BCIT SPACE MANAGEMENT
BUSINESS PLAN
Prepared by Educational Support Services,
Office of the VP Education Research and International
June, 2014
TABLE OF CONTENTS
Table of Contents
Executive Summary ______________________________________________________________________________________ 1
Rationale and scope _______________________________________________________________________________________________ 1
Opportunity ________________________________________________________________________________________________________ 1
Risks ________________________________________________________________________________________________________________ 1
Timelines ___________________________________________________________________________________________________________ 2
Rationale and Objectives_________________________________________________________________________________ 3
External Stakeholder Expectations_______________________________________________________________________________ 3
BC Skills for Jobs Blueprint _______________________________________________________________________________________ 4
Sustainability_______________________________________________________________________________________________________ 4
Scope _______________________________________________________________________________________________________________ 5
Opportunity_______________________________________________________________________________________________ 6
Business Drivers ___________________________________________________________________________________________________ 6
Other opportunities _______________________________________________________________________________________________ 7
Costs_______________________________________________________________________________________________________ 8
Risks_______________________________________________________________________________________________________ 9
Short Term _________________________________________________________________________________________________________ 9
Long Term __________________________________________________________________________________________________________ 9
Milestones_______________________________________________________________________________________________ 10
Metrics: Estimating the opportunity__________________________________________________________________ 11
Gross square feet per FTE________________________________________________________________________________________11
Utilization Data _________________________________________________________________________________________ 13
Room Utilization __________________________________________________________________________________________________13
Seat Utilization____________________________________________________________________________________________________14
Supply and Demand ______________________________________________________________________________________________15
Appendix 1 – Space Management Project Resources ________________________________________________ 16
Appendix 2 – Space Management Initiative Gantt Chart ____________________________________________ 17
Appendix 3 – Detailed Data source information _____________________________________________________ 18
TABLE OF CONTENTS
Primary data list __________________________________________________________________________________________________18
Calculations _______________________________________________________________________________________________________18
Utilization Data Classroom List__________________________________________________________________________________19
SPACE MANAGEMENT BUSINESS PLAN
Page 1
Executive Summary
Post-secondary institutes across North America are recognizing that space is their second
most valuable resource after Human Resources. Space Management is a proven
methodology to reduce costs, develop revenue generating capacity and support
educational quality. A Space Management strategy that is properly resourced will help
BCIT meet stakeholder expectations and capitalize on future opportunities.
RATIONALE AND SCOPE
Improving our space utilization is a key strategy articulated in our current Strategic Plan
(Sub Goal 1.1). Eliminating waste and ensuring the most appropriate space for activities
is central to space management best practices. The Ministry of Advanced Education has
also outlined expanded enrolment targets for trades training in both the short term (LNG)
and longer term (Shipbuilding and High Tech). Space is a strategic enabler for BCIT,
allowing us to play a key role in meeting the province’s labour market needs.
This project will include in its scope all types of space on all of our campuses. It will
consider the space needs of all types of activity including education, research, industry
services and external events.
OPPORTUNITY
Space Management will provide the Institute with significant opportunity to expand
revenue generating activity including enrolment increases in both domestic and
international students, industry services, external events and commercialization/research
opportunities. It has also proven to have a significant impact on operational efficiency at
other PSEs, potentially saving the institute millions in annual cost avoidance. The project
will provide the institute with the opportunity to implement our Campus Development
Plan, fostering innovation and keeping pace with technological change in education and
supporting the justification for new capital construction.
RISKS
If the Institute does not pursue Space Management best practices, it will compromise our
ability to meet the short term targets set out in the BC Skills for Jobs Blueprint. It will also
limit our flexibility to react quickly to future opportunities presented by the government
as well as industry. Without Space Management, we will also not be in a position to
SPACE MANAGEMENT BUSINESS PLAN
Page 2
control our capital equipment costs and facilities operating costs or reduce our capital
infrastructure.
TIMELINES
Space Management Triage Complete by Fall 2014
Data collection standards Complete by Fall 2017
Space and Timetabling standards Complete by Fall 2018
Incentivizing Complete by Fall 2016
Space Mining Strategies Ongoing
SPACE MANAGEMENT BUSINESS PLAN
Page 3
Rationale and Objectives
This initiative is an important opportunity for the Institute to adopt and implement
industry best practices in space management. It is a holistic approach in managing space
as an institutional asset. By optimizing our space resources with effective and efficient
business processes, we will create additional capacity within our existing footprint by
targeting waste. With this additional capacity comes the opportunity for new revenue
generating initiatives. It also enables us to demonstrate to external stakeholders the
value of investing in BCIT.
Space Management is a strategic priority:
EXTERNAL STAKEHOLDER EXPECTATIONS
• Space Management is the road map that will
identify the capacity and provide the flexibility
within our existing footprint to react quickly to
Government priorities, plans, and funding
opportunities, such as:
Immediate opportunities:
o Critical Trades Training seats
o Liquefied Natural Gas (LNG)
Longer term opportunities
o Shipbuilding
o Aboriginal Initiatives
o International Strategies
o Mining
o High Tech
Align $270 million
in post-secondary
funding to
programs that
support in-demand
jobs.
Objective 2, Key action 2
BC Skills for Jobs Blueprint, 2014
Strategic Sub-Goal 1.1: Increase Our Number of Graduates
1.1 Increase utilization of existing and future space.
1.1.a. Ensure programs are designed to fully use our
current space, particularly in the summer.
1.1.b. Maximize classroom and learning space capacity.
Create learning spaces that allow for multiple uses
and changing needs.
SPACE MANAGEMENT BUSINESS PLAN
Page 4
This initiative will help the Institute:
• Position itself to leverage our utilization
metrics, as outlined on page 13, for capital
investment dollars from the Ministry of
Advanced Education.
• Demonstrate to the City of Burnaby how we
