Gettheknowledgetodesigncasingforanywells!
Petrosync Distinguished Instructor
AdvancedCasingDesignAdvancedCasingDesign
Improveyour
techniquesand
learnfromthe
Expert!
Fayez Makkar
Drilling and Workover Consultant
Independent Professional Training & Coaching Professional
Over 35 years of experience in Petroleum Industry.
Extensive experience on workover, completion logging interpretation and design.
Accomplished Instructor with over 20 years of experience.
18thMay2015-22ndMay2015,Bali,Indonesia
UNDERSTAND the main fuctions, characteristics and different types of casing
RECOGNIZE the geometric characteristics and properties of casing, and how these can affect performance
APPERCIATE the requirements for casing seat selection with regards to subsurface information
CONDUCT casing design calculations for different load cases via different methods
UNDERSTAND how buckling affects casing design limitations and show an appreciation for mitigating its effects
RECOGNIZE the effects of temperature and wear on casing design
KNOW how corrosion can reduce casing life / performance and recognize signs of corrosion
Course Objectives
Specially Designed for
This course is specifically designed for, but not limited to employees in the oil and gas industry who holds the following
roles:
Supported by
FOCUS TRAINING • REDUCE COST • ENHANCED RESULTS
Over the years, there has been a growing demand for hybrid training programs. It is an excellent option to maximize your training dollar for your
specific training needs. We make it possible to run a training program that is customized totally to your training needs at a fraction of an in-house
budget!
If you like to know more about this excellent program, please contact us on +65 6415 4500 or email general@petrosync.com
HYBRID TRAINING SOLUTIONS
Drilling Managers
Drilling Supervisors
Drilling Superintendents
Senior Drillers
Drilling Engineers
Operation Engineers
Project Engineers
The 5-day course will cover relevant subjects required to understand the structural mechanics of downhole tubular. Material aspects,
connection selection, performance properties, load cases, design factors and buckling are just a few of the many topics covered.The
training is designed to take delegates through the key drivers behind casing design for exploration, appraisal and well developments
and their associated risks, challenges and solutions.
Participants will be able to design casing for any well: onshore, offshore, high pressure and high temperature wells, horizontal and
multilateral wells.
Petrosync Distinguished Instructor
Course Overview
ADVANCED CASING DESIGN
18-22 May 2015, Bali, Indonesia
CLIENTLISTINCLUDES:
Saudi Aramco
Arabian Drilling Company (ADC)
Kuwait Petroleum Corporation (KPC)
Greater Nile Petroleum Operating Company (GNPOC)
White Nile Petroleum Operating Company (WNPOC)
Petro Energy E&P
Petrodar Operating Company
Abu Dhabi Marine Operating Company (ADMA-OPCO)
Iraq Drilling Company (IDC)
LISTOFPAPERSPRESENTEDININTERNATIONALCONFERENCE
SPE Kuwait International conference on 12/12/2011 - What's the optimum well geometry & reservoir parameters in fracture
carbonate reservoir subjected to steam stimulation? (SPE 150533)
Egypt international conference in 2000 - LWF logging while fishing
Italy International conference in1998 - LWF logging while fishing
Fayez Makkar is an independent drilling and workover consultant having more than 36 years of experience in
Petroleum industry. He has extensive background in workover, completion design and logging interpretation
in directional and horizontal wells. He also has experience in all types of drilling operations including deep
wells on both offshore and onshore oil, gas and H2S wells. His teaching experience began since 1992 and at the
moment he has taught more than 25 courses. He conducted several courses through TPS and NExT in Turkey.
Limited Attendees
The course has limited seats to ensure maximum learning and experience for all delegates.
Certificate of Attendance
YouwillreceiveaCertificateofAttendancebearingthesignaturesoftheTraineruponsuccessfulcompletionofthecourse.Thiscertificateisproof
of your continuing professional development.
Interactive Training
You will be attending training designed to share both the latest knowledge and practical experience through interactive sessions. This will
provide you with a deeper and more long-term understanding of your current issues.
High Quality Course Materials
Printed course manual will provide you with working materials throughout the course and will be an invaluable source of reference for you and
