PORTFOLIO
CARLOS
CALDERON
Carlos Francisco Cuadros Calderón
07511 488 010
cuadroscalderon@gmail.com
https://www.linkedin.com/in/carlos-cuadros-calderon
SUMMARY
WORK EXPERIENCE
Ÿ Civil Parish land laws application mapping............................................................
Ÿ Civil Parish Fire Emergency Plan...........................................................................
Ÿ On site landslip stabilisation and regeneration project tracking.............................
UNIVERSITY PROJECTS
Ÿ Underground car park viability study......................................................................
Ÿ Water supply, water distribution and wastewater collection systems.....................
Ÿ Residential building structural design.....................................................................
Ÿ Underground water tank structural design.............................................................
Ÿ Street lighting project..............................................................................................
Ÿ Proposal for the improvement of a marina-fishing port and its surroundings.........
Ÿ Urban logistics research.........................................................................................
..
3
4
5
6
7
8
9
10
11
12
Took place at:
Team of:
Department:
Internship placement:
Project time span:
CazorlaTown Council
1
Building works and urbanism
department
1
1 month
CIVIL PARISH
LAND LAWS APPLICATION
MAPPING
This work consisted of the
identification and mapping of the land
laws' application throughout Cazorla
Civil Parish (Jaén -Spain-).
The represented zones were those
classified followed the autonomous
region’s legislation, and those affected
by easements and land use restrictions
due to infrastructures, rivers and so on.
Basically, this tool provides useful
information when somebody intends to
perform any kind of intervention in the
area, from building a new house to
creating a new track to reach a farm, so
that it is easily recognised what the
restrictions are and the licences needed.
The digital file also offers the
possibility to switch on or off the different
areas in case you may want to have a
clearer view. Moreover, it is
accompanied by an additional document
which schematises the most relevant
information.
485000,000000
485000,000000
490000,000000
490000,000000
495000,000000
495000,000000
500000,000000
500000,000000
505000,000000
505000,000000
510000,000000
510000,000000
515000,000000
515000,000000
520000,000000
520000,000000
4185000,000000
4185000,000000
4190000,000000
4190000,000000
4195000,000000
4195000,000000
4200000,000000
4200000,000000
4205000,000000
4205000,000000
2°45'0"W
2°45'0"W
2°50'0"W
2°50'0"W
2°55'0"W
2°55'0"W
3°0'0"W
3°0'0"W
3°5'0"W
3°5'0"W
3°10'0"W
3°10'0"W
38°0'0"N 38°0'0"N
37°55'0"N 37°55'0"N
37°50'0"N 37°50'0"N
Municipio de Cazorla
CLASIFICACIÓN DEL SUELO SEGÚN LA LEY DE ORDENACIÓN URBANÍSTICA DE ANDALUCÍA
PLANO CLASIFICACIÓN DEL SUELO SEGÚN LA LOUA
ÁMBITO MUNICIPIO DE CAZORLA (JAÉN)
FECHA REALIZACIÓN Agosto 2014
FORMATO DE PAPEL DIN A0
ESCALA 1 : 35.000
«
Coordinate System: ETRS 1989 UTM Zone 30N
Projection: Transverse Mercator
Datum: ETRS 1989
False Easting: 500.000,0000
False Northing: 0,0000
Central Meridian: -3,0000
Scale Factor: 0,9996
Latitude Of Origin: 0,0000
Units: Meter
0 1 2 3 4 50,5
Km
LEYENDA
Límite_Municipio
Suelo Urbano Suelo Urbanizable
Suelo No Urbanizable
Suelo Urbano según propuesta del PGOU (no aprobado) Suelo Urbanizable según propuesta del PGOU (no aprobado)
De especial protección por legislación específica
De carácter natural o ruralDominio Público Viario
Dominio Público Hidráulico
Vías Pecuarias
BIC
Yacimientos Arqueológicos
Red Natura 2000
De especial protección por planificación territorial o urbanística De carácter natural o rural
PEPMF Jaén
PORN Jaén
PGOU (no aprobado)
Hábitat Rural Diseminado
Hábitat Rural Diseminado
3
Took place at:
Team of:
Department:
Internship placement:
Project time span:
CazorlaTown Council
2
Building works and urbanism
department
2
1 month
CIVIL PARISH
FIRE EMERGENCY
PLAN
I was responsible, along with a
topographer, for the development of the
official Cazorla Civil Parish Fire
Emergency Plan (Cazorla -Spain-).
The purpose of it is to provide all the
information and procedures to follow in
case of a fire emergency at any point of
the territory administrated by the council.
The major difficulties fell on getting
input from official and reliable sources,
and processing such data according to
new regulations and standardisation.
Additionally, accurate output was
essential as the readability of both maps
and tables needed to be as clear as
possible due to the importance of such
documents at emergency moments.
The plan was approved straight away
by the county government and its period
of validity is from 2015 to 2019.
%
%
%
%
%%
%
%
%
%
%%%
?@
?@
?@
?@
9
9
99T 1
T 2
T 3
T 4
T 5
T 6
T 7
T 8
T 9
T 10
T11
T 12T 13
RíoGuadalquivir
Río
Guadalquivir
RíoG
uadalq
uivir
Río
Gua
da
lquivir
Río
Guadalquivir
Río
Guadalquivir
Río
Guadalquivir
Río
Guadalquivir
R
ío
de
C
az
or
la
Río
de
C
azo
rla
Rí
o de
Cazo
rla
RíodeCazorla
R
ío de Cazorla
R
ío
de
C azorla
RíodeCazorla
RíodeCazorla
Río
de
Cazorla
E 4
D 1
B 1
B 2
B 3
B 4
B 5
B 6B 7
B 8
B 9
B 10
B11
B 12
B 13
B 15
B 16
B 17
B 18
B 19
B 20
Navahondona/Banderin
1
2
C.R
16
C.R26
C.R12
C.R6
C.R18
C.R17
C.R19
C.R15
C.R7
C.R
1
C.R
21
C.R 5
C.R 28
C.R
14
C.R 23
C.R
22
C.R
8
C
.R
27
C.R 25
C.R
4
C.R
11
C
.R
20
C.R
10
C.R 29
C.R 2
C.R24
C.R 3
P
F
2
77
PF 278
PF279
JF-7093
JA-8106
JA-7104
JA-6108
A-620
4
A-315
A-620
7
A-319
A-322
Úbeda
Torreperogil
Santo
Tomé
Chilluévar
La Iruela
Peal de
Becerro
Quesada
1
2
1
2
3
4
1
2
3
4
484.000
484.000
488.000
488.000
492.000
492.000
496.000
496.000
500.000
500.000
4.194.000
4.194.000
4.196.000
4.196.000
4.198.000
4.198.000
4.200.000
4.200.000
4.202.000
4.202.000
4.204.000
4.204.000
4.206.000
4.206.000
EXCELENTISIMO
AYUNTAMIENTO
DE
C A Z O R L A
Proyecto:
Plan Local de Emergencaias por Incendios Forestales
Plano:
Puntos Interés
F. Javier Tallante Martinez. Arquitecto
Escala:
Fecha:
1:24.000 1/3
m 0 0,5 1 1,5 20,25
Kilometros
Centros de confinamiento
1, Albergue de Cazorla
2, Pabellon Municipal Cazorla
Ríos
guadalquivir