steward our space resources consistent with
Civic and Campus Development Plans.
BC SKILLS FOR JOBS BLUEPRINT
Space Management is integral to the success of the institute but BC’s new Skills for Jobs
Blueprint has given us specific short-term purpose and urgency in this project.
Understanding and strategically managing
our space will allow us to react appropriately
to the peaks and valleys of our enrolment
patterns. We embrace the Skills for Jobs
Blueprint as a catalyst to move Space
Management forward.
SUSTAINABILITY
An effective Space Management strategy will enable BCIT to position ourselves to achieve
our environmental, social and financial targets. Implementing best practices will enable us
to minimize our ecological footprint and increase our capacity to offer affordable access to
education. Reducing operating costs and avoiding capital costs will allow us to redirect
funds to more critical areas of need.
Targeted LNG vocations taught at
BCIT
Expected labor demand
in jobs by 2018
Construction Trades 11,800
Steamfitters and Pipefitters 3,800
Welders 2,200
Carpenters 1,400
Gas Fitters 1,100
Purchasing Agents and officers 875
Total 21,175 jobs
BC Skills for Jobs Blueprint, 2014, p. 29-32.
Over the next 3 years,
government will spend
$750 million for
infrastructure and
equipment at our post-
secondary institutions.
Objective 2, Key action 8
BC Skills for Jobs Blueprint, 2014
SPACE MANAGEMENT BUSINESS PLAN
Page 5
SCOPE
• All campuses
• All types of space
• All programming and activity
SPACE MANAGEMENT BUSINESS PLAN
Page 6
Opportunity
BUSINESS DRIVERS
Optimization Opportunities:
1. Significantly increase capacity for new revenue generation opportunities
 Programming in both trades and technology
 Industry Partnerships
 External Events
 Commercialization
2. Operational efficiencies and capital investment optimization
 A net reduction in square footage will positively affect our operating costs
 Maintenance
 Utilities
 Custodial
 A net reduction in facilities will reduce our capital equipment requirements
 Depreciation expense
 Furniture
 AV/IT installations
3. The implementation of our Campus Development Plan
 Upgrading existing space to meet innovative and technological change in
curriculum design and student collaboration
 Rationale and justification for building renewal and construction of new
buildings.
 Land use transformation
SPACE MANAGEMENT BUSINESS PLAN
Page 7
OTHER OPPORTUNITIES
Performance Improvement Framework
Space Management is aligned with performance measurement and is a catalyst for
continuous service improvement. The application of Lean methodologies or Fujitsu Flow
Improvement could provide valuable learning opportunities for our Continuous Service
Improvement team.
Living Lab
The scope of the Space Management initiative is so broad that it may provide valuable
opportunities for our Living Lab initiative. This could include access to space utilization
and ecological footprint data and the identification of new space to support student
collaboration and research. Opportunities may be found in the following areas:
• Business Analytics and Statistics
• Sustainability
• Change Management
• Project Management
• Interior and architectural Design
SPACE MANAGEMENT BUSINESS PLAN
Page 8
Costs
1 FTE (Salary/Benefits) Permanent Management position.
Salary Range: $78,000 - $90,000 (salary and benefits)
To be funded by BC Jobs Plan targeted funding. Job description is under development.
Final pay grade is dependent on placement
Expenses - Professional Development (workshops, seminars) $5000 – $10,000
This is specifically to bring Phil Rouble, Associate Director of Facilities Planning and
Sustainability at Algonquin College to BCIT for a week long workshop on Space
Management best practices for key stakeholders.
SPACE MANAGEMENT BUSINESS PLAN
Page 9
Risks
The following are some risks associated with not pursuing Space Management
SHORT TERM
1. BCIT’s ability to deliver on the BC Skills for
Jobs Blueprint may be impacted if we do not
adopt Space Management best practices in
the immediate future.
LONG TERM
1. Without the implementation of Space
Management strategies and best practices,
BCIT will not have the capacity or flexibility
to meet ministry enrolment growth targets.
2. We will not be in a position to control growing capital equipment, capital
infrastructure, and facilities operating costs.
3. We will not be able to address the gap between our current capacity constraints
and Ministry of Advanced Education utilization data.
4. Lost opportunities for capital infrastructure funding.
The Provincial
Government is
providing an
additional $6.6 million
this year for critical
trades seats.
Objective 2, Key action 3
BC Skills for Jobs Blueprint, 2014
SPACE MANAGEMENT BUSINESS PLAN
Page 10
Milestones
Space Management Triage* Underway Complete by Fall 2014
Data collection and reporting Begins Summer 2014 Complete by Fall 2017
Space standards and stewardship Begins Fall 2014 Complete by Fall 2018
Incentivizing Begins Summer 2015 Complete by Fall 2016
Space Mining Strategies Underway Ongoing
*Space Management Triage refers to high-priority, quick-win projects that offer two tangible benefits to
the Space Management Initiative; provides significant return on investment and provides the team insight
into the complexities of the broader Space Management Initiative. Some examples of current triage projects
are:
• SoCE Lab Utilization expansion
• SW01 Space Database Pilot Project
• Trades Training Enrolment Increase
SPACE MANAGEMENT BY PROJECT CATEGORY
Data Collection and Reporting Incentivizing
SW01 Pilot Project Utilization Expectations, Thresholds and Guidelines
Space Database Standardization Space Costing Model
Archibus Upgrade RFI
New Space Database Data Entry Space Mining
Routine Space Database Update/Validation Process Space Needs Analysis
Space Database Synchronization Term Length Alignment
Scheduling System Needs Set Size Standardization and Optimization
Scheduling Data Entry Admin Space Audit
Utilization Data Reporting Service Area Audit
Seat and Room Utilization Strategies
Space Standards and Stewardship Online Learning strategy
Space Management Governance Hours of Instruction
Timetabling Process and Guidelines Learning Space Design
Space Allocation Guidelines Enrolment increase impact analysis
Standardization of Space Attributes
Space Audit within Program Development and Review
Room Access and Security Review
SPACE MANAGEMENT BUSINESS PLAN
Page 11
Metrics: Estimating the opportunity
GROSS SQUARE FEET PER FTE
The standard metric for Space Management is gross square feet per full time student
(GSF/FTE). This measure allows a post-secondary institution to quickly assess the general
health of its space management policies and processes. BCIT’s gross square feet per FTE
for 2012 is as follows:
Gross square feet, all campuses1 2,332,012
Full Time Students2 17,453
GSF/FTE 134 sf
There are 3 ways this ratio can be optimized through Space Management strategies:
• Sq ft stays the same, FTE enrolment increase (Revenue increase + cost avoidance)
• Sq ft reduction, FTE enrolment stays the same (cost reduction)
• Sq ft reduction, FTE enrolment increase (Cost avoidance + cost reduction + revenue
increase)
For example, a 10% reduction in our GSF/FTE from 134 to 120.6 through space
optimization strategies could have the following impact on the Institute’s resources:
$1,534,462 Cost avoidance or reduction in annual operating costs
$101,442,435
Avoidance in one-time capital construction costs (shared
ministry/BCIT costs)
820 Tonnes In annual avoided GHG Emissions
$2049 In annual avoided carbon offsets
$4,977,228 In average annual new FT tuition revenue (general)
$4,933,115 In average annual new FT tuition revenue (domestic)
$5,549,100 In average annual new FT tuition revenue (international)
Figure 1, Impact of 10% reduction in GSF/FTE. For full calculations of the above data, please refer
to appendix 3, p. 18.
1 2012 APPA Survey
2 2012/13 BCIT Enrolments by student groupings.
SPACE MANAGEMENT BUSINESS PLAN
Page 12
ALGONQUIN COLLEGE CASE STUDY
