SlideShare a Scribd company logo
1 of 35
Download to read offline
Best Practices for Improving the PCB Supply Chain: Part II 
Cheryl Tulkoff 
Senior Member of the Technical Staff 
ctulkoff@dfrsolutions.com 
1
PCB SUPPLY CHAIN BEST PRACTICES – PART I RECAP 
2
PCBs should always be considered critical components 
Custom design 
Product Foundation 
Long term PCB quality and reliability is simply not achievable without stringent controls in place for: 
Supplier selection 
Qualification 
Management 
PCBs as Critical Components 
3
Create a PCB Commodity Team with at least one representative from each of the following areas: 
Design 
Manufacturing 
Purchasing 
Quality/Reliability 
Team should meet on a routine basis 
Discuss new products and technology requirements in the development pipeline. 
Pricing, delivery, and quality performance issues with approved PCB suppliers should also be reviewed. 
Team is also tasked with identifying new suppliers and creating supplier selection and monitoring criteria 
PCB Commodity Team 
4
Established PCB supplier selection criteria in place. 
Criteria should be custom to your business 
Commonly used criteria are: 
Time in business 
Revenue 
Growth 
Employee Turnover 
Training Program 
Certified to the standards you require (IPC, MIL-SPEC, ISO, etc.) 
Capable of producing the technology you need as part of their mainstream capabilities 
Don’t exist in PCB process “niches” where suppliers claim capability but have less than ~ 15% of their volume built there 
Have quality and problem solving methodologies in place 
Have a technology roadmap 
Have a continuous improvement program in place 
Supplier Selection Criteria 
5
Rigorous qualification criteria which includes: 
On site visit by to the facility which will produce your PCBs by someone knowledgeable in PCB fabrication techniques. 
Review process controls, quality monitoring and analytical techniques, storage and handling practices and conformance to generally acceptable manufacturing practices. 
Best way to meet and establish relationships with the people responsible for manufacturing your product. 
Sample builds of an actual part you will produce which are evaluated by the PCB supplier 
Also independently evaluated by you or a representative to the standards that you require. 
PCB Qualification Criteria 
6
Use of supplier tiering 
 Low, Middle, High strategies if you have a diverse product line with products that range from simpler to complex. 
Allows for strategic tailoring to save cost and to maximize supplier quality to your product design. 
Match supplier qualifications to the complexity of your product. 
Typical criteria for tiering suppliers include: 
Finest line width 
Finest conductor spacing, 
Smallest drilled hole and via size 
Impedance control requirement 
Specialty laminate needed (Rogers, flex, mixed) 
Use of HDI, micro vias, blind or buried vias. 
Minimize use of suppliers who have to outsource critical areas of construction. 
Again, do not exist in the margins of process capabilities! 
PCB Supplier Tiering 
7
Partner with your PCB suppliers for success. 
Critical for low volumes, low spend, or high technology and reliability requirements 
Some good practices include: 
Monthly calls with PCB commodity team and each PCB supplier 
 PCB supplier team should members equivalent to your team members 
QBRs (quarterly business reviews) 
Review spend, quality, and performance metrics, and “state of the business “, business growth, new product and quoting opportunities… 
Address any upcoming changes 
 Factory expansion, move, or relocation, critical staffing changes, new equipment/capability installation etc. 
Twice per year, QBRs should be joint onsite meetings which alternate between your site and the supplier factory site. 
Factory supplier site QBR visit can double as the annual on site visit and audit that you perform. 
PCB Relationship Management 
8
Use Supplier Scorecards 
Perform quarterly and yearly on a rolling basis 
Typical metrics include: 
On Time Delivery 
PPM Defect Rates 
Communication – speed, accuracy, channels, responsiveness to quotes 
Quality Excursions / Root Cause Corrective Action Process Resolution 
Supplier Corrective Action Requests 
Discuss recalls, notifications, or scrap events exceeding a certain dollar amount 
PCB Supplier Scorecards 
9
Review the following: 
Top 3 PCB factory defects: monitoring and reporting 
Process control and improvement plans for the top 3 defects 
Product Yield and scrap reports 
Feedback on issues facing the industry 
Reliability testing performed (HATS, IST, solder float, etc.) 
Review IPC-9151B, Printed Board Process Capability, Quality, and Relative Reliability (PCQR2) Benchmark Test Standard and Database at: 
http://www.ipc.org/html/IPC-9151B.pdf 
PCB suppliers may be part of this activity already. 
Ask if they participate and if you can get a copy of their results. 
PCB Continuous Quality Monitoring 
10
Ideally, all PCBs should come from the same factory from start to finish 
Prototype (feasibility), pre-release production (testability & reliability), to released production (manufacturability). 
Any factory move introduces an element of risk 
Product must go through setup and optimization specific to each factory and equipment contained there. 
While not always possible, all PCBs intended for quality and reliability testing should come from the actual PCB production facility. 
PCB Prototype Development 
11
PART II: PERFORMING THE PCB PROCESS AUDIT 
Everything looks great on paper or on the web…… 
12
Why Perform an Onsite Audit? 
No industry standard methodology for qualifying PCB suppliers 
Standards do exist for lot-based PCB testing and acceptance within the IPC 6010 series 
 Sourcing follows the “as agreed upon between user and supplier” (AABUS) approach 
 IPC began discussing this gap in 2008 with a Blue Ribbon Committee 
IPC has recently launched a Validation Business Unit with plans to eventually move towards an IPC Qualified Manufacturers List (QML) for suppliers, including PCBs [3]. I 
In the meantime, however, onsite audits remain the best approach 
13
PCB Fabrication Processes 
More than 180 individual steps required to manufacture typical printed circuit boards 
Knowledge is key! 
Processes are complex, chemistry intensive and there are a lot of steps 
14
Audit Focus 
All steps are obviously important but this presentation will focus on: 
Requirements 
Surface Finish Highlight 
Process Control & Analysis 
Cleanliness 
Recognizing Common Defects 
Test & Final Inspection 
Material Handling 
15
Communicate Requirements 
Define the standards needed 
Communicate both quality & reliability objectives! 
Help your supplier help you 
Create a PCB Fabrication specification 
Outlines requirements and communication required for modifications to drawings 
16
Laminate selection is frequently under specified! Some common issues: 
PCB supplier frequently allowed to select laminate material 
No restrictions on laminate changes 
Generic IPC slash sheet requirements used 
Laminates called out by Tg only and with no measurement method specified (there is more than one) 
No cleanliness requirements specified 
Failure to specify stackup 
Not all laminates are created equal 
Failure to put some controls in places opens the door to failure 
PCB Materials Selection
Good quality is necessary but not SUFFICIENT to guarantee high reliability. 
IPC Class 3 by itself does not guarantee high reliability 
A PCB or PCBA can be perfectly built to IPC Class 3 standards and still be totally unreliable in its final application. 
Consider two different PCB laminates both built to IPC Class 3 standards. 
Both laminates are identical in all properties EXCEPT one laminate has a CTEz of 40 and the other has a CTEz of 60. 
The vias in the laminate with the lower CTEz will be MORE reliable in a long term, aggressive thermal cycling environment than the CTEz 60 laminate. 
A CTEz 40 laminate built to IPC class 2 could be MORE reliable than the CTEz 60 laminate built to Class 3. 
Appropriate materials selection for the environment is key! 
Quality, Reliability & IPC Class 2 versus Class 3 
18
Importance of Surface Finish 
The selection of the surface finish on your PCBs could be the most important material decision made for the final electronic assembly. 
