ELECTRICAL LTDELECTRICAL LTD
Job Name: Braintree
Retirement Home.
Job Address: Juniper
Court, Meadow Park,
Braintree, Essex, CM7
1TD
Main Contractor:
Colson & Colson Ltd.
Working on behalf: Trilectric Ltd.
Start Date: July 2008.
Completion Date: March 2009
Job Value: Labour only £ 195000.00 + Vat.
Job Description: The job consists of 107 apartments 1 & 2 bedrooms, landlords area i.e.
corridors and seating areas, Main kitchen & storage area, main LV supplies, main dining
area, Hair salon, Office areas, all external lighting i.e. lamp posts etc, managers living
quarters & electric wheel chair charging area.
The work carried out consists of twin & earth cabling for all lighting & and small power,
all sub-mains cabling consists of SWA cabling laid on metal galvanised tray suspended
on brackets above the false corridor ceilings.
The building consists of a Ground floor, First floor, Second floor & third floor loft areas.
3 Oudle Lane Much Hadham Hertfordshire SG10 6DQ
Tel: 01279 841151 Fax: 01279 843376
E.mail: darrenmansfield@btinternet.com
MANSFIELDMANSFIELD
ELECTRICAL LTDELECTRICAL LTD
Front Left Hand Side
Job Name: London Bridge Tooley Street.
Job Address: London Bridge, 160 Tooley Street, London.
Main Contractor: ISG
Working on behalf: Trilectric Ltd.
Start Date: November 2009.
Completion Date: June 2009
Job Value: Labour only £ 60000.00 + Vat.
Job Description: This contract was based on a fit out contract of which we installed the
under floor electrak, SWA cabling to electrak, 450mm galvanised tray for IT & the
adaption of the main distribution board trunking & cabling.
The building consists of ground floor, first floor, second floor, third floor, fourth floor &
fifth floor.
3 Oudle Lane Much Hadham Hertfordshire SG10 6DQ
Tel: 01279 841151 Fax: 01279 843376
E.mail: darrenmansfield@btinternet.com
MANSFIELDMANSFIELD
ELECTRICAL LTDELECTRICAL LTD
Installation carried out on the right hand side 4th
floor
Job Name: New FA Head Quarters.
Job Address: Wembley Stadium Wembley London
Main Contractor: BW Interiors.
Working on behalf: Trilectric Ltd.
Start Date: January 2009.
Completion Date: July 2009
Job Value: Labour only £ 17000.00 + Vat.
Job Description: This contract was based on a fit out contract of which we installed the
under floor electrak, SWA cabling to electrak the installation of the main distribution
board trunking & cabling & the bonding to the false floor.
3 Oudle Lane Much Hadham Hertfordshire SG10 6DQ
Tel: 01279 841151 Fax: 01279 843376
E.mail: darrenmansfield@btinternet.com
MANSFIELDMANSFIELD
ELECTRICAL LTDELECTRICAL LTD
Job Name: GPS House.
Job Address: GPS House, Great Portland Street, London
Main Contractor: Knight Harwood.
Working on behalf: Trilectric Ltd.
Start Date: May 2008.
Completion Date: January 2009
Job Value: Labour only £ 180000.00 + Vat.
Job Description: The contract consisted of a shell & core contract, which we installed the
main lighting, lighting dimmer control, all sub-main cabling & distribution boards to all
floors, the installation of the main L.V panel, main riser containment for IT, fire alarm,
car park lighting & testing & commissioning.
3 Oudle Lane Much Hadham Hertfordshire SG10 6DQ
Tel: 01279 841151 Fax: 01279 843376
E.mail: darrenmansfield@btinternet.com
MANSFIELDMANSFIELD
ELECTRICAL LTDELECTRICAL LTD
Job Name: Chatham Historic Dock Yard Museum.
Job Address: Chatham Dock Yard
Main Contractor: Mace.
Working on behalf: MJ Lonsdale Ltd.
Start Date: February 2010.
Completion Date: August 2010
Job Value: Labour only £ 155000.00 + Vat.
Job Description: The contract consisted of a part installation due to the main contractor
going in to liquidation.
The project consisted of lighting control, general power and containment for lighting,
power and data.
3 Oudle Lane Much Hadham Hertfordshire SG10 6DQ
Tel: 01279 841151 Fax: 01279 843376
E.mail: darrenmansfield@btinternet.com
MANSFIELDMANSFIELD
ELECTRICAL LTDELECTRICAL LTD
1. Mary hare Grammar School Arlington Manor Newbury Berkshire (direct to
customer).
2. Harris Academy Norwood Junction South London (working with EMCOR).
3. Stratford Eye project, Stratford (working with EMCOR).
4. 54 Chepstow villas, Portabella road (working with Trielectric).
5. Croydon Home office (working with Rotary Southern).
6. Bethnal Green Cudworth Street London flats (working with H & C building services
Ltd).
7. Aquila House Soho Square London (working for Maxwell Stewart).
8. I have carried out smaller projects in Woolwich barracks, Kensington Barracks, St.
Johns Wood Barracks and others. Cost range from).
9. Regents quarters Jahn Court Kings Cross (Working with Maxwell Stewart).
10. HSBC Bank shop, re-fit Harrow (working for Maxwell Stewart).
11. Bank of America Trading desk re-fit London near Leadenhall Street Market
(working for Lorne Stewart Plc).
12. Stock Exchange working on fit out of new trade floor, London (Working for Lorne
Stewart Plc).
13. Anderson accountants fit out of new building (Desks), Arundel Great CourtAnderson accountants fit out of new building (Desks), Arundel Great Court London
(working with Maxwell Stewart Plc).
14. Feltham Barracks, re-fit of printing and photo area (working for Maxwell Stewart)
15. Woolwich Barracks, installation of new lighting on the new emergency stairs case on
dorm areas (working with Cityline Construction Ltd).
16. St John’s Wood Barracks Remedial works (working with Cityline Construction Ltd).
17. Knightsbridge Barrack, installing new supplies for new fridges in canteen area
(Mansfield Electrical)
I have more; all different from smaller to larger projects if you need more examples
please let me know.
3 Oudle Lane Much Hadham Hertfordshire SG10 6DQ
Tel: 01279 841151 Fax: 01279 843376
E.mail: darrenmansfield@btinternet.com
MANSFIELDMANSFIELD
ELECTRICAL LTDELECTRICAL LTD
3 Oudle Lane Much Hadham Hertfordshire SG10 6DQ
Tel: 01279 841151 Fax: 01279 843376
E.mail: darrenmansfield@btinternet.com