your colleagues afterward. You can follow course progress on your laptop with soft copies provided.
Petrosync Quality
Fayez Makkar
Drilling and Workover Consultant
Independent Professional Training & Coaching Professional
PROGRAM SCHEDULE
Registration (Day 1)
Session I
Refreshment & Networking Session I
Session II
Lunch
Session III
Refreshment & Networking Session II
Session IV
End of Day
08:00-09:00
09:00-11:00
11:00-11:15
11:15-13:00
13:00-14:00
14:00-15:30
15:30-15:45
15:45-17:00
Pipe Mechanics
Pipe Designation Size,Weight
Grade
H2S and CO2 Service
Tubular Range Lengths and Colour Coding
Range lengths
API tubular marking and color coding
Markings
Color Coding
Mechanical Properties of Steel
General
Stress-Strain Diagram
HeatTreatment Of Alloy Steels
Exercise:CasingSeatSelection
Fundamental Design Principles
Burst
Collapse
Tension / Compression
Triaxial
Buoyancy and Buoyancy Force
Buckling
ClassExercise
Introduction - Purpose of casing
Casing Profiles and Drilling Scenarios
Casing Profiles
OnshoreWells
OffshoreWells - SurfaceWellhead
OffshoreWells - SurfaceWellhead &Mudline Suspension
OffshoreWells - SubseaWellhead
Drive, Structural & Conductor Casing
Surface Casing
Intermediate Casing
Production Casing
Liner
Design Requirements
UK Design and consideration Regulations (DCR)
Selection of Casing Seats
Conductor Casing
Surface Casing
Intermediate Casing
Drilling Liner
Production Casing
Differential Sticking Geologic Factors
Casing and Relative Hole Sizes Standard Casing and Hole
Sizes
SAVE COST • IMPROVE PERFORMANCE • REDUCE RISK
PetroSync understands that in current economic climate, getting an excellent return on your training investment is critical for all our clients. This
excellent training can be conducted exclusively for your organization. The training can be tailored to meet your specific needs at your preferred
location and time. We will meet you anywhere around the globe.
If you like to know more about this excellent program, please contact us on +65 6415 4502 or email general@petrosync.com
IN-HOUSE SOLUTIONS
ADVANCED CASING DESIGN
18-22 May 2015, Bali, Indonesia
Course Agenda
Day One
Material Aspects
Connections
API
Proprietary
Performance Properties
Tension
Compression
InternalYield Pressure Collapse
Yield Strength and threshold
Day Two
Casing Loading and Design Considerations
Tubular Selection
Costs
Service Load Cases
Standard Load Cases
Service Life Design Load Equations
Calculating Procedures
Summary of Equations
Burst
Collapse
Axial Force (Tension/ Compression)
Triaxial Equivalent Stress Intensity
Example String Design (Hand Calculation, Class Exercise)
Production Casing
Tubi
Day Three
ADVANCED CASING DESIGN
18-22 May 2015, Bali, Indonesia
Load Capacity Diagrams
Load vs. Depth
Design Factor vs. Depth
Triaxial Load Capacity
Introduction toTDAS / EXP
The well plan
Design / Analysis
Exercise
Special Design Condition
CasingWear
Landing Considerations for Long Strings to Prevent Buckling
Liner Buckling Due to Set Down (Compression) Compression
and Burst
String to String LoadTransfers, Multi String Affairs.
Shock Rebound Loads
Trapped annulus pressure build up, and other trapped fluid
concepts
Well head groth
KickTolerance
Torque and Drag, casing floatation, ERD applications
Day Four
Day Five
CasingDesignMathematicalModels
ProprietaryModels
TDAS:TubingDesignAnalysisSystemWEST:Wellbore
SimulatedTemperatureROAM:TorqueandDrag
MULTI:Multistringmodel
BAROS:annuluspressurebuildup
API Standards Overview
Quality providers / Users
Documents for P.O. Generation
API Standards : Specifications, Recommended Practices &
Bulletins
Using API Specifications
Basic Handling and Running
Running Procedures
Running Equipment
Make up
Thread Compounds
Special Running Procedures for CRA products
Group Discount is based on Standard Price
* For 7 or more delegates, please inquire for more attractive package.
* Important: Please note that registration without payment will incur a SGD 200 administration fee.
1st Delegate Name
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Company:____________________________________________ Industry : __________________________________
Address: _______________________________________________________Postcode: _________________________
Country: ________________________Email: __________________________________________________________
Attention Invoice to: ______________________________________________________________________________
Direct Line Number: ______________________________ Fax: _____________________________________________
PAYMENTMETHODS
DELEGATESDETAILS
