NC 109 Section Estimated Hourly Traffic Demand
I-40 - Teague Road 486 864 1026 1458 1836 1998 2376
Teague Road - Union Cross Road 270 432 540 756 972 1026 1242
Union Cross Road - Gumtree Road 270 432 540 756 972 1026 1242
Gumtree Road - Motsinger Road 216 432 486 648 864 918 1134
Motsinger Road - Wallburg Road 216 432 540 702 918 1026 1188
Wallburg Road - Georgetown Road 216 378 432 594 756 810 972
Georgetown Road - Wallburg-High Point Road 216 378 432 594 756 810 972
Wallburg-High Point Road - Shady Grove Church Road 162 324 378 540 702 756 918
Shady Grove Church Road - Johnson Road 108 216 270 378 486 540 594
Johnson Road - Jesse Green Road 108 162 216 270 378 378 432
Jesse Green Road - Old Greensboro Road 324 540 648 918 1188 1296 1566
Hyder
Page no. 12
Table 6: Alternative 6 2035 Hourly Volume as a Percent of 1000 Vehicles per Hour
Probability of Demand Above the Table Value 99% 90% 84% 50% 16.00% 10% 1%
# of Days/Year with Higher Demand 361 329 307 183 58 37 4
Z Value -2.33 -1.39 -1.00 0.00 1.00 1.39 2.33
% of Forecast Value 30.4% 54.9% 65.0% 91.0% 117.0% 127.1% 151.6%
NC 109 Section Percent of 1000 VPH
I-40 - Teague Road 48.6% 86.4% 102.6% 145.8% 183.6% 199.8% 237.6%
Teague Road - Union Cross Road 27.0% 43.2% 54.0% 75.6% 97.2% 102.6% 124.2%
Union Cross Road - Gumtree Road 27.0% 43.2% 54.0% 75.6% 97.2% 102.6% 124.2%
Gumtree Road - Motsinger Road 21.6% 43.2% 48.6% 64.8% 86.4% 91.8% 113.4%
Motsinger Road - Wallburg Road 21.6% 43.2% 54.0% 70.2% 91.8% 102.6% 118.8%
Wallburg Road - Georgetown Road 21.6% 37.8% 43.2% 59.4% 75.6% 81.0% 97.2%
Georgetown Road - Wallburg-High Point Road 21.6% 37.8% 43.2% 59.4% 75.6% 81.0% 97.2%
Wallburg-High Point Road - Shady Grove Church
Road
16.2% 32.4% 37.8% 54.0% 70.2% 75.6% 91.8%
Shady Grove Church Road - Johnson Road 10.8% 21.6% 27.0% 37.8% 48.6% 54.0% 59.4%
Johnson Road - Jesse Green Road 10.8% 16.2% 21.6% 27.0% 37.8% 37.8% 43.2%
Jesse Green Road - Old Greensboro Road 32.4% 54.0% 64.8% 91.8% 118.8% 129.6% 156.6%
Tools for Improving Regional Travel Demand Models

More Related Content

What's hot

Ijmer 46044245
Ijmer 46044245Ijmer 46044245
Ijmer 46044245IJMER
 
A low cost method of real time pavement condition data sharing to expedite ma...
A low cost method of real time pavement condition data sharing to expedite ma...A low cost method of real time pavement condition data sharing to expedite ma...
A low cost method of real time pavement condition data sharing to expedite ma...UVision
 
Tel aviv metro transit strategic plan 2016 - Summary
Tel aviv metro transit strategic plan 2016 - SummaryTel aviv metro transit strategic plan 2016 - Summary
Tel aviv metro transit strategic plan 2016 - SummaryMarcos Szeinuk
 
Pricing Freight Transport to Account for External Costs
Pricing Freight Transport to Account for External CostsPricing Freight Transport to Account for External Costs
Pricing Freight Transport to Account for External CostsCongressional Budget Office
 
Pricing Freight Transport to Account for External Costs
Pricing Freight Transport to Account for External CostsPricing Freight Transport to Account for External Costs
Pricing Freight Transport to Account for External CostsCongressional Budget Office
 
Dynamic resource allocation in road transport sector using mobile cloud compu...
Dynamic resource allocation in road transport sector using mobile cloud compu...Dynamic resource allocation in road transport sector using mobile cloud compu...
Dynamic resource allocation in road transport sector using mobile cloud compu...IAEME Publication
 
Portfolio_YuPoChiu
Portfolio_YuPoChiuPortfolio_YuPoChiu
Portfolio_YuPoChiuBrian Chiu
 
Research summary on ITS in Europe
Research summary on ITS in Europe Research summary on ITS in Europe
Research summary on ITS in Europe Mital Damani
 
Managing California HSPR Programs-Caltrain, Bazeley
Managing California HSPR Programs-Caltrain, Bazeley Managing California HSPR Programs-Caltrain, Bazeley
Managing California HSPR Programs-Caltrain, Bazeley Roger Bazeley, USA
 
