DEVELOPMENT MANAGEMENT SERVICES
“You can get a lot of pretty designs or good
ideas, but a lot of people don’t have the
knowledge or the experience of what it is like
to have a factory out the back”
Director: Coca Cola
The gap between ideas and reality is considerable as the statement above
concisely identifies. Ideas are cheap but executing them can be very costly
indeed. What it also highlights is the fundamental need for the fusion of an
exciting idea with the practicalities of in-depth market knowledge and experience
in production and marketing techniques; a combination of which can turn a good
idea into a successful reality – and a winning product.
This is the gap that GFMS Catering Consultancy aims to fill, by providing the
expertise and experience – in market research, product development &
production, legislation, modern manufacturing methods and industry connections.
These attributes are all required to take a project from the “idea” stage to a well-
researched, tested, certified and feasible launch ready state.
Methodology
Every project starts with an idea which must then be treated to
comprehensive and exhaustive evaluation and feasibility studies to
establish its viability as a successful product or service.
The disciplines with which GFMS Catering Consultancy treat an idea or
concept product are integrated into a through three stage procedure – as
outlined in the simplified flow chart.
There are numerous reasons why you may require the services of an
experienced food service consultant but the most common request is assist
in taking a product or new food based product from concept to market
readiness.
STAGE 1
A The Idea
In the first instance, the idea must be discussed for validity, possible variations or alternatives. Remember
ideas are cheap but seeing them through can be a very expensive process.
B Evaluation
At this stage, the idea must be given some form to allow the rest of the process to develop around it.
Therefore evaluation of factors such as varieties, pack size, shape, weight, colour, flavour, appearance,
current market trends, market potential and competition etc must take place in order to establish rough
guidelines. A possible achievable margin must also be estimated at this stage.
It must be noted that any parameters established here will be refined as the development process
progresses. It is also suggested that this early general evaluation would require a small team operating on
a “think-tank” basis.
C Resource Evaluation
Linked to the evaluation of the idea must be resource evaluation; it is vital to establish in the early stage to
avoid any wastage in development costs. Items to consider should include:
1. Financial resources
2. Production capability
3. Technical and quality control skills
4. Distribution channels
5. Appropriate sales and personnel skills
6. Marketing/ Advertising resources
7. Time factor
8. Team capability
9. Availability of compound products
The findings of this evaluation must be supplemented by market evaluation in order to establish a clear
picture of parameters and constraints.
D Market Evaluation
At this stage the market must be researched thoroughly in order to establish any potential market gaps,
the likely demand for the product / service and its positioning. Research would include:
1. Market size and potential, possible pricing structure
2. Consumer demand / sectors
3. Trade/ buyer demands
4. Competitive products
5. Distribution channels / retail outlets / trade
6. Current market trends
At the end of stage 1, a full report summarizing product, market & resource evaluation would be prepared.
STAGE 2
E Prototype Plan
A plan must now be established for the production of the prototype, with all of the
following factors considered:
1. Size
2. Shape
3. Weight
4. Varieties
5. Pack design
6. Branding
7. Price/Margin available
8. Production capabilities
F Prototype Mock-Ups
In order to accurately test likely demand for the finished product, the prototype must
now be produced in a highly finished form
G Market Research
A skilled placement research company will be chosen to test reaction to all aspects of
the prototype, including branding, pricing, varieties, weight, quality, visual appeal,
desirability etc
H Resource & Product Conclusions
Conclusions regarding both product resource requirements and mock-up product
conclusions will be considered and evaluated.
At the end of stage 2, a full report summarizing the concept product and market