Please note:
- Indicate if you have already registered by Phone Fax Email Web
I agree to PetroSync’s terms & conditions,payment terms and cancellation policy.
By Direct Transfer : Please quote invoice number(s) on remittance advice
All bank charges to be borne by payer. Please ensure that PetroSync Global Pte Ltd receives the full invoiced amount.
By Credit Card :
Please debit my credit card: Visa MasterCard
Card Number:
Name printed on card: _____________________________________________________________________
Expiry Date:
Security Code:
INVOICEDETAILS
Authorized Signature : ____________________________________________________________________________
Mrs Ms Dr OthersMr
DETAILS
PROGRAMMECONSULTANT
PAYMENT TERMS : Payment is due in full at the time of registration. Full payment is mandatory for event attendance.
2nd Delegate Name
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Mrs Ms Dr OthersMr
3rd Delegate Name
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Mrs Ms Dr OthersMr
INVESTMENT PACKAGES
CourseDetails
AMEX
TERMSANDCONDITIONS
CHARGES&FEE(s)
- For Payment by Direct TelegraphicTransfer,
client has to bear both local and oversea
bank charges.
- For credit card payment, there is additional
4% credit card processsing fee.
DISCLAIMER
Please note that trainers and topics were confirmed at
the time of publishing; however, PetroSync may
necessitate substitutions, alterations or cancellations of
the trainers or topics. As such, PetroSync reserves the
right to change or cancel any part of its published
programme due to unforeseen circumstances. Any
substitutions or alterations will be updated on our web
page as soon as possible.
DATAPROTECTION
The information you provide will be safeguarded by
PetroSync that may be used to keep you informed of
relevant products and services. As an international
group we may transfer your data on a global basis for
the purpose indicated above. If you do not want us to
share your information with other reputable companies,
please tick this box
CANCELLATIONPOLICY
You may substitute delegates at any time as long as
reasonable advance notice is given to PetroSync. For
any cancellation received in writing not less than
fourteen (14) working days prior to the training course,
you will receive credit voucher less a SGD $200
administration fee and any related bank or credit card
charges.
Delegates who cancel less than fourteen (14) working
days of the training course, or who do not attend the
course, are liable to pay the full course fee and no
refunds will be granted.
In the event that PetroSync cancels or postpones an
event for any reason and that the delegate is unable or
unwilling to attend in on the rescheduled date, you will
receive a credit voucher for 100% of the contract fee
paid. You may use this credit voucher for another
PetroSync to be mutually agreed with PetroSync, which
must occur within a year from the date of postponement.
PetroSync is not responsible for any loss or damage as
a result of the cancellation policy. PetroSync will assume
no liability whatsoever in the event this event is
cancelled, rescheduled or postponed due to any Act of
God, fire, act of government or state, war, civil
commotion, insurrection, embargo, industrial action, or
any other reason beyond management control.
CERTIFICATEOFATTENDANCE
70% attendance is required for PetroSync’s Certificate
of Attendance
* To enjoy the promotion & discount offer, payment must be made before deadline
* Prices include lunches, refreshments and materials. Promotion & discount cannot be combined with other promotional offers.
Please accept our apologies for mail or email that is
incorrectly addressed.
Please email us at registration@petrosync.com and
inform us of any incorrect details. We will amend them
accordingly.
- If you have not received an acknowledgement before the training, please call us to confirm your booking.
Confirmation
InvestmentPackage FULLMASTERCLASS
Standard Price 15MAY2015 SGD$ 5,995
Group Discount
(3 or more Delegates)
Early Bird Offer
Deadline
15MAY2015
10APR2015 SGD$ 5,795
Title : Advanced Casing Design
Date : 18th - 22nd May 2015
Location : Bali, Indonesia
SGD$ 5,695
PetroSync Global Pte Ltd Bank details:
Account Name: PetroSync Global Pte Ltd
Bank Name : DBS Bank Ltd
Bank Code : 7171 • Bank Swift Code : DBSSSGSGXXX • Branch code : 288
Account No : • SGD : 2889018980 • USD : 0288002682016
Bank Address : 12 Marina Boulevard, Level 3. Marina Bay Financial Centre Tower 3. Singapore 018982
Name : Mia. C
Email : mia.c@petrosync.com
Phone : +65 6415 4500
Fax : +65 6826 4322