The surface finish influences the process yield, the amount of rework, field failure rate, the ability to test, the scrap rate, and of course the cost. 
One can be lead astray by selecting the lowest cost surface finish only to find that the eventual total cost is much higher. 
The selection of a surface finish should be done with a holistic approach that considers all important aspects of the assembly. 
19
Surface Finish Selection Guideline 
Cost Sensitive Product 
High Volume Required 
Pb-Free Shock/Drop is a Concern 
Cosmetics of Finish is Important 
Corrosion Failure is Possible 
Fine Pitch Components Used 
Pb-Free Wave Solder 
(PCB > 62mil) 
High Yield ICT Required 
Is Important to Product 
Is not required for the Product 
Attributes 
Wire bonding to Finish is Required 
SF Type 
20
Process Control & Analysis 
Cross Sections 
In process & taken to verify: 
Hole wall quality 
Desmear / Etchback 
Plating thickness 
Dielectrics 
Cross sections of finished product supplied per customer specification. 
Inspections 
Visual Inspections 
Automatic Optical Inspection (AOI) 
Programmed from the gerber data to inspect the etched copper panels. 
X-Ray Inspection 
Drilling Performance 
Layer alignment 
Cleanliness Measurements 
21
IPC-5701: Users Guide for Cleanliness of Unpopulated Printed Boards (2003) 
IPC-5702: Guidelines for OEMs in Determining Acceptable Levels of Cleanliness of Unpopulated Printed Boards (2007) 
IPC-5703: Guidelines for Printed Board Fabricators in Determining Acceptable Levels of Cleanliness of Unpopulated Printed Boards (Industry Review Draft) 
IPC-5704: Cleanliness Requirements for Unpopulated Printed Boards (2010) 
IPC PCB Cleanliness Standards 
22
Resistivity of Solvent Extract (ROSE) Test Method IPC-TM-650 2.3.25 
The ROSE test method is used as a process control tool to detect the presence of bulk ionics. The IPC upper limit is set at 10.0 mg/NaCl/in2. This test is performed using a Zero-Ion or similar style ionic testing unit that detects total ionic contamination, but does not identify specific ions present. This process draws the ions present on the PCB into the solvent solution. The results are reported as bulk ions present on the PCB per square inch. 
Modified Resistivity of Solvent Extract (Modified ROSE) Test Method TM 2.3.25.1 
The modified ROSE test method involves a thermal extraction. The PCB is exposed in a solvent solution at an elevated temperature for a specified time period. This process draws the ions present on the PCB into the solvent solution. The solution is tested using an Ionograph-style test unit. The results are reported as bulk ions present on the PCB per square inch. 
Ion Chromatography IPC-TM-650 2.3.28.2 
IPC Ionic Contamination Test Standards 
23
Test Procedures: Best Practice 
Ion Chromatography (IC) is the ‘gold standard’ 
Some, but very few, PCB manufacturers qualify lots based on IC results 
Larger group uses IC to baseline ROSE / Omegameter / Ionograph (R/O/I) results 
Perform lot qualification with R/O/I 
Periodically recalibrate with IC (every week, month, or quarter) 
24
Common PCB Defects 
Basic understanding of common PCB defects is helpful 
Ask for cross-section images 
Required for process control 
Knowledge can be used by an organization to monitor supplier performance over time 
Insufficient Plating, Voids, Nodules, Folds, Etch Pits, Fiber Protrusion 
25
Insufficient Plating Thickness 
ANSI/IPC-A-600 requires an average plating thickness of 20 um, with isolated areas allowed to reach 15 um. 
Insufficient plating thickness is caused by either insufficient current/time in the copper plating bath or poor throwing power. 
When insufficient plating thickness is observed throughout the PTH, instead of just at the center, the root-cause is more likely insufficient current/time in the plating bath. 
26
Glass Fiber Protrusion 
Glass fiber protrusion into PTH walls affects PTH plating thickness and hence can contribute to PTH cracking. 
Glass fiber protrusion may be due to process control variabilities during hole drilling, hole preparation or application of flash copper. 
Glass fiber protrusion is allowed by IPC guidelines only if the min. plating thickness is met. 
27
Plating Folds 
Plating folds create detrimental stress concentrations. 
Rough drilling or improper hole preparation can cause plating folds. 
Rough drilling can be caused by poor laminate material, worn drill bits, or an out-of-control drilling process. 
Improper hole preparation is due to excessive removal of epoxy resin caused by incomplete cure of resin system or a preparation process (desmear/etchback) that is not optimized. 
28
Plating Nodules 
Root causes of nodulation include poor drilling, particles in solution, solution temperature out of range, or brightener level in excess. 
The relatively straight hole walls and the lack of particles in the nodules seemed to suggest the later two as root cause. 
The presence of plating nodules can be detrimental to high reliability. 
Plating nodules create highly stressed areas in the plating wall and can possibly reduce lifetime under temperature cycling. 
ANSI/IPC-A-600 states that nodules are acceptable if the hole diameter is above the minimum specified. 
29
Plating void is a generic term to describe voids present in and around the PTH wall. 
Can cause large stress concentrations, resulting in crack initiation. 
The location of the voids can provide crucial information in identifying the defective process. 
Around the glass bundles 
In the area of the resin 
At the inner layer interconnects (aka, wedge voids) 
Center or edges of the PTH 
Plating Voids 
30
Test & Final Inspection 
Electrical Test 
IPC-D-356 netlist is uploaded into the tester. 
Each PCB is manually placed on fixture and tested for continuity and resistance 
Verify handling for segregating passes & fails 
Final Inspection 
Visually inspect 100% of the finished product 
Review of: 
Fabrication drawing requirements 
Dimensional properties 
Board size 
Finished hole sizes 
Customer specification 
31
PCBs should remain in sealed packaging until assembly 
Package PCBs in brick counts which closely emulate run quantities 
PCBs should be stored in temperature and humidity controlled conditions 
Packaging in MBB (moisture barrier bags) with desiccant and HIC (humidity indicator cards) may be needed for some laminates 
Shipping & Handling 
Vacuum Sealer 
Humidity Indicator Card 
Moisture Barrier Bag 
32
Conclusions 
Foundation of a reliable product is a reliable PCB 
PCBs are always custom, critical components 
 Have a comprehensive strategy for selecting and qualifying PCB suppliers 
 Ensures that the foundation is strong 
Performing effective on site audits is a critical component of that strategy. 
33
Speaker Biography 
Cheryl Tulkoff has over 22 years of experience in electronics manufacturing with an emphasis on failure analysis and reliability. She has worked throughout the electronics manufacturing life cycle beginning with semiconductor fabrication processes, into printed circuit board fabrication and assembly, through functional and reliability testing, and culminating in the analysis and evaluation of field returns. She has also managed no clean and RoHS-compliant conversion programs and has developed and managed comprehensive reliability programs. 
Cheryl earned her Bachelor of Mechanical Engineering degree from Georgia Tech. She is a published author, experienced public speaker and trainer and a Senior member of both ASQ and IEEE. She has held leadership positions in the IEEE Central Texas Chapter, IEEE WIE (Women In Engineering), and IEEE ASTR (Accelerated Stress Testing and Reliability) sections. She chaired the annual IEEE ASTR workshop for four years, is an ASQ Certified Reliability Engineer and a member of SMTA and iMAPS. 
She has a strong passion for pre-college STEM (Science, Technology, Engineering, and Math) outreach and volunteers with several organizations that specialize in encouraging pre-college students to pursue careers in these fields. 
34
Contact Information 
•Questions? 
•Contact Cheryl Tulkoff, ctulkoff@dfrsolutions.com, 512-913-8624 
•www.dfrsolutions.com 
•Connect with me in LinkedIn as well! 
35