conclusions will be prepared.
STAGE 3
Utilising the findings of both stage 1 & 2 the idea must now be finally concluded on before
a commitment to production is made.
I Compatibility Conclusions
The project team should meet to discuss the prototype and placement research, together
with market and resource evaluation. At this stage, the following elements should be
finalised:
1. Any commitment to capital expenditure
2. Ordering of Raw materials
3. Target date for initial production run
4. Initial production quantities
J Plan Launch Programme
Having made a commitment to production, a launch programme should be planned which
will take account of:
1) SALES & DISTRIBUTION
• Initial quantities
• Initial customer/ sales targets
• Pricing
• Initial throughput estimates
• Storage
• Distribution
• Sales personnel
2) MARKETING
• Marketing Plan
• Test market areas/ full launch
• Launch offers
• Promotional literature/point of sale
• Media recommendations
• P.R. support
K Launch Programme Confirmed
All project team members must now double-check all plans re:
1. Financing
2. Production / technical
3. Delivery dates on raw materials
4. Sales/Personnel
5. Storage
6. Distribution
7. Training
8. Marketing
9. Launch date re-confirmed
L Initial Production Run
Following the initial production run, the project team must evaluate the product
to ensure that all criteria are satisfied. At this stage, one final question should
be asked and confirmed.
“Are we launch ready?”
THE LAUNCH
If the answer to “L” is affirmative and all items
and resources under “K” are checked and
available, product is now ready for test market
or full launch.
The project team must now implement the
launch plan, monitoring deadlines and quality
throughout to ensure maximum impact and
sales.
With a long background in the Contract Catering, the Wedding catering and
Events industry and then in fresh & frozen Ready Meal Manufacturing, I have a
wealth of food industry experience gained over 25 years.
With an extraordinary practical knowledge and a fantastic list of reliable contacts
and partners, I am in a very good position to help your business manufacture
your food product no matter how diverse the request.
Small business often struggle to outsource production as most contactable food
manufacturers are simply not interested in talking about smaller volume
production.
You may be looking simply increase margin on your products by seeking a more
cost effective supply chain or require a specific product or service and are
struggling to source this solution.
There are numerous reasons why you may require the services of an
experienced food service consultant but the most common request is assist in
taking a product or new food based product from concept to market readiness.
The key to a client / consultant relationship is to understand a clear brief and to
carry this out in good time and with regular communication.
Problem solving and solution supplying is what GFMS Catering Consultancy
offer.
Conclusion
DOG FOOD
I was recently asked to assist in finding a suitable manufacturer for a fresh dog food
product range after the owners had struggled for several months to find any one
interested in taking their excellent product on board.
The client had initial low sales projections building to good volumes in a 6-9 month
period and as is often the case they could not find a suitable manufacturer due to
the start up position.
I found them a manufacturer, arranged the suitable food safety and Defra legislative
requirements, took recopies from table top samples to manufacturing recipes,
organised all production processes and shelf life testing as well as sourcing the
complete supply chain and packaging solutions well inside budget.
EXPORT OF FROZEN READY MEALS
I have organised a range of 15 ready meals and 12 side dishes from initial meetings
and presentations ready for export to Hong Kong – 40,000 meals monthly.
Range, recipes, manufacturer, container choice, branding and signed off end
product range within agreed time scale and within budget.
Time scale was 3 months
Case Study
MANUFACTURING KITCHEN DESIGN
Project manage & oversee the build.
Ahead of time and under budget
HEALTHY READY MEAL S
Design a new and exciting range of fresh frozen
ready meals, clean low calorie meals with a high
protein & low carb content. In addition to
designing a new & confidential manufacturing
process for the high volume product range.