The following represents actual change in GSF/FTE at Algonquin College between 1990
and 2005.
Algonquin College – Actual Growth Change
Analysis period 1990 2005 15 years
Audited Enrolment 7034 FTE 12,400 FTE +5366 FTE
Total Facilities GSF 1,400,000 sf 1,257,000 sf -143,000 sf
GSF/FTE 199 101 -49%
Rouble, P. (2007), Space Mining: A Space Management Approach to Sustainable Success, (Powerpoint).
Based on a model of cost avoidance only, Algonquin College estimates it has saved
$484,240,000 over 15 years due to their Space Management strategies.
SPACE MANAGEMENT BUSINESS PLAN
Page 13
Utilization Data
The standard metric for space utilization is one student in one room for one hour, or a
‘seat hour’. Based on calculations of total number of instructional spaces at BCIT, their
average seating capacity and the number of teaching hours in a standard week, it is
estimated that there are over 38,000,000 available seat hours per year.
ROOM UTILIZATION
Room utilization is the percentage of the available teaching hours over the period of a
term that a room can be scheduled for instructional activity. The data is collected as a
snapshot in the 5th week of the term.
Room sample size3 72
Total teaching hours in 1 week 50 (7:30-17:20, M-F)
Total available room hours 3,600
Total scheduled room hours 2,327
Room Utilization 65%
• Monday-Friday, 7:30-5:20
• Generally timetabled Classrooms and Theatres. BBY campus only
• Snapshot data from the week of October 7-11, 2013
Examples of classroom utilization rates for daytime activities from other PSEs:
Algonquin College 82.5%
Thompson Rivers University 70%
University of the South Pacific 90%
TEFMA4 Utilization target 75%
3 For a full list of rooms included in the sample, please see Appendix 3, p. 18.
4 Tertiary Education Facilities Management Association.
SPACE MANAGEMENT BUSINESS PLAN
Page 14
SEAT UTILIZATION
Seat utilization measures the actual enrolment of a scheduled activity against the capacity
of the room. The metric is a percentage of seats used per hour. Snapshot data is collected
in the 5th week of the term.
Room sample size 72
Total Seating Capacity 101,473
Total seats used 58,667
Seat Utilization Rate 57.8%
• Monday-Friday, 7:30-5:20
• Generally timetabled Classrooms and Theatres. BBY campus
• Snapshot data from the week of October 7-11, 2013
Examples of seat utilization rates for daytime activities from other PSEs:
Algonquin College 73.1%
Thompson Rivers University 60%
University of the South Pacific 90%
TEFMA Utilization target 75%
SPACE MANAGEMENT BUSINESS PLAN
Page 15
SUPPLY AND DEMAND
Supply and demand allows us to compare the size of our available classrooms and the size
of the sets that are scheduled into those classrooms. This metric allows us to better plan
the size of instructional spaces to meet the needs of our programs. It attempts to compare
actual enrolment with the room capacity of our instructional spaces.
Some inferences from the above data:
• We have too few classrooms with a capacity below 26.
• We have too many classrooms with capacities between 26 and 40.
• Our classroom infrastructure is well positioned if we are to increase set sizes beyond the 26 student
mark.
• We are well proportioned for classrooms with capacities above 40
• Any availability constraints in our large theatres (100 and above) is likely caused by the scheduling
of small classes in these large spaces.
7%
45%
13%
17% 17%
56%
18%
8% 11% 7%
0%
10%
20%
30%
40%
50%
60%
1-25 26-40 41-60 61-100 100+
PercentageofActivity
Supply: % of the room sample with defined # of seats
Demand: % of courses scheduled into the sample with defined actual enrolment
Based on Room Hour activity
Supply and Demand Analysis
72 generally timetabled classrooms and theatres in BBY
Snapshot Data: Week of October 7 to October 11, 2013
Full-time studies only (M-F, 7:00 - 17:20)
Room Capacity
Enrolment
SPACE MANAGEMENT BUSINESS PLAN
Page 16
Appendix 1 – Space Management Project Resources
The following documents can be downloaded from the Space Management Sharepoint site by clicking on the
link. You may be asked to log in using your standard BCIT credentials.
Space Management Project Charter
Space Management Steering Committee Terms of Reference
Space Management Working Committee Terms of Reference
Space Management Project Identification Document
Space Manager Job Description
SPACE MANAGEMENT BUSINESS PLAN
Page 17
Appendix 2 – Space Management Initiative Gantt Chart
Project April
2014
Summer
2014
Fall
2014
Winter
2015
Summer
2015
Fall
2015
Winter
2016
Summer
2016
Fall
2016
Winter
2017
Summer
2017
Fall
2017
Winter
2018
Summer
2018
Fall
2018
DataCollectionandReporting
1 SW01 Space Inventory Pilot Project
2 Space Data Standardization
3 Archibus Upgrade RFI
4 New Space Database data entry
5 Routine Space Database Update/Validation Process
6 Space Data Synchronization
7 Scheduling System Needs
8 Scheduling Data Entry
9 Utilization Data Reporting
SpaceStandardsand
Stewardship
10 Space Management Governance
11 Timetabling Process and Guidelines
12 Space Allocation Guidelines
13 Standardization of Space Attributes
14 Space Audit within Program Development and Review Processes
15 Room Access/Security Review
Incenti
vizing
16 Utilization Expectations, Thresholds and Guidelines
17 Space Costing Model
SpaceMining
18 Space Needs Analysis
19 Term Length Alignment
20 Set Size Standardization and Optimization
21 Admin Space Audit
22 Service Area Audit
23 Seat and Room Utilization Strategies
24 Online Learning Strategy
25 Hours of Instruction
26 Learning Space Design
27 Enrolment Increase Impact Analysis
Green – Working Period Amber – Evaluation and Refinement Period Blue – Monitoring Period
SPACE MANAGEMENT BUSINESS PLAN
Page 18
Appendix 3 – Detailed data source information
PRIMARY DATA LIST
Data Source
Total Square Feet 2,332,012 sq ft 2012 APPA Survey
Total Facilities Operating Costs, 2012 $15,344,638 2012 APPA Survey
Annual Operating Costs/Sq Ft $6.58 2012 APPA Survey
Full Time Enrolment 2012/13 17, 453 FTE Enrolments by Student Grouping
2013
Full-Time Enrolment 2012/13 Domestic 16, 211 FTE Enrolments by Student Grouping
2013
BCIT International Students 2013
Full-Time Enrolment 2012/13 International 1,242 FTE BCIT International Students 2013
Full-Time Tuition Revenue fy 2012/13 $49,772,285 2012/13 Consolidated Financials
Domestic Full-Time Tuition Revenue, fy 2012/13 $45,822,454 2012/13 Consolidated Financials
International Full-Time Tuition Revenue fy 2012/13 $3,949,831 2012/13 Consolidated Financials
GHG Emissions, 2013 calendar year 8196 Tonnes 2013 Ministry report
Carbon Offsets paid in 2013 calendar year $204,909 2013 Ministry report
CALCULATIONS
10% reduction in gross square feet/FTE (Figure 1, p.10)
Cost avoidance or reduction in annual operating costs
(2,332,012sf x 10%) = 233,201sf
233,201sf x $6.58/sf = $1,534,462
One-time capital construction costs
Average facility replacement costs (construction + soft costs + FF & E) = $435/sf
233,201sf x $435/sf = $101,442,435
GHG Emissions
8196 tonnes/yr x 10% = 820 Tonnes
Carbon Offsets
$204,909/yr x 10% = $2049
SPACE MANAGEMENT BUSINESS PLAN
Page 19
FT Tuition Revenue
$49,772,285 FT Tuition x 10% = $4,977,228
Domestic FT Tuition Revenue
$45,822,454 domestic tuition / 16,211 domestic FTE = $2827/FTE
17,453 FTE x 10% = 1,745 FTE
1,745 FTE x $2,827/FTE = $4,933,115
International FT Tuition Revenue
$3,949,831 International Tuition Revenue / 1,242 International FTE = $3,180/FTE
17,453 FTE x 10% = 1,745 FTE
1,745 FTE x $3,180/FTE = $5,549,100
UTILIZATION DATA CLASSROOM LIST
NE01 SE12 SE06 SW01 SW03 SW05 SW09
NE1 103
NE1 107
NE1 216
NE1 318
NE1 319
NE1 320
NE1 325
NE1 330
NE1 331
NE1 401
NE1 402
NE1 403
NE1 404
SE12 302
SE12 307
SE12 309
SE12 312
SE12 313
SE6 108
SE6 109
SE6 112
SE6 114
SE6 202
SE6 203
SE6 204
SE6 205
SE6 206
SE6 207
SE6 208
SE6 209
SE6 233
SW1 1021
SW1 1025
SW1 1205
SW1 2004
SW1 2005
SW1 2009
SW1 2016
SW1 2020
SW1 2024
SW1 2030
SW1 2590
SW1 3005
SW1 3150
SW1 3170
SW1 3190
SW1 3195
SW1 3570
SW1 4076
SW3 1710
SW3 1750
SW3 2620
SW3 2715
SW3 2745
SW3 2765
SW3 3615
SW3 3660
SW3 4675
SW3 4695
SW3 4725
SW5 1840
SW5 1850
SW9 110
SW9 121
SW9 122
SW9 127
SW9 206