guadalentin
Cerezuelo
Tomas de agua
% T 1, Poligono Industrial
% T 10, S5 (Sector desarrollado)
% T 11, S5 (Sector desarrollado)
% T 12, S5 (Sector desarrollado)
% T 13, S5 (Sector desarrollado)
% T 2, Salida Cazorla-Peal de Becerro (Las harinillas)
% T 3, Salida Cazorla-S.Tome (Piensos Bermejo)
% T 4, UE-5 (Unidades de ejecución)
% T 5, UE-1 (Unidades de ejecución)
% T 6, UE-1 (Unidades de ejecución)
% T 7, S5 (Sector desarrollado)
% T 8, S5 (Sector desarrollado)
% T 9, S5 (Sector desarrollado)
Embalses
E 1, Embalse Cerrada Utrero
E 2, Embalse de la Bolera
E 3, Laguna de Valdeazores
E 4, Embalse Puente de la Cerrada
Depositos
D 1, Piscina Riogazas
D 2, Deposito Empalme del Valle
D 3, Algibe Almiceran
D 4, Deposito Vadillo
D 5, Piscina Linarejos
D 6, Piscina Vadillo
D 7, Alberca Navas de San Pedro
Balsas
B 1, Cabeza Rey
B 2, Casas Estepa
B 3, La Pajarica
B 4, C.Regantes El Molar
B 5, Piscina Municipal
B 6, Los angulos (CR Cristo C) 1
B 7, Los angulos (CR Cristo C) 2
B 8, Vado Cortijo
B 9, Balsa Almedina
B 10, Balsa Camino Viejo Quesada
B 11, Balsa Cortijo jamilero
B 12, C.R Cortijo del vado
B 13, Cortijo del Vado
B 14, Cortijo del Vado
B 15, Encima Cortijo de los alcachofares
B 16, Cerro de Judas
B 17, Jamilero
B 18, Jamilero
B 19, Loma del Quintanar ( Cortijo las Albercas )
B 20, Cortijo de la Pajarita
Pistas de aterrizaje helicopteros
1, Campo de futbol
2, Recinto Ferial
3, Vadillo Castril
Centro Sanitario
centro sanitario
Red de Carreteras
MATRICULA, DENOMINACIÓN
JF-7094, De JF-7091 a P. del Adelantado
A-315, De Torreperogil a Baza por Pozo Alcón
A-319, De Peal de Becerro a Hornos por Cazorla
A-322, De Jódar a Cazorla
A-6204, De Villacarrillo a Cazorla
A-6207, De Peal de Becerro a Santo Tomé
JA-6108, JA-6108 - Puente de la Cerrada a Santo Tome
JA-7104, JA-7104 - Acceso a El Molar
JA-8106, JA-8106 - Acceso a la Iruela
JF-7091, de JV-7014 a JZ-1
JF-7092, carretera longitudinal
JF-7093, de La Iruela a Pozo Alcón
JF-7096, de JF-7091 a JZ-12
JF-7097, De JF-7091 a Valdetrillo
JF-7098, camino forestal
Pistas Forestales
PF 212, Camino Majallena
PF 241, Camino La Cabrilla
PF 242, Camino Nava del Espino - Fuente de la Umbría
PF 244, Camino Barranco Guadalentín
PF 245, Camino Vado de las Carretas - Puntal de Ana María
PF 246, Camino Lancha del Almicerao
PF 247, Camino del Poyo de la Mesa
PF 248, Camino Nava del Espino-Torrillo del Guday
PF 249, Camino la Medianega
PF 250, Camino Juan Cubierta
PF 251, Camino Caida a la Canaliega
PF 254, Camino Collado Verde
PF 255, Cuerda de los Vaquerizos
PF 256, Cuesta del Bazan
PF 257, Camino Morra del Pinar
PF 258, Camino Laguna de Valdeozores
PF 259, Camino Los Arenales
PF 260, Camino Majal de la Carrasca
PF 262, Camino Tía Plageda
PF 263, Camino Cortijo Las Locas
PF 264, Camino Casita de Venato
PF 265, Camino Coto del Valle a la Rajona
PF 266, Camino Poyo Nicolás
PF 267, Camino Puente Las Herrerias - Pino Las Cruces
PF 268, Camino Arroyo La Mesa
PF 269, Camino del Collado del Escaramujal
PF 270, Camino Los Habares
PF 271, Camino Majada Las Vacas
PF 277, Camino Siete Fuentes a Pico del Águila
PF 278, Camino Cerro de la Arcuza
PF 279, Camino Montesión
PF 280, Camino Los Rasos - Laguna Cazorla
PF 281, Camino Hazas de Román
PF 283, Camino Carrillo la Vieja a Gilillo
PF 284, Camino Arroyo de los Cierzos
PF 287, Camino Sacejo - Laguna de la Iruela
PF 288, Camino Arroyo Maillar - Calerón
PF 289, Camino Umbría Arroyo Maillar
PF 293, Camino La Cabrilla
Red eléctrica
Red electrica
Caminos Rurales
C.R 1, Camino del Cortijo del Alamillo
C.R 10, Camino del Cortijo de Oratorio
C.R 11, Camino de la Coscoja al Camino de Timoteo
C.R 12, Camino desde la Cruz del Cerro hasta el Polígono Industrial
C.R 14, Camino de La Almedina a Cortijo de la Solana
C.R 15, Camino de La Almedina a Los Peralejos
C.R 16, Camino del Cortijo de la Solana
C.R 17, Camino desde la A-319 hasta el Cortijo de la Cruz
C.R 18, Camino desde el Cortijo de la Cruz hasta los Ramblizos
C.R 19, Camino de Los Nerios a Cañada Real de Peal de Becerro a Santo Tomé
C.R 2, Camino del Cortijo de Timoteo
C.R 20, Camino de Llanos del Ciego a Camino de Arroyo Salado
C.R 21, Camino de Arroyo Salado a Alcachofares
C.R 22, Camino de Llanos del Ciego a Cortijo Blanco
C.R 23, Camino de los Risueños
C.R 24, Camino del Cortijo de Niño Alfonso a las Albercas
C.R 25, Camino desde la Carretera JA-6108 a las Albahacas
C.R 26, Camino del Cordel de Vado Palomo al Molar hasta las Arcas
C.R 27, Camino Estrecho
C.R 28, Camino de Montesión
C.R 29, Camino de San Blas
C.R 3, Camino de los Fruteros
C.R 4, Camino de Arroyo Salado
C.R 5, Senda de La Mojonera
C.R 6, Camino desde el Camino del Cortijo de Timoteo a la Carretera Vieja de Peal de Becerro
C.R 7, Camino desde el Camino del Cortijo de Timoteo a Los Peralejos
C.R 8, Camino de Coto Barrutia
Peal de Becerro
Patrimonios Históricos
?@ 1, Castillo de la Yedra
?@ 2, Centro Histórico
?@ 3, Castillo de las Cinco Esquinas
?@ 4, Palacio de las Cadenas
Industrias
9 1, Aceites Cazorla Sociedad Cooperativa
9 2, Embutidos Tomas Navarro
9 3, Embutidos Carrasco
9 4, Embutidos Navarro
La Iruela
Castril
Peal de Becerro
Santiago-Pontones
Quesada
I 9
I 8
I 7
I 6
I 5
I 4
I 3
I 2
I 1
I 80
I 78
I 79
I 77
I 76
I 75
I 74
I 59
I 58
I 57
I 56
I 55
I 54
I 47
I 46
I 45
I 33
I 29
I 26
I 25
I 24I 23
I 22
I 21
I 20I 19I 18
I 17I 16
I 15
I 14
I 13
I 12I 11
I 10
I 81
502.000
502.000
505.000
505.000
508.000
508.000
511.000
511.000
514.000
514.000
517.000
517.000
520.000
520.000
4.190.000
4.190.000
4.192.000
4.192.000
4.194.000
4.194.000
4.196.000
4.196.000
4.198.000
4.198.000
4.200.000
4.200.000
4.202.000
4.202.000
Usos del suelo
Cultivos herbáceos con arbolado de quecíneas
Formaciones arboladas densas
Formaciones de matorral denso con arbolado
Formaciones de matorral disperso con arbolado
Formaciones de pastizal con arbolado
Matorral sin arbolado
Otros
Pastizales no arbolados
Suelo desnudo
Talas y plantaciones forestales recientes
Zonas húmedas y superficies de agua continentales
Zonas industriales y comerciales e infraestructuras técnicas
Zonas mineras, vertederos y áreas de construcción
Zonas urbanas
Áreas agrícolas homogéneas en secano
Cortafuegos
Masa Forestal Monte Navahondona
Inventario nucleo, instalaciones...