More Related Content

What's hot

Role of merch. in pd process
Role of merch. in pd  processRole of merch. in pd  process
Role of merch. in pd processTarun Das
 
Experienced Marketing Direcotor - Copy
Experienced Marketing Direcotor - CopyExperienced Marketing Direcotor - Copy
Experienced Marketing Direcotor - CopyTarek Otifa
 
Emad eldin mohamed ahmed 8 12
Emad eldin mohamed ahmed 8 12Emad eldin mohamed ahmed 8 12
Emad eldin mohamed ahmed 8 12Emad Eldin Ahmed
 
Resume legi-latest update-10 july 2011
Resume  legi-latest update-10 july 2011Resume  legi-latest update-10 july 2011
Resume legi-latest update-10 july 2011Legi George
 
RESULTS: Client Success CPG Brand Launch
RESULTS: Client Success CPG Brand LaunchRESULTS: Client Success CPG Brand Launch
RESULTS: Client Success CPG Brand LaunchKathleen Milbier
 
Rough cut launch plan check list
Rough cut launch plan check listRough cut launch plan check list
Rough cut launch plan check listamit kumar
 
Resume_of_Debashish_Pan_updated_Aug_15 (1)
Resume_of_Debashish_Pan_updated_Aug_15 (1)Resume_of_Debashish_Pan_updated_Aug_15 (1)
Resume_of_Debashish_Pan_updated_Aug_15 (1)Debashish Pan
 
CURRCULIM VIATE NAVEED KHAN 16-1-17
CURRCULIM VIATE NAVEED KHAN 16-1-17CURRCULIM VIATE NAVEED KHAN 16-1-17
CURRCULIM VIATE NAVEED KHAN 16-1-17naveed khan
 

What's hot (20)

deepak resume
deepak resumedeepak resume
deepak resume
 
Hossam Mohamed Sharaf ElDin
Hossam Mohamed Sharaf ElDinHossam Mohamed Sharaf ElDin
Hossam Mohamed Sharaf ElDin
 
AllisonCupillariCV_2014_12
AllisonCupillariCV_2014_12AllisonCupillariCV_2014_12
AllisonCupillariCV_2014_12
 
Role of merch. in pd process
Role of merch. in pd  processRole of merch. in pd  process
Role of merch. in pd process
 
Experienced Marketing Direcotor - Copy
Experienced Marketing Direcotor - CopyExperienced Marketing Direcotor - Copy
Experienced Marketing Direcotor - Copy
 
Emad eldin mohamed ahmed 8 12
Emad eldin mohamed ahmed 8 12Emad eldin mohamed ahmed 8 12
Emad eldin mohamed ahmed 8 12
 
Factory manager
Factory managerFactory manager
Factory manager
 
CV Irgashev AB VP
CV Irgashev AB VPCV Irgashev AB VP
CV Irgashev AB VP
 
Resume legi-latest update-10 july 2011
Resume  legi-latest update-10 july 2011Resume  legi-latest update-10 july 2011
Resume legi-latest update-10 july 2011
 
Rakesh_Sunyara_CV
Rakesh_Sunyara_CVRakesh_Sunyara_CV
Rakesh_Sunyara_CV
 
Food Product Development
Food Product DevelopmentFood Product Development
Food Product Development
 
Narelle Gooding
Narelle GoodingNarelle Gooding
Narelle Gooding
 
RESULTS: Client Success CPG Brand Launch
RESULTS: Client Success CPG Brand LaunchRESULTS: Client Success CPG Brand Launch
RESULTS: Client Success CPG Brand Launch
 
FRED ALMOGELA-Prod Developer
FRED ALMOGELA-Prod DeveloperFRED ALMOGELA-Prod Developer
FRED ALMOGELA-Prod Developer
 
Rough cut launch plan check list
Rough cut launch plan check listRough cut launch plan check list
Rough cut launch plan check list
 
Resume_of_Debashish_Pan_updated_Aug_15 (1)
Resume_of_Debashish_Pan_updated_Aug_15 (1)Resume_of_Debashish_Pan_updated_Aug_15 (1)
Resume_of_Debashish_Pan_updated_Aug_15 (1)
 
KVR CV- 28 Oct 15
KVR CV- 28 Oct 15KVR CV- 28 Oct 15
KVR CV- 28 Oct 15
 
CV SHEHARA MENDIS
CV SHEHARA MENDISCV SHEHARA MENDIS
CV SHEHARA MENDIS
 
CURRCULIM VIATE NAVEED KHAN 16-1-17
CURRCULIM VIATE NAVEED KHAN 16-1-17CURRCULIM VIATE NAVEED KHAN 16-1-17
CURRCULIM VIATE NAVEED KHAN 16-1-17
 
Ursula Andrews CV
Ursula Andrews CVUrsula Andrews CV
Ursula Andrews CV
 

Similar to NEW GFMS CC PRESENTATION

Nikhin marketting(titto sunny)
Nikhin marketting(titto sunny)Nikhin marketting(titto sunny)
Nikhin marketting(titto sunny)Traum Academy
 
