SlideShare a Scribd company logo
1 of 5
WELCOME
2
April 2, 1991: Signing of contract with
Danieli & C. SpA. Italy
October 1991: Construction of plant in
Gurun
February 20, 1993: Official opening of
Bar and Wire Rod
Mill
BRIEF HISTORY
BAR AND WIRE ROD MILL
3
November 4, 1993 : Contract was signed
with Itochu-Nisho-Kawasaki
February 20, 1994: Construction started
July 22, 1996: First hot- run
October 1996: Commercial production
May 12, 1997: Official opening of Beam
and Section Mill
BEAM AND SECTION MILL
BRIEF HISTORY
4
Product Min. Size Max. Size
(mm) (mm)
Wire rods: 5.5 mm 19 mm
Big rounds in
coils:
20 mm 45 mm
Straight bars: 20 mm 85 mm
Design Finished Products Sizes
BAR AND WIRE ROD MILL
5
Design Capacity: 700,000 mton/year
Product Range:
H-Beam:
 150mm x 150mm - 350mm x 350mm
 200mm x 100mm - 600mm x 300mm
I-Beam
 200mm x 100mm - 600mm x 190mm
Channels
 150mm x 75mm to 380mm x 100mm
 Angles:
 125mm x 125mm to 200mm x 200mm
BEAM AND SECTION MIIL

More Related Content

Viewers also liked

Low carbon footprint metal extraction
Low carbon footprint metal extractionLow carbon footprint metal extraction
Low carbon footprint metal extraction
Piyush Verma
 
Hermite bicubic-surface-patch
Hermite bicubic-surface-patchHermite bicubic-surface-patch
Hermite bicubic-surface-patch
Rohit Gothwal
 
Mechanical working of metals
Mechanical working of metalsMechanical working of metals
Mechanical working of metals
Aamir Asdaque
 

Viewers also liked (16)

wire drawing machine
wire drawing machinewire drawing machine
wire drawing machine
 
Analysis of Surface cracks in CHQ grades
Analysis of Surface cracks in CHQ gradesAnalysis of Surface cracks in CHQ grades
Analysis of Surface cracks in CHQ grades
 
Low carbon footprint metal extraction
Low carbon footprint metal extractionLow carbon footprint metal extraction
Low carbon footprint metal extraction
 
Dieless drawing
Dieless drawingDieless drawing
Dieless drawing
 
Hermite bicubic-surface-patch
Hermite bicubic-surface-patchHermite bicubic-surface-patch
Hermite bicubic-surface-patch
 
DRAWING PROCESS AND DRAWING MACHINES
DRAWING PROCESS AND DRAWING MACHINESDRAWING PROCESS AND DRAWING MACHINES
DRAWING PROCESS AND DRAWING MACHINES
 
CHQ Schools Presentation
CHQ Schools PresentationCHQ Schools Presentation
CHQ Schools Presentation
 
Presentation wire drawing
Presentation  wire drawingPresentation  wire drawing
Presentation wire drawing
 
Drawing Processes
Drawing ProcessesDrawing Processes
Drawing Processes
 
Wire drawing ppt
Wire drawing pptWire drawing ppt
Wire drawing ppt
 
Mechanical working of metals
Mechanical working of metalsMechanical working of metals
Mechanical working of metals
 
Fasteners Presentation
Fasteners PresentationFasteners Presentation
Fasteners Presentation
 
CURTAIN WALL
CURTAIN WALLCURTAIN WALL
CURTAIN WALL
 
Fundamentals of Drawing
Fundamentals of DrawingFundamentals of Drawing
Fundamentals of Drawing
 
Line Drawing Techniques
Line Drawing TechniquesLine Drawing Techniques
Line Drawing Techniques
 
Raw Material Handling in Fasteners Manufacturing Process by Rupal Jyotishi
Raw Material Handling in Fasteners Manufacturing Process by Rupal JyotishiRaw Material Handling in Fasteners Manufacturing Process by Rupal Jyotishi
Raw Material Handling in Fasteners Manufacturing Process by Rupal Jyotishi
 

Similar to PERFECT CHANNEL_PRESENTATION - Summary

Rock Drilling Tools
Rock Drilling ToolsRock Drilling Tools
Rock Drilling Tools
Jeb Williams
 
Concreat filing information about K007en.pdf
Concreat filing information about K007en.pdfConcreat filing information about K007en.pdf
Concreat filing information about K007en.pdf
thinagara
 
Art Of Fusion Iss 01 LR.PDF
Art Of Fusion Iss 01 LR.PDFArt Of Fusion Iss 01 LR.PDF
Art Of Fusion Iss 01 LR.PDF
Joel Glazebrook
 

Similar to PERFECT CHANNEL_PRESENTATION - Summary (20)

the charcoal burner technical report
the charcoal burner technical report the charcoal burner technical report
the charcoal burner technical report
 