I 80, Cortijo Manuel Ruiz
I 1, Casa Forestal Fuente Acero
I 10, Area Rec-kiosko Pte. Herrería
I 11, Kiosko Cerrada de Utrero
I 12, Punto Informacion Cerrada Utrero
I 13, Vadillo
I 14, Puesto Vigilancia Banderin
I 15, Teinada Arroyo Millar
I 16, CF Hotel Fuente del Oso
I 17, Roturación Fte. Del Oso
I 18, Area rec-kiosko Empalme Valle
I 19, Roturación Rincón Avellanar
I 2, Control Rambla Seca
I 20, Roturación CF- Fuente Fresca
I 21, Roturación Castellones Abajo
I 22, Roturación Cortijo de los Locos
I 23, CF Los Chorrillos
I 24, Roturación Castellones Arriba
I 25, CF Central Elec del Utrero
I 26, Roturación Molino Anica
I 29, Mirador Pto. Palomas
I 3, Kiosko- Roturación Nava San Pedro
I 33, Hotel Rural Sacejo
I 4, C.Forestal Nava San Pedro
I 45, Cortijo de la Canalilla
I 46, Cortijo Poyo Trivaldo
I 47, Cortijo Vado Carretas
I 5, C.F los Collados
I 54, Cortijos Nava San Pedro
I 55, Camping-caballos Pte. Herreria
I 56, Casa Caleron
I 57, Parador Nac El adelantado
I 58, Hotel Coto del Valle
I 59, Aldea Vado Ancho
I 6, Area recreativa Linarejos
I 7, Mirador Estrecho Perales
I 74, Roturación Cortijo Abajo (Nava de San Pedro)
I 75, Centro de Rec. del Quebrantahuesos
I 76, Puesto de Vigilancia Poyos de la Mesa
I 77, Roturación de Venato
I 78, Roturación Los Cortijillos de Vadillo
I 79, Área recreativa Fuente de la Garganta
I 8, Mirador Poyo Manquillo
I 9, Mirador Poyo de la Mesa
EXCELENTISIMO
AYUNTAMIENTO
DE
C A Z O R L A
Proyecto:
Plan Local de Emergencaias por Incendios Forestales
Plano:
Vegetación, Cortafuegos e Instalaciones obligadas
a tener un plan de autoprotección
F. Javier Tallante Martinez. Arquitecto
Escala:
Fecha:
1:24.000 3/3
m 0 0,5 1 1,5 20,25
Kilometros
Vigencia del Plan: 2015/2019
SI Total
MUNICIPIOS
LIMÍTROFES:
NORTE: SANTO TOMÉ, CHILLUÉVAR, LA IRUELA, SANTIAGO PONTONES
SUR: PEAL DE BECERRO, QUESADA, POZO ALCÓN
ESTE: PROVINCIA DE GRANADA
OESTE: ÚBEDA, TORREPEROGIL
PLAN LOCAL DE EMERGENCIA POR INCENDIOS FORESTALES
1. ÁMBITO TERRITORIAL
MUNICIPIO: CAZORLA PROVINCIA: JAÉN
ESPACIO NATURAL
PROTEGIDO:
ENP: PARQUE NATURAL DE CAZORLA, SEGURA YLAS VILLAS
LONGITUD KM
5.0
21.3
7.9
2.5
9.1
7.6
1.0
0.2
Carretera convencional:
red provincial de Jaén
DENOMINACIÓN COMPETENCIA (*) TIPO (**)
Autonómica
Carretera convencional:
red complementaria de Jaén
JA-6108
de Puente de la Cerrada a Santo Tomé
Diputación
Carretera convencional:
red provincial de Jaén
Autonómica
Carretera convencional:
red complementaria de Jaén
JA-7104
acceso a El Molar
Diputación
Carretera convencional:
red provincial de Jaén
A-319
de Peal de Becerro a Hornos por Cazorla
Autonómica
Carretera convencional:
red autonómica intercomarcal
A-322
de Jódar a Cazorla
Autonómica
Carretera convencional:
red autonómica intercomarcal
A-6204
de Villacarrillo a Cazorla
A-6207
de Peal de Becerro a Santo Tomé
A-315
de Torreperogil a Baza por Pozo Alcón
Autonómica
Carretera convencional:
red autonómica intercomarcal
JA-8106
acceso a La Iruela
Diputación
2.2. VÍAS DE COMUNICACIÓN: CARRETERAS / FERROCARRILES QUE RECORREN EL MUNICIPIO Ubicar en mapa, escala
mínima 1:25.000.
MUNICIPIO CAZORLA
4
Took place at:
Team of:
Department:
Internship placement:
Project time span:
CazorlaTown Council
+9
Building works and urbanism
department
2
1 month
ON SITE
LANDSLIP STABILISATION
AND
REGENERATION PROJECT
TRACKING
This project had a triple aim: applying
measures to slow down a rotational
landslide, environmental recovery of the
area, and providing new spaces to
home a possible future adventure park.
The site’s background is determined
by, on the one hand, environmental
decline, largely terrain desertification
after being a national quad bike circuit,
and on the other hand, a discovered big
rotational landslide which had started
causing some issues on the roads
nearby.
I took part in the on-site tracking of the
works which focussed on stopping the
erosion through building gabions walls,
driving the rain and ground water back to
their natural reinforced riverbed and
planting trees.Additionally, new terraces
were made which both helped to
stabilise the landslide and provided
great opportunities for future uses.
5
Took place at:
Team of:
Subject name:
Academic year:
Project time span:
University of Granada
6
Organisation and management
of projects and construction sites
5
3 months
UNDERGROUND
CAR PARK
VIABILITY STUDY
The objective of this project was to
define whether an underground car park
located in Granada was profitable or not
to build on.
The methodology followed consisted
of analysing the amount of car parking
space required in the area served. After
that, several proposed designs were
evaluated concluding the returning
inversion period under a paid parking
basis.
Among the main tasks carried out, the
following are worthy of mention:
- Socioeconomic, demographic,
urban, topographic and transport
analysis.
- Drafting different alternatives
considering best use of the available
space, structures needed, safety and
usefulness.
- Economic assessment.
Alternativa tipo s-1 Alternativa tipo s-2 Diseño final
PRESUPUESTO DE EJECUCIÓN MATERIAL 6.175.113,49 € 5.155.931,73 € 5.442.527,76 €
GASTOS GENERALES (13% s/P.E.M.) 802.764,75 € 670.271,13 € 707.528,61 €
BENEFICIO INDUSTRIAL (6% s/P.E.M.) 370.506,81 € 309.355,90 € 326.551,67 €
TOTAL 7.348.385,05 € 6.135.558,76 € 6.476.608,04 €
I.V.A. (21% s/TOTAL) 1.543.160,861 € 1.288.467,34 € 1.360.087,69 €
PRESUPUESTO DE EJECUCIÓN POR CONTRATA 8.891.545,91 € 7.424.026,10 € 7.836.695,72 €
PROYECTO Y DIRECCIÓN DE OBRA (5% s/P.E.C.) 444.577,29 € 371.201,31 € 391.834,79 €
COSTE DE LICENCIAS DE OBRA (1% s/P.E.M.) 61.751,13 € 51.559,32 € 54.425,28 €
INVERSION TOTAL 9.397.874,34 € 7.846.786,72 € 8.282.955,79 €
COSTE POR PLAZA 16.010 € 15.032,16 € 15.867,73 €
6
Took place at:
Team of:
Subject name:
Academic year:
Project time span:
University of Lisbon
4
Sanitation engineering and the
environment
4
3 months
WATER SUPPLY,
WATER DISTRIBUTION &
WASTEWATER COLLECTION
SYSTEMS
The project consisted of three different
parts:
The first one, the design of the supply
system from the source to the
consuming areas, considering different
alternatives regarding the topography
and assessing the economic investment
and exploitation.
In the second one, a distribution
network within a new urbanised area
was drafted where it was essential to
ensure the minimum service pressure in
all points and the water diversions in
case of breakdowns.
The last part includes the design of
both the wastewater and rainwater
collectors, taking into account the
performance, safety and economic
costs.