Dr. ibha Rani_ New product Development.pptx
Dr. ibha Rani_ New product Development.pptxDr. ibha Rani_ New product Development.pptx
Dr. ibha Rani_ New product Development.pptxIbhaRani
 
Principles of marketing explained
Principles of marketing explainedPrinciples of marketing explained
Principles of marketing explainedSachiArun
 
Grp 6 developing global products & brands
Grp   6 developing global products & brandsGrp   6 developing global products & brands
Grp 6 developing global products & brandsolffa
 
Product design and development
Product design and developmentProduct design and development
Product design and developmentKishor Tayade
 
The product planning process
The product planning processThe product planning process
The product planning processLianafitri1
 
POM: Product design and development
POM: Product design and developmentPOM: Product design and development
POM: Product design and developmentKishor Tayade
 
New product development
New product developmentNew product development
New product developmentrani mamatha
 
Presentation1 visual beeblackstylepdd
Presentation1   visual beeblackstylepddPresentation1   visual beeblackstylepdd
Presentation1 visual beeblackstylepddChan Sethey
 
Food Product Development.pdf
Food Product Development.pdfFood Product Development.pdf
Food Product Development.pdfSumanRiaz5
 
New product development in Marketing Mansgement
New product development in Marketing MansgementNew product development in Marketing Mansgement
New product development in Marketing MansgementSusmitaGhosh36
 
PLCM Module-3-Dr.GMS JSSATEB.pptx
PLCM Module-3-Dr.GMS JSSATEB.pptxPLCM Module-3-Dr.GMS JSSATEB.pptx
PLCM Module-3-Dr.GMS JSSATEB.pptxswamy62
 
Food Product Development Process, Design & Strategies"
Food Product Development Process,  Design & Strategies"Food Product Development Process,  Design & Strategies"
Food Product Development Process, Design & Strategies"Freelancer
 
Food Product Development.pdf
Food Product Development.pdfFood Product Development.pdf
Food Product Development.pdfSumanRiaz5
 
New product development
New product developmentNew product development
New product developmentNishant Pahad
 
Innovation strategyroadmap ppt
Innovation strategyroadmap pptInnovation strategyroadmap ppt
Innovation strategyroadmap pptJoe Hines
 
Current issues in manangement
Current issues in manangementCurrent issues in manangement
Current issues in manangementYawehElShaddai
 

Similar to NEW GFMS CC PRESENTATION (20)

Nikhin marketting(titto sunny)
Nikhin marketting(titto sunny)Nikhin marketting(titto sunny)
Nikhin marketting(titto sunny)
 
Dr. ibha Rani_ New product Development.pptx
Dr. ibha Rani_ New product Development.pptxDr. ibha Rani_ New product Development.pptx
Dr. ibha Rani_ New product Development.pptx
 
Principles of marketing explained
Principles of marketing explainedPrinciples of marketing explained
Principles of marketing explained
 
Grp 6 developing global products & brands
Grp   6 developing global products & brandsGrp   6 developing global products & brands
Grp 6 developing global products & brands
 
Product design and development
Product design and developmentProduct design and development
Product design and development
 
The product planning process
The product planning processThe product planning process
The product planning process
 
POM: Product design and development
POM: Product design and developmentPOM: Product design and development
POM: Product design and development
 
New product development
New product developmentNew product development
New product development
 
Presentation1 visual beeblackstylepdd
Presentation1   visual beeblackstylepddPresentation1   visual beeblackstylepdd
Presentation1 visual beeblackstylepdd
 
Food Product Development.pdf
Food Product Development.pdfFood Product Development.pdf
Food Product Development.pdf
 
New product development in Marketing Mansgement
New product development in Marketing MansgementNew product development in Marketing Mansgement
New product development in Marketing Mansgement
 
PLCM Module-3-Dr.GMS JSSATEB.pptx
PLCM Module-3-Dr.GMS JSSATEB.pptxPLCM Module-3-Dr.GMS JSSATEB.pptx
PLCM Module-3-Dr.GMS JSSATEB.pptx
 
Food Product Development Process, Design & Strategies"
Food Product Development Process,  Design & Strategies"Food Product Development Process,  Design & Strategies"
Food Product Development Process, Design & Strategies"
 