Paper id 71201985
Paper id 71201985Paper id 71201985
Paper id 71201985IJRAT
 
One-Day Long Statistical Analysis of Parking Demand by Using Single-Camera Va...
One-Day Long Statistical Analysis of Parking Demand by Using Single-Camera Va...One-Day Long Statistical Analysis of Parking Demand by Using Single-Camera Va...
One-Day Long Statistical Analysis of Parking Demand by Using Single-Camera Va...toukaigi
 
Where to from here? – a modelling methodology for measuring land-use and publ...
Where to from here? – a modelling methodology for measuring land-use and publ...Where to from here? – a modelling methodology for measuring land-use and publ...
Where to from here? – a modelling methodology for measuring land-use and publ...JumpingJaq
 
Traffic Access and Impact Study Guidelines & Procedures
Traffic Access and Impact Study Guidelines & ProceduresTraffic Access and Impact Study Guidelines & Procedures
Traffic Access and Impact Study Guidelines & Proceduresgscplanning
 
Study of Congestion Control Scheme with Decentralized Threshold Function in V...
Study of Congestion Control Scheme with Decentralized Threshold Function in V...Study of Congestion Control Scheme with Decentralized Threshold Function in V...
Study of Congestion Control Scheme with Decentralized Threshold Function in V...ijtsrd
 
IRJET- Study of Design Traffic Signal
IRJET- Study of Design Traffic SignalIRJET- Study of Design Traffic Signal
IRJET- Study of Design Traffic SignalIRJET Journal
 
INTELLIGENT TRANSPORTATION SYSTEM BASED TRAFFIC CONGESTION MODELLING FOR URBA...
INTELLIGENT TRANSPORTATION SYSTEM BASED TRAFFIC CONGESTION MODELLING FOR URBA...INTELLIGENT TRANSPORTATION SYSTEM BASED TRAFFIC CONGESTION MODELLING FOR URBA...
INTELLIGENT TRANSPORTATION SYSTEM BASED TRAFFIC CONGESTION MODELLING FOR URBA...civej
 

What's hot (20)

Ijmer 46044245
Ijmer 46044245Ijmer 46044245
Ijmer 46044245
 
A low cost method of real time pavement condition data sharing to expedite ma...
A low cost method of real time pavement condition data sharing to expedite ma...A low cost method of real time pavement condition data sharing to expedite ma...
A low cost method of real time pavement condition data sharing to expedite ma...
 
Masters Dissertation Posters 2017
Masters Dissertation Posters 2017Masters Dissertation Posters 2017
Masters Dissertation Posters 2017
 
Tel aviv metro transit strategic plan 2016 - Summary
Tel aviv metro transit strategic plan 2016 - SummaryTel aviv metro transit strategic plan 2016 - Summary
Tel aviv metro transit strategic plan 2016 - Summary
 
Pricing Freight Transport to Account for External Costs
Pricing Freight Transport to Account for External CostsPricing Freight Transport to Account for External Costs
Pricing Freight Transport to Account for External Costs
 
Pricing Freight Transport to Account for External Costs
Pricing Freight Transport to Account for External CostsPricing Freight Transport to Account for External Costs
Pricing Freight Transport to Account for External Costs
 
Dynamic resource allocation in road transport sector using mobile cloud compu...
Dynamic resource allocation in road transport sector using mobile cloud compu...Dynamic resource allocation in road transport sector using mobile cloud compu...
Dynamic resource allocation in road transport sector using mobile cloud compu...
 
Portfolio_YuPoChiu
Portfolio_YuPoChiuPortfolio_YuPoChiu
Portfolio_YuPoChiu
 
Research summary on ITS in Europe
Research summary on ITS in Europe Research summary on ITS in Europe
Research summary on ITS in Europe
 
Managing California HSPR Programs-Caltrain, Bazeley
Managing California HSPR Programs-Caltrain, Bazeley Managing California HSPR Programs-Caltrain, Bazeley
Managing California HSPR Programs-Caltrain, Bazeley
 
Paper id 71201985
Paper id 71201985Paper id 71201985
Paper id 71201985
 
One-Day Long Statistical Analysis of Parking Demand by Using Single-Camera Va...
One-Day Long Statistical Analysis of Parking Demand by Using Single-Camera Va...One-Day Long Statistical Analysis of Parking Demand by Using Single-Camera Va...
One-Day Long Statistical Analysis of Parking Demand by Using Single-Camera Va...
 
I1037175
I1037175I1037175
I1037175
 
Where to from here? – a modelling methodology for measuring land-use and publ...
Where to from here? – a modelling methodology for measuring land-use and publ...Where to from here? – a modelling methodology for measuring land-use and publ...
Where to from here? – a modelling methodology for measuring land-use and publ...
 
20320140506003
2032014050600320320140506003
20320140506003
 
Traffic Access and Impact Study Guidelines & Procedures
Traffic Access and Impact Study Guidelines & ProceduresTraffic Access and Impact Study Guidelines & Procedures
Traffic Access and Impact Study Guidelines & Procedures
 
Study of Congestion Control Scheme with Decentralized Threshold Function in V...
Study of Congestion Control Scheme with Decentralized Threshold Function in V...Study of Congestion Control Scheme with Decentralized Threshold Function in V...
Study of Congestion Control Scheme with Decentralized Threshold Function in V...
 