More Related Content

What's hot

Unit v11 proactive maintenance analysis
Unit v11 proactive maintenance analysisUnit v11 proactive maintenance analysis
Unit v11 proactive maintenance analysisCharlton Inao
 
Procurement quality-management PJM400 Mod2
Procurement quality-management PJM400 Mod2Procurement quality-management PJM400 Mod2
Procurement quality-management PJM400 Mod2KHogan62
 
eXception EMS "Fastrack Service"
eXception EMS "Fastrack Service"eXception EMS "Fastrack Service"
eXception EMS "Fastrack Service"GT100
 
Facility & Equipment Quality System Outline
Facility & Equipment Quality System OutlineFacility & Equipment Quality System Outline
Facility & Equipment Quality System OutlineJoseph Busfield
 
High Purity Water Project Presentation No Unplanned Downtime
High Purity Water Project Presentation No Unplanned DowntimeHigh Purity Water Project Presentation No Unplanned Downtime
High Purity Water Project Presentation No Unplanned DowntimeHargrove Life Sciences
 
Quality management-plan template
Quality management-plan templateQuality management-plan template
Quality management-plan templateVivek Srivastava
 
Risk Management integrated pub
Risk Management integrated pubRisk Management integrated pub
Risk Management integrated pubManfred Walder
 
Qualification & validation concept & terminology
Qualification & validation concept & terminologyQualification & validation concept & terminology
Qualification & validation concept & terminologyMuhammad Luqman Ikram
 
Management Strategies to Facilitate Continual Quality Improvement
Management Strategies to Facilitate Continual Quality ImprovementManagement Strategies to Facilitate Continual Quality Improvement
Management Strategies to Facilitate Continual Quality ImprovementInstitute of Validation Technology
 
Concept of URS,DQ,IQ,OQ,PQ
Concept of URS,DQ,IQ,OQ,PQConcept of URS,DQ,IQ,OQ,PQ
Concept of URS,DQ,IQ,OQ,PQdhavalrock24
 
2016 Fermenick Resume doc
2016 Fermenick Resume doc2016 Fermenick Resume doc
2016 Fermenick Resume docMark Fermenick
 
QAP PRESENTATION-16-04-10
QAP PRESENTATION-16-04-10QAP PRESENTATION-16-04-10
QAP PRESENTATION-16-04-10Dharmesh Patel
 

What's hot (20)

Unit v11 proactive maintenance analysis
Unit v11 proactive maintenance analysisUnit v11 proactive maintenance analysis
Unit v11 proactive maintenance analysis
 
Doc. RMD
Doc. RMDDoc. RMD
Doc. RMD
 
Landon mertz cerion nanomaterials
Landon mertz   cerion nanomaterialsLandon mertz   cerion nanomaterials
Landon mertz cerion nanomaterials
 