More Related Content

What's hot

Human Resource Management in Local Government in the Philippines
Human Resource Management in Local Government in the PhilippinesHuman Resource Management in Local Government in the Philippines
Human Resource Management in Local Government in the PhilippinesJay Abawag
 
Hr Planning Presentation Final
Hr Planning Presentation   FinalHr Planning Presentation   Final
Hr Planning Presentation Finalhelenroos
 
Pisay batch 2013 js prom presentation
Pisay batch 2013 js prom presentationPisay batch 2013 js prom presentation
Pisay batch 2013 js prom presentationChito Reyes
 
Performance management- Human resource management
Performance management- Human resource management Performance management- Human resource management
Performance management- Human resource management Sunita Sharma
 
Manpower Services
Manpower ServicesManpower Services
Manpower ServicesMsFullMoon
 
The Local Legislative Process: Powers and Functions of the Sanggunian
The Local Legislative Process: Powers and Functions of the SanggunianThe Local Legislative Process: Powers and Functions of the Sanggunian
The Local Legislative Process: Powers and Functions of the SanggunianJo Balucanag - Bitonio
 
HUMAN RESOURCE DEPARTMENT OF STATE BANK OF PAKISTAN:
HUMAN RESOURCE DEPARTMENT OF STATE BANK OF PAKISTAN:HUMAN RESOURCE DEPARTMENT OF STATE BANK OF PAKISTAN:
HUMAN RESOURCE DEPARTMENT OF STATE BANK OF PAKISTAN:mehreen21
 
2022-SGLG-MISOCC-PRESENTATION (1).pptx
2022-SGLG-MISOCC-PRESENTATION (1).pptx2022-SGLG-MISOCC-PRESENTATION (1).pptx
2022-SGLG-MISOCC-PRESENTATION (1).pptxDodong21
 
Notice to Explain WITH PREVENTIVE SUSPENSION (Sample Form)
Notice to Explain WITH PREVENTIVE SUSPENSION (Sample Form)Notice to Explain WITH PREVENTIVE SUSPENSION (Sample Form)
Notice to Explain WITH PREVENTIVE SUSPENSION (Sample Form)PoL Sangalang
 
Deed of assignment and transfer of rights
Deed of assignment and transfer of rightsDeed of assignment and transfer of rights
Deed of assignment and transfer of rightsGreen Minds
 
HR Proposal Powerpoint Presentation Slides
HR Proposal Powerpoint Presentation SlidesHR Proposal Powerpoint Presentation Slides
HR Proposal Powerpoint Presentation SlidesSlideTeam
 
Deed of sale with right to repurchase
Deed of sale with right to repurchaseDeed of sale with right to repurchase
Deed of sale with right to repurchaseDams Zainal
 

What's hot (20)

Human Resource Management in Local Government in the Philippines
Human Resource Management in Local Government in the PhilippinesHuman Resource Management in Local Government in the Philippines
Human Resource Management in Local Government in the Philippines
 
Hr Planning Presentation Final
Hr Planning Presentation   FinalHr Planning Presentation   Final
Hr Planning Presentation Final
 
Pisay batch 2013 js prom presentation
Pisay batch 2013 js prom presentationPisay batch 2013 js prom presentation
Pisay batch 2013 js prom presentation
 
CDP Quick Guide
CDP Quick GuideCDP Quick Guide
CDP Quick Guide
 
Performance management- Human resource management
Performance management- Human resource management Performance management- Human resource management
Performance management- Human resource management
 
Manpower Services
Manpower ServicesManpower Services
Manpower Services
 
The Local Legislative Process: Powers and Functions of the Sanggunian
The Local Legislative Process: Powers and Functions of the SanggunianThe Local Legislative Process: Powers and Functions of the Sanggunian
The Local Legislative Process: Powers and Functions of the Sanggunian
 
The sangguniang barangay
The sangguniang barangayThe sangguniang barangay
The sangguniang barangay
 
HUMAN RESOURCE DEPARTMENT OF STATE BANK OF PAKISTAN:
HUMAN RESOURCE DEPARTMENT OF STATE BANK OF PAKISTAN:HUMAN RESOURCE DEPARTMENT OF STATE BANK OF PAKISTAN:
HUMAN RESOURCE DEPARTMENT OF STATE BANK OF PAKISTAN:
 
Shamiyana project
Shamiyana projectShamiyana project
Shamiyana project
 
2022-SGLG-MISOCC-PRESENTATION (1).pptx
2022-SGLG-MISOCC-PRESENTATION (1).pptx2022-SGLG-MISOCC-PRESENTATION (1).pptx
2022-SGLG-MISOCC-PRESENTATION (1).pptx
 
Notice to Explain WITH PREVENTIVE SUSPENSION (Sample Form)
Notice to Explain WITH PREVENTIVE SUSPENSION (Sample Form)Notice to Explain WITH PREVENTIVE SUSPENSION (Sample Form)
Notice to Explain WITH PREVENTIVE SUSPENSION (Sample Form)
 
Solicitation Letter
Solicitation LetterSolicitation Letter
Solicitation Letter
 
Regional Development Plan 2017-2022
Regional Development Plan 2017-2022Regional Development Plan 2017-2022
Regional Development Plan 2017-2022
 
Barangay & SK Governance
Barangay & SK GovernanceBarangay & SK Governance
Barangay & SK Governance
 
PH Local Government System
PH Local Government SystemPH Local Government System
PH Local Government System
 
Deed of assignment and transfer of rights
Deed of assignment and transfer of rightsDeed of assignment and transfer of rights
Deed of assignment and transfer of rights
 
HR Proposal Powerpoint Presentation Slides
HR Proposal Powerpoint Presentation SlidesHR Proposal Powerpoint Presentation Slides
HR Proposal Powerpoint Presentation Slides
 
Deed of sale with right to repurchase
Deed of sale with right to repurchaseDeed of sale with right to repurchase
Deed of sale with right to repurchase
 
