SlideShare a Scribd company logo
1 of 124
Download to read offline
Welcome to
Your Career Guidance Program
Agenda of Todays
Seminar / Webinar Guided Internship
सम सुढ भारत तयार करायचा असेल तर
मुलांवरती काम करायला हवे.
3
मुलांवरती काम करायला हवे.
Dr. APJ Abdul Kalam
Currently We are dealing with
1. Government Contracting Business Module
2. E Tendering Business Module
3. Site Internship / Construction Project
3. Site Internship / Construction Project
Management Internship
4
And Guided Internships in
• Structural
• Cost Engineering
• Valuation
• Valuation
• Interior
• Formwork
• Landscaping
VISION 2030
To Build
SKILL DEVELOPMENT
SKILL DEVELOPMENT
UNIVERSITY
6
We are Registering as
Construction Sector Research 
Development Foundation
7
ISO 9001-2015
QMS Certified Institute
Empowering Construction Sector Since 2015 8
We are Having Apps:
9
Empowering Construction Sector Since 2015
3 Online Mobile Apps for You:
Self Learning Courses:
AutoCAD
Advance CAD
10
Empowering Construction Sector Since 2015
Advance CAD
Excel for Civil Engineers
Government Estimation
Internships in
Structural Designing
BIM
50+ Technical Webinars
3 Online Mobile Apps for You:
11
Empowering Construction Sector Since 2015
You Get Internships in
1. AutoCAD
2. Cost Engineering
3. Site Execution
4. Construction Project Management
3 Online Mobile Apps for You:
What You Get:
12
Empowering Construction Sector Since 2015
What You Get:
1. E Tendering Trainings
2. MSEB Tenders
3. Railway Tenders
4. MIDC Tenders
5. Business Module of Etendering
6. Digital Signatures
7. Registrations of Contractors
 Many More
ISR Digital Library Civil
t.me/elibrarycivil
17
Empowering Construction Sector Since 2015
t.me/elibrarycivil
ISR Jobs Civil
t.me/jobscivil
18
Empowering Construction Sector Since 2015
t.me/jobscivil
19
20
करयर मये अपयशी होयाचे एक मुख व महवाचे कारण
STUDENT 100
Not Decide Career 25%
Decide Career 75%
21
जे करअर डसाईड करतात %या 75% मुलांपैक*
45% मुले दहावीचा -नकाल लागला क* करअर बदलतात
20% मुले बारावीचा -नकाल लागला क* करअर बदलतात
10% मुले ह3 Graduation चा -नकाल लागला क* करयर बदलतात
5% मुले च करअरमये यश4वी होतात
जर आप6याला करअरमये यश4वी 7हायचे असेल तर
आप6याला आप6या समजुती तोडा7या लागतील
22
उ9:द;ट पूण होईपय?त क
े लेल3 वाटचाल @हणजे यश होय
23
फBत नाव व पैसा कमावणे @हणजे यश नाह3
Cया:दवशी आप6याब9दल आप6या आईवडलांना समाजाला
व गुDवया?ना अEभमान वाटेल
24
व गुDवया?ना अEभमान वाटेल
%या :दवशी आपण खरे यश4वी झालो असे समजावे
यश4वी करअर करायचे असेल तर एका कागदावर या सहा W ची उGरे Eलहावीत
What is that I want to do?
25
Where I want to do it?
When I want to finish it?
Who is going to do it?
Why is it that I want to do it?
HoW am I going to do it?
रह4य यश4वी होयाचे
-नणय + योजना + कृ ती = यश
-नणय = काह3ह3 झाले तर3 मला यश4वी 7हायचेच आहे
योजना = दैनं:दन :दनचया ची योKय अशी योजना आखा
कृ ती = आखले6या योजनेवर ामाLणकपणे व सकारा%मक कृ ती करा
26
कृ ती = आखले6या योजनेवर ामाLणकपणे व सकारा%मक कृ ती करा
नBक*च आप6याला हवे ते यश Eमळेल
कारण आपण 4वतः 4वतःOया परणामासाठQ कारणीभूत असतो. %येक
7यBतीकडे यश4वी होयासाठQ आवSयक असलेल3 सव साधने असतात,
गरज असते ती फBत 4वतःतील 4वतःला ओळखयाची.
Career Decision
from 72+ Career Options
27
So Decide Your
5 Years Goal
10 Years Goal
10 Years Goal
Don’t Expect too much, It brings disappointments.
28
If You are having any difficulty:
95455 07853
29
सुवात कर	यापूव
 काह नांची उरे हवी आहेत...
30
Yes / No
Real Estate Sector
तुह जॉब करायचा वचार करताय का?
31
तुह जॉब करायचा वचार करताय का?
Yes / No
मॅनेजम#ट लेवल la जॉब करायची इ'छा आहे का?
32
Yes / No
जॉब साठ* +येक ,ठकाणी कामाचा अनुभव मागतात का?
33
Yes / No
कोठेह Interview ,दला तर +यात 3सले4शन 6हावे असे वाटते का?
34
Yes / No
एखा9या चालू ोजे4ट वर कॉलेज म:ये 3शकले;या कसे=ट
कया implement होतात हे पाहायचे आहे का?
35
Yes / No
एखादा चालू ोजे4ट वर M.Tech Construction Management
'या टेि4नक apply क?न पहाय'या आहेत का?
36
Yes / No
एकाच ोजे4ट वर +याचे Execution बरोबर +याच ोजे4ट 'या
quantity काढणे, ट#डर कसे भरले जाते, +याचे बजेट कसे बनवले जाते,
+याचे Cब3लंग करायचे, +याचे MS Project वर =लॅDनंग, tracking व
closure करायचे, Quality plan बनव	या पासून ते Quality चेक
करणे, Safety कसे पा,हले पा,हजे, MIS, EरपोटFग कसे क
े ले जाते
37
करणे, Safety कसे पा,हले पा,हजे, MIS, EरपोटFग कसे क
े ले जाते
हे सवG 3शकायचे आहे का?
तर मग घेऊन आलो आहोत…
एक गायडस ोJॅम
38
एक गायडस ोJॅम
Internship on High-rise Project
Project
Management
Consultant
39
Contractor
Internship on High-rise Project
40
Project Management
Consultant
Project Contractor
Institutional Partner
Project
Affordable Housing
Affordable Housing
For Pimpri Chinchwad Municipal Corporation
Walk Through 41
Project Facts:
Location : PCMC, Maharashtra
Area : Around 5 Lacks Sq.ft.
Project Costs : Around 75 Crore
42
Area : Around 5 Lacks Sq.ft.
Buildings : 2 Buildings
Total Floors : 16 Storied
2 Commercial + 2 Parkings + 12 Storied
Total Flats: 700 flats
Project Facts:
Start Date: July 2020 (Revised due to Lockdown)
43
Completion Date: December 2021
INTRODUTION of
KARAN BUILDERS
KARAN BUILDERS
44
Project Selection Criteria
45
Project Selection Criteria:
 ISO 9001:2015 : Quality Management System
 Full fledged Safety Department with
ISO 45001:2018 of Occupational Health  Safety
46
ISO 45001:2018 of Occupational Health  Safety
Management System
 ISO 14001:2015 : of Environmental Management System
Project Selection Criteria:
 Full fledged In House all Departments Team
 Like Planning Department, Safety Department, Quality
Department, Plant  Machinery Department
 Own Plant  Machinery
47
 Own Plant  Machinery
 Lock  Key Project With Material Project
 Multi Storied Building
 Firm should have multiple Shuttering Material Options
Site Organisation Chart:
Project
Manager
Sr.
Engineer
Jr.
Engineer
Quality
Engineer
Quality
Supervisor
Billing
Engineer
Plant 
M/C Dept
Operators
Store
Department
Store
Incharge
48
Engineer
Forman
Supervisor
Supervisor
Operators
Electrician
Mechanics
Incharge
Store
Assistant
START Now
Linking Experience to Resume
• From Anywhere
• From Any Academic Year
• Even though you are Preparing for Competitive Exams
• Even though Working
49
PROJECT STATUS
50
Project Status on 1st July 2020
UGWT Work:
51
Project Status on 15th July 2020
52
Project Status on 14th August 2020
53
Project Status on 15th September 2020
1st Slab Casting
54
Project Status on 15th October 2020
3rd Slab Casting
55
Click to Start: Video
Project Status on 21st November 2020
5th Slab Shuttering Work  Upper Basement Block work Started:
56
Project Status on 15th April 2021 after
(
(
(
( 9 Months)
)
)
)
57
What we Guide?
58
Project Status Updating Method:
Hardcopy Status Updating:
59
Actual Case Study Discussed:
60
Project 3D Designing:
61
Project 3D Designing:
Value
Addition:
Revit
62
Revit
Architectures
Model
Making 3 Hrs
Project 3D Designing:
63
Live Site Online Internship
64
Testimonials:
Listen What Abhishek Anand Say’s:
65
Click to Start: Video
Listen What Taher Haji Say’s:
66
Click to Start: Video
Live Site Online Internship
360
0
67
360
Experience
Your JOB ROLE
Involvements:
SITE
Planning
Tendering