E2
(63,8m)
E3
(59,5m)
E4
(48,7m)
E5
(25,4m)
I5
(43,5m)
I4
(47,8m)
I3
(47,5m)
I2
(52,4m)
I1
(61,8m)
M1
(43,3m)
M2
(27,5m)
I12
(14,2m)
E9
(10,7m)
I11
(17,7m)
E7
(23m)
I10
(16,8m)
E8
(12m)
I9
(5,7m)
I8
(16,5m)
I7
(23,5m)
I6
(29m)
E6
(34,5m)
Mc5
Mc4
Mc8
Mc6
Mc3
Mc7
Mc9
Mc2
Mc10
Mc1
Mc11
ëRP3
VRP2
VR
P1
PĈ
t2
t22
t23
t21
t16
t14
t19
t15
t17
t18
t20
t3
t4
t6
t5
t7
t8
t9
t10
t11
t12
t13
t24
a1
c2
C3
A3
a2
a4
A5
A6
B5
b2b1
b3
d17
D18D15
d14
C5
c4
c1
d1 D3
d2
D5
d4
d6
D7
d8D9
d10 D11
D13
d12
Fim (à estação
de tratamento)
B4
D16
c1.1
c1.2
c1.3
c1.4
c1.5
c1.6
c3.1
c3.2
c3.3 c3.4
c3.5
c3.6
c4.1
c5.1
D16.1
D16.2
CAIXAS
COTAS
Designação
Terreno
(m)
(mm)
(m/m)
(m)
(m)
Declives
Diâmetros
DISTÂNCIAS
Profundidade da Soleira
Soleira
Perfis
Caixas
Origem
C1
62.200.00
46.35
46.35
60.551.65
C1.1 C1.2 C1.3 C1.4 C1.5 C3.1 C3.2 C3.3 C3.4 C3.5 C3.6 C5 C5.1 D16 D16.1 D16.2 D18 B5 B5.1 A6
61.2046.3559.551.65
58.5099.5156.851.65
57.00137.8755.351.65
55.10176.8253.451.65
52.80209.2451.151.65
52.30219.0450.651.65
49.70275.6748.051.65
47.50320.9643.404.10
41.00345.8638.612.39
36.80374.2333.493.31
30.90401.1329.501.40
28.80424.5322.322.06
23.80453.3918.805.00
17.10504.8815.431.67
15.80536.2614.091.71
13.30569.3911.571.73
8.80622.867.111.69
5.90671.504.221.68
5.40725.413.71.70
3.90761.032.221.68
280
0.022
53.16
53.16
0.051
38.36
38.36
0.039
38.95
38.95
0.049
32.42
32.42
0.071
9.80
9.80
0.051
56.63
56.63
0.046
45.29
45.29
0.049
24.90
24.90
0.264
28.37
0.147 0.219
23.40
23.40
0.089
28.86
28.86
0.174
51.49
51.49
0.115
31.38
31.38
0.042
33.13
33.13
0.076
53.47
53.47
0.084
48.64
48.64
0.059
53.91
53.91
0.009
35.62
35.62
280
0.042
35.59
35.59
0.017
3.30796.621.621.68
28.37
26.90
26.90
C3
PEAD, Ø250/Ø280
671.50 m
PEAD,Ø280
125.12m
7
Took place at:
Team of:
Subject name:
Academic year:
Project time span:
University of Lisbon
4
Construction and prefabrication
buildings
5
3 months
RESIDENTIAL
BUILDING
STRUCTURAL DESIGN
The work focussed on the design and
calculation of a (5+2)-storey residential
building structure to be placed in Setubal
(Portugal).
In a first stage, the approach was as
follows:
- Drafting of different alternatives
meeting the functional planning of the
building.
- Preliminary sizing.
- Detailing and final design of all
elements.
- Checking and model analysis using
SAP2000 software.
In a second stage, the possibility of
switching part of bean-based slabs into a
prestressed slab was studied in order to
gain a longer span.
One of the most difficult
considerations was taking into account
the seismic influence over such an area.
8
Took place at:
Team of:
Subject name:
Academic year:
Project time span:
University of Granada
3
Reinforced and prestressed
concrete
4
2 months
UNDERGROUND
WATER TANK
STRUCTURAL DESIGN
In this project the main goal was to
quantify the reinforcement steel bars, so
the stress diagrams were calculated
from a simplified method instead of the
application of plate analysis theories.
Once all the hypotheses were
evaluated, the steel frame was
calculated regarding the requirements
for all the walls and the base floor
according to the ultimate and
serviceability limit states, and to the
verifications due in the Eurocodes and
proper regulations.
The approach to the problem involves
a good understanding of concrete
principles and design algorithms.
TIPO DE ARMADURA
Nº DE REDONDOS Y
DIÁMETRO UNA
CÉLULA
Nº DE REDONDOS Y
DIÁMETRO FINAL
Muro Central- Armadura Vertical 20ø16 20ø16
Muro Central-Armadura
Horizontal
23ø20 23ø20
Muro Corto-Armadura Vertical 20ø16 20ø16
Muro Corto-Armadura Horizontal 23ø20 23ø20
Muro Largo- Armadura Vertical 70ø20 140ø20
Muro Largo- Armadura Horizontal 23ø20 23ø20
Solera- Armadura inferior
paralela al lado corto
109ø20 218ø20
Solera-Armadura inferior paralela
al lado largo
59ø20 59ø20
Solera-Armadura superior
paralela al lado corto
74ø20 148ø20
Solera-Armadura superior
paralela al lado largo
17ø20 17ø20
9
Took place at:
Team of:
Subject name:
Academic year:
Project time span:
University of Granada
2
Lighting techniques: public and
urban lighting systemsldings
2
1 month
STREET LIGHTING
DESIGN
In this project, the aim was to find a
new way to illuminate a narrow
pedestrian street located in Granada’s
downtown (Spain).
In order to work out the most
appropriate lighting system, various
factors were considered including the
geometry, the use, the importance of the
street within the area, pedestrian and
vehicles flow, position of houses’
windows and crime risk.
The study resulted in an S-2 class
according to the respective regulations,
which means an average illuminance of
10 lx, with a minimum of 3 lx and the
average uniformity rate being 0.3.
The solution proposed consisted of
high pressure sodium bulbs, which were
suitable for chromatic display and
performance, one-sided placements at 6
m high and 18 m of span, reaching a
great average uniformity rate of 0'71.
CalleSantiago
CalleSecodeLucena
CalledelCobertizodeSanto
Domingo
CalleSantoSepulcro
CalledelasComendadorasdeSantiago
CALLE DEL AGUADO CALLE DEL AGUADO
2,72
39,321,7
2,37
11,86
44,6
1,65
0 1 2 3 4 5 6 7 8 91 m
10
Took place at:
Team of:
Subject name:
Academic year:
Project time span:
University of Granada
1
Urban and landscape integration
of marina-fishing ports. Contest
3
1 month
PROPOSAL
FOR THE IMPROVEMENT OF
A MARINA-FISHING PORT
AND ITS SURROUNDINGS
This project was born with the purpose
of expounding any new ideas over an
extension project for the existing marina-
fishing port at ‘Caleta de Vélez’
(Málaga). It was part of a voluntary
contest I participated in.
In such a contest, we were allowed to
modify anything in the project, including
its closest surroundings, in order to
improve the urban and landscape
integration so that it could revitalise the
area while keeping its functionality.
In my proposal, I maintained the
original boundaries of the port itself and
changed the distribution of the required
zones a port of this type needs. The
objective of the latter was adapting it to
new strategies such as new open public
spaces and strip malls, new balance for
pedestrianised-car parks areas and
taking advantage of the breakwaters for
other uses.
I got an honorific mention.
11
Took place at:
Team of:
Subject name:
Academic year:
Project time span:
University of Granada
1
Final dissertation
pfc
5
12 months x12
URBAN LOGISTICS
RESEARCH
The research corresponds to my
Master’s grade final dissertation.
This is the result from one year’s work
exclusively dedicated to investigating
the logistics world, with special attention
to urban solutions to freight deliveries
and inverse flow problems.
The document compiles the most
recent studies and handbooks over
freight transport and urban logistics as a
complete book. Afterwards, as a case of
study, a deep analysis was performed
over the city of Granada (Spain),
concluding with the most relevant
measures which could be applied to
improve this issue.