IRJET- Study of Design Traffic Signal
IRJET- Study of Design Traffic SignalIRJET- Study of Design Traffic Signal
IRJET- Study of Design Traffic Signal
 
INTELLIGENT TRANSPORTATION SYSTEM BASED TRAFFIC CONGESTION MODELLING FOR URBA...
INTELLIGENT TRANSPORTATION SYSTEM BASED TRAFFIC CONGESTION MODELLING FOR URBA...INTELLIGENT TRANSPORTATION SYSTEM BASED TRAFFIC CONGESTION MODELLING FOR URBA...
INTELLIGENT TRANSPORTATION SYSTEM BASED TRAFFIC CONGESTION MODELLING FOR URBA...
 
The Northern Way
The Northern WayThe Northern Way
The Northern Way
 

Similar to Tools for Improving Regional Travel Demand Models

4 estimating benefits-from_specific_highwa
4   estimating benefits-from_specific_highwa4   estimating benefits-from_specific_highwa
4 estimating benefits-from_specific_highwaSierra Francisco Justo
 
1 s2.0-s096585641530224 x-main
1 s2.0-s096585641530224 x-main1 s2.0-s096585641530224 x-main
1 s2.0-s096585641530224 x-mainAe Duduy
 
Irregularities in Traffic Forecasts
Irregularities in Traffic ForecastsIrregularities in Traffic Forecasts
Irregularities in Traffic ForecastsBasil Psarianos
 
The Distributional Impacts of Transportation Networks in China
The Distributional Impacts of Transportation Networks in ChinaThe Distributional Impacts of Transportation Networks in China
The Distributional Impacts of Transportation Networks in Chinamalin84
 
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...IRJET Journal
 
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOW
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOWTRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOW
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOWIRJET Journal
 
The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)theijes
 
Chapter 3 -Line-Based Analysis-edited-final
Chapter 3 -Line-Based Analysis-edited-finalChapter 3 -Line-Based Analysis-edited-final
Chapter 3 -Line-Based Analysis-edited-finalAdriana Abramovich
 
IRJET- Evaluating Traffic Congestion and its Remedial Measures
IRJET-  	  Evaluating Traffic Congestion and its Remedial MeasuresIRJET-  	  Evaluating Traffic Congestion and its Remedial Measures
IRJET- Evaluating Traffic Congestion and its Remedial MeasuresIRJET Journal
 
Study of Road Maintenance Fund Needs Approach with Link Based and Network Based
Study of Road Maintenance Fund Needs Approach with Link Based and Network BasedStudy of Road Maintenance Fund Needs Approach with Link Based and Network Based
Study of Road Maintenance Fund Needs Approach with Link Based and Network Basedijtsrd
 
IRJET - To Study Impact of Road Roughness on Free Flow Speed of Vehicle
IRJET - To Study Impact of Road Roughness on Free Flow Speed of VehicleIRJET - To Study Impact of Road Roughness on Free Flow Speed of Vehicle
IRJET - To Study Impact of Road Roughness on Free Flow Speed of VehicleIRJET Journal
 
Design of Highway with Major Bridge on Stagnant Water
Design of Highway with Major Bridge on Stagnant WaterDesign of Highway with Major Bridge on Stagnant Water
Design of Highway with Major Bridge on Stagnant WaterIRJET Journal
 
Headings - 2015 Volume I
Headings - 2015 Volume IHeadings - 2015 Volume I
Headings - 2015 Volume IHeadings
 
The Per Mile Costs of Operating Automobiles and Trucks
The Per Mile Costs of Operating Automobiles and TrucksThe Per Mile Costs of Operating Automobiles and Trucks
The Per Mile Costs of Operating Automobiles and TrucksDivyanshu Dayal
 
PhD Abtract_HoangDao_July2016
PhD Abtract_HoangDao_July2016PhD Abtract_HoangDao_July2016
PhD Abtract_HoangDao_July2016Hoang Dao
 

Similar to Tools for Improving Regional Travel Demand Models (20)

4 estimating benefits-from_specific_highwa
4   estimating benefits-from_specific_highwa4   estimating benefits-from_specific_highwa
4 estimating benefits-from_specific_highwa
 
1 s2.0-s096585641530224 x-main
1 s2.0-s096585641530224 x-main1 s2.0-s096585641530224 x-main
1 s2.0-s096585641530224 x-main
 
Irregularities in Traffic Forecasts
Irregularities in Traffic ForecastsIrregularities in Traffic Forecasts
Irregularities in Traffic Forecasts
 
The Distributional Impacts of Transportation Networks in China
The Distributional Impacts of Transportation Networks in ChinaThe Distributional Impacts of Transportation Networks in China
The Distributional Impacts of Transportation Networks in China
 
04626520
0462652004626520
04626520
 
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
 
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOW
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOWTRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOW
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOW
 
The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)
 
Chapter 3 -Line-Based Analysis-edited-final
Chapter 3 -Line-Based Analysis-edited-finalChapter 3 -Line-Based Analysis-edited-final
Chapter 3 -Line-Based Analysis-edited-final
 