Contracts
QS 
Billing
Project
Controls
Structural
68
SITE Billing
Quality
Safety
Project
Manager
Controls
Your Involvement
In AGENCY
SITE
Main
Contractor
Sub
Contractor
Plumbing
Consultant
69
SITE
Labour
Contractors
Structural
Consultant
Electrical
Consultant
Type of Contractors
Involvements:
SITE
SITE
RCC
Contractor
RCC
Contractor
Brickwork,
Plaster
Contractor
Brickwork,
Plaster
Contractor
Waterproofi
Waterproofi
Steel
Fabricators
Steel
Fabricators
70
Waterproofi
ng
Contractor
Waterproofi
ng
Contractor
Gypsum
Contractor
Gypsum
Contractor
Doors
Carpenters
Doors
Carpenters
Window
Window
Type of
Service
Contractors
Involvements:
SITE
Plumbing
Contractor
Electrical
Contractor
STP
Contractor
71
Excavation
Contractor
Department
al Labour
Suppliers
Fire
Fighting
Contractor
Type of
Machinery
Involvements:
SITE
Steel
Cutting
Machine
Steel
Binding
Machine
Tower
Crane
RM 800
Mixers
Compact
ors
72
Concrete
Pump
Boom
Placer
Material
Lifts
Hands on Experience on the softwares:
Excel PPT
AutoCAD MSP
73
AutoCAD MSP
ERP
Revit
Architecture
What you get:
1. Daily Photos of Project
2. Daily Concrete Report
3. Daily Material Receipt
74
3. Daily Material Receipt
4. Daily Labour Report : To Costing, Constants, Rates etc.
5. Daily Work Activities
6. Daily Videos
Offer Letter Sample Copy:
75
Experience Certificate Sample Copy:
76
Certificate Sample Copy:
77
Recorded Live Sessions on App:
For Internship Duration, View Unlimited Times
78
Whatsapp Group for
Technical Support  JOB Updates
79
What are your
Benefits at the End
CONFIDENCE…
Experience
Which have Value…
JOB
Recommendations…
Live Site Online Internship
81
Why ? Highlights
Every Activity Explained
in Following Parameters:
 Site Location
 Site Drawing
 Relevant IS Codes
 SOP / Step by step methods for activity
 Relevant Equipments / Tools / Consumables
 Mode of Measurement / Quantity Surveying
82
 Mode of Measurement / Quantity Surveying
 Labour
 Material
 Overheads
 Checklists
 Quality Tests
 On Site Experience Sharing, Case Studies : What If Goes Wrong
 Planning, Duration, Time Period, Dependencies of Activity
 Other Available options
 Photos, Videos of Site
Structured Internship:
 Site Management : 25 Days
 Site Execution : 90 Days
 Quality Aspects : 90 Days
 Structural Designers Aspects : 30 Days
 Safety Aspects : 30 Days
 Quantity Surveying : 30 Days
Activity
Spread
Over
83
 Quantity Surveying : 30 Days
 Rate Analysis : 10 Days
 Budgeting : 10 Days
 Billing : 10 Days
 Tendering : 15 Days
 Contracts : 10 Days
Note: Demonstrates Overall Distribution over the Period of Total Project, Each Part covered as per
progress of the project.
24 Months
Structured Internship:
 Planning  Tracking : 50 Days
 Construction Project Management : 25 Days
 Plant  Machinery, Tools : 25 Days
 MIS, Project Controls : 25 Days
 Material Management : 25 Days
 Manpower Resource Management : 25 Days
Activity
Spread
84
 Manpower Resource Management : 25 Days
 Plumbing : 15 Days
 Electrical : 15 Days
 Firefighting : 10 Days
 AutoCAD, Excel, PPT, ERP, MSP : 25 Days
 Green Building and other : 25 Days
Spread
Over
24 Months
Site Management: 25 Days
Site Layout Mobilisation Plan
Communication
flow of Site
Site
Organisation
Structure
Various
Consultants,
Contractors
Roles
Site Mobilisation
Activities
Planning
Site Mobilisation
Budget
Zero Budget
85
Roles
Shuttering
Scheme to be
used
Drawing
Reading from
Various Angles
Temporary
Structures
Site
Documentations
Site Overheads
Budget
Site Execution: 90 Days
Excavation,
Backfilling
5 Days
RCC Work
25 Days
Masonary Work
5 Days
Plastering
5 Days
Flooring
5 Days
Doors
2 Days
Windows
2 Days
Cladding
2 Days
86
Painting
2 Days
Waterproofing
5 Days
Shuttering
15 Days
Fabrication
Works
5 Days
Site Execution
Communication
Flow
Quality Aspects: 90 Days
ISO
Organisation
ISO
9001:2015
ISO
45001:2018
ISO IS Codes
87
ISO
14001:2015
MTR
IS Codes
75 Nos.
Quality Plan Checklists SOP
Structural Designers Aspects: 30 Days
DBR Members Concrete
Structural IS Site
88
Steel
Structural IS
Codes
Site
Inspections
Geotechnical
Report
Safety Aspects: 25 Days
Safety Need
Scope
Accidents
Procedures 
SOP’s
Tool Box
Talks, Various
Permits
Material
Handling
BOCW Act
Excavation
Safety
Electrical
Safety
89
Temporary
Structures
Safety
Works at
Height
Hot Works 
Fire Safety
PM Safety
Hand Held
Tools Y
Tackles Safety
Planning for
Safety
Vehicle
Movement
Scaffold 
Formwork
QS, Billing, RA, Budgeting, Tendering  Contracts: 90 Days
Quantity
Surveying All
Items
Bar Bending
Schedule
Focused
Billing of Each
Item
Rate Analysis of
Each Items
Preparing
Budget of
Project
Tendering for
Project
Working
Tender Floating
for Contractors
Negotiations
90
Contractor
Finalisation Work
Orders
Contractual
Clauses
Arbitration Correspondence
Extra Items
Claims
Settlements
Planning  Construction Project Management: 90 Days
Project
Management
framework
CPM
LEAN
Construction
DPR, WPR,
MPR
MIS, KPI
Project Start 
Closure
Documentation
MSP
Scheduling 
Tracking
Last Planner
System
91
Excel Smart
Templates
Project
Dashboard
Development
Risks  Key
Issues
Root Cause
Analysis
Delay Analysis
Earned Value
Analysis
Plant  Machinery, Tools: 25 Days
Boom
Placers
Concrete
Pump
Concrete
Mixers RM
800
Tower Crane
Bar Bending
Machine
Bar Cutting
Machine
92
Earth
Compactor
Material Lifts
Maintenance
MIS, Project Controls: 25 Days
Project
Control
Department
Thumb
Rules
Constants
Data Various Score
93
Data
Gathering
Various
Analysis
Score
Boards
Material Management: 25 Days
Purchase
Department
Procurement
Engineer
Documentation
Suppliers
94
Whole Salers
Dealers
Negotiations Inventory
Other Industry Aspects
Green
Building
Valuation
95
BIM
Current Enrollments
From
13 States
1. Maharashtra
2. Gujrat
3. Karnataka
4. Madhya Pradesh
5. Delhi
6. Assam
7. Rajasthan
8. Bihar
9. Telangana
96
9. Telangana
10. Tamilnadu
11. Uttarakhand
12. Uttar Pradesh
13. West Bengal
Enrollments From
17 Universities 
Professional Inst.
1. Pune, Savitribai Phule University (MH)
2. BATU (MH)
3. Nagpur, Saint Gadgebaba University (MH)
4. Kolhapur University (MH)
5. Mumbai University (MH)
6. Indus University, Gujrat
7. Galgotias University, Greater Noida (UP)
8. Madan Mohal malaviya University (UP)
9. DY Patil University (MH)
10. Sandip University (MH)
11. Visvesvaraya Technological University, Karnataka
97
11. Visvesvaraya Technological University, Karnataka
12. Jawaharlal Nehru Technological University, Hyderabad
13. Guwahati University (Assam)
14. Rajasthan Technical University
15. Uttarakhand Technical University
 NICMAR
 INDSEARCH
Enrollment Variants
Experience Wise
 Civil Engineers
 Architects
 Interior Designers
 Diploma
 BE 2nd Year
 M.Tech
 M.Arch
98
Meet Project Stake Holders