I got a high mark of 8.5 of 10.
PERFIL
DOMINANTE
Entorno Plaza Gracia PERFIL E
Calle Recogidas PERFIL A
Calle Pedro Antonio de Alarcón PERFIL A
Calle Tablas + Obispo Hurtado PERFIL A
Calle Puentezuelas PERFIL A
Entorno Calle Elvira PERFIL E
12
CONTACT DETAILS
Full name
Telephone number
E-mail address
LinkedIn URL
Carlos Francisco Cuadros Calderón
07511 488 010
cuadroscalderon@gmail.com
https://www.linkedin.com/in/carlos-cuadros-calderon

More Related Content

Recently uploaded

(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Recently uploaded (20)

(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

Featured

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by HubspotMarius Sescu
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTExpeed Software
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsPixeldarts
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 

Featured (20)

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 

University Portfolio Carlos Calderon

  • 1. PORTFOLIO CARLOS CALDERON Carlos Francisco Cuadros Calderón 07511 488 010 cuadroscalderon@gmail.com https://www.linkedin.com/in/carlos-cuadros-calderon
  • 2. SUMMARY WORK EXPERIENCE Ÿ Civil Parish land laws application mapping............................................................ Ÿ Civil Parish Fire Emergency Plan........................................................................... Ÿ On site landslip stabilisation and regeneration project tracking............................. UNIVERSITY PROJECTS Ÿ Underground car park viability study...................................................................... Ÿ Water supply, water distribution and wastewater collection systems..................... Ÿ Residential building structural design..................................................................... Ÿ Underground water tank structural design............................................................. Ÿ Street lighting project.............................................................................................. Ÿ Proposal for the improvement of a marina-fishing port and its surroundings......... Ÿ Urban logistics research......................................................................................... .. 3 4 5 6 7 8 9 10 11 12
  • 3. Took place at: Team of: Department: Internship placement: Project time span: CazorlaTown Council 1 Building works and urbanism department 1 1 month CIVIL PARISH LAND LAWS APPLICATION MAPPING This work consisted of the identification and mapping of the land laws' application throughout Cazorla Civil Parish (Jaén -Spain-). The represented zones were those classified followed the autonomous region’s legislation, and those affected by easements and land use restrictions due to infrastructures, rivers and so on. Basically, this tool provides useful information when somebody intends to perform any kind of intervention in the area, from building a new house to creating a new track to reach a farm, so that it is easily recognised what the restrictions are and the licences needed. The digital file also offers the possibility to switch on or off the different areas in case you may want to have a clearer view. Moreover, it is accompanied by an additional document which schematises the most relevant information. 485000,000000 485000,000000 490000,000000 490000,000000 495000,000000 495000,000000 500000,000000 500000,000000 505000,000000 505000,000000 510000,000000 510000,000000 515000,000000 515000,000000 520000,000000 520000,000000 4185000,000000 4185000,000000 4190000,000000 4190000,000000 4195000,000000 4195000,000000 4200000,000000 4200000,000000 4205000,000000 4205000,000000 2°45'0"W 2°45'0"W 2°50'0"W 2°50'0"W 2°55'0"W 2°55'0"W 3°0'0"W 3°0'0"W 3°5'0"W 3°5'0"W 3°10'0"W 3°10'0"W 38°0'0"N 38°0'0"N 37°55'0"N 37°55'0"N 37°50'0"N 37°50'0"N Municipio de Cazorla CLASIFICACIÓN DEL SUELO SEGÚN LA LEY DE ORDENACIÓN URBANÍSTICA DE ANDALUCÍA PLANO CLASIFICACIÓN DEL SUELO SEGÚN LA LOUA ÁMBITO MUNICIPIO DE CAZORLA (JAÉN) FECHA REALIZACIÓN Agosto 2014 FORMATO DE PAPEL DIN A0 ESCALA 1 : 35.000 « Coordinate System: ETRS 1989 UTM Zone 30N Projection: Transverse Mercator Datum: ETRS 1989 False Easting: 500.000,0000 False Northing: 0,0000 Central Meridian: -3,0000 Scale Factor: 0,9996 Latitude Of Origin: 0,0000 Units: Meter 0 1 2 3 4 50,5 Km LEYENDA Límite_Municipio Suelo Urbano Suelo Urbanizable Suelo No Urbanizable Suelo Urbano según propuesta del PGOU (no aprobado) Suelo Urbanizable según propuesta del PGOU (no aprobado) De especial protección por legislación específica De carácter natural o ruralDominio Público Viario Dominio Público Hidráulico Vías Pecuarias BIC Yacimientos Arqueológicos Red Natura 2000 De especial protección por planificación territorial o urbanística De carácter natural o rural PEPMF Jaén PORN Jaén PGOU (no aprobado) Hábitat Rural Diseminado Hábitat Rural Diseminado 3
  • 4. Took place at: Team of: Department: Internship placement: Project time span: CazorlaTown Council 2 Building works and urbanism department 2 1 month CIVIL PARISH FIRE EMERGENCY PLAN I was responsible, along with a topographer, for the development of the official Cazorla Civil Parish Fire Emergency Plan (Cazorla -Spain-). The purpose of it is to provide all the information and procedures to follow in case of a fire emergency at any point of the territory administrated by the council. The major difficulties fell on getting input from official and reliable sources, and processing such data according to new regulations and standardisation. Additionally, accurate output was essential as the readability of both maps and tables needed to be as clear as possible due to the importance of such documents at emergency moments. The plan was approved straight away by the county government and its period of validity is from 2015 to 2019. % % % % %% % % % % %%% ?@ ?@ ?@ ?