Rock Drilling Tools
Rock Drilling ToolsRock Drilling Tools
Rock Drilling Tools
 
Pulley & coupling by uncle bugs
Pulley & coupling by uncle bugsPulley & coupling by uncle bugs
Pulley & coupling by uncle bugs
 
Concreat filing information about K007en.pdf
Concreat filing information about K007en.pdfConcreat filing information about K007en.pdf
Concreat filing information about K007en.pdf
 
Grate Cooler Alignment
Grate Cooler AlignmentGrate Cooler Alignment
Grate Cooler Alignment
 
Art Of Fusion Iss 01 LR.PDF
Art Of Fusion Iss 01 LR.PDFArt Of Fusion Iss 01 LR.PDF
Art Of Fusion Iss 01 LR.PDF
 
Flow and connection solutions Palamatic Process
Flow and connection solutions Palamatic ProcessFlow and connection solutions Palamatic Process
Flow and connection solutions Palamatic Process
 
Flow and connection Palamatic Process
Flow and connection Palamatic ProcessFlow and connection Palamatic Process
Flow and connection Palamatic Process
 
HYUNDAI ALUMINUM FORMWORK SYSTEM_CATALOGUE
HYUNDAI ALUMINUM FORMWORK SYSTEM_CATALOGUEHYUNDAI ALUMINUM FORMWORK SYSTEM_CATALOGUE
HYUNDAI ALUMINUM FORMWORK SYSTEM_CATALOGUE
 
TREFILERIAS QUIJANO LONG BROCHURE
TREFILERIAS QUIJANO LONG BROCHURETREFILERIAS QUIJANO LONG BROCHURE
TREFILERIAS QUIJANO LONG BROCHURE
 
Mgm presentation gurpreet_singh_flyash
Mgm presentation gurpreet_singh_flyashMgm presentation gurpreet_singh_flyash
Mgm presentation gurpreet_singh_flyash
 
YDM Laboratory Technique Catalogue
YDM Laboratory Technique CatalogueYDM Laboratory Technique Catalogue
YDM Laboratory Technique Catalogue
 
TRUMPF UK Power Tools Overview
TRUMPF UK Power Tools OverviewTRUMPF UK Power Tools Overview
TRUMPF UK Power Tools Overview
 
Nanshan Aluminum presentation v2016
Nanshan Aluminum presentation v2016Nanshan Aluminum presentation v2016
Nanshan Aluminum presentation v2016
 
main project
main projectmain project
main project
 
symintec profile
symintec profilesymintec profile
symintec profile
 
IBS Factory Report Assignment
IBS Factory Report AssignmentIBS Factory Report Assignment
IBS Factory Report Assignment
 
Mindrill contractor tools
Mindrill contractor toolsMindrill contractor tools
Mindrill contractor tools
 
B m p/ rotary endodontic courses by indian dental academy
B  m p/ rotary endodontic courses by indian dental academyB  m p/ rotary endodontic courses by indian dental academy
B m p/ rotary endodontic courses by indian dental academy
 
Aluminum_profile_Catalogue_Apr_2021.pdf
Aluminum_profile_Catalogue_Apr_2021.pdfAluminum_profile_Catalogue_Apr_2021.pdf
Aluminum_profile_Catalogue_Apr_2021.pdf
 

PERFECT CHANNEL_PRESENTATION - Summary

  • 2. 2 April 2, 1991: Signing of contract with Danieli & C. SpA. Italy October 1991: Construction of plant in Gurun February 20, 1993: Official opening of Bar and Wire Rod Mill BRIEF HISTORY BAR AND WIRE ROD MILL
  • 3. 3 November 4, 1993 : Contract was signed with Itochu-Nisho-Kawasaki February 20, 1994: Construction started July 22, 1996: First hot- run October 1996: Commercial production May 12, 1997: Official opening of Beam and Section Mill BEAM AND SECTION MILL BRIEF HISTORY
  • 4. 4 Product Min. Size Max. Size (mm) (mm) Wire rods: 5.5 mm 19 mm Big rounds in coils: 20 mm 45 mm Straight bars: 20 mm 85 mm Design Finished Products Sizes BAR AND WIRE ROD MILL
  • 5. 5 Design Capacity: 700,000 mton/year Product Range: H-Beam:  150mm x 150mm - 350mm x 350mm  200mm x 100mm - 600mm x 300mm I-Beam  200mm x 100mm - 600mm x 190mm Channels  150mm x 75mm to 380mm x 100mm  Angles:  125mm x 125mm to 200mm x 200mm BEAM AND SECTION MIIL

Editor's Notes

  1. The new management came in 1996.Private sector participation was through Maju group. 1996 the new meltshop plant in Kemaman and Beam and section mill were commissioned.
  2. The company was incorporated in 1982 We first started operation in 1985 at Kemaman producing Billet and Hot Briquetted Iron or HBI. Then in 1993 the Bar and Wire Rod Mill was commissioned in Gurun. In the same year Direct Reduced Iron Plant (DRI Plant) was commissioned iusing HYL III technology.