99
Karan Builders
Er. Pramod Suryawanshi
Mr. Pramod Suryawanshi has been in
Construction Industry since thirty-two
Managing Director
100
Construction Industry since thirty-two
years. A Graduate Engineer by profession,
Mr. Suryawanshi has been responsible for
successful execution of all projects
undertaken by Karan Builders.
Execution Mentor
Er. Prakash Bhat
EXPERIENCE:
Along with Quality, Cost Optimization
 ISO Audits
101
More than 30 years of rich  comprehensive
experience in Site Management, Cost
optimization, Operations and Quality
Management
Previously associated with
Gagan Developers as a Chief Engineer
 Goel Ganga Group
Structural Mentor
ME Structures, AMIE, PGDBM
Er. Saurabh Patil
EXPERIENCE:
102
6 years of experience as a structural designer.
BIM Modeller  Detailing Works
Expert in 25 Civil Engineering Softwares
Planning  Quality Control Mentor
BE Civil, PMP
Er. Shrirang Palande
More than 35 years of rich  comprehensive
EXPERIENCE:
103
More than 35 years of rich  comprehensive
experience in Site Management, Productivity
Enhancement, Vendor  Contract Management,
Project Management, Operations and Quality
Management
Previously associated with Phadnis
Infrastructure Limited, Pune as V.P. – Project
Management
Quantity Surveying, Billing Mentor
ME Construction Management
Er. Rupali Desai
More than 12 years of experience in
EXPERIENCE:
104
More than 12 years of experience in
Government, Private, Real Estate Sector.
Core Areas: Quantity Surveying, Tendering,
Billing  Budgeting.
SAFETY
Mr. Satishkumar Nair
More than 21 years of Industry Experience and
EXPERIENCE:
105
More than 21 years of Industry Experience and
16 Years in Safety  health as a consultant,
trainer  business developer.
Safety Audit Panel Member of
1. Builders Association of India (BAI)
2. CREDAI
3. PCERF  More
He is director of Safeskill Safety Services and
providing safety services as per National 
International Standards.
Construction Management
B.E. (CIVIL), M.B.A. C.M.
Er. Mitesh Bhatt
EXPERIENCE:
Er. Kedar Shelar
B.E. (CIVIL), M.Tech CM
106
•
More than 4 years of experience
In implementing Construction Management
Techniques in Various Projects
Project Co-ordinator
Cost Control  MIS Mentor
BE Civil
Er. Pravin Mundhe
EXPERIENCE:
107
19 years of experience in execution to Top
management Level. Last Job as Head Project
Controls Department.
Expert in Data Analysis  Interpretation
Dashboards, MIS Creation
Process, System Set-up  ERP Implementation
Startup Supports
Material Management
BE Civil
Er. Prakash Medhekar
EXPERIENCE:
108
Abroad projects: Iraq, Oman, Malaysia
Projects Category : Residential, Industrial, Commercial,
Infrastructure , Marine etc. with strict Quality control guidelines.
Malaysia Project: Year 1996 was First BOT project in the world.
Its ISO 9002 Company. Light Rail Transit Project .
He has successfully performed ISO International audit in
Malaysia.
More than 35 years of experience in execution
of large Civil Engineering projects in India and
abroad with MNC companies.
Responsibilities will be Given to Interns:
Daily
109
Weekly
Monthly
Project Portfolio
To be Submitted  Presented
110
by Interns which we will
certify
Internship Duration:
Duration : As per your choice,
111
as like Join  Exit from company
Duration for Ease of Payment:
1 Month
3 Month
112
3 Month
6 Month
12 Month
24 Month / Project Completion
Joining Through Internship APP
Download Link:
https://aalicia.page.link/D5Bf
113
https://aalicia.page.link/D5Bf
How to Purchase:
114
Banks Providing EMI Facility:
115
How to Purchase  Check EMI Eligibility:
116
Various Bank EMI:
117
How to Enroll Directly:
118
FAQ: वारंवार वचारले जाणारे न
Internship कोणासाठ* आहे?
बांधकाम ेWात काम करयास इOछ
ु क असणाZया सवा?साठQ हा कोस[ आहे.
Internship कोण+या भाषेत आहे?
फBत :हंद3 भाषेत आहे, टेक-नकल श]द इंिKलश मयेच असतात.
Internship कसा जॉईन करायचा?
Internship ऍप खाल3ल Eलंक व`न डाऊनलोड करावा लागेल.
ऍप अँcॉइड व iOS दोeह3 वर उपल]ध आहे.
119
ऍप अँcॉइड व iOS दोeह3 वर उपल]ध आहे.
Android App Link https://aalicia.page.link/D5Bf
Steps to login using iPhone https://apps.apple.com/in/app/classplus/id1324522260
1.Download Classplus App from App store. 2. Enter org code of your app. (Org code - ceiit)
3. Enter mobile number and click on Continue. 4. Enter the OTP and Verify. It's Done.
Internship कसा जॉईन करायचा? पेम#ट कसे करायचे? ि6हMडओ अनलॉक कसे करायचे?
ऍप डाऊनलोड क
े 6यावर 4टोअर मये जाऊन कोस वर जाऊन पेमfट करायचे आहे. तु@हाला रEसgट मेल वर व आप
वर पण भेटेल.
CEIIT / Internship ऍप डाऊनलोड क?न कोसG PURCHASE क
े ;यावर पुढे काय करायचे?
ऍप डाऊनलोड क
े 6यावर फोन करा,
9112078538 ि7हडओ कसे पाहायचे आहे याचे मागदशन क`.
अडचण असेल तर सपोटG भेटेल का?
तु@हाला काह3ह3 अडचण असेल तर तु@ह3 सपोट घेऊ शकतात.
खाल3ल नंबर वर फोन क`न 9112078538, 9545507853 (सकाळी 10 ते सायंकाळी 6 पय?त)
FAQ: वारंवार वचारले जाणारे न
120
Certificate भेटेल का? कधी? व कसे?
कोस पूण क
े 6यावर तु@हाला फोन क`न ऑनलाईन 15 Eम-नट Oया टे4ट साठQ वेळ oयावा लागेल, टे4ट मये पास
झा6यावर आमOया कडून डिजटल signature असणारे स:टpफक
े ट भेटेल. qंट 4व`पात हवे अस6यावर इिe4टrयूट
मधून घेऊन जाऊ शकतात pकं वा पो4टल खच देऊन मागवू शकतात.
इिQटRयूट कधी पासून आहे व कोठे आहे?
इिe4टrयूट 2015 पासून पुणे येथे अलका टॉक*ज चौक येथे आहे.
अuधक मा:हती आपण www.civilengineeringiit.in  www.civilengineeringiit.com या आप6या वेबसाईट वर भेटेल,
तसेच खाल3ल सोशल मीडया वर पाहू शकाल.
Internship फT इंQटॉलम#ट म:ये देऊ शकतो का? लोन सुवधा आहे का?
नाह3, फ* :ह पूण 9यावी लागेल. परंतु app वर payment चे वेगवेगळे पयाय उपल]ध आहेत. यातून तु@ह3 तुमचे
डटे6स टाक
ू न लोन ची पाWता तपासू शकता.
अuधक मा:हती साठQ ९११२०७८५३८ वर संपक
 करावा.
एकदा फT भर;यावर Internship क
ॅ
सल होते का?
Internship कोण%याह3 परि4थती मये क
ॅ eसल होत नाह3. दुसZयाला ाe4फर :ह होत नाह3. फ* :ह परत भेटत
नाह3.
FAQ: वारंवार वचारले जाणारे न
121
नाह3.
Internship in Construction Project Management
Site Internship: Online
Till Project Completion or
2 Years : Rs. 50,000/- Rs. 19,999/-*
1 Year : Rs. 30,000/- Rs. 14,999/-*
1 Month : Rs. 3,000/- Rs. 2,499/-
3 Month : Rs. 9,000/- Rs. 5,999/-
6 Month : Rs. 15,000/- Rs. 9,999/-
*Note: Offer Valid till 22.4.21, upto 7PM
Empowering Civil Engineers Since 2015 122
मनःपूवक धeयवाद व शुभेOछा
w w w . c i v i l e n g i n e e r i n g i i t . i n
मनःपूवक धeयवाद व शुभेOछा
Facebook : https://www.facebook.com/Civilengineeringiit/
Instagram : https://www.instagram.com/civilengineeringiit/
YouTube : https://www.youtube.com/channel/UC86xjGlPZX8NpdqnIS0--UQ
Get Connected with CEiiT on Social Media:
Pinterest : https://in.pinterest.com/civilengineeringiitpune/
Telegram : https://t.me/civilengineeringiit/
Twitter : https://twitter.com/ceinstituteofit
LinkedIn : https://www.linkedin.com/in/civil-engineering-iit-pune-95234b132