IRJET- Evaluating Traffic Congestion and its Remedial Measures
IRJET-  	  Evaluating Traffic Congestion and its Remedial MeasuresIRJET-  	  Evaluating Traffic Congestion and its Remedial Measures
IRJET- Evaluating Traffic Congestion and its Remedial Measures
 
paper 170
paper 170paper 170
paper 170
 
Study of Road Maintenance Fund Needs Approach with Link Based and Network Based
Study of Road Maintenance Fund Needs Approach with Link Based and Network BasedStudy of Road Maintenance Fund Needs Approach with Link Based and Network Based
Study of Road Maintenance Fund Needs Approach with Link Based and Network Based
 
CBI Paper for ISEHP 2016
CBI Paper for ISEHP 2016CBI Paper for ISEHP 2016
CBI Paper for ISEHP 2016
 
IRJET - To Study Impact of Road Roughness on Free Flow Speed of Vehicle
IRJET - To Study Impact of Road Roughness on Free Flow Speed of VehicleIRJET - To Study Impact of Road Roughness on Free Flow Speed of Vehicle
IRJET - To Study Impact of Road Roughness on Free Flow Speed of Vehicle
 
Design of Highway with Major Bridge on Stagnant Water
Design of Highway with Major Bridge on Stagnant WaterDesign of Highway with Major Bridge on Stagnant Water
Design of Highway with Major Bridge on Stagnant Water
 
Headings - 2015 Volume I
Headings - 2015 Volume IHeadings - 2015 Volume I
Headings - 2015 Volume I
 
Cost pr km
Cost pr kmCost pr km
Cost pr km
 
The Per Mile Costs of Operating Automobiles and Trucks
The Per Mile Costs of Operating Automobiles and TrucksThe Per Mile Costs of Operating Automobiles and Trucks
The Per Mile Costs of Operating Automobiles and Trucks
 
PhD Abtract_HoangDao_July2016
PhD Abtract_HoangDao_July2016PhD Abtract_HoangDao_July2016
PhD Abtract_HoangDao_July2016
 
GDRR Opening Workshop - Transportation System Reliability: Challenges and Opp...
GDRR Opening Workshop - Transportation System Reliability: Challenges and Opp...GDRR Opening Workshop - Transportation System Reliability: Challenges and Opp...
GDRR Opening Workshop - Transportation System Reliability: Challenges and Opp...
 