More Related Content

Viewers also liked

Practical Approach to Drilling Fluid Engineering Mia
Practical Approach to Drilling Fluid Engineering MiaPractical Approach to Drilling Fluid Engineering Mia
Practical Approach to Drilling Fluid Engineering MiaCarla Karenina
 
Acceptance and Rejection Theory with Foster Child
Acceptance and Rejection Theory with Foster ChildAcceptance and Rejection Theory with Foster Child
Acceptance and Rejection Theory with Foster ChildLisa Michelle Farist
 
Obsessive Compulsive and Related Disorders
Obsessive Compulsive and Related DisordersObsessive Compulsive and Related Disorders
Obsessive Compulsive and Related DisordersLisa Michelle Farist
 
Child sexual offenders counseling center
Child sexual offenders counseling centerChild sexual offenders counseling center
Child sexual offenders counseling centerLisa Michelle Farist
 
Juvenile Sexual Offender Program using DBT
Juvenile Sexual Offender Program using DBTJuvenile Sexual Offender Program using DBT
Juvenile Sexual Offender Program using DBTLisa Michelle Farist
 

Viewers also liked (9)

Csa linging into old age
Csa linging into old ageCsa linging into old age
Csa linging into old age
 
Gender keywords
Gender keywordsGender keywords
Gender keywords
 
Practical Approach to Drilling Fluid Engineering Mia
Practical Approach to Drilling Fluid Engineering MiaPractical Approach to Drilling Fluid Engineering Mia
Practical Approach to Drilling Fluid Engineering Mia
 
Acceptance and Rejection Theory with Foster Child
Acceptance and Rejection Theory with Foster ChildAcceptance and Rejection Theory with Foster Child
Acceptance and Rejection Theory with Foster Child
 
Obsessive Compulsive and Related Disorders
Obsessive Compulsive and Related DisordersObsessive Compulsive and Related Disorders
Obsessive Compulsive and Related Disorders
 
Child sexual offenders counseling center
Child sexual offenders counseling centerChild sexual offenders counseling center
Child sexual offenders counseling center
 
Juvenile Sexual Offender Program using DBT
Juvenile Sexual Offender Program using DBTJuvenile Sexual Offender Program using DBT
Juvenile Sexual Offender Program using DBT
 
Sfbt with self harm
Sfbt with self harmSfbt with self harm
Sfbt with self harm
 
Malaikat dan tugasnya
Malaikat dan tugasnyaMalaikat dan tugasnya
Malaikat dan tugasnya
 

Similar to ACD, Mia

PetroSync - Drilling String Design
PetroSync - Drilling String DesignPetroSync - Drilling String Design
PetroSync - Drilling String DesignPetroSync
 
PetroSync - Deepwater Drilling Optimisation
PetroSync - Deepwater Drilling OptimisationPetroSync - Deepwater Drilling Optimisation
PetroSync - Deepwater Drilling OptimisationPetroSync
 
Asme section viii division 1 and 2 pressure vessel series ( CONFIRM RUN )
Asme section viii division 1 and 2   pressure vessel series ( CONFIRM RUN )Asme section viii division 1 and 2   pressure vessel series ( CONFIRM RUN )
Asme section viii division 1 and 2 pressure vessel series ( CONFIRM RUN )Putri Kolopaking
 
INTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIES
INTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIESINTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIES
INTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIESpetroEDGE
 
Vinod kumar senior structural lead engineer
Vinod kumar  senior structural lead  engineerVinod kumar  senior structural lead  engineer
Vinod kumar senior structural lead engineerVinodh Kumar
 
PetroSync - Drilling Engineering for Non-Drilling Engineers
PetroSync - Drilling Engineering for Non-Drilling EngineersPetroSync - Drilling Engineering for Non-Drilling Engineers
PetroSync - Drilling Engineering for Non-Drilling EngineersPetroSync
 
PetroSync - ASME VIII Division 1 & 2 Pressure vessel Series
PetroSync - ASME VIII Division 1 & 2 Pressure vessel SeriesPetroSync - ASME VIII Division 1 & 2 Pressure vessel Series
PetroSync - ASME VIII Division 1 & 2 Pressure vessel SeriesPetroSync
 
Rope Access Presentation from Abfad Limited, World Leaders in Rope Access Tec...
Rope Access Presentation from Abfad Limited, World Leaders in Rope Access Tec...Rope Access Presentation from Abfad Limited, World Leaders in Rope Access Tec...
Rope Access Presentation from Abfad Limited, World Leaders in Rope Access Tec...The Images Group
 
COMPLETIONS DESIGN SCHOOL
COMPLETIONS DESIGN SCHOOLCOMPLETIONS DESIGN SCHOOL
COMPLETIONS DESIGN SCHOOLpetroEDGE
 
FPSO / Floating Production Technology for Offshore Oil & Gas Production
FPSO / Floating Production Technology for Offshore Oil & Gas ProductionFPSO / Floating Production Technology for Offshore Oil & Gas Production
FPSO / Floating Production Technology for Offshore Oil & Gas ProductionWalter Lee
 