More Related Content

Similar to Civil engineers career guidance 21 april 21 site internship

How agile is your team
How agile is your teamHow agile is your team
How agile is your team
Phani Bhushan
 
DevOps/Flow workshop for agile india 2015
DevOps/Flow workshop for agile india 2015DevOps/Flow workshop for agile india 2015
DevOps/Flow workshop for agile india 2015
Yuval Yeret
 
The Good, The Bad, and The Metrics
 The Good, The Bad, and The Metrics The Good, The Bad, and The Metrics
The Good, The Bad, and The Metrics
TeamQualityPro
 

Similar to Civil engineers career guidance 21 april 21 site internship (20)

5W2H Implementation Project.pptx
5W2H Implementation Project.pptx5W2H Implementation Project.pptx
5W2H Implementation Project.pptx
 
How to Build a Recruiting System You Can LOVE
How to Build a Recruiting System You Can LOVEHow to Build a Recruiting System You Can LOVE
How to Build a Recruiting System You Can LOVE
 
Project Management Complete Training level 4 - Adams Academy
Project Management Complete Training level 4 - Adams AcademyProject Management Complete Training level 4 - Adams Academy
Project Management Complete Training level 4 - Adams Academy
 
Goal Examples for Agile Engineering
Goal Examples for Agile EngineeringGoal Examples for Agile Engineering
Goal Examples for Agile Engineering
 