Food Product Development.pdf
Food Product Development.pdfFood Product Development.pdf
Food Product Development.pdf
 
New product development
New product developmentNew product development
New product development
 
17 Strategic Product Management - Strategy Making & Strategic Alternatives
17 Strategic Product Management - Strategy Making & Strategic Alternatives17 Strategic Product Management - Strategy Making & Strategic Alternatives
17 Strategic Product Management - Strategy Making & Strategic Alternatives
 
Innovation strategyroadmap ppt
Innovation strategyroadmap pptInnovation strategyroadmap ppt
Innovation strategyroadmap ppt
 
19 Strategic Product Management - Strategy making & New Product Development (...
19 Strategic Product Management - Strategy making & New Product Development (...19 Strategic Product Management - Strategy making & New Product Development (...
19 Strategic Product Management - Strategy making & New Product Development (...
 
Product planning
Product planningProduct planning
Product planning
 
Current issues in manangement
Current issues in manangementCurrent issues in manangement
Current issues in manangement
 

NEW GFMS CC PRESENTATION

  • 1. Catering Consultancy Tel: 07970645075 Professional advice, assistance & industry knowledge
  • 2. GFMS CATERING CONSULTANCY DEVELOPMENT MANAGEMENT SERVICES “You can get a lot of pretty designs or good ideas, but a lot of people don’t have the knowledge or the experience of what it is like to have a factory out the back” Director: Coca Cola The gap between ideas and reality is considerable as the statement above concisely identifies. Ideas are cheap but executing them can be very costly indeed. What it also highlights is the fundamental need for the fusion of an exciting idea with the practicalities of in-depth market knowledge and experience in production and marketing techniques; a combination of which can turn a good idea into a successful reality – and a winning product. This is the gap that GFMS Catering Consultancy aims to fill, by providing the expertise and experience – in market research, product development & production, legislation, modern manufacturing methods and industry connections. These attributes are all required to take a project from the “idea” stage to a well- researched, tested, certified and feasible launch ready state.
  • 3. Methodology Every project starts with an idea which must then be treated to comprehensive and exhaustive evaluation and feasibility studies to establish its viability as a successful product or service. The disciplines with which GFMS Catering Consultancy treat an idea or concept product are integrated into a through three stage procedure – as outlined in the simplified flow chart. There are numerous reasons why you may require the services of an experienced food service consultant but the most common request is assist in taking a product or new food based product from concept to market readiness.
  • 4.
  • 5. STAGE 1 A The Idea In the first instance, the idea must be discussed for validity, possible variations or alternatives. Remember ideas are cheap but seeing them through can be a very expensive process. B Evaluation At this stage, the idea must be given some form to allow the rest of the process to develop around it. Therefore evaluation of factors such as varieties, pack size, shape, weight, colour, flavour, appearance, current market trends, market potential and competition etc must take place in order to establish rough guidelines. A possible achievable margin must also be estimated at this stage. It must be noted that any parameters established here will be refined as the development process progresses. It is also suggested that this early general evaluation would require a small team operating on a “think-tank” basis. C Resource Evaluation Linked to the evaluation of the idea must be resource evaluation; it is vital to establish in the early stage to avoid any wastage in development costs. Items to consider should include: 1. Financial resources 2. Production capability 3. Technical and quality control skills 4. Distribution channels 5. Appropriate sales and personnel skills 6. Marketing/ Advertising resources 7. Time factor 8. Team capability 9. Availability of compound products The findings of this evaluation must be supplemented by market evaluation in order to establish a clear picture of parameters and constraints. D Market Evaluation At this stage the market must be researched thoroughly in order to establish any potential market gaps, the likely demand for the product / service and its positioning. Research would include: 1. Market size and potential, possible pricing structure 2. Consumer demand / sectors 3. Trade/ buyer demands 4. Competitive products 5. Distribution channels / retail outlets / trade 6. Current market trends At the end of stage 1, a full report summarizing product, market & resource evaluation would be prepared.