@ 9 9 99T 1 T 2 T 3 T 4 T 5 T 6 T 7 T 8 T 9 T 10 T11 T 12T 13 RíoGuadalquivir Río Guadalquivir RíoG uadalq uivir Río Gua da lquivir Río Guadalquivir Río Guadalquivir Río Guadalquivir Río Guadalquivir R ío de C az or la Río de C azo rla Rí o de Cazo rla RíodeCazorla R ío de Cazorla R ío de C azorla RíodeCazorla RíodeCazorla Río de Cazorla E 4 D 1 B 1 B 2 B 3 B 4 B 5 B 6B 7 B 8 B 9 B 10 B11 B 12 B 13 B 15 B 16 B 17 B 18 B 19 B 20 Navahondona/Banderin 1 2 C.R 16 C.R26 C.R12 C.R6 C.R18 C.R17 C.R19 C.R15 C.R7 C.R 1 C.R 21 C.R 5 C.R 28 C.R 14 C.R 23 C.R 22 C.R 8 C .R 27 C.R 25 C.R 4 C.R 11 C .R 20 C.R 10 C.R 29 C.R 2 C.R24 C.R 3 P F 2 77 PF 278 PF279 JF-7093 JA-8106 JA-7104 JA-6108 A-620 4 A-315 A-620 7 A-319 A-322 Úbeda Torreperogil Santo Tomé Chilluévar La Iruela Peal de Becerro Quesada 1 2 1 2 3 4 1 2 3 4 484.000 484.000 488.000 488.000 492.000 492.000 496.000 496.000 500.000 500.000 4.194.000 4.194.000 4.196.000 4.196.000 4.198.000 4.198.000 4.200.000 4.200.000 4.202.000 4.202.000 4.204.000 4.204.000 4.206.000 4.206.000 EXCELENTISIMO AYUNTAMIENTO DE C A Z O R L A Proyecto: Plan Local de Emergencaias por Incendios Forestales Plano: Puntos Interés F. Javier Tallante Martinez. Arquitecto Escala: Fecha: 1:24.000 1/3 m 0 0,5 1 1,5 20,25 Kilometros Centros de confinamiento 1, Albergue de Cazorla 2, Pabellon Municipal Cazorla Ríos guadalquivir guadalentin Cerezuelo Tomas de agua % T 1, Poligono Industrial % T 10, S5 (Sector desarrollado) % T 11, S5 (Sector desarrollado) % T 12, S5 (Sector desarrollado) % T 13, S5 (Sector desarrollado) % T 2, Salida Cazorla-Peal de Becerro (Las harinillas) % T 3, Salida Cazorla-S.Tome (Piensos Bermejo) % T 4, UE-5 (Unidades de ejecución) % T 5, UE-1 (Unidades de ejecución) % T 6, UE-1 (Unidades de ejecución) % T 7, S5 (Sector desarrollado) % T 8, S5 (Sector desarrollado) % T 9, S5 (Sector desarrollado) Embalses E 1, Embalse Cerrada Utrero E 2, Embalse de la Bolera E 3, Laguna de Valdeazores E 4, Embalse Puente de la Cerrada Depositos D 1, Piscina Riogazas D 2, Deposito Empalme del Valle D 3, Algibe Almiceran D 4, Deposito Vadillo D 5, Piscina Linarejos D 6, Piscina Vadillo D 7, Alberca Navas de San Pedro Balsas B 1, Cabeza Rey B 2, Casas Estepa B 3, La Pajarica B 4, C.Regantes El Molar B 5, Piscina Municipal B 6, Los angulos (CR Cristo C) 1 B 7, Los angulos (CR Cristo C) 2 B 8, Vado Cortijo B 9, Balsa Almedina B 10, Balsa Camino Viejo Quesada B 11, Balsa Cortijo jamilero B 12, C.R Cortijo del vado B 13, Cortijo del Vado B 14, Cortijo del Vado B 15, Encima Cortijo de los alcachofares B 16, Cerro de Judas B 17, Jamilero B 18, Jamilero B 19, Loma del Quintanar ( Cortijo las Albercas ) B 20, Cortijo de la Pajarita Pistas de aterrizaje helicopteros 1, Campo de futbol 2, Recinto Ferial 3, Vadillo Castril Centro Sanitario centro sanitario Red de Carreteras MATRICULA, DENOMINACIÓN JF-7094, De JF-7091 a P. del Adelantado A-315, De Torreperogil a Baza por Pozo Alcón A-319, De Peal de Becerro a Hornos por Cazorla A-322, De Jódar a Cazorla A-6204, De Villacarrillo a Cazorla A-6207, De Peal de Becerro a Santo Tomé JA-6108, JA-6108 - Puente de la Cerrada a Santo Tome JA-7104, JA-7104 - Acceso a El Molar JA-8106, JA-8106 - Acceso a la Iruela JF-7091, de JV-7014 a JZ-1 JF-7092, carretera longitudinal JF-7093, de La Iruela a Pozo Alcón JF-7096, de JF-7091 a JZ-12 JF-7097, De JF-7091 a Valdetrillo JF-7098, camino forestal Pistas Forestales PF 212, Camino Majallena PF 241, Camino La Cabrilla PF 242, Camino Nava del Espino - Fuente de la Umbría PF 244, Camino Barranco Guadalentín PF 245, Camino Vado de las Carretas - Puntal de Ana María PF 246, Camino Lancha del Almicerao PF 247, Camino del Poyo de la Mesa PF 248, Camino Nava del Espino-Torrillo del Guday PF 249, Camino la Medianega PF 250, Camino Juan Cubierta PF 251, Camino Caida a la Canaliega PF 254, Camino Collado Verde PF 255, Cuerda de los Vaquerizos PF 256, Cuesta del Bazan PF 257, Camino Morra del Pinar PF 258, Camino Laguna de Valdeozores PF 259, Camino Los Arenales PF 260, Camino Majal de la Carrasca PF 262, Camino Tía Plageda PF 263, Camino Cortijo Las Locas PF 264, Camino Casita de Venato PF 265, Camino Coto del Valle a la Rajona PF 266, Camino Poyo Nicolás PF 267, Camino Puente Las Herrerias - Pino Las Cruces PF 268, Camino Arroyo La Mesa PF 269, Camino del Collado del Escaramujal PF 270, Camino Los Habares PF 271, Camino Majada Las Vacas PF 277, Camino Siete Fuentes a Pico del Águila PF 278, Camino Cerro de la Arcuza PF 279, Camino Montesión PF 280, Camino Los Rasos - Laguna Cazorla PF 281, Camino Hazas de Román PF 283, Camino Carrillo la Vieja a Gilillo PF 284, Camino Arroyo de los Cierzos PF 287, Camino Sacejo - Laguna de la Iruela PF 288, Camino Arroyo Maillar - Calerón PF 289, Camino Umbría Arroyo Maillar PF 293, Camino La Cabrilla Red eléctrica Red electrica Caminos Rurales C.R 1, Camino del Cortijo del Alamillo C.R 10, Camino del Cortijo de Oratorio C.R 11, Camino de la Coscoja al Camino de Timoteo C.R 12, Camino desde la Cruz del Cerro hasta el Polígono Industrial C.R 14, Camino de La Almedina a Cortijo de la Solana C.R 15, Camino de La Almedina a Los Peralejos C.R 16, Camino del Cortijo de la Solana C.R 17, Camino desde la A-319 hasta el Cortijo de la Cruz C.R 18, Camino desde el Cortijo de la Cruz hasta los Ramblizos C.R 19, Camino de Los Nerios a Cañada Real de Peal de Becerro a Santo Tomé C.R 2, Camino del Cortijo de Timoteo C.R 20, Camino de Llanos del Ciego a Camino de Arroyo Salado C.R 21, Camino de Arroyo Salado a Alcachofares C.R 22, Camino de Llanos del Ciego a Cortijo Blanco C.R 23, Camino de los Risueños C.R 24, Camino del Cortijo de Niño Alfonso a las Albercas C.R 25, Camino desde la Carretera JA-6108 a las Albahacas C.R 26, Camino del Cordel de Vado Palomo al Molar hasta las Arcas C.R 27, Camino Estrecho C.R 28, Camino de Montesión C.R 29, Camino de San Blas C.R 3, Camino de los Fruteros C.R 4, Camino de Arroyo Salado C.R 5, Senda de La Mojonera C.R 6, Camino desde el Camino del Cortijo de Timoteo a la Carretera Vieja de Peal de Becerro C.R 7, Camino desde el Camino del Cortijo de Timoteo a Los Peralejos C.R 8, Camino de Coto Barrutia Peal de Becerro Patrimonios Históricos ?@ 1, Castillo de la Yedra ?@ 2, Centro Histórico ?@ 3, Castillo de las Cinco Esquinas ?@ 4, Palacio de las Cadenas Industrias 9 1, Aceites Cazorla Sociedad Cooperativa 9 2, Embutidos Tomas Navarro 9 3, Embutidos Carrasco 9 4, Embutidos Navarro La Iruela Castril Peal de Becerro Santiago-Pontones Quesada I 9 I 8 I 7 I 6 I 5 I 4 I 3 I 2 I 1 I 80 I 78 I 79 I 77 I 76 I 75 I 74 I 59 I 58 I 57 I 56 I 55 I 54 I 47 I 46 I 45 I 33 I 29 I 26 I 25 I 24I 23 I 22 I 21 I 20I 19I 18 I 17I 16 I 15 I 14 I 13 I 12I 11 I 10 I 81 502.000 502.000 505.000 505.000 508.000 508.000 511.000 511.000 514.000 514.000 517.000 517.000 520.000 520.000 4.190.000 4.190.000 4.192.000 4.192.000 4.194.000 4.194.000 4.196.000 4.196.000 4.198.000 4.198.000 4.200.000 4.200.000 4.202.000 4.202.000 Usos del suelo Cultivos herbáceos con arbolado de quecíneas Formaciones arboladas densas Formaciones de matorral denso con arbolado Formaciones de matorral disperso con arbolado Formaciones de pastizal con arbolado Matorral sin arbolado Otros Pastizales no arbolados Suelo desnudo Talas y plantaciones forestales recientes Zonas húmedas y superficies de agua continentales Zonas industriales y comerciales e infraestructuras técnicas Zonas mineras, vertederos y áreas de construcción Zonas urbanas Áreas agrícolas homogéneas en secano Cortafuegos Masa Forestal Monte Navahondona Inventario nucleo, instalaciones... I 80, Cortijo Manuel Ruiz I 1, Casa Forestal Fuente Acero I 10, Area Rec-kiosko Pte. Herrería I 11, Kiosko Cerrada de Utrero I 12, Punto Informacion Cerrada Utrero I 13, Vadillo I 14, Puesto Vigilancia Banderin I 15, Teinada Arroyo Millar I 