Project Management Complete Training level 4 - Adams Academy
Project Management Complete Training level 4 - Adams AcademyProject Management Complete Training level 4 - Adams Academy
Project Management Complete Training level 4 - Adams Academy
 
Test Estimation in Practice
Test Estimation in PracticeTest Estimation in Practice
Test Estimation in Practice
 
Extreme SAFe - Turning Up the Flow in PI Execution
Extreme SAFe - Turning Up the Flow in PI ExecutionExtreme SAFe - Turning Up the Flow in PI Execution
Extreme SAFe - Turning Up the Flow in PI Execution
 
Test Estimation in Practice
Test Estimation in PracticeTest Estimation in Practice
Test Estimation in Practice
 
How agile is your team
How agile is your teamHow agile is your team
How agile is your team
 
Tradeline Space Strategies: Pop-ups, Prototypes, and Pilots
Tradeline Space Strategies: Pop-ups, Prototypes, and PilotsTradeline Space Strategies: Pop-ups, Prototypes, and Pilots
Tradeline Space Strategies: Pop-ups, Prototypes, and Pilots
 
DevLearn 2018 - Designing AR Experiences for Performance Support
DevLearn 2018 -  Designing AR Experiences for Performance SupportDevLearn 2018 -  Designing AR Experiences for Performance Support
DevLearn 2018 - Designing AR Experiences for Performance Support
 
GTR-The End Of Testing As We Know It
GTR-The End Of Testing As We Know ItGTR-The End Of Testing As We Know It
GTR-The End Of Testing As We Know It
 
DevOps/Flow workshop for agile india 2015
DevOps/Flow workshop for agile india 2015DevOps/Flow workshop for agile india 2015
DevOps/Flow workshop for agile india 2015
 
The Good, The Bad, and The Metrics
 The Good, The Bad, and The Metrics The Good, The Bad, and The Metrics
The Good, The Bad, and The Metrics
 
Project management skills accredited training - Adams Academy
Project management skills accredited training - Adams AcademyProject management skills accredited training - Adams Academy
Project management skills accredited training - Adams Academy
 
Microsoft project 2016 advanced - Adams Academy
Microsoft project 2016 advanced - Adams AcademyMicrosoft project 2016 advanced - Adams Academy
Microsoft project 2016 advanced - Adams Academy
 
[GUTS-RS] World Quality Report 2014-15 Key Findings
[GUTS-RS] World Quality Report 2014-15 Key Findings[GUTS-RS] World Quality Report 2014-15 Key Findings
[GUTS-RS] World Quality Report 2014-15 Key Findings
 
Profile Seema Wadhwa
Profile Seema WadhwaProfile Seema Wadhwa
Profile Seema Wadhwa
 
Devconf - Moving 65000 Microsofties to DevOps with Visual Studio Team Services
Devconf - Moving 65000 Microsofties to DevOps with Visual Studio Team ServicesDevconf - Moving 65000 Microsofties to DevOps with Visual Studio Team Services
Devconf - Moving 65000 Microsofties to DevOps with Visual Studio Team Services
 
Moving 75,000 Microsofties to DevOps with Visual Studio Team Services
Moving 75,000 Microsofties to DevOps with Visual Studio Team ServicesMoving 75,000 Microsofties to DevOps with Visual Studio Team Services
Moving 75,000 Microsofties to DevOps with Visual Studio Team Services
 

Recently uploaded

Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 

Recently uploaded (20)

Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 

Civil engineers career guidance 21 april 21 site internship

  • 1. Welcome to Your Career Guidance Program
  • 2. Agenda of Todays Seminar / Webinar Guided Internship
  • 3. सम सुढ भारत तयार करायचा असेल तर मुलांवरती काम करायला हवे. 3 मुलांवरती काम करायला हवे. Dr. APJ Abdul Kalam
  • 4. Currently We are dealing with 1. Government Contracting Business Module 2. E Tendering Business Module 3. Site Internship / Construction Project 3. Site Internship / Construction Project Management Internship 4
  • 5. And Guided Internships in • Structural • Cost Engineering • Valuation • Valuation • Interior • Formwork • Landscaping
  • 6. VISION 2030 To Build SKILL DEVELOPMENT SKILL DEVELOPMENT UNIVERSITY 6
  • 7. We are Registering as Construction Sector Research Development Foundation 7
  • 8. ISO 9001-2015 QMS Certified Institute Empowering Construction Sector Since 2015 8
  • 9. We are Having Apps: 9 Empowering Construction Sector Since 2015
  • 10. 3 Online Mobile Apps for You: Self Learning Courses: AutoCAD Advance CAD 10 Empowering Construction Sector Since 2015 Advance CAD Excel for Civil Engineers Government Estimation Internships in Structural Designing BIM 50+ Technical Webinars
  • 11. 3 Online Mobile Apps for You: 11 Empowering Construction Sector Since 2015 You Get Internships in 1. AutoCAD 2. Cost Engineering 3. Site Execution 4. Construction Project Management
  • 12. 3 Online Mobile Apps for You: What You Get: 12 Empowering Construction Sector Since 2015 What You Get: 1. E Tendering Trainings 2. MSEB Tenders 3. Railway Tenders 4. MIDC Tenders 5. Business Module of Etendering 6. Digital Signatures 7. Registrations of Contractors Many More
  • 13.
  • 14.
  • 15.
  • 16.
  • 17. ISR Digital Library Civil t.me/elibrarycivil 17 Empowering Construction Sector Since 2015 t.me/elibrarycivil
  • 18. ISR Jobs Civil t.me/jobscivil 18 Empowering Construction Sector Since 2015 t.me/jobscivil
  • 19. 19
  • 20. 20
  • 21. करयर मये अपयशी होयाचे एक मुख व महवाचे कारण STUDENT 100 Not Decide Career 25% Decide Career 75% 21 जे करअर डसाईड करतात %या 75% मुलांपैक* 45% मुले दहावीचा -नकाल लागला क* करअर बदलतात 20% मुले बारावीचा -नकाल लागला क* करअर बदलतात 10% मुले ह3 Graduation चा -नकाल लागला क* करयर बदलतात 5% मुले च करअरमये यश4वी होतात
  • 22. जर आप6याला करअरमये यश4वी 7हायचे असेल तर आप6याला आप6या समजुती तोडा7या लागतील 22
  • 23. उ9:द;ट पूण होईपय?त क े लेल3 वाटचाल @हणजे यश होय 23
  • 24. फBत नाव व पैसा कमावणे @हणजे यश नाह3 Cया:दवशी आप6याब9दल आप6या आईवडलांना समाजाला व गुDवया?ना अEभमान वाटेल 24 व गुDवया?ना अEभमान वाटेल %या :दवशी आपण खरे यश4वी झालो असे समजावे
  • 25. यश4वी करअर करायचे असेल तर एका कागदावर या सहा W ची उGरे Eलहावीत What is that I want to do? 25 Where I want to do it? When I want to finish it? Who is going to do it? Why is it that I want to do it? HoW am I going to do it?
  • 26. रह4य यश4वी होयाचे -नणय + योजना + कृ ती = यश -नणय = काह3ह3 झाले तर3 मला यश4वी 7हायचेच आहे योजना = दैनं:दन :दनचया ची योKय अशी योजना आखा कृ ती = आखले6या योजनेवर ामाLणकपणे व सकारा%मक कृ ती करा 26 कृ ती = आखले6या योजनेवर ामाLणकपणे व सकारा%मक कृ ती करा नBक*च आप6याला हवे ते यश Eमळेल कारण आपण 4वतः 4वतःOया परणामासाठQ कारणीभूत असतो. %येक 7यBतीकडे यश4वी होयासाठQ आवSयक असलेल3 सव साधने असतात, गरज असते ती फBत 4वतःतील 4वतःला ओळखयाची.
  • 27. Career Decision from 72+ Career Options 27
  • 28. So Decide Your 5 Years Goal 10 Years Goal 10 Years Goal Don’t Expect too much, It brings disappointments. 28
  • 29. If You are having any difficulty: 95455 07853 29
  • 30. सुवात कर यापूव काह नांची उरे हवी आहेत... 30
  • 31. Yes / No Real Estate Sector तुह जॉब करायचा वचार करताय का? 31 तुह जॉब करायचा वचार करताय का?
  • 32. Yes / No मॅनेजम#ट लेवल la जॉब करायची इ'छा आहे का? 32
  • 33. Yes / No जॉब साठ* +येक ,ठकाणी कामाचा अनुभव मागतात का? 33
  • 34. Yes / No कोठेह Interview ,दला तर +यात 3सले4शन 6हावे असे वाटते का? 34
  • 35. Yes / No एखा9या चालू ोजे4ट वर कॉलेज म:ये 3शकले;या कसे=ट कया implement होतात हे पाहायचे आहे का? 35
  • 36. Yes / No एखादा चालू ोजे4ट वर M.Tech Construction Management 'या टेि4नक apply क?न पहाय'या आहेत का? 36
  • 37. Yes / No एकाच ोजे4ट वर +याचे Execution बरोबर +याच ोजे4ट 'या quantity काढणे, ट#डर कसे भरले जाते, +याचे बजेट कसे बनवले जाते, +याचे Cब3लंग करायचे, +याचे MS Project वर =लॅDनंग, tracking व closure करायचे, Quality plan बनव या पासून ते Quality चेक करणे, Safety कसे पा,हले पा,हजे, MIS, EरपोटFग कसे क े ले जाते 37 करणे, Safety कसे पा,हले पा,हजे, MIS, EरपोटFग कसे क े ले जाते हे सवG 3शकायचे आहे का?
  • 38. तर मग घेऊन आलो आहोत… एक गायडस ोJॅम 38 एक गायडस ोJॅम
  • 39. Internship on High-rise Project Project Management Consultant 39 Contractor
  • 40. Internship on High-rise Project 40 Project Management Consultant Project Contractor Institutional Partner
  • 41. Project Affordable Housing Affordable Housing For Pimpri Chinchwad Municipal Corporation Walk Through 41
  • 42. Project Facts: Location : PCMC, Maharashtra Area : Around 5 Lacks Sq.ft. Project Costs : Around 75 Crore 42 Area : Around 5 Lacks Sq.ft. Buildings : 2 Buildings Total Floors : 16 Storied 2 Commercial + 2 Parkings + 12 Storied Total Flats: 700 flats
  • 43. Project Facts: Start Date: July 2020 (Revised due to Lockdown) 43 Completion Date: December 2021
  • 46. Project Selection Criteria:  ISO 9001:2015 : Quality Management System  Full fledged Safety Department with ISO 45001:2018 of Occupational Health Safety 46 ISO 45001:2018 of Occupational Health Safety Management System  ISO 14001:2015 : of Environmental Management System
  • 47. Project Selection Criteria:  Full fledged In House all Departments Team  Like Planning Department, Safety Department, Quality Department, Plant Machinery Department  Own Plant Machinery 47  Own Plant Machinery  Lock Key Project With Material Project  Multi Storied Building  Firm should have multiple Shuttering Material Options
  • 48. Site Organisation Chart: Project Manager Sr. Engineer Jr. Engineer Quality Engineer Quality Supervisor Billing Engineer Plant M/C Dept Operators Store Department Store Incharge 48 Engineer Forman Supervisor Supervisor Operators Electrician Mechanics Incharge Store Assistant
  • 49. START Now Linking Experience to Resume • From Anywhere • From Any Academic Year • Even though you are Preparing for Competitive Exams • Even though Working 49
  • 51. Project Status on 1st July 2020 UGWT Work: 51
  • 52. Project Status on 15th July 2020 52
  • 53. Project Status on 14th August 2020 53
  • 54. Project Status on 15th September 2020 1st Slab Casting 54
  • 55. Project Status on 15th October 2020 3rd Slab Casting 55 Click to Start: Video
