1. Project Scope Management
WBS of Construction Phase
2 A 1 Construction Phase
2A 1
2A 1.1
2A 1.1.1 2A 1.1.2
2A 1.1.3 2A 1.1.4
2A 1.2
2 A 1.2.1 2 A 1.2.2
2 A 1.2.2a 2 A 1.2.2b
2 A 1.2.2c 2 A 1.2.2d
2 A 1.2.2e 2 A 1.2.3f
2 A 1.2.2g 2 A 1.2.2h
2 A 1.2.2i 2 A 1.2.2j
2 A 1.2.2k 2 A 1.2.2l
2A 1.3 2A 1.4 2A 1.5 2A 1.6 2A 1.7 2A 1.8 2A 1.9 2A 1.10 2A 1.11 2A 1.12 2A 1.13 2A 1.14 2A 1.15
2. Processes:
2 A 1.1: Mobilization of resources at sites
2 A 1.1.1: Mobilization of Contractor’s Human Resources
2 A 1.1.2: Mobilization of Contractor’s Machinery & technical Resources
2 A 1.1.3: Handing Over Site Possession for all Area
2 A 1.1.4: Maintaining Resource Register
2A 1.1
Mobilization of resources at sites
2 A 1.1.1
Mobilization of
Contractor’s Human
Resources
2 A 1.1.2
Mobilization of
Contractor’s Machinery &
technical Resources
2 A 1.1.3
Handing Over Site
Possession for all Area
2 A 1.1.4
Maintaining
Resource Register
3. 2 A 1.2: Issuance of Detailed Construction Drawings
2 A 1.2.1 Requirement of Soil Investigation
2 A 1.2.2 Detailed Drawings Guide Banks
2 A 1.2.2a Detailed Drawings of Earth Work
2 A 1.2.2b Detailed Drawings of Pavement Works (Rigid & Flexible)
2 A 1.2.2c Detailed Drawings of Asphalt
2 A 1.2.2d Detailed Drawings of Rigid Pavement
2 A 1.2.2e Detailed Drawings of Box Culverts (36)
2 A 1.2.2f Detailed Drawings of Pipe Culverts (10)
2 A 1.2.2g Detailed Drawings of Underpasses (5)
2 A 1.2. 2h Detailed Drawings of Toll plaza & Interchange Building (1)
2 A 1.2.2i Detailed Drawings of Bridges (10)
2 A 1.2.2j Detailed Drawings of Flyover (1)
2 A 1.2.2k Detailed Drawings of Retaining Wall & Breast Walls
2 A 1.2.2l Detailed Drawings of Ancillary Work
4. 2 A 1.2:
Issuance of Detailed
Construction Drawings
2 A 1.2.2a
Detailed
Drawings of
Earth Work
2 A 1.2.2b
Detailed
Drawings of
Pavement
Works (Rigid
& Flexible)
2 A 1.2.2c
Detailed
Drawings of
Asphalt
2 A 1.2.2d
Detailed
Drawings of
Rigid
Pavement
2 A 1.2.2e
Detailed
Drawings of
Box Culverts
(36)
2 A 1.2.2f
Detailed
Drawings of
Pipe Culverts
(10)
2 A 1.2.2g
Detailed
Drawings of
Underpasses
(5)
2 A 1.2. 2h
Detailed
Drawings of
Toll plaza &
Interchange
Building (1)
2 A 1.2.2i
Detailed
Drawings of
Bridges (10)
2 A 1.2.2j
Detailed
Drawings of
Flyover (1)
2 A 1.2.2k
Detailed
Drawings of
Retaining
Wall & Breast
Walls
2 A 1.2.2l
Detailed
Drawings of
Ancillary
Work
2 A 1.2.1:
Requirement of Soil Investigation
2 A 1.2.2:
Detailed Drawings Guide Banks
5. 2A.1.3: Review of Drawing and Procurement arrangements
2A.1.3.1 Review of Drawings & Procurements arrangements- Earth Work
2A.1.3.2 Review of Drawings & Procurements arrangements- Soil Investigation
2A.1.3.3 Review of Drawings & Procurements arrangements- Box-Culverts
2A.1.3.3a Box Culverts – G1
2A.1.3.3b Box Culverts – G 2
2A.1.3.3c Box Culverts – G3
2A.1.3.4 Review of Drawings & Procurements arrangements- Retaining and Breast Walls