Tools for Improving Regional Travel Demand Models

  • 1. 13-114 C4: Tools for Improving Regional Travel Demand Models A TALE OF TWO FORECASTS David Hyder (Author) Parsons Corporation Yanbu, Saudi Arabia Stacey Bricka (Corresponding Presenter) Research Scientist Texas A&M Transportation Institute 505 E. Huntland Dr., Ste 455 Austin, TX 78752 Tel: 512-407-1123 Fax: 512-467-8952 The transportation project development cycle is very long. Many of today’s transportation projects started before the financial crisis of 2008. The sharp drop in travel demand and the slow recovery from the recession triggered by the financial crisis have caused some states, North Carolina among them, to reevaluate demand forecasts for projects already in project development. If the second traffic forecast is similar to the first then all is well and good. However, when the second traffic forecast is different from the original traffic forecast it can call into question the need for the project, and undermine much of the effort put into developing the project to that point. The agency sponsors then must choose which forecast to use and which to discard. In turn, this can leave the sponsor open to charges of arbitrary decision- making if the project is at all controversial. In such cases, the project sponsor is often left with three undesirable, and possibly costly options. The sponsor may cancel the project. The sponsor may, based on judgment, choose which forecast to use. The sponsor may commission yet another traffic forecast, or if the forecast is based on a travel demand model the sponsor may perform an arbitrary sensitivity analysis to help inform the decision. Essentially, the project sponsor has the choice of using or discarding one, or more, forecasts. This is not the only, or perhaps even the best, option. Over the past twenty years, the transportation planning profession has become familiar with the concept that traffic forecasts have a considerable amount of uncertainty built in to them. In fact there is significant variation in traffic demand on a day to day, month to month, and year to year basis. For years, researchers have been pointing out the uncertainty in travel models, and demand forecasts for toll roads, transit facilities, and mega-projects. In general, transportation researchers, and researchers on forecasting have learned several things: (1) at the regional level travel models are fairly good, but at the project level their output may vary greatly, (2) optimism bias exists in traffic demand forecasts, (3) different forecasters will produce different forecasts even when looking at the same information and (4) the average of several independent forecasts is more accurate than its component forecasts. This paper takes these lessons and applies them to a real project in North Carolina. It discusses how to improve the forecast by averaging forecasts together, and provides a few visual tools to show how to communicate the uncertainty or risk associated with the forecast to decision-makers.
  • 2. Hyder Page no. 2 A TALE OF TWO FORECASTS INTRODUCTION NCDOT’s project R-2568C is intended to relieve congestion and improve safety on NC 109 between I-40, on the north end of the project and Old Greensboro Road (SR 1756) to the south. FHWA and NCDOT issued the Draft Environmental Impact Statement (EIS) on the project on September 7, 2010 (NCDOT- PDEA, 2010). The traffic forecast in the Draft EIS estimated that traffic along the NC 109 corridor would grow at 2.4% per year. The result was the determination that traffic would double by 2035, and thus, to accommodate the expected traffic a much improved NC 109 would be needed. In 2012, NCDOT reviewed and revised the project traffic forecast. The new traffic forecast estimates that traffic will grow at 0.9% per year, which will double traffic on NC 109 around 2090. If the revised traffic forecast is the better estimate of future conditions a much different roadway is needed. Figure 1: Map of Study Area and NC 109 Alternatives Source: http://www.journalnow.com/news/local/nc-dot-selects-route-for-new-stretch-of-n- c/article_0e5a627f-66b5-5a33-bd5e-afe05a9ead64.html?mode=image&photo=0 Historically, it was assumed that the traffic forecast was a good predictor of the demand for a facility twenty or thirty years in the future. However, beginning in the 1990’s researchers began to question this assumption. These researchers began by comparing demand forecasts for fixed guideway transit systems (Pickerel) and toll roads (Flyvberg) with traffic counts shortly after opening. Bain found that, for toll roads, the actual volume was approximately 77% of the forecasted volume with a standard deviation of 26%. Although this is based on opening year forecasts, in further research he found that this relationship holds for the life to the project. Specifically, he believes that the error in the design year may be ±40%. Other research has shown that opening volumes on ‘free’ facilities area approximately 91% of forecasted base year volume (Bent Flyvberg, Nils Bruzelius, Werner Rothengatter, 2003). This paper documents the use of averages to overcome disparate traffic volume forecasts, in an effort to inform the NC 109 project as well as provide an example that others in a similar situation may find useful. The analysis includes an evaluation of traffic growth along NC 109, a statistical evaluation of the traffic forecasts, an estimation of the range of traffic volumes on the selected alternatives, and an assessment of the probability of traffic volumes exceeding capacity for a two-lane arterial. The results conform to current literature, which indicates that traffic forecasts are subject to high levels of error, and that as the geography for the traffic forecast gets smaller, the error increases. A
