TheCityofBarrieplannedtoexpandCentennial
ParkbyrealigningLakeshoreDriveontotheformer
CNrailwayrightofway.Thisinitiativewillincrease
thegreenspace,pathwaysandparkingalongthe
CityofBarrie’swaterfront.
LAKESHOREDRIVERECONSTRUCTIONANDUTILITYSUPPORTONHELICALPILES
BARRIE,ONTARIO
THEPROBLEM
Depositsoforganicmaterial(peat)and20to45metresofsoftclay
requiredthedesignofculverts,stormceptors,sanitaryandstormsewers
tobesupportedonreinforcedconcretegradebeamsandhelicalpiles.
THESOLUTION
UndertherecommendationoftheCityofBarrieandtheirengineering
team,EBSGeostructuralwascontactedtodesignandinstalltestpilesafter
repeatedtestpilefailuresbytheoriginal“lowbid”helicalpilecontractor
(nonChanceHelicalPilematerial).
EBSinstalledfourtestChanceHelicalPilesnexttotheoriginalhelicalpile
contractor’stestpiles.AllfouroftheEBSdesignedChanceHelicalPiles
metthemovementcriteriaattestload.EBSwasawardedthecontractto
install670helicalpilesusingtheirdesign.
Thefailuresofthe“lowbid”helicalpilecontractordelayedtheproject
byapproximatelyeightweeks.Thisdelaycostthecityandthestructural
engineermoretimethananticipatedduetotheextrareviewrequired.
PHOTO
EBSGeostructuralinstallingChanceHelicalPiles
EBS GEOSTRUCTURAL
AND CHANCE HELICAL PILES:
OFTEN IMITATED,
NEVER DUPLICATED
AN EBS CASE STUDY
EBS Geostructural Inc.
320 Woolwich Street South
Breslau, ON N0B 1M0
PHONE: 	 51 9 . 6 4 8 . 3 6 1 3
FAX:	 51 9 . 6 4 8 . 2 5 2 6
WEB: 	 www.ebsgeo.com
EMAIL: 	 info@ebsgeo.com
John Smith
Big Shot Engineer
Engineeringcomtech
123 Anyplace Street, Suite 123
Anytown, AB
A1B C2D
The City of Barrie planned to expand Centennial
Park by realigning Lakeshore Drive onto the former
CN railway right of way. This initiative will increase
the green space, pathways and parking along the
City of Barrie’s waterfront.
LAKESHORE DRIVE RECONSTRUCTION AND UTILITY SUPPORT ON HELICAL PILES
BARRIE, ONTARIO
THE PROBLEM
Deposits of organic material (peat) and 20 to 45 metres of soft clay
required the design of culverts, stormceptors, sanitary and storm sewers
to be supported on reinforced concrete grade beams and helical piles.
THE SOLUTION
Under the recommendation of the City of Barrie and their engineering
team, EBS Geostructural was contacted to design and install test piles after
repeated test pile failures by the original “low bid” helical pile contractor
(non Chance Helical Pile material).
EBS installed four test Chance Helical Piles next to the original helical pile
contractor’s test piles. All four of the EBS designed Chance Helical Piles
met the movement criteria at test load. EBS was awarded the contract to
install 670 helical piles using their design.
The failures of the “low bid” helical pile contractor delayed the project
by approximately eight weeks. This delay cost the city and the structural
engineer more time than anticipated due to the extra review required.
PHOTO
EBS Geostructural installing Chance Helical Piles
EBSGEOSTRUCTURAL
ANDCHANCEHELICALPILES:
OFTENIMITATED,
NEVERDUPLICATED
ANEBSCASESTUDY
EBSGeostructuralInc.
320WoolwichStreetSouth
Breslau,ONN0B1M0
PHONE:	519.648.3613
FAX:	519.648.2526
WEB:	www.ebsgeo.com
EMAIL:	info@ebsgeo.com
JohnSmith
BigShotEngineer
Engineeringcomtech
123AnyplaceStreet,Suite123
Anytown,AB
A1BC2D
Chance Helical Piles Competitor’s Helical Piles
Helical Pile Manufacturer’s
Approval + QA/QC
•	 Fabricated in an ISO 9001
	 Certified Facility
•	 Canadian Construction Materials
	 Centre Approved (CCMC 13193-R)
•	 Minister’s Ruling – Ontario
•	 Mill Prime Material
(Not secondary material)
•	 Facility Certified by Canadian
	 Welding Bureau (CWB)
Installed Helical Pile Description
•	 Grouted Chance 44mm (1.75 inch)
	 Solid Square Bar
•	 200mm, 250mm and 300mm
	 Diameter Helical Plates
•	 90mm O.D. (6mm wall thickness)	
	 Round Shaft Helical Pile
•	 250mm, 300mm and 350mm
	 Diameter Helical Plates
Final Installation Depth from Grade 38m (125 feet) 36.6m (120 feet)
Final Installation Torque 15,000kN m (11,000 ft-lbs) 15,000kN m (11,000 ft-lbs)
Movement at 520 kN (2xSLS Load) 18mm 74mm
Maximum Allowable Movement at
520 kN (Prescribed in Tender Documents)
25mm
Meet Movement + Load Criteria PASSED (4 tests) FAILED (4 tests)
LOAD TEST COMPARISON FOR CHANCE HELICAL
PILES AND COMPETITOR’S HELICAL PILES
Square Shaft Chance Helical Piles