2A.1.3.5 Review of Drawings & Procurements arrangements- Pavements
2A.1.3.5a Pavements Work
2A.1.3.5b Rigid Pavement
2A.1.3.6 Review of Drawings & Procurements arrangements- Under Passes
2A.1.3.7 Review of Drawings & Procurements arrangements- Asphalt work
2A.1.3.8 Review of Drawings & Procurements arrangements- Bridges
2A.1.3.8a Bridge32 +935
2A.1.3.8b Bridge33 +295
2A.1.3.8c Bridge-34 + 905
2A.1.3.8d Bridge-36 + 150
2A.1.3.8e Bridge-41 + 130
2A.1.3.8f Bridge-44 + 210
2A.1.3.8g Bridge-44 + 370
2A.1.3.8h Bridge-44 + 750
2A.1.3.8i Bridge-45 + 760
2A.1.3.8j Bridge-48 + 380
2A.1.3.8k Bridge-50 + 430
2A.1.3.8l Bridge-45 + 430
2A.1.3.9 Review of Drawings & Procurement arrangements: Toll plaza
2A.1.3.10 Review of Drawings & Procurement arrangements: Drainage & erosion works
2A.1.3.11 Review of Drawings & Procurement arrangements: Ancillary Works
6. 2A.1.3: Review of Drawing and Procurement
arrangements
2A.1.3.1
Review of Drawings
& Procurements
arrangements-
Earth Work
2A.1.3.2
Review of Drawings
& Procurements
arrangements- Soil
Investigation
2A.1.3.3
Review of Drawings &
Procurements
arrangements- Box-
Culverts
2A.1.3.3a
Box Culverts – G1
2A.1.3.3b
Box Culverts – G 2
2A.1.3.3c
Box Culverts – G3
2A.1.3.4
Review of Drawings &
Procurements
arrangements- Retaining
and Breast Walls
2A.1.3.5
Review of Drawings
& Procurements
arrangements-
Pavements
2A.1.3.5a
Pavements Work
2A.1.3.5b Rigid
Pavement
2A.1.3.6
Review of Drawings
& Procurements
arrangements-
Under Passes
2A.1.3.7
Review of Drawings
& Procurements
arrangements-
Asphalt work
2A.1.3.8
Review of Drawings
& Procurements
arrangements-
Bridges
2A.1.3.8a Bridge32
+935
2A.1.3.8b Bridge33
+295
2A.1.3.8c
Bridge-34 + 905
2A.1.3.8d
Bridge-36 + 150
2A.1.3.8e
Bridge-41 + 130
2A.1.3.8f
ridge-44 + 210
2A.1.3.8g
Bridge-44 + 370
2A.1.3.8h
Bridge-44 + 750
2A.1.3.8i
Bridge-45 + 760
2A.1.3.8j
Bridge-48 + 380
2A.1.3.8k
Bridge-50 + 430
2A.1.3.8l
Bridge-45 + 430
2A.1.3.9
Review of Drawings
& Procurement
arrangements: Toll
plaza
2A.1.3.10
Review of Drawings
& Procurement
arrangements:
Drainage & erosion
works
2A.1.3.11
Review of Drawings
& Procurement
arrangements:
Ancillary Works
7. 2A.1.4 Earth Works
2A.1.4.1 Cleaning and Grubbing and CNG
2A.1.4.2 Formation of Granular Material Platform
2A.1.4.3 Improved subgrade
2A.1.4.4 Formation of Embankment
2A.1.4
Earth Works
2A.1.4.1
Cleaning and Grubbing
and CNG
2A.1.4.2
Formation of Granular
Material Platform
2A.1.4.3
Improved subgrade
2A.1.4.4
Formation of
Embankment
8. 2A.1.5 Sub base and Base Course
2A.1.5.1 Scarification and breaking of existing pavement
2A.1.5.2 Granular Sub base
2A.1.5.3 Aggregate Base
2A.1.5.4 Prime Coat
2A.1.5.5 Asphaltic Base course
2A.1.5
Sub base and Base Course
2A.1.5.1
Scarification and breaking
of existing pavement
2A.1.5.2
Granular Sub base
2A.1.5.3
Aggregate Base
2A.1.5.4
Prime Coat