Request letter
Request letterRequest letter
Request letter
 

Similar to Space Management Business Plan Final

case study.pdf
case study.pdfcase study.pdf
case study.pdfHongLc19
 
toolbox_strategic_workforce_planning_guide.pdf
toolbox_strategic_workforce_planning_guide.pdftoolbox_strategic_workforce_planning_guide.pdf
toolbox_strategic_workforce_planning_guide.pdfValerieBez1
 
IRJET- An Overview on Project Management
IRJET- An Overview on Project ManagementIRJET- An Overview on Project Management
IRJET- An Overview on Project ManagementIRJET Journal
 
Saudi Electronic UniversityCollege of Administrative and F.docx
Saudi Electronic UniversityCollege of Administrative and F.docxSaudi Electronic UniversityCollege of Administrative and F.docx
Saudi Electronic UniversityCollege of Administrative and F.docxanhlodge
 
sample strategy implementation 7-S.pptx
sample strategy implementation 7-S.pptxsample strategy implementation 7-S.pptx
sample strategy implementation 7-S.pptxOsamaNur
 
Capital and infrastructure solution brochure Single FINAL
Capital and infrastructure solution brochure Single FINALCapital and infrastructure solution brochure Single FINAL
Capital and infrastructure solution brochure Single FINALChristopher Matthews
 
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...IRJET Journal
 
Priority Based Budgeting - How to respond to Downturn and Austerity
Priority Based Budgeting - How to respond to Downturn and AusterityPriority Based Budgeting - How to respond to Downturn and Austerity
Priority Based Budgeting - How to respond to Downturn and AusterityMalcolm Anthony
 
CEDS strategic framework
CEDS strategic frameworkCEDS strategic framework
CEDS strategic frameworkOscarOrtiz174
 
Managing costs and budget
Managing costs and budgetManaging costs and budget
Managing costs and budgetMahmoud Shaqria
 
Research Inventy : International Journal of Engineering and Science
Research Inventy : International Journal of Engineering and ScienceResearch Inventy : International Journal of Engineering and Science
Research Inventy : International Journal of Engineering and Scienceresearchinventy
 
A return to engineering, a return to performance
A return to engineering, a return to performanceA return to engineering, a return to performance
A return to engineering, a return to performanceMelissa Gaspari
 
STR 581 Strategic Plan and Implementation Proposal.docx
STR 581 Strategic Plan and Implementation Proposal.docxSTR 581 Strategic Plan and Implementation Proposal.docx
STR 581 Strategic Plan and Implementation Proposal.docxJulie Bentley
 
STR 581 PP Strategic Plan and Implementation Proposal
STR 581 PP Strategic Plan and Implementation ProposalSTR 581 PP Strategic Plan and Implementation Proposal
STR 581 PP Strategic Plan and Implementation ProposalJulie Bentley
 
Budgeting system, Line-Item, Lump sum and PPBS
Budgeting system, Line-Item, Lump sum and PPBSBudgeting system, Line-Item, Lump sum and PPBS
Budgeting system, Line-Item, Lump sum and PPBSrey castro
 

Similar to Space Management Business Plan Final (20)

case study.pdf
case study.pdfcase study.pdf
case study.pdf
 
toolbox_strategic_workforce_planning_guide.pdf
toolbox_strategic_workforce_planning_guide.pdftoolbox_strategic_workforce_planning_guide.pdf
toolbox_strategic_workforce_planning_guide.pdf
 
IRJET- An Overview on Project Management
IRJET- An Overview on Project ManagementIRJET- An Overview on Project Management
IRJET- An Overview on Project Management
 
Saudi Electronic UniversityCollege of Administrative and F.docx
Saudi Electronic UniversityCollege of Administrative and F.docxSaudi Electronic UniversityCollege of Administrative and F.docx
Saudi Electronic UniversityCollege of Administrative and F.docx
 
sample strategy implementation 7-S.pptx
sample strategy implementation 7-S.pptxsample strategy implementation 7-S.pptx
sample strategy implementation 7-S.pptx
 
Understanding the Impact of Project Management Knowledge and Education Implem...
Understanding the Impact of Project Management Knowledge and Education Implem...Understanding the Impact of Project Management Knowledge and Education Implem...
Understanding the Impact of Project Management Knowledge and Education Implem...
 
Understanding the Impact of Project Management Knowledge and Education Implem...
Understanding the Impact of Project Management Knowledge and Education Implem...Understanding the Impact of Project Management Knowledge and Education Implem...
Understanding the Impact of Project Management Knowledge and Education Implem...
 
Capital and infrastructure solution brochure Single FINAL
Capital and infrastructure solution brochure Single FINALCapital and infrastructure solution brochure Single FINAL
Capital and infrastructure solution brochure Single FINAL
 
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
 
Priority Based Budgeting - How to respond to Downturn and Austerity
Priority Based Budgeting - How to respond to Downturn and AusterityPriority Based Budgeting - How to respond to Downturn and Austerity
Priority Based Budgeting - How to respond to Downturn and Austerity
 
CEDS strategic framework
CEDS strategic frameworkCEDS strategic framework
CEDS strategic framework
 
Managing costs and budget
Managing costs and budgetManaging costs and budget
Managing costs and budget
 
Project Plan Draft 2
Project Plan Draft 2Project Plan Draft 2
Project Plan Draft 2
 
BUSINESS PLAN.pptx
BUSINESS PLAN.pptxBUSINESS PLAN.pptx
BUSINESS PLAN.pptx
 
Training-Operation-Manual-BKMEA
Training-Operation-Manual-BKMEATraining-Operation-Manual-BKMEA
Training-Operation-Manual-BKMEA
 
Research Inventy : International Journal of Engineering and Science
Research Inventy : International Journal of Engineering and ScienceResearch Inventy : International Journal of Engineering and Science
Research Inventy : International Journal of Engineering and Science
 
A return to engineering, a return to performance
A return to engineering, a return to performanceA return to engineering, a return to performance
A return to engineering, a return to performance
 
STR 581 Strategic Plan and Implementation Proposal.docx
STR 581 Strategic Plan and Implementation Proposal.docxSTR 581 Strategic Plan and Implementation Proposal.docx
STR 581 Strategic Plan and Implementation Proposal.docx
 
STR 581 PP Strategic Plan and Implementation Proposal
STR 581 PP Strategic Plan and Implementation ProposalSTR 581 PP Strategic Plan and Implementation Proposal
STR 581 PP Strategic Plan and Implementation Proposal
 
Budgeting system, Line-Item, Lump sum and PPBS
Budgeting system, Line-Item, Lump sum and PPBSBudgeting system, Line-Item, Lump sum and PPBS
Budgeting system, Line-Item, Lump sum and PPBS
 