FACTORY ACCEPTANCE TEST
FACTORY ACCEPTANCE TEST FACTORY ACCEPTANCE TEST
FACTORY ACCEPTANCE TEST
 
Procurement quality-management PJM400 Mod2
Procurement quality-management PJM400 Mod2Procurement quality-management PJM400 Mod2
Procurement quality-management PJM400 Mod2
 
eXception EMS "Fastrack Service"
eXception EMS "Fastrack Service"eXception EMS "Fastrack Service"
eXception EMS "Fastrack Service"
 
Embedding quality assurance within procurement
Embedding quality assurance within procurementEmbedding quality assurance within procurement
Embedding quality assurance within procurement
 
Facility & Equipment Quality System Outline
Facility & Equipment Quality System OutlineFacility & Equipment Quality System Outline
Facility & Equipment Quality System Outline
 
Pharmaceutical Documentation
Pharmaceutical DocumentationPharmaceutical Documentation
Pharmaceutical Documentation
 
High Purity Water Project Presentation No Unplanned Downtime
High Purity Water Project Presentation No Unplanned DowntimeHigh Purity Water Project Presentation No Unplanned Downtime
High Purity Water Project Presentation No Unplanned Downtime
 
Quality management-plan template
Quality management-plan templateQuality management-plan template
Quality management-plan template
 
Risk Management integrated pub
Risk Management integrated pubRisk Management integrated pub
Risk Management integrated pub
 
Qualification & validation concept & terminology
Qualification & validation concept & terminologyQualification & validation concept & terminology
Qualification & validation concept & terminology
 
Management Strategies to Facilitate Continual Quality Improvement
Management Strategies to Facilitate Continual Quality ImprovementManagement Strategies to Facilitate Continual Quality Improvement
Management Strategies to Facilitate Continual Quality Improvement
 
Concept of URS,DQ,IQ,OQ,PQ
Concept of URS,DQ,IQ,OQ,PQConcept of URS,DQ,IQ,OQ,PQ
Concept of URS,DQ,IQ,OQ,PQ
 
2016 Fermenick Resume doc
2016 Fermenick Resume doc2016 Fermenick Resume doc
2016 Fermenick Resume doc
 
Validation boot camp 4
Validation boot camp 4Validation boot camp 4
Validation boot camp 4
 
Urs,dq, iq,oq,pq
Urs,dq, iq,oq,pqUrs,dq, iq,oq,pq
Urs,dq, iq,oq,pq
 
QAP PRESENTATION-16-04-10
QAP PRESENTATION-16-04-10QAP PRESENTATION-16-04-10
QAP PRESENTATION-16-04-10
 
Design qualification
Design qualificationDesign qualification
Design qualification
 

Viewers also liked

StartupsHK Startup Saturday Phonejoy Making Of Deck
StartupsHK Startup Saturday Phonejoy Making Of DeckStartupsHK Startup Saturday Phonejoy Making Of Deck
StartupsHK Startup Saturday Phonejoy Making Of DeckMartin Kessler
 
Take a Virtual Walk through the Luminous Garden
Take a Virtual Walk through the Luminous GardenTake a Virtual Walk through the Luminous Garden
Take a Virtual Walk through the Luminous GardenShelly D. Farnham, Ph.D.
 
So.cl: An interest Network for Informal Learning
So.cl:  An interest Network for Informal LearningSo.cl:  An interest Network for Informal Learning
So.cl: An interest Network for Informal LearningShelly D. Farnham, Ph.D.
 
Startup toolbox for Entrepreneurs and Business Managers...
Startup toolbox for Entrepreneurs and Business Managers...Startup toolbox for Entrepreneurs and Business Managers...
Startup toolbox for Entrepreneurs and Business Managers...Marzooq Prince
 
___ ________ (_____ ______ ___)
  ___ ________ (_____ ______ ___)  ___ ________ (_____ ______ ___)
___ ________ (_____ ______ ___)Ahmed Aboubakr
 
Attentional on Diversity in British TV: the complete dataset
Attentional on Diversity in British TV: the complete datasetAttentional on Diversity in British TV: the complete dataset
Attentional on Diversity in British TV: the complete datasetDavid Graham
 
Attentional on Diversity in British TV: the complete dataset
Attentional on Diversity in British TV: the complete datasetAttentional on Diversity in British TV: the complete dataset
Attentional on Diversity in British TV: the complete datasetDavid Graham
 

Viewers also liked (10)

StartupsHK Startup Saturday Phonejoy Making Of Deck
StartupsHK Startup Saturday Phonejoy Making Of DeckStartupsHK Startup Saturday Phonejoy Making Of Deck
StartupsHK Startup Saturday Phonejoy Making Of Deck
 
Take a Virtual Walk through the Luminous Garden
Take a Virtual Walk through the Luminous GardenTake a Virtual Walk through the Luminous Garden
Take a Virtual Walk through the Luminous Garden
 
So.cl: An interest Network for Informal Learning
So.cl:  An interest Network for Informal LearningSo.cl:  An interest Network for Informal Learning
So.cl: An interest Network for Informal Learning
 
Startup toolbox for Entrepreneurs and Business Managers...
Startup toolbox for Entrepreneurs and Business Managers...Startup toolbox for Entrepreneurs and Business Managers...
Startup toolbox for Entrepreneurs and Business Managers...
 