  • 56. Project Status on 21st November 2020 5th Slab Shuttering Work Upper Basement Block work Started: 56
  • 57. Project Status on 15th April 2021 after ( ( ( ( 9 Months) ) ) ) 57
  • 59. Project Status Updating Method: Hardcopy Status Updating: 59
  • 60. Actual Case Study Discussed: 60
  • 64. Live Site Online Internship 64 Testimonials:
  • 65. Listen What Abhishek Anand Say’s: 65 Click to Start: Video
  • 66. Listen What Taher Haji Say’s: 66 Click to Start: Video
  • 67. Live Site Online Internship 360 0 67 360 Experience
  • 68. Your JOB ROLE Involvements: SITE Planning Tendering Contracts QS Billing Project Controls Structural 68 SITE Billing Quality Safety Project Manager Controls
  • 73. Hands on Experience on the softwares: Excel PPT AutoCAD MSP 73 AutoCAD MSP ERP Revit Architecture
  • 74. What you get: 1. Daily Photos of Project 2. Daily Concrete Report 3. Daily Material Receipt 74 3. Daily Material Receipt 4. Daily Labour Report : To Costing, Constants, Rates etc. 5. Daily Work Activities 6. Daily Videos
  • 78. Recorded Live Sessions on App: For Internship Duration, View Unlimited Times 78
  • 79. Whatsapp Group for Technical Support JOB Updates 79
  • 80. What are your Benefits at the End CONFIDENCE… Experience Which have Value… JOB Recommendations…
  • 81. Live Site Online Internship 81 Why ? Highlights
  • 82. Every Activity Explained in Following Parameters:  Site Location  Site Drawing  Relevant IS Codes  SOP / Step by step methods for activity  Relevant Equipments / Tools / Consumables  Mode of Measurement / Quantity Surveying 82  Mode of Measurement / Quantity Surveying  Labour  Material  Overheads  Checklists  Quality Tests  On Site Experience Sharing, Case Studies : What If Goes Wrong  Planning, Duration, Time Period, Dependencies of Activity  Other Available options  Photos, Videos of Site
  • 83. Structured Internship:  Site Management : 25 Days  Site Execution : 90 Days  Quality Aspects : 90 Days  Structural Designers Aspects : 30 Days  Safety Aspects : 30 Days  Quantity Surveying : 30 Days Activity Spread Over 83  Quantity Surveying : 30 Days  Rate Analysis : 10 Days  Budgeting : 10 Days  Billing : 10 Days  Tendering : 15 Days  Contracts : 10 Days Note: Demonstrates Overall Distribution over the Period of Total Project, Each Part covered as per progress of the project. 24 Months
  • 84. Structured Internship:  Planning Tracking : 50 Days  Construction Project Management : 25 Days  Plant Machinery, Tools : 25 Days  MIS, Project Controls : 25 Days  Material Management : 25 Days  Manpower Resource Management : 25 Days Activity Spread 84  Manpower Resource Management : 25 Days  Plumbing : 15 Days  Electrical : 15 Days  Firefighting : 10 Days  AutoCAD, Excel, PPT, ERP, MSP : 25 Days  Green Building and other : 25 Days Spread Over 24 Months
  • 85. Site Management: 25 Days Site Layout Mobilisation Plan Communication flow of Site Site Organisation Structure Various Consultants, Contractors Roles Site Mobilisation Activities Planning Site Mobilisation Budget Zero Budget 85 Roles Shuttering Scheme to be used Drawing Reading from Various Angles Temporary Structures Site Documentations Site Overheads Budget
  • 86. Site Execution: 90 Days Excavation, Backfilling 5 Days RCC Work 25 Days Masonary Work 5 Days Plastering 5 Days Flooring 5 Days Doors 2 Days Windows 2 Days Cladding 2 Days 86 Painting 2 Days Waterproofing 5 Days Shuttering 15 Days Fabrication Works 5 Days Site Execution Communication Flow
  • 87. Quality Aspects: 90 Days ISO Organisation ISO 9001:2015 ISO 45001:2018 ISO IS Codes 87 ISO 14001:2015 MTR IS Codes 75 Nos. Quality Plan Checklists SOP
  • 88. Structural Designers Aspects: 30 Days DBR Members Concrete Structural IS Site 88 Steel Structural IS Codes Site Inspections Geotechnical Report
  • 89. Safety Aspects: 25 Days Safety Need Scope Accidents Procedures SOP’s Tool Box Talks, Various Permits Material Handling BOCW Act Excavation Safety Electrical Safety 89 Temporary Structures Safety Works at Height Hot Works Fire Safety PM Safety Hand Held Tools Y Tackles Safety Planning for Safety Vehicle Movement Scaffold Formwork
  • 90. QS, Billing, RA, Budgeting, Tendering Contracts: 90 Days Quantity Surveying All Items Bar Bending Schedule Focused Billing of Each Item Rate Analysis of Each Items Preparing Budget of Project Tendering for Project Working Tender Floating for Contractors Negotiations 90 Contractor Finalisation Work Orders Contractual Clauses Arbitration Correspondence Extra Items Claims Settlements
  • 91. Planning Construction Project Management: 90 Days Project Management framework CPM LEAN Construction DPR, WPR, MPR MIS, KPI Project Start Closure Documentation MSP Scheduling Tracking Last Planner System 91 Excel Smart Templates Project Dashboard Development Risks Key Issues Root Cause Analysis Delay Analysis Earned Value Analysis
  • 92. Plant Machinery, Tools: 25 Days Boom Placers Concrete Pump Concrete Mixers RM 800 Tower Crane Bar Bending Machine Bar Cutting Machine 92 Earth Compactor Material Lifts Maintenance
  • 93. MIS, Project Controls: 25 Days Project Control Department Thumb Rules Constants Data Various Score 93 Data Gathering Various Analysis Score Boards
  • 94. Material Management: 25 Days Purchase Department Procurement Engineer Documentation Suppliers 94 Whole Salers Dealers Negotiations Inventory
  • 96. Current Enrollments From 13 States 1. Maharashtra 2. Gujrat 3. Karnataka 4. Madhya Pradesh 5. Delhi 6. Assam 7. Rajasthan 8. Bihar 9. Telangana 96 9. Telangana 10. Tamilnadu 11. Uttarakhand 12. Uttar Pradesh 13. West Bengal
  • 97. Enrollments From 17 Universities Professional Inst. 1. Pune, Savitribai Phule University (MH) 2. BATU (MH) 3. Nagpur, Saint Gadgebaba University (MH) 4. Kolhapur University (MH) 5. Mumbai University (MH) 6. Indus University, Gujrat 7. Galgotias University, Greater Noida (UP) 8. Madan Mohal malaviya University (UP) 9. DY Patil University (MH) 10. Sandip University (MH) 11. Visvesvaraya Technological University, Karnataka 97 11. Visvesvaraya Technological University, Karnataka 12. Jawaharlal Nehru Technological University, Hyderabad 13. Guwahati University (Assam) 14. Rajasthan Technical University 15. Uttarakhand Technical University  NICMAR  INDSEARCH
  • 98. Enrollment Variants Experience Wise  Civil Engineers  Architects  Interior Designers  Diploma  BE 2nd Year  M.Tech  M.Arch 98
  • 99. Meet Project Stake Holders 99
  • 100. Karan Builders Er. Pramod Suryawanshi Mr. Pramod Suryawanshi has been in Construction Industry since thirty-two Managing Director 100 Construction Industry since thirty-two years. A Graduate Engineer by profession, Mr. Suryawanshi has been responsible for successful execution of all projects undertaken by Karan Builders.
