2. PRESENTATION OVERVIEW
HISTORY OF PORTLANT WATER
BUREAU
HOURS, SCHEDULES, AND WAGES
SERVICE GROUPS FOR PWB
PROJECT INVOLVEMENT OVERVIEW
BIG PROJECTS
USEFUL CLASSES
TAKE AWAYS
FROM FOREST TO FAUCET, WE DELIVER THE BEST DRINKING WATER IN THE WORLD.
3. BRIEF HISTORY OF PWB
PWB WAS ESTABLISHED IN 1851.
IN 1895, BULL RUN COMPLETED CONSTRUCTION OF CONDUIT
1 WHICH ALLOWED FLOW TO MT. TABOR.
CREDIT WAS DUE IN 1905 TO PWB FOR THE DECREASE IN
DEATHS SINCE BULL RUN BECAME OPERATIONAL.
1927 WATER METERS WERE INSTALLED IN THE PORTLAND
AREA TO ALL WATER SERVICES.
1930-1940 CHLORINE WAS FIRST INTRODUCE TO PREP WATER
FOR TREATMENT AND ALLOWED FOR CLEANER WATER FOR
PUBLIC USE.
BY 1962 BOTH DAM 1 AND 2 WERE CONSTRUCTED AT BULL
RUN.
DURING THE 2000’S, TECHNOLOGY INCREASED ALLOWING
FOR EFFICIENCY AND REUSABLE UTILITIES WHICH
DECREASED WATER USAGE BY 80%.
IN 1995, PWB INSTALLED A 50 MILLION GALLON TANK AT
POWELL BUTTE TO HELP DISTRIBUTE WATER TO CONSUMERS.
4. HOURS
I CHOSE MY OWN
WORKING HOURS.
I WORKED 7:00AM TO
4:30PM.
30 MIN LUNCH.
FLEXIBLE.
SCHEDUELS
WAGES
THEY OFFERED A FLEX
SCHEDULE.
9 HR WORK DAYS MON-
THRU.
WORK 8 HR EVERY
OTHER FRIDAY.
EVERY OTHER FRIDAY
OFF.
HAD THE OPTION FOR
MY FLEX DAYS.
MENTORS AND
COWORKERS WORKED
WELL WITH MY
PERSONAL SCHEDULE.
40 HOUR WORK
WEEKS.
19$ AN HOUR.
PAYED HOLIDAYS.
NO BENEFITS.
SICK DAYS AFTER
90 DAYS.
5. ENGINEERING CM SERVICES GROUP
Teresa Elliott
Chief Engineer
Stan VandeBergh
Principal
Engineer
Walter Lewandowski
Senior Engineer
Rick Lapp
Sr Eng Associate
Jim Scanlon
CAD Tech III
Roy Martinez
Inspection
Manager
Branden Confer
CM Intern
Kate Barrrett
Senior Inspector
Ted Roos
Senior Inspector
Clay Luper
Senior Inspector
7. Road 10 Activates
Erosion and traffic controls
Saw Cutting
Grinding (Change in spec..)
Overlaying
North and South side widening
Culvert replacements
Reconditioning and paving
Retaining wall
8. Road 10 Cont.…
Pre Bid Meeting
To give the bidders an opportunity to ask questions and get answers about the project.
Pre Con meeting
Contractor ask specific questions and submits submittals to the CM before project.
Contract Weekly Meetings
Up coming schedule and communication on project details.
Submittals
Items /materials needed for project. Kept record of each sub and response.
RFI’s
Request for information between CM and Contractor.
Chlorine Safety Certified
Chlorine station located close to project.
Inspections
Inspected/ site walks to insure safety and progress for project.
9. INTERSTATE RENOVATION PROJECT
Activities
Administration
Reconciling of documentation
for project.
Inspections
Daily reports, safety, and
progress, punch lists.
Electrical As-builds
Worked in Auto Cad and Micro
Station to build the electrical
As-build for IRP.
10. FULTON PUMP STATION ACTIVITIES
INSPECTIONS
Inspected the sight to insure safety and progress.
PROJECT MEETINGS
A collective meeting where we confer upcoming schedules and discuss potential
problems.
PERMITS
Permit revision.
RFI
Request for Information.
Submittals
11. Hydrogravitram Involvement
Built by Shab Levy 1983
Masonry
Metal Work
Cleaning
Planning
Organizing
Scheduling
https://www.facebook.com/branden.confer.1/videos/1335081266506917/
12. Side Activities
Wood Fair
CM/GC
Micro Station
Operations/GIS
Culvert Inspections
Surveying
Air Compressor
Woodend Culvert
& Largest Culvert.
Combusted Pipe
at Mt. Tabor.
Surveying at
Watershed