___ ________ (_____ ______ ___)
  ___ ________ (_____ ______ ___)  ___ ________ (_____ ______ ___)
___ ________ (_____ ______ ___)
 
Attentional on Diversity in British TV: the complete dataset
Attentional on Diversity in British TV: the complete datasetAttentional on Diversity in British TV: the complete dataset
Attentional on Diversity in British TV: the complete dataset
 
Abce
AbceAbce
Abce
 
Abce
AbceAbce
Abce
 
Prome drg
Prome drgProme drg
Prome drg
 
Attentional on Diversity in British TV: the complete dataset
Attentional on Diversity in British TV: the complete datasetAttentional on Diversity in British TV: the complete dataset
Attentional on Diversity in British TV: the complete dataset
 

Similar to Best Practices for Improving the PCB Supply Chain: Part II

Match Your High-Tech PCB Design to Your Suppliers Capabilities
Match Your High-Tech PCB Design to Your Suppliers CapabilitiesMatch Your High-Tech PCB Design to Your Suppliers Capabilities
Match Your High-Tech PCB Design to Your Suppliers CapabilitiesEpec Engineered Technologies
 
Re-Engineering Obsolete Printed Circuit Boards Webinar
Re-Engineering Obsolete Printed Circuit Boards WebinarRe-Engineering Obsolete Printed Circuit Boards Webinar
Re-Engineering Obsolete Printed Circuit Boards WebinarEpec Engineered Technologies
 
Design for Manufacturability Guidelines Every Designer should Follow
Design for Manufacturability Guidelines Every Designer should FollowDesign for Manufacturability Guidelines Every Designer should Follow
Design for Manufacturability Guidelines Every Designer should FollowDFMPro
 
Quick Turn PCBs - Why an Experienced Supply Chain Matters
Quick Turn PCBs - Why an Experienced Supply Chain MattersQuick Turn PCBs - Why an Experienced Supply Chain Matters
Quick Turn PCBs - Why an Experienced Supply Chain MattersEpec Engineered Technologies
 
A guide for lauching hardware based IoT products for startups and scaleups
A guide for lauching hardware based IoT products for startups and scaleupsA guide for lauching hardware based IoT products for startups and scaleups
A guide for lauching hardware based IoT products for startups and scaleupsAlex Gluhak
 
Why High-Tech Multi-Layer PCB Features Add Cost and Processing Time
Why High-Tech Multi-Layer PCB Features Add Cost and Processing TimeWhy High-Tech Multi-Layer PCB Features Add Cost and Processing Time
Why High-Tech Multi-Layer PCB Features Add Cost and Processing TimeEpec Engineered Technologies
 
Optimizing Product Realization Costs Across the Value Chain
Optimizing Product Realization Costs Across the Value ChainOptimizing Product Realization Costs Across the Value Chain
Optimizing Product Realization Costs Across the Value ChainCognizant
 
Meritronics_Company rev 07.02.14
Meritronics_Company rev 07.02.14Meritronics_Company rev 07.02.14
Meritronics_Company rev 07.02.14Fides Sales
 
Successful Flex & Rigid-Flex Designs for Streamlining Production
Successful Flex & Rigid-Flex Designs for Streamlining ProductionSuccessful Flex & Rigid-Flex Designs for Streamlining Production
Successful Flex & Rigid-Flex Designs for Streamlining ProductionEpec Engineered Technologies
 
Quality & Reliability Consultant
Quality & Reliability ConsultantQuality & Reliability Consultant
Quality & Reliability ConsultantMunirhaq
 
POC_to_product1
POC_to_product1POC_to_product1
POC_to_product1yatinec
 
PCB Manufacturing Facilities - Certifications, Compliance, and Security
PCB Manufacturing Facilities - Certifications, Compliance, and SecurityPCB Manufacturing Facilities - Certifications, Compliance, and Security
PCB Manufacturing Facilities - Certifications, Compliance, and SecurityEpec Engineered Technologies
 
Battery Pack Development Timeline and Expectations
Battery Pack Development Timeline and ExpectationsBattery Pack Development Timeline and Expectations
Battery Pack Development Timeline and ExpectationsEpec Engineered Technologies
 
Low Layer Count PCBs – Why They Are Not All Created Equal
Low Layer Count PCBs – Why They Are Not All Created EqualLow Layer Count PCBs – Why They Are Not All Created Equal
Low Layer Count PCBs – Why They Are Not All Created EqualEpec Engineered Technologies
 
JR Dickens - ASME 1999
JR Dickens - ASME 1999JR Dickens - ASME 1999
JR Dickens - ASME 1999jrd9234
 
Garner Osborne Overview Brochure
Garner Osborne Overview BrochureGarner Osborne Overview Brochure
Garner Osborne Overview BrochureLaura Goslin
 
Design for Manufacturing: Challenges & Opportunities
Design for Manufacturing: Challenges & OpportunitiesDesign for Manufacturing: Challenges & Opportunities
Design for Manufacturing: Challenges & OpportunitiesCheryl Tulkoff
 

Similar to Best Practices for Improving the PCB Supply Chain: Part II (20)

Match Your High-Tech PCB Design to Your Suppliers Capabilities
Match Your High-Tech PCB Design to Your Suppliers CapabilitiesMatch Your High-Tech PCB Design to Your Suppliers Capabilities
Match Your High-Tech PCB Design to Your Suppliers Capabilities
 
Re-Engineering Obsolete Printed Circuit Boards Webinar
Re-Engineering Obsolete Printed Circuit Boards WebinarRe-Engineering Obsolete Printed Circuit Boards Webinar
Re-Engineering Obsolete Printed Circuit Boards Webinar
 
Design for Manufacturability Guidelines Every Designer should Follow
Design for Manufacturability Guidelines Every Designer should FollowDesign for Manufacturability Guidelines Every Designer should Follow
Design for Manufacturability Guidelines Every Designer should Follow
 
Quick Turn PCBs - Why an Experienced Supply Chain Matters
Quick Turn PCBs - Why an Experienced Supply Chain MattersQuick Turn PCBs - Why an Experienced Supply Chain Matters
Quick Turn PCBs - Why an Experienced Supply Chain Matters
 
A guide for lauching hardware based IoT products for startups and scaleups
A guide for lauching hardware based IoT products for startups and scaleupsA guide for lauching hardware based IoT products for startups and scaleups
A guide for lauching hardware based IoT products for startups and scaleups
 