  • 101. Execution Mentor Er. Prakash Bhat EXPERIENCE: Along with Quality, Cost Optimization ISO Audits 101 More than 30 years of rich comprehensive experience in Site Management, Cost optimization, Operations and Quality Management Previously associated with Gagan Developers as a Chief Engineer Goel Ganga Group
  • 102. Structural Mentor ME Structures, AMIE, PGDBM Er. Saurabh Patil EXPERIENCE: 102 6 years of experience as a structural designer. BIM Modeller Detailing Works Expert in 25 Civil Engineering Softwares
  • 103. Planning Quality Control Mentor BE Civil, PMP Er. Shrirang Palande More than 35 years of rich comprehensive EXPERIENCE: 103 More than 35 years of rich comprehensive experience in Site Management, Productivity Enhancement, Vendor Contract Management, Project Management, Operations and Quality Management Previously associated with Phadnis Infrastructure Limited, Pune as V.P. – Project Management
  • 104. Quantity Surveying, Billing Mentor ME Construction Management Er. Rupali Desai More than 12 years of experience in EXPERIENCE: 104 More than 12 years of experience in Government, Private, Real Estate Sector. Core Areas: Quantity Surveying, Tendering, Billing Budgeting.
  • 105. SAFETY Mr. Satishkumar Nair More than 21 years of Industry Experience and EXPERIENCE: 105 More than 21 years of Industry Experience and 16 Years in Safety health as a consultant, trainer business developer. Safety Audit Panel Member of 1. Builders Association of India (BAI) 2. CREDAI 3. PCERF More He is director of Safeskill Safety Services and providing safety services as per National International Standards.
  • 106. Construction Management B.E. (CIVIL), M.B.A. C.M. Er. Mitesh Bhatt EXPERIENCE: Er. Kedar Shelar B.E. (CIVIL), M.Tech CM 106 • More than 4 years of experience In implementing Construction Management Techniques in Various Projects
  • 107. Project Co-ordinator Cost Control MIS Mentor BE Civil Er. Pravin Mundhe EXPERIENCE: 107 19 years of experience in execution to Top management Level. Last Job as Head Project Controls Department. Expert in Data Analysis Interpretation Dashboards, MIS Creation Process, System Set-up ERP Implementation Startup Supports
  • 108. Material Management BE Civil Er. Prakash Medhekar EXPERIENCE: 108 Abroad projects: Iraq, Oman, Malaysia Projects Category : Residential, Industrial, Commercial, Infrastructure , Marine etc. with strict Quality control guidelines. Malaysia Project: Year 1996 was First BOT project in the world. Its ISO 9002 Company. Light Rail Transit Project . He has successfully performed ISO International audit in Malaysia. More than 35 years of experience in execution of large Civil Engineering projects in India and abroad with MNC companies.
  • 109. Responsibilities will be Given to Interns: Daily 109 Weekly Monthly
  • 110. Project Portfolio To be Submitted Presented 110 by Interns which we will certify
  • 111. Internship Duration: Duration : As per your choice, 111 as like Join Exit from company
  • 112. Duration for Ease of Payment: 1 Month 3 Month 112 3 Month 6 Month 12 Month 24 Month / Project Completion
  • 113. Joining Through Internship APP Download Link: https://aalicia.page.link/D5Bf 113 https://aalicia.page.link/D5Bf
  • 115. Banks Providing EMI Facility: 115
  • 116. How to Purchase Check EMI Eligibility: 116
  • 118. How to Enroll Directly: 118
  • 119. FAQ: वारंवार वचारले जाणारे न Internship कोणासाठ* आहे? बांधकाम ेWात काम करयास इOछ ु क असणाZया सवा?साठQ हा कोस[ आहे. Internship कोण+या भाषेत आहे? फBत :हंद3 भाषेत आहे, टेक-नकल श]द इंिKलश मयेच असतात. Internship कसा जॉईन करायचा? Internship ऍप खाल3ल Eलंक व`न डाऊनलोड करावा लागेल. ऍप अँcॉइड व iOS दोeह3 वर उपल]ध आहे. 119 ऍप अँcॉइड व iOS दोeह3 वर उपल]ध आहे. Android App Link https://aalicia.page.link/D5Bf Steps to login using iPhone https://apps.apple.com/in/app/classplus/id1324522260 1.Download Classplus App from App store. 2. Enter org code of your app. (Org code - ceiit) 3. Enter mobile number and click on Continue. 4. Enter the OTP and Verify. It's Done. Internship कसा जॉईन करायचा? पेम#ट कसे करायचे? ि6हMडओ अनलॉक कसे करायचे? ऍप डाऊनलोड क े 6यावर 4टोअर मये जाऊन कोस वर जाऊन पेमfट करायचे आहे. तु@हाला रEसgट मेल वर व आप वर पण भेटेल.
  • 120. CEIIT / Internship ऍप डाऊनलोड क?न कोसG PURCHASE क े ;यावर पुढे काय करायचे? ऍप डाऊनलोड क े 6यावर फोन करा, 9112078538 ि7हडओ कसे पाहायचे आहे याचे मागदशन क`. अडचण असेल तर सपोटG भेटेल का? तु@हाला काह3ह3 अडचण असेल तर तु@ह3 सपोट घेऊ शकतात. खाल3ल नंबर वर फोन क`न 9112078538, 9545507853 (सकाळी 10 ते सायंकाळी 6 पय?त) FAQ: वारंवार वचारले जाणारे न 120 Certificate भेटेल का? कधी? व कसे? कोस पूण क े 6यावर तु@हाला फोन क`न ऑनलाईन 15 Eम-नट Oया टे4ट साठQ वेळ oयावा लागेल, टे4ट मये पास झा6यावर आमOया कडून डिजटल signature असणारे स:टpफक े ट भेटेल. qंट 4व`पात हवे अस6यावर इिe4टrयूट मधून घेऊन जाऊ शकतात pकं वा पो4टल खच देऊन मागवू शकतात. इिQटRयूट कधी पासून आहे व कोठे आहे? इिe4टrयूट 2015 पासून पुणे येथे अलका टॉक*ज चौक येथे आहे. अuधक मा:हती आपण www.civilengineeringiit.in www.civilengineeringiit.com या आप6या वेबसाईट वर भेटेल, तसेच खाल3ल सोशल मीडया वर पाहू शकाल.
  • 121. Internship फT इंQटॉलम#ट म:ये देऊ शकतो का? लोन सुवधा आहे का? नाह3, फ* :ह पूण 9यावी लागेल. परंतु app वर payment चे वेगवेगळे पयाय उपल]ध आहेत. यातून तु@ह3 तुमचे डटे6स टाक ू न लोन ची पाWता तपासू शकता. अuधक मा:हती साठQ ९११२०७८५३८ वर संपक करावा. एकदा फT भर;यावर Internship क ॅ सल होते का? Internship कोण%याह3 परि4थती मये क ॅ eसल होत नाह3. दुसZयाला ाe4फर :ह होत नाह3. फ* :ह परत भेटत नाह3. FAQ: वारंवार वचारले जाणारे न 121 नाह3.
  • 122. Internship in Construction Project Management Site Internship: Online Till Project Completion or 2 Years : Rs. 50,000/- Rs. 19,999/-* 1 Year : Rs. 30,000/- Rs. 14,999/-* 1 Month : Rs. 3,000/- Rs. 2,499/- 3 Month : Rs. 9,000/- Rs. 5,999/- 6 Month : Rs. 15,000/- Rs. 9,999/- *Note: Offer Valid till 22.4.21, upto 7PM Empowering Civil Engineers Since 2015 122
  • 123. मनःपूवक धeयवाद व शुभेOछा w w w . c i v i l e n g i n e e r i n g i i t . i n मनःपूवक धeयवाद व शुभेOछा
  • 124. Facebook : https://www.facebook.com/Civilengineeringiit/ Instagram : https://www.instagram.com/civilengineeringiit/ YouTube : https://www.youtube.com/channel/UC86xjGlPZX8NpdqnIS0--UQ Get Connected with CEiiT on Social Media: Pinterest : https://in.pinterest.com/civilengineeringiitpune/ Telegram : https://t.me/civilengineeringiit/ Twitter : https://twitter.com/ceinstituteofit LinkedIn : https://www.linkedin.com/in/civil-engineering-iit-pune-95234b132