  • 3. Hyder Page no. 3 recommendation is made that each project have at least two independently developed traffic forecasts. These forecasts should use the same base and horizon years, but should be separated by several years and should be performed by different staff or different contractors. REVIEW EXISTING CONDITIONS Between 2003 and 2011 traffic along the section of NC 109 included in this project had growth rates below 1% per year and in four of six count locations traffic fell, as shown in Figure 1. The red bars on Figure 1 show locations where traffic fell between 2003 and 2011. The whiskers show the highest and lowest traffic count between 2003 and 2011. The 2011 count is posted on the graph. Traffic fell at either end of the project but grew between Wallburg Road and Gumtree Road. Figure 2: Study Area Traffic Counts ANALYTIC APPROACH There are two traffic forecasts for this project that appear to conflict with one another: the Draft EIS forecast of 2.4% growth per annum (2010) and the 2012 revised NCDOT forecast of 0.9% growth per annum. Given that the two traffic forecasts were developed using good professional practice, they can be used to better understand what is likely to happen in the region, using the Central Limit Theorem of statistics. The central limit theorem helps in two ways. First, it allows the combination of the two traffic forecasts into average forecast. Second, it allows an estimation of the error in the average forecast (Frey, 2006). Since there are two traffic estimates for every road in the traffic forecast, this is accomplished through taking the average of each forecast value. Getting the likely error is a little harder and uses the following formula: or in English, the error is the standard deviation of the sample divided by the square root of the number of samples. I-40 - Teague Road Union Cross Road - Gumtree Road Gumtree Road - Motsinger Road Motsinger Road - Wallburg Road Shady Grove Church Road - Johnson Road Jesse Green Road - Old Greensboro Road 2003 17,0009,8007,7008,8008,2007,400 Highest ADT 17000100008600940088008100 Lowest ADT 1600096007200760076006600 2011 16,0009,7008,0009,2008,0007,200 16,000 9,700 8,000 9,200 8,0007,200 6,000 7,000 8,000 9,000 10,000 11,000 12,000 13,000 14,000 15,000 16,000 17,000 ADT NC 109 Traffic Changes (2003 - 2011) To Thomasville Wallburg To Winston-Salem
  • 4. Hyder Page no. 4 Assuming that the forecast is optimistic and that the standard deviation of a forecast is 26% (Bain, 2011) of the forecasted value it is possible to estimate a range of likely volumes for NC 109 using the following formula: Where z is the number of standard deviations away from the mean a forecast is, δ is the standard deviation, and E is 91% of the forecast value for that section of roadway. AVERAGING THE TWO FORECASTS Alternative 1 (Improve Existing) Figure 3 shows the average forecasted traffic on each section of existing NC 109 for 2035 along with the 95 percent confidence interval for the forecasts. Based on the two traffic forecasts, if NCDOT does not undertake other improvements traffic on the north end of the project will be near 23,000 vehicles per day while traffic on the south end of the project will be near 13,000 vehicles per day. Using a 9% design hourly volume and a 60% directional split (Paul S. Schroeder, 2013) the peak period traffic near I-40 will be around 1200 vehicles per hour and while the peak period traffic at the south end of the project will be around 700 vehicles per hour. Using an hourly vehicle capacity of 1000 vehicles per hour and assuming that hourly volume should be below 80% of capacity much of NC 109 needs improvement and the section of NC 109 between I-40 and Gumtree Road is a bottleneck that badly needs more capacity. Figure 3: Forecasted Traffic on Existing NC 109 Showing Forecast Error The next step is to estimate the traffic variability. The results of this step are shown in Table 1. The values in the body of the table show possible daily travel demand along NC 109 and how often demand will be above that level. The cells are color coded: blue cells show low demand and red cells have higher demand. For example, the lowest demand shown is 4000 vehicles per day between Old Greensboro Road and Jesse Green Road while the highest demand shown is 35,000 vehicles per day 23,000 21,000 18,000 15,000 15,000 16,000 15,000 14,000 14,000 13,000 13,000 5,000 10,000 15,000 20,000 25,000 30,000 No Build Alternative Lower Bound of Forecast Average Forecast Upper Bound of Forecast