Why High-Tech Multi-Layer PCB Features Add Cost and Processing Time
Why High-Tech Multi-Layer PCB Features Add Cost and Processing TimeWhy High-Tech Multi-Layer PCB Features Add Cost and Processing Time
Why High-Tech Multi-Layer PCB Features Add Cost and Processing Time
 
Sistechcon
SistechconSistechcon
Sistechcon
 
Optimizing Product Realization Costs Across the Value Chain
Optimizing Product Realization Costs Across the Value ChainOptimizing Product Realization Costs Across the Value Chain
Optimizing Product Realization Costs Across the Value Chain
 
Meritronics_Company rev 07.02.14
Meritronics_Company rev 07.02.14Meritronics_Company rev 07.02.14
Meritronics_Company rev 07.02.14
 
Successful Flex & Rigid-Flex Designs for Streamlining Production
Successful Flex & Rigid-Flex Designs for Streamlining ProductionSuccessful Flex & Rigid-Flex Designs for Streamlining Production
Successful Flex & Rigid-Flex Designs for Streamlining Production
 
Quality & Reliability Consultant
Quality & Reliability ConsultantQuality & Reliability Consultant
Quality & Reliability Consultant
 
POC_to_product1
POC_to_product1POC_to_product1
POC_to_product1
 
PCB Manufacturing Facilities - Certifications, Compliance, and Security
PCB Manufacturing Facilities - Certifications, Compliance, and SecurityPCB Manufacturing Facilities - Certifications, Compliance, and Security
PCB Manufacturing Facilities - Certifications, Compliance, and Security
 
Battery Pack Development Timeline and Expectations
Battery Pack Development Timeline and ExpectationsBattery Pack Development Timeline and Expectations
Battery Pack Development Timeline and Expectations
 
FAROOQ CV, PRODUCTION, QUALITY, PLC AUTOMATION,.pdf
FAROOQ CV, PRODUCTION, QUALITY,  PLC AUTOMATION,.pdfFAROOQ CV, PRODUCTION, QUALITY,  PLC AUTOMATION,.pdf
FAROOQ CV, PRODUCTION, QUALITY, PLC AUTOMATION,.pdf
 
Bryan allcock trl9 ready
Bryan allcock   trl9 readyBryan allcock   trl9 ready
Bryan allcock trl9 ready
 
Low Layer Count PCBs – Why They Are Not All Created Equal
Low Layer Count PCBs – Why They Are Not All Created EqualLow Layer Count PCBs – Why They Are Not All Created Equal
Low Layer Count PCBs – Why They Are Not All Created Equal
 
JR Dickens - ASME 1999
JR Dickens - ASME 1999JR Dickens - ASME 1999
JR Dickens - ASME 1999
 
Garner Osborne Overview Brochure
Garner Osborne Overview BrochureGarner Osborne Overview Brochure
Garner Osborne Overview Brochure
 
Design for Manufacturing: Challenges & Opportunities
Design for Manufacturing: Challenges & OpportunitiesDesign for Manufacturing: Challenges & Opportunities
Design for Manufacturing: Challenges & Opportunities
 

Recently uploaded

"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxnull - The Open Security Community
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024The Digital Insurer
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
Bluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfBluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfngoud9212
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentationphoebematthew05
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsAndrey Dotsenko
 
Science&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfScience&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfjimielynbastida
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 

Recently uploaded (20)

"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
Bluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfBluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdf
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentation
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
The transition to renewables in India.pdf
The transition to renewables in India.pdfThe transition to renewables in India.pdf
The transition to renewables in India.pdf
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Science&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfScience&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdf
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 