More Related Content

Similar to photos & job descriptions

Case Study - Tower Hamlets, external refubsihment to Bromley Road
Case Study - Tower Hamlets, external refubsihment to Bromley RoadCase Study - Tower Hamlets, external refubsihment to Bromley Road
Case Study - Tower Hamlets, external refubsihment to Bromley RoadSteve Mandry
 
Ashwood Design Presentation 2023
Ashwood Design Presentation 2023Ashwood Design Presentation 2023
Ashwood Design Presentation 2023NadinThomson1
 
Godfrey Martin Ltd - Statement of Competence - 09.01.17
Godfrey Martin Ltd - Statement of Competence - 09.01.17Godfrey Martin Ltd - Statement of Competence - 09.01.17
Godfrey Martin Ltd - Statement of Competence - 09.01.17Kevin Martin MCIOB
 
Spatial designers brochure 2011
Spatial designers brochure 2011Spatial designers brochure 2011
Spatial designers brochure 2011Spatial Designers
 
Elextric Electrical Services
Elextric Electrical ServicesElextric Electrical Services
Elextric Electrical Serviceselextricuk21
 
6614b46b-cd0e-473d-b581-67a2d2af21e7 (1)
6614b46b-cd0e-473d-b581-67a2d2af21e7 (1)6614b46b-cd0e-473d-b581-67a2d2af21e7 (1)
6614b46b-cd0e-473d-b581-67a2d2af21e7 (1)Trevor Holt
 
swan-yard-brochure-low-res
swan-yard-brochure-low-resswan-yard-brochure-low-res
swan-yard-brochure-low-resNicholas Silver
 
09 flagship education projects 2012
09 flagship education projects 201209 flagship education projects 2012
09 flagship education projects 2012JerramFalkus
 
Case Study - Honourable Artillery Company (HAC)
Case Study - Honourable Artillery Company (HAC)Case Study - Honourable Artillery Company (HAC)
Case Study - Honourable Artillery Company (HAC)Steve Mandry
 
Arbetsexempel urval
Arbetsexempel  urvalArbetsexempel  urval
Arbetsexempel urvalAnnicaC
 
Monte Construction Ltd PDF 2015
Monte Construction Ltd PDF 2015Monte Construction Ltd PDF 2015
Monte Construction Ltd PDF 2015Mantas Pravilonis
 

Similar to photos & job descriptions (20)

Case Study - Tower Hamlets, external refubsihment to Bromley Road
Case Study - Tower Hamlets, external refubsihment to Bromley RoadCase Study - Tower Hamlets, external refubsihment to Bromley Road
Case Study - Tower Hamlets, external refubsihment to Bromley Road
 