16, CF Hotel Fuente del Oso I 17, Roturación Fte. Del Oso I 18, Area rec-kiosko Empalme Valle I 19, Roturación Rincón Avellanar I 2, Control Rambla Seca I 20, Roturación CF- Fuente Fresca I 21, Roturación Castellones Abajo I 22, Roturación Cortijo de los Locos I 23, CF Los Chorrillos I 24, Roturación Castellones Arriba I 25, CF Central Elec del Utrero I 26, Roturación Molino Anica I 29, Mirador Pto. Palomas I 3, Kiosko- Roturación Nava San Pedro I 33, Hotel Rural Sacejo I 4, C.Forestal Nava San Pedro I 45, Cortijo de la Canalilla I 46, Cortijo Poyo Trivaldo I 47, Cortijo Vado Carretas I 5, C.F los Collados I 54, Cortijos Nava San Pedro I 55, Camping-caballos Pte. Herreria I 56, Casa Caleron I 57, Parador Nac El adelantado I 58, Hotel Coto del Valle I 59, Aldea Vado Ancho I 6, Area recreativa Linarejos I 7, Mirador Estrecho Perales I 74, Roturación Cortijo Abajo (Nava de San Pedro) I 75, Centro de Rec. del Quebrantahuesos I 76, Puesto de Vigilancia Poyos de la Mesa I 77, Roturación de Venato I 78, Roturación Los Cortijillos de Vadillo I 79, Área recreativa Fuente de la Garganta I 8, Mirador Poyo Manquillo I 9, Mirador Poyo de la Mesa EXCELENTISIMO AYUNTAMIENTO DE C A Z O R L A Proyecto: Plan Local de Emergencaias por Incendios Forestales Plano: Vegetación, Cortafuegos e Instalaciones obligadas a tener un plan de autoprotección F. Javier Tallante Martinez. Arquitecto Escala: Fecha: 1:24.000 3/3 m 0 0,5 1 1,5 20,25 Kilometros Vigencia del Plan: 2015/2019 SI Total MUNICIPIOS LIMÍTROFES: NORTE: SANTO TOMÉ, CHILLUÉVAR, LA IRUELA, SANTIAGO PONTONES SUR: PEAL DE BECERRO, QUESADA, POZO ALCÓN ESTE: PROVINCIA DE GRANADA OESTE: ÚBEDA, TORREPEROGIL PLAN LOCAL DE EMERGENCIA POR INCENDIOS FORESTALES 1. ÁMBITO TERRITORIAL MUNICIPIO: CAZORLA PROVINCIA: JAÉN ESPACIO NATURAL PROTEGIDO: ENP: PARQUE NATURAL DE CAZORLA, SEGURA YLAS VILLAS LONGITUD KM 5.0 21.3 7.9 2.5 9.1 7.6 1.0 0.2 Carretera convencional: red provincial de Jaén DENOMINACIÓN COMPETENCIA (*) TIPO (**) Autonómica Carretera convencional: red complementaria de Jaén JA-6108 de Puente de la Cerrada a Santo Tomé Diputación Carretera convencional: red provincial de Jaén Autonómica Carretera convencional: red complementaria de Jaén JA-7104 acceso a El Molar Diputación Carretera convencional: red provincial de Jaén A-319 de Peal de Becerro a Hornos por Cazorla Autonómica Carretera convencional: red autonómica intercomarcal A-322 de Jódar a Cazorla Autonómica Carretera convencional: red autonómica intercomarcal A-6204 de Villacarrillo a Cazorla A-6207 de Peal de Becerro a Santo Tomé A-315 de Torreperogil a Baza por Pozo Alcón Autonómica Carretera convencional: red autonómica intercomarcal JA-8106 acceso a La Iruela Diputación 2.2. VÍAS DE COMUNICACIÓN: CARRETERAS / FERROCARRILES QUE RECORREN EL MUNICIPIO Ubicar en mapa, escala mínima 1:25.000. MUNICIPIO CAZORLA 4
  • 5. Took place at: Team of: Department: Internship placement: Project time span: CazorlaTown Council +9 Building works and urbanism department 2 1 month ON SITE LANDSLIP STABILISATION AND REGENERATION PROJECT TRACKING This project had a triple aim: applying measures to slow down a rotational landslide, environmental recovery of the area, and providing new spaces to home a possible future adventure park. The site’s background is determined by, on the one hand, environmental decline, largely terrain desertification after being a national quad bike circuit, and on the other hand, a discovered big rotational landslide which had started causing some issues on the roads nearby. I took part in the on-site tracking of the works which focussed on stopping the erosion through building gabions walls, driving the rain and ground water back to their natural reinforced riverbed and planting trees.Additionally, new terraces were made which both helped to stabilise the landslide and provided great opportunities for future uses. 5
  • 6. Took place at: Team of: Subject name: Academic year: Project time span: University of Granada 6 Organisation and management of projects and construction sites 5 3 months UNDERGROUND CAR PARK VIABILITY STUDY The objective of this project was to define whether an underground car park located in Granada was profitable or not to build on. The methodology followed consisted of analysing the amount of car parking space required in the area served. After that, several proposed designs were evaluated concluding the returning inversion period under a paid parking basis. Among the main tasks carried out, the following are worthy of mention: - Socioeconomic, demographic, urban, topographic and transport analysis. - Drafting different alternatives considering best use of the available space, structures needed, safety and usefulness. - Economic assessment. Alternativa tipo s-1 Alternativa tipo s-2 Diseño final PRESUPUESTO DE EJECUCIÓN MATERIAL 6.175.113,49 € 5.155.931,73 € 5.442.527,76 € GASTOS GENERALES (13% s/P.E.M.) 802.764,75 € 670.271,13 € 707.528,61 € BENEFICIO INDUSTRIAL (6% s/P.E.M.) 370.506,81 € 309.355,90 € 326.551,67 € TOTAL 7.348.385,05 € 6.135.558,76 € 6.476.608,04 € I.V.A. (21% s/TOTAL) 1.543.160,861 € 1.288.467,34 € 1.360.087,69 € PRESUPUESTO DE EJECUCIÓN POR CONTRATA 8.891.545,91 € 7.424.026,10 € 7.836.695,72 € PROYECTO Y DIRECCIÓN DE OBRA (5% s/P.E.C.) 444.577,29 € 371.201,31 € 391.834,79 € COSTE DE LICENCIAS DE OBRA (1% s/P.E.M.) 61.751,13 € 51.559,32 € 54.425,28 € INVERSION TOTAL 9.397.874,34 € 7.846.786,72 € 8.282.955,79 € COSTE POR PLAZA 16.010 € 15.032,16 € 15.867,73 € 6
  • 7. Took place at: Team of: Subject name: Academic year: Project time span: University of Lisbon 4 Sanitation engineering and the environment 4 3 months WATER SUPPLY, WATER DISTRIBUTION & WASTEWATER COLLECTION SYSTEMS The project consisted of three different parts: The first one, the design of the supply system from the source to the consuming areas, considering different alternatives regarding the topography and assessing the economic investment and exploitation. In the second one, a distribution network within a new urbanised area was drafted where it was essential to ensure the minimum service pressure in all points and the water diversions in case of breakdowns. The last part includes the design of both the wastewater and rainwater collectors, taking into account the performance, safety and economic costs. E2 (63,8m) E3 (59,5m) E4 (48,7m) E5 (25,4m) I5 (43,5m) I4 (47,8m) I3 (47,5m) I2 (52,4m) I1 (61,8m) M1 (43,3m) M2 (27,5m) I12 (14,2m) E9 (10,7m) I11 (17,7m) E7 (23m) I10 (16,8m) E8 (12m) I9 (5,7m) I8 (16,5m) I7 (23,5m) I6 (29m) E6 (34,5m) Mc5 Mc4 Mc8 Mc6 Mc3 Mc7 Mc9 Mc2 Mc10 Mc1 Mc11 ëRP3 VRP2 VR P1 PĈ t2 t22 t23 t21 t16 t14 t19 t15 t17 t18 t20 t3 t4 t6 t5 t7 t8 t9 t10 t11 t12 t13 t24 a1 c2 C3 A3 a2 a4 A5 A6 B5 b2b1 b3 d17 D18D15 d14 C5 c4 c1 d1 D3 d2 D5 d4 d6 D7 d8D9 d10 D11 D13 d12 Fim (à estação de tratamento) B4 D16 