Best Practices for Improving the PCB Supply Chain: Part II

  • 1. Best Practices for Improving the PCB Supply Chain: Part II Cheryl Tulkoff Senior Member of the Technical Staff ctulkoff@dfrsolutions.com 1
  • 2. PCB SUPPLY CHAIN BEST PRACTICES – PART I RECAP 2
  • 3. PCBs should always be considered critical components Custom design Product Foundation Long term PCB quality and reliability is simply not achievable without stringent controls in place for: Supplier selection Qualification Management PCBs as Critical Components 3
  • 4. Create a PCB Commodity Team with at least one representative from each of the following areas: Design Manufacturing Purchasing Quality/Reliability Team should meet on a routine basis Discuss new products and technology requirements in the development pipeline. Pricing, delivery, and quality performance issues with approved PCB suppliers should also be reviewed. Team is also tasked with identifying new suppliers and creating supplier selection and monitoring criteria PCB Commodity Team 4
  • 5. Established PCB supplier selection criteria in place. Criteria should be custom to your business Commonly used criteria are: Time in business Revenue Growth Employee Turnover Training Program Certified to the standards you require (IPC, MIL-SPEC, ISO, etc.) Capable of producing the technology you need as part of their mainstream capabilities Don’t exist in PCB process “niches” where suppliers claim capability but have less than ~ 15% of their volume built there Have quality and problem solving methodologies in place Have a technology roadmap Have a continuous improvement program in place Supplier Selection Criteria 5
  • 6. Rigorous qualification criteria which includes: On site visit by to the facility which will produce your PCBs by someone knowledgeable in PCB fabrication techniques. Review process controls, quality monitoring and analytical techniques, storage and handling practices and conformance to generally acceptable manufacturing practices. Best way to meet and establish relationships with the people responsible for manufacturing your product. Sample builds of an actual part you will produce which are evaluated by the PCB supplier Also independently evaluated by you or a representative to the standards that you require. PCB Qualification Criteria 6
  • 7. Use of supplier tiering  Low, Middle, High strategies if you have a diverse product line with products that range from simpler to complex. Allows for strategic tailoring to save cost and to maximize supplier quality to your product design. Match supplier qualifications to the complexity of your product. Typical criteria for tiering suppliers include: Finest line width Finest conductor spacing, Smallest drilled hole and via size Impedance control requirement Specialty laminate needed (Rogers, flex, mixed) Use of HDI, micro vias, blind or buried vias. Minimize use of suppliers who have to outsource critical areas of construction. Again, do not exist in the margins of process capabilities! PCB Supplier Tiering 7
  • 8. Partner with your PCB suppliers for success. Critical for low volumes, low spend, or high technology and reliability requirements Some good practices include: Monthly calls with PCB commodity team and each PCB supplier  PCB supplier team should members equivalent to your team members QBRs (quarterly business reviews) Review spend, quality, and performance metrics, and “state of the business “, business growth, new product and quoting opportunities… Address any upcoming changes  Factory expansion, move, or relocation, critical staffing changes, new equipment/capability installation etc. Twice per year, QBRs should be joint onsite meetings which alternate between your site and the supplier factory site. Factory supplier site QBR visit can double as the annual on site visit and audit that you perform. PCB Relationship Management 8
  • 9. Use Supplier Scorecards Perform quarterly and yearly on a rolling basis Typical metrics include: On Time Delivery PPM Defect Rates Communication – speed, accuracy, channels, responsiveness to quotes Quality Excursions / Root Cause Corrective Action Process Resolution Supplier Corrective Action Requests Discuss recalls, notifications, or scrap events exceeding a certain dollar amount PCB Supplier Scorecards 9
  • 10. Review the following: Top 3 PCB factory defects: monitoring and reporting Process control and improvement plans for the top 3 defects Product Yield and scrap reports Feedback on issues facing the industry Reliability testing performed (HATS, IST, solder float, etc.) Review IPC-9151B, Printed Board Process Capability, Quality, and Relative Reliability (PCQR2) Benchmark Test Standard and Database at: http://www.ipc.org/html/IPC-9151B.pdf PCB suppliers may be part of this activity already. Ask if they participate and if you can get a copy of their results. PCB Continuous Quality Monitoring 10
  • 11. Ideally, all PCBs should come from the same factory from start to finish Prototype (feasibility), pre-release production (testability & reliability), to released production (manufacturability). Any factory move introduces an element of risk Product must go through setup and optimization specific to each factory and equipment contained there. While not always possible, all PCBs intended for quality and reliability testing should come from the actual PCB production facility. PCB Prototype Development 11
  • 12. PART II: PERFORMING THE PCB PROCESS AUDIT Everything looks great on paper or on the web…… 12
  • 13. Why Perform an Onsite Audit? No industry standard methodology for qualifying PCB suppliers Standards do exist for lot-based PCB testing and acceptance within the IPC 6010 series  Sourcing follows the “as agreed upon between user and supplier” (AABUS) approach  IPC began discussing this gap in 2008 with a Blue Ribbon Committee IPC has recently launched a Validation Business Unit with plans to eventually move towards an IPC Qualified Manufacturers List (QML) for suppliers, including PCBs [3]. I In the meantime, however, onsite audits remain the best approach 13
  • 14. PCB Fabrication Processes More than 180 individual steps required to manufacture typical printed circuit boards Knowledge is key! Processes are complex, chemistry intensive and there are a lot of steps 14
  • 15. Audit Focus All steps are obviously important but this presentation will focus on: Requirements Surface Finish Highlight Process Control & Analysis Cleanliness Recognizing Common Defects Test & Final Inspection Material Handling 15
  • 16. Communicate Requirements Define the standards needed Communicate both quality & reliability objectives! Help your supplier help you Create a PCB Fabrication specification Outlines requirements and communication required for modifications to drawings 16
  • 17. Laminate selection is frequently under specified! Some common issues: PCB supplier frequently allowed to select laminate material No restrictions on laminate changes Generic IPC slash sheet requirements used Laminates called out by Tg only and with no measurement method specified (there is more than one) No cleanliness requirements specified Failure to specify stackup Not all laminates are created equal Failure to put some controls in places opens the door to failure PCB Materials Selection
  • 18. Good quality is necessary but not SUFFICIENT to guarantee high reliability. IPC Class 3 by itself does not guarantee high reliability A PCB or PCBA can be perfectly built to IPC Class 3 standards and still be totally unreliable in its final application. Consider two different PCB laminates both built to IPC Class 3 standards. Both laminates are identical in all properties EXCEPT one laminate has a CTEz of 40 and the other has a CTEz of 60. The vias in the laminate with the lower CTEz will be MORE reliable in a long term, aggressive thermal cycling environment than the CTEz 60 laminate. A CTEz 40 laminate built to IPC class 2 could be MORE reliable than the CTEz 60 laminate built to Class 3. Appropriate materials selection for the environment is key! Quality, Reliability & IPC Class 2 versus Class 3 18