Strata se1
Strata se1Strata se1
Strata se1
 
Steve Bailey CV
Steve Bailey CVSteve Bailey CV
Steve Bailey CV
 
Ashwood Design Presentation 2023
Ashwood Design Presentation 2023Ashwood Design Presentation 2023
Ashwood Design Presentation 2023
 
Godfrey Martin Ltd - Statement of Competence - 09.01.17
Godfrey Martin Ltd - Statement of Competence - 09.01.17Godfrey Martin Ltd - Statement of Competence - 09.01.17
Godfrey Martin Ltd - Statement of Competence - 09.01.17
 
C.V. u
C.V. uC.V. u
C.V. u
 
Parkside
ParksideParkside
Parkside
 
Spatial designers brochure 2011
Spatial designers brochure 2011Spatial designers brochure 2011
Spatial designers brochure 2011
 
Elextric Electrical Services
Elextric Electrical ServicesElextric Electrical Services
Elextric Electrical Services
 
AF CV June 2014
AF CV June 2014AF CV June 2014
AF CV June 2014
 
6614b46b-cd0e-473d-b581-67a2d2af21e7 (1)
6614b46b-cd0e-473d-b581-67a2d2af21e7 (1)6614b46b-cd0e-473d-b581-67a2d2af21e7 (1)
6614b46b-cd0e-473d-b581-67a2d2af21e7 (1)
 
JG Molloy Brochure - Building On Our Reputation
JG Molloy Brochure - Building On Our ReputationJG Molloy Brochure - Building On Our Reputation
JG Molloy Brochure - Building On Our Reputation
 
swan-yard-brochure-low-res
swan-yard-brochure-low-resswan-yard-brochure-low-res
swan-yard-brochure-low-res
 
09 flagship education projects 2012
09 flagship education projects 201209 flagship education projects 2012
09 flagship education projects 2012
 
Case Study - Honourable Artillery Company (HAC)
Case Study - Honourable Artillery Company (HAC)Case Study - Honourable Artillery Company (HAC)
Case Study - Honourable Artillery Company (HAC)
 
EIL ref Ian Raybold
EIL ref Ian RayboldEIL ref Ian Raybold
EIL ref Ian Raybold
 
John_Buckley_CV_Dec 2016
John_Buckley_CV_Dec 2016John_Buckley_CV_Dec 2016
John_Buckley_CV_Dec 2016
 
John_Buckley_CV_V9
John_Buckley_CV_V9John_Buckley_CV_V9
John_Buckley_CV_V9
 
Arbetsexempel urval
Arbetsexempel  urvalArbetsexempel  urval
Arbetsexempel urval
 
Monte Construction Ltd PDF 2015
Monte Construction Ltd PDF 2015Monte Construction Ltd PDF 2015
Monte Construction Ltd PDF 2015
 