More Related Content

Similar to EBS_CaseHistory_LakeshoreDrive

Eng Practices For The Commercialization Of Biorefineries R Pagel
Eng Practices For The Commercialization Of Biorefineries R PagelEng Practices For The Commercialization Of Biorefineries R Pagel
Eng Practices For The Commercialization Of Biorefineries R PagelRPagel
 
March Investor Roadshow | Canyon Resources
March Investor Roadshow | Canyon ResourcesMarch Investor Roadshow | Canyon Resources
March Investor Roadshow | Canyon ResourcesSymposium
 
KDK RES 2016 Sunoco
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 SunocoKarl Keller
 
Economy Parking at JFK Jet Blue Airways
Economy Parking at JFK Jet Blue AirwaysEconomy Parking at JFK Jet Blue Airways
Economy Parking at JFK Jet Blue AirwaysWilliam Wieners
 
Polivka Profile
Polivka ProfilePolivka Profile
Polivka ProfileDebbout
 
Composite materials for bridge construction
Composite materials for bridge constructionComposite materials for bridge construction
Composite materials for bridge constructionBalu Balla
 
Pre Construction Piles Caisson Replacement
Pre Construction Piles Caisson ReplacementPre Construction Piles Caisson Replacement
Pre Construction Piles Caisson Replacementdewcraig
 
East Java Gas Pipeline
East Java Gas PipelineEast Java Gas Pipeline
East Java Gas PipelineBoudewijn Baan
 
Callum Black Portfolio_V3_180716
Callum Black Portfolio_V3_180716Callum Black Portfolio_V3_180716
Callum Black Portfolio_V3_180716callum black
 
2015 excellence-infrastructure-summary-slides-en
2015 excellence-infrastructure-summary-slides-en2015 excellence-infrastructure-summary-slides-en
2015 excellence-infrastructure-summary-slides-enTeresa Elliott
 

Similar to EBS_CaseHistory_LakeshoreDrive (20)

Crossrail-C336-Paddington-New-Yard
Crossrail-C336-Paddington-New-YardCrossrail-C336-Paddington-New-Yard
Crossrail-C336-Paddington-New-Yard
 
sharndencv
sharndencvsharndencv
sharndencv
 
Projects MeerkatII Copy
Projects MeerkatII CopyProjects MeerkatII Copy
Projects MeerkatII Copy
 
Eng Practices For The Commercialization Of Biorefineries R Pagel
Eng Practices For The Commercialization Of Biorefineries R PagelEng Practices For The Commercialization Of Biorefineries R Pagel
Eng Practices For The Commercialization Of Biorefineries R Pagel
 
March Investor Roadshow | Canyon Resources
March Investor Roadshow | Canyon ResourcesMarch Investor Roadshow | Canyon Resources
March Investor Roadshow | Canyon Resources
 
KDK RES 2016 Sunoco
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 Sunoco
 
CV_AKSHAY RAJPUT
CV_AKSHAY RAJPUTCV_AKSHAY RAJPUT
CV_AKSHAY RAJPUT
 
Economy Parking at JFK Jet Blue Airways
Economy Parking at JFK Jet Blue AirwaysEconomy Parking at JFK Jet Blue Airways
Economy Parking at JFK Jet Blue Airways
 
Ambulance Station - Beverley
Ambulance Station - BeverleyAmbulance Station - Beverley
Ambulance Station - Beverley
 
Polivka Profile
Polivka ProfilePolivka Profile
Polivka Profile
 
Linkedin
LinkedinLinkedin
Linkedin
 
RA_CV - October 2016
RA_CV - October 2016RA_CV - October 2016
RA_CV - October 2016
 
FINAL PPT phase 2.pptx
FINAL PPT phase 2.pptxFINAL PPT phase 2.pptx
FINAL PPT phase 2.pptx
 
Composite materials for bridge construction
Composite materials for bridge constructionComposite materials for bridge construction
Composite materials for bridge construction
 
Pre Construction Piles Caisson Replacement
Pre Construction Piles Caisson ReplacementPre Construction Piles Caisson Replacement
Pre Construction Piles Caisson Replacement
 
Ns brochure
Ns  brochureNs  brochure
Ns brochure
 
East Java Gas Pipeline
East Java Gas PipelineEast Java Gas Pipeline
East Java Gas Pipeline
 
Ag Star Presentation 2011
Ag Star Presentation 2011Ag Star Presentation 2011
Ag Star Presentation 2011
 
Callum Black Portfolio_V3_180716
Callum Black Portfolio_V3_180716Callum Black Portfolio_V3_180716
Callum Black Portfolio_V3_180716
 
2015 excellence-infrastructure-summary-slides-en
2015 excellence-infrastructure-summary-slides-en2015 excellence-infrastructure-summary-slides-en
2015 excellence-infrastructure-summary-slides-en
 

EBS_CaseHistory_LakeshoreDrive