Space Management Business Plan Final

  • 1. BCIT SPACE MANAGEMENT BUSINESS PLAN Prepared by Educational Support Services, Office of the VP Education Research and International June, 2014
  • 2. TABLE OF CONTENTS Table of Contents Executive Summary ______________________________________________________________________________________ 1 Rationale and scope _______________________________________________________________________________________________ 1 Opportunity ________________________________________________________________________________________________________ 1 Risks ________________________________________________________________________________________________________________ 1 Timelines ___________________________________________________________________________________________________________ 2 Rationale and Objectives_________________________________________________________________________________ 3 External Stakeholder Expectations_______________________________________________________________________________ 3 BC Skills for Jobs Blueprint _______________________________________________________________________________________ 4 Sustainability_______________________________________________________________________________________________________ 4 Scope _______________________________________________________________________________________________________________ 5 Opportunity_______________________________________________________________________________________________ 6 Business Drivers ___________________________________________________________________________________________________ 6 Other opportunities _______________________________________________________________________________________________ 7 Costs_______________________________________________________________________________________________________ 8 Risks_______________________________________________________________________________________________________ 9 Short Term _________________________________________________________________________________________________________ 9 Long Term __________________________________________________________________________________________________________ 9 Milestones_______________________________________________________________________________________________ 10 Metrics: Estimating the opportunity__________________________________________________________________ 11 Gross square feet per FTE________________________________________________________________________________________11 Utilization Data _________________________________________________________________________________________ 13 Room Utilization __________________________________________________________________________________________________13 Seat Utilization____________________________________________________________________________________________________14 Supply and Demand ______________________________________________________________________________________________15 Appendix 1 – Space Management Project Resources ________________________________________________ 16 Appendix 2 – Space Management Initiative Gantt Chart ____________________________________________ 17 Appendix 3 – Detailed Data source information _____________________________________________________ 18
  • 3. TABLE OF CONTENTS Primary data list __________________________________________________________________________________________________18 Calculations _______________________________________________________________________________________________________18 Utilization Data Classroom List__________________________________________________________________________________19
  • 4. SPACE MANAGEMENT BUSINESS PLAN Page 1 Executive Summary Post-secondary institutes across North America are recognizing that space is their second most valuable resource after Human Resources. Space Management is a proven methodology to reduce costs, develop revenue generating capacity and support educational quality. A Space Management strategy that is properly resourced will help BCIT meet stakeholder expectations and capitalize on future opportunities. RATIONALE AND SCOPE Improving our space utilization is a key strategy articulated in our current Strategic Plan (Sub Goal 1.1). Eliminating waste and ensuring the most appropriate space for activities is central to space management best practices. The Ministry of Advanced Education has also outlined expanded enrolment targets for trades training in both the short term (LNG) and longer term (Shipbuilding and High Tech). Space is a strategic enabler for BCIT, allowing us to play a key role in meeting the province’s labour market needs. This project will include in its scope all types of space on all of our campuses. It will consider the space needs of all types of activity including education, research, industry services and external events. OPPORTUNITY Space Management will provide the Institute with significant opportunity to expand revenue generating activity including enrolment increases in both domestic and international students, industry services, external events and commercialization/research opportunities. It has also proven to have a significant impact on operational efficiency at other PSEs, potentially saving the institute millions in annual cost avoidance. The project will provide the institute with the opportunity to implement our Campus Development Plan, fostering innovation and keeping pace with technological change in education and supporting the justification for new capital construction. RISKS If the Institute does not pursue Space Management best practices, it will compromise our ability to meet the short term targets set out in the BC Skills for Jobs Blueprint. It will also limit our flexibility to react quickly to future opportunities presented by the government as well as industry. Without Space Management, we will also not be in a position to
  • 5. SPACE MANAGEMENT BUSINESS PLAN Page 2 control our capital equipment costs and facilities operating costs or reduce our capital infrastructure. TIMELINES Space Management Triage Complete by Fall 2014 Data collection standards Complete by Fall 2017 Space and Timetabling standards Complete by Fall 2018 Incentivizing Complete by Fall 2016 Space Mining Strategies Ongoing
  • 6. SPACE MANAGEMENT BUSINESS PLAN Page 3 Rationale and Objectives This initiative is an important opportunity for the Institute to adopt and implement industry best practices in space management. It is a holistic approach in managing space as an institutional asset. By optimizing our space resources with effective and efficient business processes, we will create additional capacity within our existing footprint by targeting waste. With this additional capacity comes the opportunity for new revenue generating initiatives. It also enables us to demonstrate to external stakeholders the value of investing in BCIT. Space Management is a strategic priority: EXTERNAL STAKEHOLDER EXPECTATIONS • Space Management is the road map that will identify the capacity and provide the flexibility within our existing footprint to react quickly to Government priorities, plans, and funding opportunities, such as: Immediate opportunities: o Critical Trades Training seats o Liquefied Natural Gas (LNG) Longer term opportunities o Shipbuilding o Aboriginal Initiatives o International Strategies o Mining o High Tech Align $270 million in post-secondary funding to programs that support in-demand jobs. Objective 2, Key action 2 BC Skills for Jobs Blueprint, 2014 Strategic Sub-Goal 1.1: Increase Our Number of Graduates 1.1 Increase utilization of existing and future space. 1.1.a. Ensure programs are designed to fully use our current space, particularly in the summer. 1.1.b. Maximize classroom and learning space capacity. Create learning spaces that allow for multiple uses and changing needs.