  • 6. STAGE 2 E Prototype Plan A plan must now be established for the production of the prototype, with all of the following factors considered: 1. Size 2. Shape 3. Weight 4. Varieties 5. Pack design 6. Branding 7. Price/Margin available 8. Production capabilities F Prototype Mock-Ups In order to accurately test likely demand for the finished product, the prototype must now be produced in a highly finished form G Market Research A skilled placement research company will be chosen to test reaction to all aspects of the prototype, including branding, pricing, varieties, weight, quality, visual appeal, desirability etc H Resource & Product Conclusions Conclusions regarding both product resource requirements and mock-up product conclusions will be considered and evaluated. At the end of stage 2, a full report summarizing the concept product and market conclusions will be prepared.
  • 7. STAGE 3 Utilising the findings of both stage 1 & 2 the idea must now be finally concluded on before a commitment to production is made. I Compatibility Conclusions The project team should meet to discuss the prototype and placement research, together with market and resource evaluation. At this stage, the following elements should be finalised: 1. Any commitment to capital expenditure 2. Ordering of Raw materials 3. Target date for initial production run 4. Initial production quantities J Plan Launch Programme Having made a commitment to production, a launch programme should be planned which will take account of: 1) SALES & DISTRIBUTION • Initial quantities • Initial customer/ sales targets • Pricing • Initial throughput estimates • Storage • Distribution • Sales personnel 2) MARKETING • Marketing Plan • Test market areas/ full launch • Launch offers • Promotional literature/point of sale • Media recommendations • P.R. support
  • 8. K Launch Programme Confirmed All project team members must now double-check all plans re: 1. Financing 2. Production / technical 3. Delivery dates on raw materials 4. Sales/Personnel 5. Storage 6. Distribution 7. Training 8. Marketing 9. Launch date re-confirmed L Initial Production Run Following the initial production run, the project team must evaluate the product to ensure that all criteria are satisfied. At this stage, one final question should be asked and confirmed. “Are we launch ready?” THE LAUNCH If the answer to “L” is affirmative and all items and resources under “K” are checked and available, product is now ready for test market or full launch. The project team must now implement the launch plan, monitoring deadlines and quality throughout to ensure maximum impact and sales.
  • 9. With a long background in the Contract Catering, the Wedding catering and Events industry and then in fresh & frozen Ready Meal Manufacturing, I have a wealth of food industry experience gained over 25 years. With an extraordinary practical knowledge and a fantastic list of reliable contacts and partners, I am in a very good position to help your business manufacture your food product no matter how diverse the request. Small business often struggle to outsource production as most contactable food manufacturers are simply not interested in talking about smaller volume production. You may be looking simply increase margin on your products by seeking a more cost effective supply chain or require a specific product or service and are struggling to source this solution. There are numerous reasons why you may require the services of an experienced food service consultant but the most common request is assist in taking a product or new food based product from concept to market readiness. The key to a client / consultant relationship is to understand a clear brief and to carry this out in good time and with regular communication. Problem solving and solution supplying is what GFMS Catering Consultancy offer. Conclusion
  • 10. DOG FOOD I was recently asked to assist in finding a suitable manufacturer for a fresh dog food product range after the owners had struggled for several months to find any one interested in taking their excellent product on board. The client had initial low sales projections building to good volumes in a 6-9 month period and as is often the case they could not find a suitable manufacturer due to the start up position. I found them a manufacturer, arranged the suitable food safety and Defra legislative requirements, took recopies from table top samples to manufacturing recipes, organised all production processes and shelf life testing as well as sourcing the complete supply chain and packaging solutions well inside budget. EXPORT OF FROZEN READY MEALS I have organised a range of 15 ready meals and 12 side dishes from initial meetings and presentations ready for export to Hong Kong – 40,000 meals monthly. Range, recipes, manufacturer, container choice, branding and signed off end product range within agreed time scale and within budget. Time scale was 3 months Case Study MANUFACTURING KITCHEN DESIGN Project manage & oversee the build. Ahead of time and under budget HEALTHY READY MEAL S Design a new and exciting range of fresh frozen ready meals, clean low calorie meals with a high protein & low carb content. In addition to designing a new & confidential manufacturing process for the high volume product range.