Pebisnis global dengan pengalaman 25 tahun. Bidang usahanya meliputi Oil & Gas dengan perusahaan yang reputable, memiliki dan mengelola LPG, LNG, CNG, Gas Pipe Distribution, pengolahan mineral dan precious metal, serta investment. Di antara perusahaannya adalah PT. Reka Tirta, PT LAKSEL Indonesia, PT Pasuruan Estate Agung Kemuliaan, PT Tosan Sumber Murni, PT Bintang Dua Pulau, PT Peleburan Tembaga Semare
4. 4
major
experiences
in GAS
PIPELINES
East Java Gas Transmission System O&M
(1997 – 2007)
• Acting as an Operations and Maintenance (“O&M”)
contractor for PERTAMINA for a 440 km gas pipeline
(28” onshore & offshore), from Pagerungan Island to
Gersik with 200 MMSCFD Gas Flow Rate.
• Pipeline capacity : 600 mmscfd with SCADA control
system
5. 5
Grissik - Duri Gas
Transmission System
O&M (1997 – 2003)
• In Cooperation with Nova
TransCanada Pipelines, Titis
Sampurna acting as an O&M
contractor for PT Perusahaan
Gas Negara (PGN) for 536 km
28” gas pipeline, from Grissik to
Duri (Central Sumatera) with 310
MMSCFD Gas Flow Rate.
6. 6
West Natuna to Singapore Gas
Transmission System (2000)
Supervision, Verification and Certification of EPC and
Offshore Pipeline Installation and Testing for 656 Km
28”, 22”, 16” and 15” gas pipeline. The Pipeline is a cross-
border between Indonesia and Singapore start from
Block B - Conoco, Block A – Premier, Block Kakap – Gulf
(Indonesia) to Sakra Island (Singapore).
West Natuna to Malaysia Gas
Transmission System (2001)
Supervision, Verification and Certification of EPC and
Offshore Pipeline Installation and Testing for 135 Km
12”, 14”, 18” gas pipeline. The Pipeline is a cross-border
between Indonesia and Malaysia start from Kijing Field -
Keong Field – Hangtuah Platform (Conoco-Indonesia) to
Duyong Central Processing Platform (Petronas-Malaysia)
7. 7
KM 53 - Bontang Gas Transmission System
(Start 2000), Own Investment
• The project (BOO) comprises of a 13 km 20” gas
pipeline in Bontang, East Kalimantan including
supporting facilities with 165 – 300 MMSCFD gas flow
rate.
• The gas is supplied by PERTAMINA and consumed by
Mitsui and Mitsubishi (Ammonia Plant).
• EPC were done by Titis Sampurna
8. 8
Sub-sea Control System
Project Pagerungan Block C,
ARCO (1995 – 1996)
• Engineering Design, Fabrication &
Installation of the Sub-sea Control
System and associated equipment
to the existing Pagerungan-C Facility,
including the interfaces with existing
Facilities.
• The Work including the onshore and
offshore equipment such as: Sub-sea
Control System, Chemical Injection
System, Sub-sea Service Umbilicals,
Sub-sea Venturi Meter
major
experiences in
ENGINEERING &
CONSTRUCTION
9. 9
Poleng Gas Field Re-activation
Project, East Java (1996 - 1999)
• An EPC and turnkey project for re-activating
and enhancing of five offshore’ wells name
Poleng Field of KODECO Energy.
• Scope of Work : Detailed Engineer,
Fabricate, Install, Hook-up and pre
commission the new facilities
Kamojang Geothermal Power
Plant
• Front End Engineering Design (FEED) 2004
Lahendong Geothermal Power
Plant
• Front End Engineering Design (FEED) 2005
• Project Management Consultant 2006
10. 10
3 X 1500 HP Gas
Compressors&
DehydrationUnit
4 X 1500 HP Gas
Compressors&
DehydrationUnit
AIR SERDANG
LIMAUTIMUR
BERINGIN
Project
Location
27.5 km 10” GasPipeline
14 MMSCFD Flowrate
32.5 km 8” Gas Pipeline
22 MMSCFD Flowrate
LPG Plant (200 MTD LPG,
1500BBLD Condensate)
& CO2 Removal
PROJECT
LOCATION
Prabumulih
11. 11
south sumatera
GAS UTILIZATION
Gas Transmission System- 60 km
Gas Compressor Stations - 7 x 1500 hp
Gas Extraction Facility (36 MMSCFD Feed Natural Gas)
• CO2 Removal
• LPG Plant (200 MTD LPG, 1500 BBLD Stabilized Condensate)
15. 15
Gas Supply
To Tambak
Lorok Ccgt
Power Plant
Central Java
Investment of 140 km 20
gas pipeline with 6,000 hp
compressorsfrom gundih area
to tambak lorok power plant,
central java