  • 7. SPACE MANAGEMENT BUSINESS PLAN Page 4 This initiative will help the Institute: • Position itself to leverage our utilization metrics, as outlined on page 13, for capital investment dollars from the Ministry of Advanced Education. • Demonstrate to the City of Burnaby how we steward our space resources consistent with Civic and Campus Development Plans. BC SKILLS FOR JOBS BLUEPRINT Space Management is integral to the success of the institute but BC’s new Skills for Jobs Blueprint has given us specific short-term purpose and urgency in this project. Understanding and strategically managing our space will allow us to react appropriately to the peaks and valleys of our enrolment patterns. We embrace the Skills for Jobs Blueprint as a catalyst to move Space Management forward. SUSTAINABILITY An effective Space Management strategy will enable BCIT to position ourselves to achieve our environmental, social and financial targets. Implementing best practices will enable us to minimize our ecological footprint and increase our capacity to offer affordable access to education. Reducing operating costs and avoiding capital costs will allow us to redirect funds to more critical areas of need. Targeted LNG vocations taught at BCIT Expected labor demand in jobs by 2018 Construction Trades 11,800 Steamfitters and Pipefitters 3,800 Welders 2,200 Carpenters 1,400 Gas Fitters 1,100 Purchasing Agents and officers 875 Total 21,175 jobs BC Skills for Jobs Blueprint, 2014, p. 29-32. Over the next 3 years, government will spend $750 million for infrastructure and equipment at our post- secondary institutions. Objective 2, Key action 8 BC Skills for Jobs Blueprint, 2014
  • 8. SPACE MANAGEMENT BUSINESS PLAN Page 5 SCOPE • All campuses • All types of space • All programming and activity
  • 9. SPACE MANAGEMENT BUSINESS PLAN Page 6 Opportunity BUSINESS DRIVERS Optimization Opportunities: 1. Significantly increase capacity for new revenue generation opportunities  Programming in both trades and technology  Industry Partnerships  External Events  Commercialization 2. Operational efficiencies and capital investment optimization  A net reduction in square footage will positively affect our operating costs  Maintenance  Utilities  Custodial  A net reduction in facilities will reduce our capital equipment requirements  Depreciation expense  Furniture  AV/IT installations 3. The implementation of our Campus Development Plan  Upgrading existing space to meet innovative and technological change in curriculum design and student collaboration  Rationale and justification for building renewal and construction of new buildings.  Land use transformation
  • 10. SPACE MANAGEMENT BUSINESS PLAN Page 7 OTHER OPPORTUNITIES Performance Improvement Framework Space Management is aligned with performance measurement and is a catalyst for continuous service improvement. The application of Lean methodologies or Fujitsu Flow Improvement could provide valuable learning opportunities for our Continuous Service Improvement team. Living Lab The scope of the Space Management initiative is so broad that it may provide valuable opportunities for our Living Lab initiative. This could include access to space utilization and ecological footprint data and the identification of new space to support student collaboration and research. Opportunities may be found in the following areas: • Business Analytics and Statistics • Sustainability • Change Management • Project Management • Interior and architectural Design
  • 11. SPACE MANAGEMENT BUSINESS PLAN Page 8 Costs 1 FTE (Salary/Benefits) Permanent Management position. Salary Range: $78,000 - $90,000 (salary and benefits) To be funded by BC Jobs Plan targeted funding. Job description is under development. Final pay grade is dependent on placement Expenses - Professional Development (workshops, seminars) $5000 – $10,000 This is specifically to bring Phil Rouble, Associate Director of Facilities Planning and Sustainability at Algonquin College to BCIT for a week long workshop on Space Management best practices for key stakeholders.
  • 12. SPACE MANAGEMENT BUSINESS PLAN Page 9 Risks The following are some risks associated with not pursuing Space Management SHORT TERM 1. BCIT’s ability to deliver on the BC Skills for Jobs Blueprint may be impacted if we do not adopt Space Management best practices in the immediate future. LONG TERM 1. Without the implementation of Space Management strategies and best practices, BCIT will not have the capacity or flexibility to meet ministry enrolment growth targets. 2. We will not be in a position to control growing capital equipment, capital infrastructure, and facilities operating costs. 3. We will not be able to address the gap between our current capacity constraints and Ministry of Advanced Education utilization data. 4. Lost opportunities for capital infrastructure funding. The Provincial Government is providing an additional $6.6 million this year for critical trades seats. Objective 2, Key action 3 BC Skills for Jobs Blueprint, 2014
  • 13. SPACE MANAGEMENT BUSINESS PLAN Page 10 Milestones Space Management Triage* Underway Complete by Fall 2014 Data collection and reporting Begins Summer 2014 Complete by Fall 2017 Space standards and stewardship Begins Fall 2014 Complete by Fall 2018 Incentivizing Begins Summer 2015 Complete by Fall 2016 Space Mining Strategies Underway Ongoing *Space Management Triage refers to high-priority, quick-win projects that offer two tangible benefits to the Space Management Initiative; provides significant return on investment and provides the team insight into the complexities of the broader Space Management Initiative. Some examples of current triage projects are: • SoCE Lab Utilization expansion • SW01 Space Database Pilot Project • Trades Training Enrolment Increase SPACE MANAGEMENT BY PROJECT CATEGORY Data Collection and Reporting Incentivizing SW01 Pilot Project Utilization Expectations, Thresholds and Guidelines Space Database Standardization Space Costing Model Archibus Upgrade RFI New Space Database Data Entry Space Mining Routine Space Database Update/Validation Process Space Needs Analysis Space Database Synchronization Term Length Alignment Scheduling System Needs Set Size Standardization and Optimization Scheduling Data Entry Admin Space Audit Utilization Data Reporting Service Area Audit Seat and Room Utilization Strategies Space Standards and Stewardship Online Learning strategy Space Management Governance Hours of Instruction Timetabling Process and Guidelines Learning Space Design Space Allocation Guidelines Enrolment increase impact analysis Standardization of Space Attributes Space Audit within Program Development and Review Room Access and Security Review
  • 14. SPACE MANAGEMENT BUSINESS PLAN Page 11 Metrics: Estimating the opportunity GROSS SQUARE FEET PER FTE The standard metric for Space Management is gross square feet per full time student (GSF/FTE). This measure allows a post-secondary institution to quickly assess the general health of its space management policies and processes. BCIT’s gross square feet per FTE for 2012 is as follows: Gross square feet, all campuses1 2,332,012 Full Time Students2 17,453 GSF/FTE 134 sf There are 3 ways this ratio can be optimized through Space Management strategies: • Sq ft stays the same, FTE enrolment increase (Revenue increase + cost avoidance) • Sq ft reduction, FTE enrolment stays the same (cost reduction) • Sq ft reduction, FTE enrolment increase (Cost avoidance + cost reduction + revenue increase) For example, a 10% reduction in our GSF/FTE from 134 to 120.6 through space optimization strategies could have the following impact on the Institute’s resources: $1,534,462 Cost avoidance or reduction in annual operating costs $101,442,435 Avoidance in one-time capital construction costs (shared ministry/BCIT costs) 820 Tonnes In annual avoided GHG Emissions $2049 In annual avoided carbon offsets $4,977,228 In average annual new FT tuition revenue (general) $4,933,115 In average annual new FT tuition revenue (domestic) $5,549,100 In average annual new FT tuition revenue (international) Figure 1, Impact of 10% reduction in GSF/FTE. For full calculations of the above data, please refer to appendix 3, p. 18. 1 2012 APPA Survey 2 2012/13 BCIT Enrolments by student groupings.