  • 5. Hyder Page no. 5 between Teague Road and I-40. Cells to the left of the heavy black line have hourly volumes below 800 vehicles per hour. Cells to the right of the black line have hourly volumes over 800 vehicles per hour. The middle column of Table 1 shows the most likely travel demand on any given day in 2035. In the middle column of the table only the section of NC 109 between I-40 and Gumtree Road have traffic volumes over 800 vehicles per hour. However there is a good chance that the rest of NC 109 will be congested for many days during a year. Alternative 6 (Recommendation from the DEIS) Figure 4 shows the average forecasted traffic on each section of Alternative 6 and the 95 percent confidence interval for the forecasts. Much of Alternative 6 is on a different alignment than NC 109 and the expected demand in the middle of the project reflects the new location. Using a 9% design hourly volume and a 60% directional split (Paul S. Schroeder, 2013) the peak period traffic near I-40 will be around 1600 vehicles per hour, and while the peak period traffic at the south end of the project will be around 700 vehicles per hour. Using an hourly vehicle capacity of 1000 vehicles per hour and assuming that hourly volume should be below 80% of capacity much of NC 109 needs improvement and the section of NC 109 between I-40 and Gumtree Road is a bottleneck that badly needs more capacity. Figure 4: Forecasted Traffic on Alternative 6 Showing Forecast Error 29,000 15,000 15,000 14,000 15,000 12,000 12,000 11,000 8,000 6,000 19,000 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 Alternative 6-Recommded Lower Limit of Forecast Average Forecast Upper Limit of Forecast
  • 6. Hyder Page no. 6 Table 2 shows the expected demand distribution for Alternative 6 based on both traffic forecasts. The values in the body of the table show possible daily travel demand on Alternative 6. The cells are color coded: blue cells show low demand and red cells show higher demand. The lowest demand shown, for this alternative, is 2,000 vehicles per day between Jesse Green Road and Shady Grove Church Road. The highest volume shown is 44,000 vehicle per day between I-40 and Teague Road. Cells to the left of the two heavy black lines in Table 2 are expected to have volumes less than 800 vehicles per hour. Furthermore several sections of Alternative 6 are likely to have excess capacity until the design year. FINDINGS  Based on current literature, traffic forecasts are subject to high levels of error.  As the geography of the traffic forecast gets smaller the error gets larger (Bain, 2011).  Having two independent traffic forecasts available improves our ability to make recommendations for the project. Averaging them provides a better position for planning purposes.  Most of NC 109 needs to be improved, and the north end of the project needs additional capacity.  There has been little growth in travel demand along NC 109 since 2003. RECOMMENDATIONS Each project should have at least two independently developed traffic forecasts. These forecasts should use the same base and horizon years, but should be separated by several years and should be performed by different staff or different contractors. Forecasting requires high levels of expertise and judgment. Traffic forecasters should receive training in good forecasting methodology and statistical analysis. In addition, state Departments of Transportation should embark upon research, state specific research to assess the error and variability of traffic forecasts over time for various types of transportation projects. The author believes that in our current funding climate that it will be beneficial to better understanding of the errors and accuracy of traffic forecasts and how traffic forecasts compare with volumes on different types of projects. References Bain, R. (2011, April 5). On the reasonableness of traffic forecasts. Traffic Engineering and Control, 52(5), 213-217. Retrieved July 9, 2013, from RB Consult: http://www.robbain.com/TEC%20Bain%20Final.pdf Bent Flyvberg, Nils Bruzelius, Werner Rothengatter. (2003). Megaprojects and Risk: An Anatomy of Amibtion. Cambridge, UK: Cambridge University Press. NCDOT-PDEA. (2010). Administrative Action Draft Environmental Impact Statement NC 109 Improvements Study. NCDOT, Program Develoopment Branch. Raleigh: NCDOT. Paul S. Schroeder, PhD. PE. (2013, February 8). Traffic Forecast fore R-2568C. Raleigh, NC, USA: NCDOT.
  • 7. Table 1: Expected Demand Distribution for the No Build Case Probability of Demand Above the Table Value 99% 90% 84% 50% 16% 10% 1% # of Days/Year with higher demand 361 329 307 183 58 37 4 Z Value -2.33 -1.39 -1.00 0.00 1.00 1.39 2.33 % of Average Forecast 30.4% 54.9% 65.0% 91.0% 117.0% 127.1% 151.6% NC 109 Segment Estimated Daily Traffic I-40 - Teague Road 7,000 13,000 15,000 21,000 27,000 29,000 35,000 Teague Road - Union Cross Road 6,000 11,000 13,000 19,000 24,000 26,000 31,000 Union Cross Road - Gumtree Road 5,000 10,000 12,000 16,000 21,000 23,000 27,000 Gumtree Road - Motsinger Road 5,000 8,000 10,000 14,000 18,000 19,000 23,000 Motsinger Road - Wallburg Road 5,000 8,000 10,000 14,000 18,000 20,000 23,000 Wallburg Road - Georgetown Road 5,000 9,000 10,000 14,000 18,000 20,000 24,000 Georgetown Road - Wallburg-High Point Road 5,000 8,000 10,000 14,000 18,000 20,000 23,000 Wallburg-High Point Road - Shady Grove Church Road 4,000 8,000 9,000 13,000 17,000 18,000 21,000 Shady Grove Church Road - Johnson Road 4,000 8,000 9,000 13,000 17,000 18,000 22,000 Johnson Road - Jesse Green Road 4,000 7,000 8,000 12,000 15,000 17,000 20,000 Jesse Green Road - Old Greensboro Road 4,000 7,000 9,000 12,000 16,000 17,000 20,000