photos & job descriptions

  • 1. MANSFIELDMANSFIELD ELECTRICAL LTDELECTRICAL LTD Job Name: Braintree Retirement Home. Job Address: Juniper Court, Meadow Park, Braintree, Essex, CM7 1TD Main Contractor: Colson & Colson Ltd. Working on behalf: Trilectric Ltd. Start Date: July 2008. Completion Date: March 2009 Job Value: Labour only £ 195000.00 + Vat. Job Description: The job consists of 107 apartments 1 & 2 bedrooms, landlords area i.e. corridors and seating areas, Main kitchen & storage area, main LV supplies, main dining area, Hair salon, Office areas, all external lighting i.e. lamp posts etc, managers living quarters & electric wheel chair charging area. The work carried out consists of twin & earth cabling for all lighting & and small power, all sub-mains cabling consists of SWA cabling laid on metal galvanised tray suspended on brackets above the false corridor ceilings. The building consists of a Ground floor, First floor, Second floor & third floor loft areas. 3 Oudle Lane Much Hadham Hertfordshire SG10 6DQ Tel: 01279 841151 Fax: 01279 843376 E.mail: darrenmansfield@btinternet.com
  • 2. MANSFIELDMANSFIELD ELECTRICAL LTDELECTRICAL LTD Front Left Hand Side Job Name: London Bridge Tooley Street. Job Address: London Bridge, 160 Tooley Street, London. Main Contractor: ISG Working on behalf: Trilectric Ltd. Start Date: November 2009. Completion Date: June 2009 Job Value: Labour only £ 60000.00 + Vat. Job Description: This contract was based on a fit out contract of which we installed the under floor electrak, SWA cabling to electrak, 450mm galvanised tray for IT & the adaption of the main distribution board trunking & cabling. The building consists of ground floor, first floor, second floor, third floor, fourth floor & fifth floor. 3 Oudle Lane Much Hadham Hertfordshire SG10 6DQ Tel: 01279 841151 Fax: 01279 843376 E.mail: darrenmansfield@btinternet.com
  • 3. MANSFIELDMANSFIELD ELECTRICAL LTDELECTRICAL LTD Installation carried out on the right hand side 4th floor Job Name: New FA Head Quarters. Job Address: Wembley Stadium Wembley London Main Contractor: BW Interiors. Working on behalf: Trilectric Ltd. Start Date: January 2009. Completion Date: July 2009 Job Value: Labour only £ 17000.00 + Vat. Job Description: This contract was based on a fit out contract of which we installed the under floor electrak, SWA cabling to electrak the installation of the main distribution board trunking & cabling & the bonding to the false floor. 3 Oudle Lane Much Hadham Hertfordshire SG10 6DQ Tel: 01279 841151 Fax: 01279 843376 E.mail: darrenmansfield@btinternet.com
  • 4. MANSFIELDMANSFIELD ELECTRICAL LTDELECTRICAL LTD Job Name: GPS House. Job Address: GPS House, Great Portland Street, London Main Contractor: Knight Harwood. Working on behalf: Trilectric Ltd. Start Date: May 2008. Completion Date: January 2009 Job Value: Labour only £ 180000.00 + Vat. Job Description: The contract consisted of a shell & core contract, which we installed the main lighting, lighting dimmer control, all sub-main cabling & distribution boards to all floors, the installation of the main L.V panel, main riser containment for IT, fire alarm, car park lighting & testing & commissioning. 3 Oudle Lane Much Hadham Hertfordshire SG10 6DQ Tel: 01279 841151 Fax: 01279 843376 E.mail: darrenmansfield@btinternet.com
  • 5. MANSFIELDMANSFIELD ELECTRICAL LTDELECTRICAL LTD Job Name: Chatham Historic Dock Yard Museum. Job Address: Chatham Dock Yard Main Contractor: Mace. Working on behalf: MJ Lonsdale Ltd. Start Date: February 2010. Completion Date: August 2010 Job Value: Labour only £ 155000.00 + Vat. Job Description: The contract consisted of a part installation due to the main contractor going in to liquidation. The project consisted of lighting control, general power and containment for lighting, power and data. 3 Oudle Lane Much Hadham Hertfordshire SG10 6DQ Tel: 01279 841151 Fax: 01279 843376 E.mail: darrenmansfield@btinternet.com
  • 6. MANSFIELDMANSFIELD ELECTRICAL LTDELECTRICAL LTD 1. Mary hare Grammar School Arlington Manor Newbury Berkshire (direct to customer). 2. Harris Academy Norwood Junction South London (working with EMCOR). 3. Stratford Eye project, Stratford (working with EMCOR). 4. 54 Chepstow villas, Portabella road (working with Trielectric). 5. Croydon Home office (working with Rotary Southern). 6. Bethnal Green Cudworth Street London flats (working with H & C building services Ltd). 7. Aquila House Soho Square London (working for Maxwell Stewart). 8. I have carried out smaller projects in Woolwich barracks, Kensington Barracks, St. Johns Wood Barracks and others. Cost range from). 9. Regents quarters Jahn Court Kings Cross (Working with Maxwell Stewart). 10. HSBC Bank shop, re-fit Harrow (working for Maxwell Stewart). 11. Bank of America Trading desk re-fit London near Leadenhall Street Market (working for Lorne Stewart Plc). 12. Stock Exchange working on fit out of new trade floor, London (Working for Lorne Stewart Plc). 13. Anderson accountants fit out of new building (Desks), Arundel Great CourtAnderson accountants fit out of new building (Desks), Arundel Great Court London (working with Maxwell Stewart Plc). 14. Feltham Barracks, re-fit of printing and photo area (working for Maxwell Stewart) 15. Woolwich Barracks, installation of new lighting on the new emergency stairs case on dorm areas (working with Cityline Construction Ltd). 16. St John’s Wood Barracks Remedial works (working with Cityline Construction Ltd). 17. Knightsbridge Barrack, installing new supplies for new fridges in canteen area (Mansfield Electrical) I have more; all different from smaller to larger projects if you need more examples please let me know. 3 Oudle Lane Much Hadham Hertfordshire SG10 6DQ Tel: 01279 841151 Fax: 01279 843376 E.mail: darrenmansfield@btinternet.com
  • 7. MANSFIELDMANSFIELD ELECTRICAL LTDELECTRICAL LTD 3 Oudle Lane Much Hadham Hertfordshire SG10 6DQ Tel: 01279 841151 Fax: 01279 843376 E.mail: darrenmansfield@btinternet.com