PE979 HIGH PRESSURE HIGH TEMPERATURE COMPLETIONS
PE979 HIGH PRESSURE HIGH TEMPERATURE COMPLETIONSPE979 HIGH PRESSURE HIGH TEMPERATURE COMPLETIONS
PE979 HIGH PRESSURE HIGH TEMPERATURE COMPLETIONSpetroEDGE
 
HPHT Well Engineering
HPHT Well Engineering HPHT Well Engineering
HPHT Well Engineering petroEDGE
 
Sand Control
Sand Control Sand Control
Sand Control petroEDGE
 
HPHT WELL ENGINEERING
HPHT   WELL ENGINEERINGHPHT   WELL ENGINEERING
HPHT WELL ENGINEERINGpetroEDGE
 
PetroSync - API 510 Pressure Vessel Inspector course
PetroSync - API 510 Pressure Vessel Inspector coursePetroSync - API 510 Pressure Vessel Inspector course
PetroSync - API 510 Pressure Vessel Inspector coursePetroSync
 
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2Zaharah Kasim
 
PE952 Drilling Essentials For New Engineers And Non-Technical Professionals
PE952 Drilling Essentials For New Engineers And Non-Technical ProfessionalsPE952 Drilling Essentials For New Engineers And Non-Technical Professionals
PE952 Drilling Essentials For New Engineers And Non-Technical ProfessionalspetroEDGE
 

Similar to ACD, Mia (20)

PetroSync - Drilling String Design
PetroSync - Drilling String DesignPetroSync - Drilling String Design
PetroSync - Drilling String Design
 
PetroSync - Deepwater Drilling Optimisation
PetroSync - Deepwater Drilling OptimisationPetroSync - Deepwater Drilling Optimisation
PetroSync - Deepwater Drilling Optimisation
 
Asme section viii division 1 and 2 pressure vessel series ( CONFIRM RUN )
Asme section viii division 1 and 2   pressure vessel series ( CONFIRM RUN )Asme section viii division 1 and 2   pressure vessel series ( CONFIRM RUN )
Asme section viii division 1 and 2 pressure vessel series ( CONFIRM RUN )
 
INTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIES
INTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIESINTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIES
INTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIES
 
Vinod kumar senior structural lead engineer
Vinod kumar  senior structural lead  engineerVinod kumar  senior structural lead  engineer
Vinod kumar senior structural lead engineer
 
PetroSync - Drilling Engineering for Non-Drilling Engineers
PetroSync - Drilling Engineering for Non-Drilling EngineersPetroSync - Drilling Engineering for Non-Drilling Engineers
PetroSync - Drilling Engineering for Non-Drilling Engineers
 
PetroSync - ASME VIII Division 1 & 2 Pressure vessel Series
PetroSync - ASME VIII Division 1 & 2 Pressure vessel SeriesPetroSync - ASME VIII Division 1 & 2 Pressure vessel Series
PetroSync - ASME VIII Division 1 & 2 Pressure vessel Series
 
Rope Access Presentation from Abfad Limited, World Leaders in Rope Access Tec...
Rope Access Presentation from Abfad Limited, World Leaders in Rope Access Tec...Rope Access Presentation from Abfad Limited, World Leaders in Rope Access Tec...
Rope Access Presentation from Abfad Limited, World Leaders in Rope Access Tec...
 
COMPLETIONS DESIGN SCHOOL
COMPLETIONS DESIGN SCHOOLCOMPLETIONS DESIGN SCHOOL
COMPLETIONS DESIGN SCHOOL
 
FPSO / Floating Production Technology for Offshore Oil & Gas Production
FPSO / Floating Production Technology for Offshore Oil & Gas ProductionFPSO / Floating Production Technology for Offshore Oil & Gas Production
FPSO / Floating Production Technology for Offshore Oil & Gas Production
 
CV-Preetesh
CV-PreeteshCV-Preetesh
CV-Preetesh
 
PE979 HIGH PRESSURE HIGH TEMPERATURE COMPLETIONS
PE979 HIGH PRESSURE HIGH TEMPERATURE COMPLETIONSPE979 HIGH PRESSURE HIGH TEMPERATURE COMPLETIONS
PE979 HIGH PRESSURE HIGH TEMPERATURE COMPLETIONS
 
HPHT Well Engineering
HPHT Well Engineering HPHT Well Engineering
HPHT Well Engineering
 