  • 8. Hyder Page no. 8 Table 2: Expected Demand Distribution for Alternative 6 Probability of Demand Above the Table Value 99% 90% 84% 50% 16.00% 10% 1% # of Days/Year with higher demand 361 329 307 183 58 37 4 Z Value -2.33 -1.39 -1.00 0.00 1.00 1.39 2.33 % of Average Forecast 30.4% 54.9% 65.0% 91.0% 117.0% 127.1% 151.6% NC 109 Section Estimated Daily Traffic I-40 - Teague Road 9,000 16,000 19,000 27,000 34,000 37,000 44,000 Teague Road - Union Cross Road 5,000 8,000 10,000 14,000 18,000 19,000 23,000 Union Cross Road - Gumtree Road 5,000 8,000 10,000 14,000 18,000 19,000 23,000 Gumtree Road - Motsinger Road 4,000 8,000 9,000 12,000 16,000 17,000 21,000 Motsinger Road - Wallburg Road 4,000 8,000 10,000 13,000 17,000 19,000 22,000 Wallburg Road - Georgetown Road 4,000 7,000 8,000 11,000 14,000 15,000 18,000 Georgetown Road - Wallburg-High Point Road 4,000 7,000 8,000 11,000 14,000 15,000 18,000 Wallburg-High Point Road - Shady Grove Church Road 3,000 6,000 7,000 10,000 13,000 14,000 17,000 Shady Grove Church Road - Johnson Road 2,000 4,000 5,000 7,000 9,000 10,000 11,000 Johnson Road - Jesse Green Road 2,000 3,000 4,000 5,000 7,000 7,000 8,000 Jesse Green Road - Old Greensboro Road 6,000 10,000 12,000 17,000 22,000 24,000 29,000
  • 9. Hyder Page no. 9 Additional Tables The following tables show additional analysis that support the information shown in the body of the report. Table 3: Hourly Demand for No Build 2035 Based Assuming 9% Peak and 60 % Directional Split Probability of Demand Above the Table Value 99% 90% 84% 50% 16% 10% 1% # of Days/Year with higher Demand 361 329 307 183 58 37 4 Z Value -2.33 -1.39 -1.00 0.00 1.00 1.39 2.33 % of Forecast Value 30.4% 54.9% 65.0% 91.0% 117.0% 127.1% 151.6% NC 109 Segment Estimated Hourly Traffic Demand I-40 - Teague Road 378 702 810 1134 1458 1566 1890 Teague Road - Union Cross Road 324 594 702 1026 1296 1404 1674 Union Cross Road - Gumtree Road 270 540 648 864 1134 1242 1458 Gumtree Road - Motsinger Road 270 432 540 756 972 1026 1242 Motsinger Road - Wallburg Road 270 432 540 756 972 1080 1242 Wallburg Road - Georgetown Road 270 486 540 756 972 1080 1296 Georgetown Road - Wallburg-High Point Road 270 432 540 756 972 1080 1242 Wallburg-High Point Road - Shady Grove Church Road 216 432 486 702 918 972 1134 Shady Grove Church Road - Johnson Road 216 432 486 702 918 972 1188 Johnson Road - Jesse Green Road 216 378 432 648 810 918 1080 Jesse Green Road - Old Greensboro Road 216 378 486 648 864 918 1080
  • 10. Hyder Page no. 10 Table 4: No Build 2035 Hourly Volume as a Percent of 1000 Vehicles per Hour Probability of Demand Above the Table Value 99% 90% 84% 50% 16% 10% 1% # of Days/Year with higher Demand 361 329 307 183 58 37 4 Z Value -2.33 -1.39 -1.00 0.00 1.00 1.39 2.33 % of Forecast Value 30.4% 54.9% 65.0% 91.0% 117.0% 127.1% 151.6% NC 109 Segment Percent of 1000 VPH I-40 - Teague Road 37.8% 70.2% 81.0% 113.4% 145.8% 156.6% 189.0% Teague Road - Union Cross Road 32.4% 59.4% 70.2% 102.6% 129.6% 140.4% 167.4% Union Cross Road - Gumtree Road 27.0% 54.0% 64.8% 86.4% 113.4% 124.2% 145.8% Gumtree Road - Motsinger Road 27.0% 43.2% 54.0% 75.6% 97.2% 102.6% 124.2% Motsinger Road - Wallburg Road 27.0% 43.2% 54.0% 75.6% 97.2% 108.0% 124.2% Wallburg Road - Georgetown Road 27.0% 48.6% 54.0% 75.6% 97.2% 108.0% 129.6% Georgetown Road - Wallburg-High Point Road 27.0% 43.2% 54.0% 75.6% 97.2% 108.0% 124.2% Wallburg-High Point Road - Shady Grove Church Road 21.6% 43.2% 48.6% 70.2% 91.8% 97.2% 113.4% Shady Grove Church Road - Johnson Road 21.6% 43.2% 48.6% 70.2% 91.8% 97.2% 118.8% Johnson Road - Jesse Green Road 21.6% 37.8% 43.2% 64.8% 81.0% 91.8% 108.0% Jesse Green Road - Old Greensboro Road 21.6% 37.8% 48.6% 64.8% 86.4% 91.8% 108.0%
  • 11. Hyder Page no. 11 Table 5: Hourly Demand for Alternative 6 2035 Based Assuming 9% Peak and 60 % Directional Split Probability of Demand Above the Table Value 99% 90% 84% 50% 16.00% 10% 1% # of Days/Year with Higher Demand 361 329 307 183 58 37 4 Z Value -2.33 -1.39 -1.00 0.00 1.00 1.39 2.33 % of Forecast Value 30.4% 54.9% 65.0% 91.0% 117.0% 127.1% 151.6% NC 109 Section Estimated Hourly Traffic Demand I-40 - Teague Road 486 864 1026 1458 1836 1998 2376 Teague Road - Union Cross Road 270 432 540 756 972 1026 1242 Union Cross Road - Gumtree Road 270 432 540 756 972 1026 1242 Gumtree Road - Motsinger Road 216 432 486 648 864 918 1134 Motsinger Road - Wallburg Road 216 432 540 702 918 1026 1188 Wallburg Road - Georgetown Road 216 378 432 594 756 810 972 Georgetown Road - Wallburg-High Point Road 216 378 432 594 756 810 972 Wallburg-High Point Road - Shady Grove Church Road 162 324 378 540 702 756 918 Shady Grove Church Road - Johnson Road 108 216 270 378 486 540 594 Johnson Road - Jesse Green Road 108 162 216 270 378 378 432 Jesse Green Road - Old Greensboro Road 324 540 648 918 1188 1296 1566
  • 12. Hyder Page no. 12 Table 6: Alternative 6 2035 Hourly Volume as a Percent of 1000 Vehicles per Hour Probability of Demand Above the Table Value 99% 90% 84% 50% 16.00% 10% 1% # of Days/Year with Higher Demand 361 329 307 183 58 37 4 Z Value -2.33 -1.39 -1.00 0.00 1.00 1.39 2.33 % of Forecast Value 30.4% 54.9% 65.0% 91.0% 117.0% 127.1% 151.6% NC 109 Section Percent of 1000 VPH I-40 - Teague Road 48.6% 86.4% 102.6% 145.8% 183.6% 199.8% 237.6% Teague Road - Union Cross Road 27.0% 43.2% 54.0% 75.6% 97.2% 102.6% 124.2% Union Cross Road - Gumtree Road 27.0% 43.2% 54.0% 75.6% 97.2% 102.6% 124.2% Gumtree Road - Motsinger Road 21.6% 43.2% 48.6% 64.8% 86.4% 91.8% 113.4% Motsinger Road - Wallburg Road 21.6% 43.2% 54.0% 70.2% 91.8% 102.6% 118.8% Wallburg Road - Georgetown Road 21.6% 37.8% 43.2% 59.4% 75.6% 81.0% 97.2% Georgetown Road - Wallburg-High Point Road 21.6% 37.8% 43.2% 59.4% 75.6% 81.0% 97.2% Wallburg-High Point Road - Shady Grove Church Road 16.2% 32.4% 37.8% 54.0% 70.2% 75.6% 91.8% Shady Grove Church Road - Johnson Road 10.8% 21.6% 27.0% 37.8% 48.6% 54.0% 59.4% Johnson Road - Jesse Green Road 10.8% 16.2% 21.6% 27.0% 37.8% 37.8% 43.2% Jesse Green Road - Old Greensboro Road 32.4% 54.0% 64.8% 91.8% 118.8% 129.6% 156.6%