  • 15. SPACE MANAGEMENT BUSINESS PLAN Page 12 ALGONQUIN COLLEGE CASE STUDY The following represents actual change in GSF/FTE at Algonquin College between 1990 and 2005. Algonquin College – Actual Growth Change Analysis period 1990 2005 15 years Audited Enrolment 7034 FTE 12,400 FTE +5366 FTE Total Facilities GSF 1,400,000 sf 1,257,000 sf -143,000 sf GSF/FTE 199 101 -49% Rouble, P. (2007), Space Mining: A Space Management Approach to Sustainable Success, (Powerpoint). Based on a model of cost avoidance only, Algonquin College estimates it has saved $484,240,000 over 15 years due to their Space Management strategies.
  • 16. SPACE MANAGEMENT BUSINESS PLAN Page 13 Utilization Data The standard metric for space utilization is one student in one room for one hour, or a ‘seat hour’. Based on calculations of total number of instructional spaces at BCIT, their average seating capacity and the number of teaching hours in a standard week, it is estimated that there are over 38,000,000 available seat hours per year. ROOM UTILIZATION Room utilization is the percentage of the available teaching hours over the period of a term that a room can be scheduled for instructional activity. The data is collected as a snapshot in the 5th week of the term. Room sample size3 72 Total teaching hours in 1 week 50 (7:30-17:20, M-F) Total available room hours 3,600 Total scheduled room hours 2,327 Room Utilization 65% • Monday-Friday, 7:30-5:20 • Generally timetabled Classrooms and Theatres. BBY campus only • Snapshot data from the week of October 7-11, 2013 Examples of classroom utilization rates for daytime activities from other PSEs: Algonquin College 82.5% Thompson Rivers University 70% University of the South Pacific 90% TEFMA4 Utilization target 75% 3 For a full list of rooms included in the sample, please see Appendix 3, p. 18. 4 Tertiary Education Facilities Management Association.
  • 17. SPACE MANAGEMENT BUSINESS PLAN Page 14 SEAT UTILIZATION Seat utilization measures the actual enrolment of a scheduled activity against the capacity of the room. The metric is a percentage of seats used per hour. Snapshot data is collected in the 5th week of the term. Room sample size 72 Total Seating Capacity 101,473 Total seats used 58,667 Seat Utilization Rate 57.8% • Monday-Friday, 7:30-5:20 • Generally timetabled Classrooms and Theatres. BBY campus • Snapshot data from the week of October 7-11, 2013 Examples of seat utilization rates for daytime activities from other PSEs: Algonquin College 73.1% Thompson Rivers University 60% University of the South Pacific 90% TEFMA Utilization target 75%
  • 18. SPACE MANAGEMENT BUSINESS PLAN Page 15 SUPPLY AND DEMAND Supply and demand allows us to compare the size of our available classrooms and the size of the sets that are scheduled into those classrooms. This metric allows us to better plan the size of instructional spaces to meet the needs of our programs. It attempts to compare actual enrolment with the room capacity of our instructional spaces. Some inferences from the above data: • We have too few classrooms with a capacity below 26. • We have too many classrooms with capacities between 26 and 40. • Our classroom infrastructure is well positioned if we are to increase set sizes beyond the 26 student mark. • We are well proportioned for classrooms with capacities above 40 • Any availability constraints in our large theatres (100 and above) is likely caused by the scheduling of small classes in these large spaces. 7% 45% 13% 17% 17% 56% 18% 8% 11% 7% 0% 10% 20% 30% 40% 50% 60% 1-25 26-40 41-60 61-100 100+ PercentageofActivity Supply: % of the room sample with defined # of seats Demand: % of courses scheduled into the sample with defined actual enrolment Based on Room Hour activity Supply and Demand Analysis 72 generally timetabled classrooms and theatres in BBY Snapshot Data: Week of October 7 to October 11, 2013 Full-time studies only (M-F, 7:00 - 17:20) Room Capacity Enrolment
  • 19. SPACE MANAGEMENT BUSINESS PLAN Page 16 Appendix 1 – Space Management Project Resources The following documents can be downloaded from the Space Management Sharepoint site by clicking on the link. You may be asked to log in using your standard BCIT credentials. Space Management Project Charter Space Management Steering Committee Terms of Reference Space Management Working Committee Terms of Reference Space Management Project Identification Document Space Manager Job Description
  • 20. SPACE MANAGEMENT BUSINESS PLAN Page 17 Appendix 2 – Space Management Initiative Gantt Chart Project April 2014 Summer 2014 Fall 2014 Winter 2015 Summer 2015 Fall 2015 Winter 2016 Summer 2016 Fall 2016 Winter 2017 Summer 2017 Fall 2017 Winter 2018 Summer 2018 Fall 2018 DataCollectionandReporting 1 SW01 Space Inventory Pilot Project 2 Space Data Standardization 3 Archibus Upgrade RFI 4 New Space Database data entry 5 Routine Space Database Update/Validation Process 6 Space Data Synchronization 7 Scheduling System Needs 8 Scheduling Data Entry 9 Utilization Data Reporting SpaceStandardsand Stewardship 10 Space Management Governance 11 Timetabling Process and Guidelines 12 Space Allocation Guidelines 13 Standardization of Space Attributes 14 Space Audit within Program Development and Review Processes 15 Room Access/Security Review Incenti vizing 16 Utilization Expectations, Thresholds and Guidelines 17 Space Costing Model SpaceMining 18 Space Needs Analysis 19 Term Length Alignment 20 Set Size Standardization and Optimization 21 Admin Space Audit 22 Service Area Audit 23 Seat and Room Utilization Strategies 24 Online Learning Strategy 25 Hours of Instruction 26 Learning Space Design 27 Enrolment Increase Impact Analysis Green – Working Period Amber – Evaluation and Refinement Period Blue – Monitoring Period
  • 21. SPACE MANAGEMENT BUSINESS PLAN Page 18 Appendix 3 – Detailed data source information PRIMARY DATA LIST Data Source Total Square Feet 2,332,012 sq ft 2012 APPA Survey Total Facilities Operating Costs, 2012 $15,344,638 2012 APPA Survey Annual Operating Costs/Sq Ft $6.58 2012 APPA Survey Full Time Enrolment 2012/13 17, 453 FTE Enrolments by Student Grouping 2013 Full-Time Enrolment 2012/13 Domestic 16, 211 FTE Enrolments by Student Grouping 2013 BCIT International Students 2013 Full-Time Enrolment 2012/13 International 1,242 FTE BCIT International Students 2013 Full-Time Tuition Revenue fy 2012/13 $49,772,285 2012/13 Consolidated Financials Domestic Full-Time Tuition Revenue, fy 2012/13 $45,822,454 2012/13 Consolidated Financials International Full-Time Tuition Revenue fy 2012/13 $3,949,831 2012/13 Consolidated Financials GHG Emissions, 2013 calendar year 8196 Tonnes 2013 Ministry report Carbon Offsets paid in 2013 calendar year $204,909 2013 Ministry report CALCULATIONS 10% reduction in gross square feet/FTE (Figure 1, p.10) Cost avoidance or reduction in annual operating costs (2,332,012sf x 10%) = 233,201sf 233,201sf x $6.58/sf = $1,534,462 One-time capital construction costs Average facility replacement costs (construction + soft costs + FF & E) = $435/sf 233,201sf x $435/sf = $101,442,435 GHG Emissions 8196 tonnes/yr x 10% = 820 Tonnes Carbon Offsets $204,909/yr x 10% = $2049
  • 22. SPACE MANAGEMENT BUSINESS PLAN Page 19 FT Tuition Revenue $49,772,285 FT Tuition x 10% = $4,977,228 Domestic FT Tuition Revenue $45,822,454 domestic tuition / 16,211 domestic FTE = $2827/FTE 17,453 FTE x 10% = 1,745 FTE 1,745 FTE x $2,827/FTE = $4,933,115 International FT Tuition Revenue $3,949,831 International Tuition Revenue / 1,242 International FTE = $3,180/FTE 17,453 FTE x 10% = 1,745 FTE 1,745 FTE x $3,180/FTE = $5,549,100 UTILIZATION DATA CLASSROOM LIST NE01 SE12 SE06 SW01 SW03 SW05 SW09 NE1 103 NE1 107 NE1 216 NE1 318 NE1 319 NE1 320 NE1 325 NE1 330 NE1 331 NE1 401 NE1 402 NE1 403 NE1 404 SE12 302 SE12 307 SE12 309 SE12 312 SE12 313 SE6 108 SE6 109 SE6 112 SE6 114 SE6 202 SE6 203 SE6 204 SE6 205 SE6 206 SE6 207 SE6 208 SE6 209 SE6 233 SW1 1021 SW1 1025 SW1 1205 SW1 2004 SW1 2005 SW1 2009 SW1 2016 SW1 2020 SW1 2024 SW1 2030 SW1 2590 SW1 3005 SW1 3150 SW1 3170 SW1 3190 SW1 3195 SW1 3570 SW1 4076 SW3 1710 SW3 1750 SW3 2620 SW3 2715 SW3 2745 SW3 2765 SW3 3615 SW3 3660 SW3 4675 SW3 4695 SW3 4725 SW5 1840 SW5 1850 SW9 110 SW9 121 SW9 122 SW9 127 SW9 206