Sand Control
Sand Control Sand Control
Sand Control
 
HPHT WELL ENGINEERING
HPHT   WELL ENGINEERINGHPHT   WELL ENGINEERING
HPHT WELL ENGINEERING
 
PetroSync - API 510 Pressure Vessel Inspector course
PetroSync - API 510 Pressure Vessel Inspector coursePetroSync - API 510 Pressure Vessel Inspector course
PetroSync - API 510 Pressure Vessel Inspector course
 
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2
 
PE952 Drilling Essentials For New Engineers And Non-Technical Professionals
PE952 Drilling Essentials For New Engineers And Non-Technical ProfessionalsPE952 Drilling Essentials For New Engineers And Non-Technical Professionals
PE952 Drilling Essentials For New Engineers And Non-Technical Professionals
 
Danish Khan CV
Danish Khan CVDanish Khan CV
Danish Khan CV
 
senthilkumar CV
senthilkumar CVsenthilkumar CV
senthilkumar CV
 

ACD, Mia

  • 1. Gettheknowledgetodesigncasingforanywells! Petrosync Distinguished Instructor AdvancedCasingDesignAdvancedCasingDesign Improveyour techniquesand learnfromthe Expert! Fayez Makkar Drilling and Workover Consultant Independent Professional Training & Coaching Professional Over 35 years of experience in Petroleum Industry. Extensive experience on workover, completion logging interpretation and design. Accomplished Instructor with over 20 years of experience. 18thMay2015-22ndMay2015,Bali,Indonesia UNDERSTAND the main fuctions, characteristics and different types of casing RECOGNIZE the geometric characteristics and properties of casing, and how these can affect performance APPERCIATE the requirements for casing seat selection with regards to subsurface information CONDUCT casing design calculations for different load cases via different methods UNDERSTAND how buckling affects casing design limitations and show an appreciation for mitigating its effects RECOGNIZE the effects of temperature and wear on casing design KNOW how corrosion can reduce casing life / performance and recognize signs of corrosion Course Objectives Specially Designed for This course is specifically designed for, but not limited to employees in the oil and gas industry who holds the following roles: Supported by FOCUS TRAINING • REDUCE COST • ENHANCED RESULTS Over the years, there has been a growing demand for hybrid training programs. It is an excellent option to maximize your training dollar for your specific training needs. We make it possible to run a training program that is customized totally to your training needs at a fraction of an in-house budget! If you like to know more about this excellent program, please contact us on +65 6415 4500 or email general@petrosync.com HYBRID TRAINING SOLUTIONS Drilling Managers Drilling Supervisors Drilling Superintendents Senior Drillers Drilling Engineers Operation Engineers Project Engineers
  • 2. The 5-day course will cover relevant subjects required to understand the structural mechanics of downhole tubular. Material aspects, connection selection, performance properties, load cases, design factors and buckling are just a few of the many topics covered.The training is designed to take delegates through the key drivers behind casing design for exploration, appraisal and well developments and their associated risks, challenges and solutions. Participants will be able to design casing for any well: onshore, offshore, high pressure and high temperature wells, horizontal and multilateral wells. Petrosync Distinguished Instructor Course Overview ADVANCED CASING DESIGN 18-22 May 2015, Bali, Indonesia CLIENTLISTINCLUDES: Saudi Aramco Arabian Drilling Company (ADC) Kuwait Petroleum Corporation (KPC) Greater Nile Petroleum Operating Company (GNPOC) White Nile Petroleum Operating Company (WNPOC) Petro Energy E&P Petrodar Operating Company Abu Dhabi Marine Operating Company (ADMA-OPCO) Iraq Drilling Company (IDC) LISTOFPAPERSPRESENTEDININTERNATIONALCONFERENCE SPE Kuwait International conference on 12/12/2011 - What's the optimum well geometry & reservoir parameters in fracture carbonate reservoir subjected to steam stimulation? (SPE 150533) Egypt international conference in 2000 - LWF logging while fishing Italy International conference in1998 - LWF logging while fishing Fayez Makkar is an independent drilling and workover consultant having more than 36 years of experience in Petroleum industry. He has extensive background in workover, completion design and logging interpretation in directional and horizontal wells. He also has experience in all types of drilling operations including deep wells on both offshore and onshore oil, gas and H2S wells. His teaching experience began since 1992 and at the moment he has taught more than 25 courses. He conducted several courses through TPS and NExT in Turkey. Limited Attendees The course has limited seats to ensure maximum learning and experience for all delegates. Certificate of Attendance