Our town hall with information on construction impacts on Eglinton Avenue East between Warden Avenue to Ionview Road. The town hall will feature detailed project maps and imagery, a small presentation, and a Q&A segment.
7
Current Work – Credit Union Drive to Ionview Road
• Utilities work, road widening and road reconstruction in progress
• Guideway construction starting Victoria Park & Pharmacy.
• Rehabilitation at Celestica, Wynford, West Don and East Don River
bridges.
• Excavation and construction of green wall at E.T. Seton Park.
• Culvert re-construction Wilson Brook and Massey Creek.
7
8
2019 Construction at Intersections
– Credit Union Drive to Ionview Road
Paving Guideway Construction
9
- ASPHALT REMOVAL
- EXCAVATION
- OVERHEAD CATENARY SYSTEM
(OCS) FOUNDATION
- DUCT BANK
- SAND LAYER
- INSULATION LAYER
- BACKFILL
- BARRIER WALLS
- TRACK SLAB
- RAILWAY
- TRAFFIC SHIFTING
Excavation depth is 2 to 6 metres; width 8 metres.
How we build the guideway
8
10
Intersection Paving
10
• CTS requires temporary changes at intersections from Credit Union to
Ionview for road paving:
– Eglinton is being widened and road must be paved before guideway
installed
– Traffic restrictions required for two weekends – one weekend for each
side of the intersection
– Credit Union/Swift & Bermondsey/Sloane require six weeks for each
side of the intersection
• Not full intersection closures.
– Eglinton remains open in both directions at all times
– Work will not take place at adjacent intersections
– Emergency services access maintained
11
Intersection operations during construction
- Paving
Sloane/Bermondsey
(6 weeks per side)
Victoria Park to Ionview
(One weekend per side)
11
12
Intersection Guideway Construction
12
• After paving temporary changes at intersections from Credit Union to
Ionview required for guideway construction:
– Work carried out in the middle of intersection
– No through north/south traffic for six weeks; traffic maintained on
Eglinton
– Signal timing will be set at the intersection and adjacent intersections
to keep traffic moving
• Restrictions are not full intersection closures.
– Eglinton remains open in both directions at all times
– Work will not take place at adjacent intersections
– North and south traffic can access Eglinton at all times via right turns
– Eglinton traffic can make right turns to access north and south streets
– Emergency services access maintained
18
Communications & Engagement
18
• On-street activations & info booths leading up to works in high
traffic areas and with TTC
- Eglinton Square Mall, Smart Centre Plaza, Golden Mile Plaza, Eglinton
Town Centre, Don Montgomery Community Centre, residential lobbies,
• Distribution of construction notices and wayfinding postcards to
businesses and residents
• Open Houses – planned for early April
• Advertising – radio, print, digital, TTC locations
• Digital – social media, Metrolinx & TTC websites
• Advanced signage – informing road users of the status of the
intersections far upstream of Eglinton and leading up to
date of works
19
416-782-8118 or 416-482-7411
24 hours/7days a week
www.thecrosstown.ca
crosstown@metrolinx.com
facebook.com/thecrosstown
twitter.com/crosstownTO
instagram.com/eglinton_crosstown
Crosstown West Office
1848 Eglinton Ave W (at Dufferin)
Crosstown East Office
660 Eglinton Ave E (at Bayview)
Stay in Touch