c1.1 c1.2 c1.3 c1.4 c1.5 c1.6 c3.1 c3.2 c3.3 c3.4 c3.5 c3.6 c4.1 c5.1 D16.1 D16.2 CAIXAS COTAS Designação Terreno (m) (mm) (m/m) (m) (m) Declives Diâmetros DISTÂNCIAS Profundidade da Soleira Soleira Perfis Caixas Origem C1 62.200.00 46.35 46.35 60.551.65 C1.1 C1.2 C1.3 C1.4 C1.5 C3.1 C3.2 C3.3 C3.4 C3.5 C3.6 C5 C5.1 D16 D16.1 D16.2 D18 B5 B5.1 A6 61.2046.3559.551.65 58.5099.5156.851.65 57.00137.8755.351.65 55.10176.8253.451.65 52.80209.2451.151.65 52.30219.0450.651.65 49.70275.6748.051.65 47.50320.9643.404.10 41.00345.8638.612.39 36.80374.2333.493.31 30.90401.1329.501.40 28.80424.5322.322.06 23.80453.3918.805.00 17.10504.8815.431.67 15.80536.2614.091.71 13.30569.3911.571.73 8.80622.867.111.69 5.90671.504.221.68 5.40725.413.71.70 3.90761.032.221.68 280 0.022 53.16 53.16 0.051 38.36 38.36 0.039 38.95 38.95 0.049 32.42 32.42 0.071 9.80 9.80 0.051 56.63 56.63 0.046 45.29 45.29 0.049 24.90 24.90 0.264 28.37 0.147 0.219 23.40 23.40 0.089 28.86 28.86 0.174 51.49 51.49 0.115 31.38 31.38 0.042 33.13 33.13 0.076 53.47 53.47 0.084 48.64 48.64 0.059 53.91 53.91 0.009 35.62 35.62 280 0.042 35.59 35.59 0.017 3.30796.621.621.68 28.37 26.90 26.90 C3 PEAD, Ø250/Ø280 671.50 m PEAD,Ø280 125.12m 7
  • 8. Took place at: Team of: Subject name: Academic year: Project time span: University of Lisbon 4 Construction and prefabrication buildings 5 3 months RESIDENTIAL BUILDING STRUCTURAL DESIGN The work focussed on the design and calculation of a (5+2)-storey residential building structure to be placed in Setubal (Portugal). In a first stage, the approach was as follows: - Drafting of different alternatives meeting the functional planning of the building. - Preliminary sizing. - Detailing and final design of all elements. - Checking and model analysis using SAP2000 software. In a second stage, the possibility of switching part of bean-based slabs into a prestressed slab was studied in order to gain a longer span. One of the most difficult considerations was taking into account the seismic influence over such an area. 8
  • 9. Took place at: Team of: Subject name: Academic year: Project time span: University of Granada 3 Reinforced and prestressed concrete 4 2 months UNDERGROUND WATER TANK STRUCTURAL DESIGN In this project the main goal was to quantify the reinforcement steel bars, so the stress diagrams were calculated from a simplified method instead of the application of plate analysis theories. Once all the hypotheses were evaluated, the steel frame was calculated regarding the requirements for all the walls and the base floor according to the ultimate and serviceability limit states, and to the verifications due in the Eurocodes and proper regulations. The approach to the problem involves a good understanding of concrete principles and design algorithms. TIPO DE ARMADURA Nº DE REDONDOS Y DIÁMETRO UNA CÉLULA Nº DE REDONDOS Y DIÁMETRO FINAL Muro Central- Armadura Vertical 20ø16 20ø16 Muro Central-Armadura Horizontal 23ø20 23ø20 Muro Corto-Armadura Vertical 20ø16 20ø16 Muro Corto-Armadura Horizontal 23ø20 23ø20 Muro Largo- Armadura Vertical 70ø20 140ø20 Muro Largo- Armadura Horizontal 23ø20 23ø20 Solera- Armadura inferior paralela al lado corto 109ø20 218ø20 Solera-Armadura inferior paralela al lado largo 59ø20 59ø20 Solera-Armadura superior paralela al lado corto 74ø20 148ø20 Solera-Armadura superior paralela al lado largo 17ø20 17ø20 9
  • 10. Took place at: Team of: Subject name: Academic year: Project time span: University of Granada 2 Lighting techniques: public and urban lighting systemsldings 2 1 month STREET LIGHTING DESIGN In this project, the aim was to find a new way to illuminate a narrow pedestrian street located in Granada’s downtown (Spain). In order to work out the most appropriate lighting system, various factors were considered including the geometry, the use, the importance of the street within the area, pedestrian and vehicles flow, position of houses’ windows and crime risk. The study resulted in an S-2 class according to the respective regulations, which means an average illuminance of 10 lx, with a minimum of 3 lx and the average uniformity rate being 0.3. The solution proposed consisted of high pressure sodium bulbs, which were suitable for chromatic display and performance, one-sided placements at 6 m high and 18 m of span, reaching a great average uniformity rate of 0'71. CalleSantiago CalleSecodeLucena CalledelCobertizodeSanto Domingo CalleSantoSepulcro CalledelasComendadorasdeSantiago CALLE DEL AGUADO CALLE DEL AGUADO 2,72 39,321,7 2,37 11,86 44,6 1,65 0 1 2 3 4 5 6 7 8 91 m 10
  • 11. Took place at: Team of: Subject name: Academic year: Project time span: University of Granada 1 Urban and landscape integration of marina-fishing ports. Contest 3 1 month PROPOSAL FOR THE IMPROVEMENT OF A MARINA-FISHING PORT AND ITS SURROUNDINGS This project was born with the purpose of expounding any new ideas over an extension project for the existing marina- fishing port at ‘Caleta de Vélez’ (Málaga). It was part of a voluntary contest I participated in. In such a contest, we were allowed to modify anything in the project, including its closest surroundings, in order to improve the urban and landscape integration so that it could revitalise the area while keeping its functionality. In my proposal, I maintained the original boundaries of the port itself and changed the distribution of the required zones a port of this type needs. The objective of the latter was adapting it to new strategies such as new open public spaces and strip malls, new balance for pedestrianised-car parks areas and taking advantage of the breakwaters for other uses. I got an honorific mention. 11
  • 12. Took place at: Team of: Subject name: Academic year: Project time span: University of Granada 1 Final dissertation pfc 5 12 months x12 URBAN LOGISTICS RESEARCH The research corresponds to my Master’s grade final dissertation. This is the result from one year’s work exclusively dedicated to investigating the logistics world, with special attention to urban solutions to freight deliveries and inverse flow problems. The document compiles the most recent studies and handbooks over freight transport and urban logistics as a complete book. Afterwards, as a case of study, a deep analysis was performed over the city of Granada (Spain), concluding with the most relevant measures which could be applied to improve this issue. I got a high mark of 8.5 of 10. PERFIL DOMINANTE Entorno Plaza Gracia PERFIL E Calle Recogidas PERFIL A Calle Pedro Antonio de Alarcón PERFIL A Calle Tablas + Obispo Hurtado PERFIL A Calle Puentezuelas PERFIL A Entorno Calle Elvira PERFIL E 12
  • 13. CONTACT DETAILS Full name Telephone number E-mail address LinkedIn URL Carlos Francisco Cuadros Calderón 07511 488 010 cuadroscalderon@gmail.com https://www.linkedin.com/in/carlos-cuadros-calderon