YouwillreceiveaCertificateofAttendancebearingthesignaturesoftheTraineruponsuccessfulcompletionofthecourse.Thiscertificateisproof of your continuing professional development. Interactive Training You will be attending training designed to share both the latest knowledge and practical experience through interactive sessions. This will provide you with a deeper and more long-term understanding of your current issues. High Quality Course Materials Printed course manual will provide you with working materials throughout the course and will be an invaluable source of reference for you and your colleagues afterward. You can follow course progress on your laptop with soft copies provided. Petrosync Quality Fayez Makkar Drilling and Workover Consultant Independent Professional Training & Coaching Professional PROGRAM SCHEDULE Registration (Day 1) Session I Refreshment & Networking Session I Session II Lunch Session III Refreshment & Networking Session II Session IV End of Day 08:00-09:00 09:00-11:00 11:00-11:15 11:15-13:00 13:00-14:00 14:00-15:30 15:30-15:45 15:45-17:00
  • 3. Pipe Mechanics Pipe Designation Size,Weight Grade H2S and CO2 Service Tubular Range Lengths and Colour Coding Range lengths API tubular marking and color coding Markings Color Coding Mechanical Properties of Steel General Stress-Strain Diagram HeatTreatment Of Alloy Steels Exercise:CasingSeatSelection Fundamental Design Principles Burst Collapse Tension / Compression Triaxial Buoyancy and Buoyancy Force Buckling ClassExercise Introduction - Purpose of casing Casing Profiles and Drilling Scenarios Casing Profiles OnshoreWells OffshoreWells - SurfaceWellhead OffshoreWells - SurfaceWellhead &Mudline Suspension OffshoreWells - SubseaWellhead Drive, Structural & Conductor Casing Surface Casing Intermediate Casing Production Casing Liner Design Requirements UK Design and consideration Regulations (DCR) Selection of Casing Seats Conductor Casing Surface Casing Intermediate Casing Drilling Liner Production Casing Differential Sticking Geologic Factors Casing and Relative Hole Sizes Standard Casing and Hole Sizes SAVE COST • IMPROVE PERFORMANCE • REDUCE RISK PetroSync understands that in current economic climate, getting an excellent return on your training investment is critical for all our clients. This excellent training can be conducted exclusively for your organization. The training can be tailored to meet your specific needs at your preferred location and time. We will meet you anywhere around the globe. If you like to know more about this excellent program, please contact us on +65 6415 4502 or email general@petrosync.com IN-HOUSE SOLUTIONS ADVANCED CASING DESIGN 18-22 May 2015, Bali, Indonesia Course Agenda Day One Material Aspects Connections API Proprietary Performance Properties Tension Compression InternalYield Pressure Collapse Yield Strength and threshold Day Two
  • 4. Casing Loading and Design Considerations Tubular Selection Costs Service Load Cases Standard Load Cases Service Life Design Load Equations Calculating Procedures Summary of Equations Burst Collapse Axial Force (Tension/ Compression) Triaxial Equivalent Stress Intensity Example String Design (Hand Calculation, Class Exercise) Production Casing Tubi Day Three ADVANCED CASING DESIGN 18-22 May 2015, Bali, Indonesia Load Capacity Diagrams Load vs. Depth Design Factor vs. Depth Triaxial Load Capacity Introduction toTDAS / EXP The well plan Design / Analysis Exercise Special Design Condition CasingWear Landing Considerations for Long Strings to Prevent Buckling Liner Buckling Due to Set Down (Compression) Compression and Burst String to String LoadTransfers, Multi String Affairs. Shock Rebound Loads Trapped annulus pressure build up, and other trapped fluid concepts Well head groth KickTolerance Torque and Drag, casing floatation, ERD applications Day Four Day Five CasingDesignMathematicalModels ProprietaryModels TDAS:TubingDesignAnalysisSystemWEST:Wellbore SimulatedTemperatureROAM:TorqueandDrag MULTI:Multistringmodel BAROS:annuluspressurebuildup API Standards Overview Quality providers / Users Documents for P.O. Generation API Standards : Specifications, Recommended Practices & Bulletins Using API Specifications Basic Handling and Running Running Procedures Running Equipment Make up Thread Compounds Special Running Procedures for CRA products