  • 19. Importance of Surface Finish The selection of the surface finish on your PCBs could be the most important material decision made for the final electronic assembly. The surface finish influences the process yield, the amount of rework, field failure rate, the ability to test, the scrap rate, and of course the cost. One can be lead astray by selecting the lowest cost surface finish only to find that the eventual total cost is much higher. The selection of a surface finish should be done with a holistic approach that considers all important aspects of the assembly. 19
  • 20. Surface Finish Selection Guideline Cost Sensitive Product High Volume Required Pb-Free Shock/Drop is a Concern Cosmetics of Finish is Important Corrosion Failure is Possible Fine Pitch Components Used Pb-Free Wave Solder (PCB > 62mil) High Yield ICT Required Is Important to Product Is not required for the Product Attributes Wire bonding to Finish is Required SF Type 20
  • 21. Process Control & Analysis Cross Sections In process & taken to verify: Hole wall quality Desmear / Etchback Plating thickness Dielectrics Cross sections of finished product supplied per customer specification. Inspections Visual Inspections Automatic Optical Inspection (AOI) Programmed from the gerber data to inspect the etched copper panels. X-Ray Inspection Drilling Performance Layer alignment Cleanliness Measurements 21
  • 22. IPC-5701: Users Guide for Cleanliness of Unpopulated Printed Boards (2003) IPC-5702: Guidelines for OEMs in Determining Acceptable Levels of Cleanliness of Unpopulated Printed Boards (2007) IPC-5703: Guidelines for Printed Board Fabricators in Determining Acceptable Levels of Cleanliness of Unpopulated Printed Boards (Industry Review Draft) IPC-5704: Cleanliness Requirements for Unpopulated Printed Boards (2010) IPC PCB Cleanliness Standards 22
  • 23. Resistivity of Solvent Extract (ROSE) Test Method IPC-TM-650 2.3.25 The ROSE test method is used as a process control tool to detect the presence of bulk ionics. The IPC upper limit is set at 10.0 mg/NaCl/in2. This test is performed using a Zero-Ion or similar style ionic testing unit that detects total ionic contamination, but does not identify specific ions present. This process draws the ions present on the PCB into the solvent solution. The results are reported as bulk ions present on the PCB per square inch. Modified Resistivity of Solvent Extract (Modified ROSE) Test Method TM 2.3.25.1 The modified ROSE test method involves a thermal extraction. The PCB is exposed in a solvent solution at an elevated temperature for a specified time period. This process draws the ions present on the PCB into the solvent solution. The solution is tested using an Ionograph-style test unit. The results are reported as bulk ions present on the PCB per square inch. Ion Chromatography IPC-TM-650 2.3.28.2 IPC Ionic Contamination Test Standards 23
  • 24. Test Procedures: Best Practice Ion Chromatography (IC) is the ‘gold standard’ Some, but very few, PCB manufacturers qualify lots based on IC results Larger group uses IC to baseline ROSE / Omegameter / Ionograph (R/O/I) results Perform lot qualification with R/O/I Periodically recalibrate with IC (every week, month, or quarter) 24
  • 25. Common PCB Defects Basic understanding of common PCB defects is helpful Ask for cross-section images Required for process control Knowledge can be used by an organization to monitor supplier performance over time Insufficient Plating, Voids, Nodules, Folds, Etch Pits, Fiber Protrusion 25
  • 26. Insufficient Plating Thickness ANSI/IPC-A-600 requires an average plating thickness of 20 um, with isolated areas allowed to reach 15 um. Insufficient plating thickness is caused by either insufficient current/time in the copper plating bath or poor throwing power. When insufficient plating thickness is observed throughout the PTH, instead of just at the center, the root-cause is more likely insufficient current/time in the plating bath. 26
  • 27. Glass Fiber Protrusion Glass fiber protrusion into PTH walls affects PTH plating thickness and hence can contribute to PTH cracking. Glass fiber protrusion may be due to process control variabilities during hole drilling, hole preparation or application of flash copper. Glass fiber protrusion is allowed by IPC guidelines only if the min. plating thickness is met. 27
  • 28. Plating Folds Plating folds create detrimental stress concentrations. Rough drilling or improper hole preparation can cause plating folds. Rough drilling can be caused by poor laminate material, worn drill bits, or an out-of-control drilling process. Improper hole preparation is due to excessive removal of epoxy resin caused by incomplete cure of resin system or a preparation process (desmear/etchback) that is not optimized. 28
  • 29. Plating Nodules Root causes of nodulation include poor drilling, particles in solution, solution temperature out of range, or brightener level in excess. The relatively straight hole walls and the lack of particles in the nodules seemed to suggest the later two as root cause. The presence of plating nodules can be detrimental to high reliability. Plating nodules create highly stressed areas in the plating wall and can possibly reduce lifetime under temperature cycling. ANSI/IPC-A-600 states that nodules are acceptable if the hole diameter is above the minimum specified. 29
  • 30. Plating void is a generic term to describe voids present in and around the PTH wall. Can cause large stress concentrations, resulting in crack initiation. The location of the voids can provide crucial information in identifying the defective process. Around the glass bundles In the area of the resin At the inner layer interconnects (aka, wedge voids) Center or edges of the PTH Plating Voids 30
  • 31. Test & Final Inspection Electrical Test IPC-D-356 netlist is uploaded into the tester. Each PCB is manually placed on fixture and tested for continuity and resistance Verify handling for segregating passes & fails Final Inspection Visually inspect 100% of the finished product Review of: Fabrication drawing requirements Dimensional properties Board size Finished hole sizes Customer specification 31
  • 32. PCBs should remain in sealed packaging until assembly Package PCBs in brick counts which closely emulate run quantities PCBs should be stored in temperature and humidity controlled conditions Packaging in MBB (moisture barrier bags) with desiccant and HIC (humidity indicator cards) may be needed for some laminates Shipping & Handling Vacuum Sealer Humidity Indicator Card Moisture Barrier Bag 32
  • 33. Conclusions Foundation of a reliable product is a reliable PCB PCBs are always custom, critical components  Have a comprehensive strategy for selecting and qualifying PCB suppliers  Ensures that the foundation is strong Performing effective on site audits is a critical component of that strategy. 33
  • 34. Speaker Biography Cheryl Tulkoff has over 22 years of experience in electronics manufacturing with an emphasis on failure analysis and reliability. She has worked throughout the electronics manufacturing life cycle beginning with semiconductor fabrication processes, into printed circuit board fabrication and assembly, through functional and reliability testing, and culminating in the analysis and evaluation of field returns. She has also managed no clean and RoHS-compliant conversion programs and has developed and managed comprehensive reliability programs. Cheryl earned her Bachelor of Mechanical Engineering degree from Georgia Tech. She is a published author, experienced public speaker and trainer and a Senior member of both ASQ and IEEE. She has held leadership positions in the IEEE Central Texas Chapter, IEEE WIE (Women In Engineering), and IEEE ASTR (Accelerated Stress Testing and Reliability) sections. She chaired the annual IEEE ASTR workshop for four years, is an ASQ Certified Reliability Engineer and a member of SMTA and iMAPS. She has a strong passion for pre-college STEM (Science, Technology, Engineering, and Math) outreach and volunteers with several organizations that specialize in encouraging pre-college students to pursue careers in these fields. 34
  • 35. Contact Information •Questions? •Contact Cheryl Tulkoff, ctulkoff@dfrsolutions.com, 512-913-8624 •www.dfrsolutions.com •Connect with me in LinkedIn as well! 35