1. Island of Excellence Training Agenda
Safety - Video
The Agenda
Timeline
Path to Excellence Pillar - .ppt
Island of Excellence – .ppt
Finishing/Converting Housekeeping - .ppt
Island of Excellence – Assessment Process (Path to Excellence)
Island of Excellence - Opportunities List
Island of Excellence – Pad Lock Board .ppt
Island of Excellence – List of Materials for LOTT Boards
Island of Excellence – Crew Meeting Form
Island of Excellence – Crew Meeting Expectations
Island of Excellence – Action Plan Forms
Island of Excellence – Tracking Results Form {Use Plant Actual}?
The Certified Island of Excellence - .ppt
Hand Out Certificates To Island of Excellence Attendees
2. Island of Excellence
Safety
Housekeeping
Results Oriented
Maintenance
Continuous
Improvement
Activities
Short Term Results
Long Term Results
3. Island of Excellence
A Focused Reliable Method to
Elevate Machine Condition and
Performance to Sustainable World
Class Levels
• Break away from the “Status Quo”
• No more of the “Same Old, Same Old”
4. Island of Excellence
An improvement process:
• Focused events with a dedicated team
• Machine condition and performance - achieve significant
results in a short period of time
Phase 1 – Manufacturing Basics
• Ensure that machine and processes are safe, clean,
organized, well maintained and capable of achieving world
class performance results
– Safety, Housekeeping & Results Oriented Maintenance
Phase 2 – Performance Results
• Sweet Spot Analysis / Top Speed – Non Stop
• Set Up Reduction
• Downtime Reduction
• Continuous Improvement
5. Island of Excellence
Goals:
• 1st Year - 2012- Be the best in Jet Container
Company
– Machine Expectations = 75% or better (see assessment)
– Performance = 100% of Process Reliability Standards
• 2nd Year - 2013
– Machine Expectations = 100% or better (see assessment)
– Performance = World Class
6. Create Dedicated Team
Dedicated team for each machine:
• Machine Operators
• Machine Maintenance Champion
• Machine Supervisor
• One Manager – GM, PM, Supt, QM, PRM, SM, CSM, etc.
• Facilitator – may be an outside resource
• NOTE – All team members should receive Machine
Specific LOTT Training
Prework:
• Machine Goals
• Machine Performance Charts
• Machine Specs
• Top Orders
7. Expectations
Safety
Housekeeping
Results Oriented Maintenance
Continuous Improvement Activities
Short Term Results
Long Term Results
Team will complete an Island of Excellence
Assessment to benchmark current condition and
create an Action Item List identifying opportunities
to improve machine and processes
8. Safety
Machine is configured to be as safe as possible
• Guards, Curtains, Safety Signage, Organization, etc.
Safety Reliable Methods are a way of life
• Standard LOTT Design, Boards & Training Procedures
• JSAs at machine and understood / followed by all
• No duct tape or baling wire on machine
– these are a symptom of something that has not been corrected properly
The goal is ZERO incidents
• Safety Incidents can cause unnecessary pain and suffering and reduce
machine productivity
• Most Safety Incidents occur in “Upset Conditions”
• The elimination of upset conditions will improve Safety and Productivity
• Safety must never be compromised for productivity
10. Housekeeping
A Place For Everything & Everything In Its Place
• Machine Area Layout – indicating proper layout and location of
LOTT Board, scrap, waste cans, tools, cutting dies, printing plates,
equipment, etc
• All tools readily available with a designated place
The Machine “Sparkles”…
• Clean Surfaces
• Plant Colors
• Proper Lighting
• Deep Cleaning
14. Results Oriented Maintenance
Team approach b/w Maintenance & Operations
• Machine Maintenance Champions
Maintain OEM (Original Equipment Manufacturer) Condition
• Essential Equipment Care
– Housekeeping, Lubrication, Preventive Maintenance, Calibration
– don’t just repair the problem - determine root cause of failure & eliminate
– PM’s Scheduled & Completed on Time
Document all Work with Work Orders
Plan & Schedule all Non-Emergency Work
Maintenance Planning Meeting
Use History to Improve the Quality of PM’s
Condition Monitoring
• All machine controls & gauges are clearly and professionally identified
The ultimate objective is zero unplanned downtime
17. Continuous Improvement Activities
Goals
• Performance Ratio, Downtime, Speed, Set Up Time, Waste, etc.
Performance Tracking
• Charting at Machine
• LED’s
Recognition & Accountability
Crew Meetings - Action Plans
• Daily Downtime Meetings (if DT over target level)
Machine Calibration & Centerlining
Top Speed - Non Stop
18. Phase One – Manufacturing Basics
Island of Excellence Assessment
• Benchmark current condition and performance
• Measure Improvement
Action Plan
• What needs to be done, by when and by whom
• Flipcharts at machine
Crew Meetings
• Follow up with Action Plan during regularly
scheduled crew meetings
19. Phase 2 - Top Speed - Non Stop
Agree on Machine Capability
• Machine Specs
Sweet Spot Analysis
• Identify machine Sweet Spot
• Identify Top 10 Orders by quantity & frequency
• Choose “Focus Jobs” from Top 10 orders that
fall within the Sweet Spot
• Sweet Spot Analysis results should be used by
Sales & Customer Service to better understand
whether a job runs with higher or lower
productivity and by scheduling to determine
which machine is best for each order
21. Phase 2 - Top Speed - Non Stop
Top Speed Non Stop
• Goal is to run top sweet spot orders at top
machine speed with minimum downtime (without
affecting safety & quality)
• Effective preparation is key:
– Safety, Housekeeping and Preventive Maintenance must
be addressed ahead of time
– Orders must be scheduled, cutting dies and printing
dies must be in good condition, and all materials must
be ready to go
• Increase speed incrementally to identify issues
and eliminate – keep detailed log during process
– “Hit the Fast Button”
22. Phase 2 - Top Speed - Non Stop
Top Speed Non Stop
• The exercise should show that significant
performance improvement is possible if
everything is organized effectively and machine
speeds are pushed
• The challenge is to get the processes in place to
be able to sustain top speed on an ongoing basis
in future
23. Short Term Results
Safe, Clean and Organized Machine & Area
Zero Safety Incidents
100% or greater Machine Performance Ratio
• Downtime - less than Process Reliability standard
• Speed - greater than standard
• Set Up Time - less than standard
24. Long Term Results
Single Digit Downtime
• Machine & Process Downtime under 5% for Corrugators &
under 10% for Finishing
Average 75% of maximum machine speed
Single minute Set Up Time
Zero No Stock Downtime
28. Island of Excellence – Top Speed Non Stop
Machine Performance Ratio
120%
After!
100%
80%
60%
40%
Before
20%
0%
Jan Feb Mar Apr May June Jul Aug Sep Oct Nov Dec
32. Contact Information
The Box Doctor
70 +Years Experience - LLC
Roger & Dean Maxson
475 Maplebrooke Dr. West
Westerville, Ohio 43082
Office/Home 614-899-0473
Cell 614-406-6145
Fax 614-899-9329
E-Mail: rmaxson@aol.com
ContainerExperts@aol.com
rmaxson@Columbus.rr.com
Web Site: www.MaxsonContainerConsultants.com
Skype # roger.maxson