  • 5. Group Discount is based on Standard Price * For 7 or more delegates, please inquire for more attractive package. * Important: Please note that registration without payment will incur a SGD 200 administration fee. 1st Delegate Name Direct Line Number: Email: Job Title: Department: Head of Department: Company:____________________________________________ Industry : __________________________________ Address: _______________________________________________________Postcode: _________________________ Country: ________________________Email: __________________________________________________________ Attention Invoice to: ______________________________________________________________________________ Direct Line Number: ______________________________ Fax: _____________________________________________ PAYMENTMETHODS DELEGATESDETAILS Please note: - Indicate if you have already registered by Phone Fax Email Web I agree to PetroSync’s terms & conditions,payment terms and cancellation policy. By Direct Transfer : Please quote invoice number(s) on remittance advice All bank charges to be borne by payer. Please ensure that PetroSync Global Pte Ltd receives the full invoiced amount. By Credit Card : Please debit my credit card: Visa MasterCard Card Number: Name printed on card: _____________________________________________________________________ Expiry Date: Security Code: INVOICEDETAILS Authorized Signature : ____________________________________________________________________________ Mrs Ms Dr OthersMr DETAILS PROGRAMMECONSULTANT PAYMENT TERMS : Payment is due in full at the time of registration. Full payment is mandatory for event attendance. 2nd Delegate Name Direct Line Number: Email: Job Title: Department: Head of Department: Mrs Ms Dr OthersMr 3rd Delegate Name Direct Line Number: Email: Job Title: Department: Head of Department: Mrs Ms Dr OthersMr INVESTMENT PACKAGES CourseDetails AMEX TERMSANDCONDITIONS CHARGES&FEE(s) - For Payment by Direct TelegraphicTransfer, client has to bear both local and oversea bank charges. - For credit card payment, there is additional 4% credit card processsing fee. DISCLAIMER Please note that trainers and topics were confirmed at the time of publishing; however, PetroSync may necessitate substitutions, alterations or cancellations of the trainers or topics. As such, PetroSync reserves the right to change or cancel any part of its published programme due to unforeseen circumstances. Any substitutions or alterations will be updated on our web page as soon as possible. DATAPROTECTION The information you provide will be safeguarded by PetroSync that may be used to keep you informed of relevant products and services. As an international group we may transfer your data on a global basis for the purpose indicated above. If you do not want us to share your information with other reputable companies, please tick this box CANCELLATIONPOLICY You may substitute delegates at any time as long as reasonable advance notice is given to PetroSync. For any cancellation received in writing not less than fourteen (14) working days prior to the training course, you will receive credit voucher less a SGD $200 administration fee and any related bank or credit card charges. Delegates who cancel less than fourteen (14) working days of the training course, or who do not attend the course, are liable to pay the full course fee and no refunds will be granted. In the event that PetroSync cancels or postpones an event for any reason and that the delegate is unable or unwilling to attend in on the rescheduled date, you will receive a credit voucher for 100% of the contract fee paid. You may use this credit voucher for another PetroSync to be mutually agreed with PetroSync, which must occur within a year from the date of postponement. PetroSync is not responsible for any loss or damage as a result of the cancellation policy. PetroSync will assume no liability whatsoever in the event this event is cancelled, rescheduled or postponed due to any Act of God, fire, act of government or state, war, civil commotion, insurrection, embargo, industrial action, or any other reason beyond management control. CERTIFICATEOFATTENDANCE 70% attendance is required for PetroSync’s Certificate of Attendance * To enjoy the promotion & discount offer, payment must be made before deadline * Prices include lunches, refreshments and materials. Promotion & discount cannot be combined with other promotional offers. Please accept our apologies for mail or email that is incorrectly addressed. Please email us at registration@petrosync.com and inform us of any incorrect details. We will amend them accordingly. - If you have not received an acknowledgement before the training, please call us to confirm your booking. Confirmation InvestmentPackage FULLMASTERCLASS Standard Price 15MAY2015 SGD$ 5,995 Group Discount (3 or more Delegates) Early Bird Offer Deadline 15MAY2015 10APR2015 SGD$ 5,795 Title : Advanced Casing Design Date : 18th - 22nd May 2015 Location : Bali, Indonesia SGD$ 5,695 PetroSync Global Pte Ltd Bank details: Account Name: PetroSync Global Pte Ltd Bank Name : DBS Bank Ltd Bank Code : 7171 • Bank Swift Code : DBSSSGSGXXX • Branch code : 288 Account No : • SGD : 2889018980 • USD : 0288002682016 Bank Address : 12 Marina Boulevard, Level 3. Marina Bay Financial Centre Tower 3. Singapore 018982 Name : Mia. C Email : mia.c@petrosync.com Phone : +65 6415 4500 Fax : +65 6826 4322