2A.1.5.5
Asphaltic Base course
9. 2A.1.6 Surface courses and Pavement
2A.1.6.1 Tack Coats
2A.1.6.2 TST
2A.1.6.3 Asphaltic Wearing Course
2A.1.7 Rigid Pavement-Toll Plaza
2A.1.7.1 Lean Concrete
2A.1.7.2 Concrete Class A
2A.1.7.3 Supply and installation of Tuff Pavers
2A.1.6
Surface courses and Pavement
2A.1.6.1
Tack Coats
2A.1.6.2
TST
2A.1.6.3
Asphaltic Wearing Course
2A.1.7
Rigid Pavement-Toll Plaza
2A.1.7.1
Lean Concrete
2A.1.7.2
Concrete Class A
2A.1.7.3
Supply and installation of Tuff
Pavers
10. 2A.1.8 Structures Box culverts
2A.1.8.1 Structural Excavation
2A.1.8.2 Granular and common Brick Fill
2A.1.8.3 Construction of Barrel
2A.1.8.4 Construction of Wing Walls
2A.1.8.5 Rip Rap Works
2A.1.8
Structures Box culverts
2A.1.8.1
Structural
Excavation
2A.1.8.2
Granular and
common Brick Fill
2A.1.8.3
Construction of
Barrel
2A.1.8.4
Construction of
Wing Walls
2A.1.8.5
Rip Rap Works
11. 2A.1.9 Structures Additional Box Culverts
2A.1.9.1 Structural Excavation
2A.1.9.2 Granular and common Brick Fill
2A.1.9.3 Construction of Barrel
2A.1.9.4 Construction of Wing Walls
2A.1.9.5 Rip Rap Works
2A.1.9
Structures Additional Box Culverts
2A.1.9.1
Structural
Excavation
2A.1.9.2
Granular and
common Brick Fill
2A.1.9.3
Construction of
Barrel
2A.1.9.4
Construction of
Wing Walls
2A.1.9.5
Rip Rap Works
12. 2A.1.10 Structures Pipe Culverts
2A.1.10.1 Structural excavation and Lean Concrete
2A.1.10.2 Installation of Pipe Culverts
2A.1.10.3 Encasement Concrete and Backfilling
2A.1.10
Structures Pipe Culverts
2A.1.10.1
Structural excavation and
Lean Concrete
2A.1.10.2
Installation of Pipe
Culverts
2A.1.10.3
Encasement Concrete and
Backfilling
13. 2A.1.11 Structures (Retaining and Breast Walls)
2A.1.11.1 Excavation and Bed Preparation
2A.1.11.2 Construction and Underpass Barrel
2A.1.12 Structure (Construction of Underpasses)
2A.1.12.1 Excavation and Bed Preparation
2A.1.12.2 Construction and Underpass Barrel
2A.1.12.4 Rip Rap Works
2A.1.11
Structures (Retaining and Breast Walls)
2A.1.11.1
Excavation and Bed
Preparation
2A.1.11.2
Construction and
Underpass Barrel
2A.1.12
Structure (Construction of Underpasses)
2A.1.12.1
Excavation and Bed Preparation
2A.1.12.2
Construction and
Underpass Barrel
2A.1.12.4
Rip Rap Works
14. 2A.1.13 Structures (Bridges and Flyovers)
2A.1.13.1-Structure of All Bridges
2A.1.13.1.1 Receipt of soil investigation report
2A.1.13.1.2 Installation and Testing of test pile
2A.1.13.1.3 Pile Proof Load Testing
2A.1.13.1.4 Piles
2A.1.13.1.5 Piles Caps
2A.1.13.1.6 Columns
2A.1.13.1.7 Casting and Stressing of Girders
2A.1.13.1.8 Transoms
2A.1.13.1.9 launching of Girders
2A.1.13.1.10 Construction of Diaphragms
2A.1.13.1.11 Construction of Deck Slabs
2A.1.13.1.12 Rip Rap Works Including Filter layers
2A.1.13.1.13 Asphalt, Expansion Joints, Barriers, lane Marking
2A.1.13.2 Construction of Flyovers
2A.1.13.2.1 Receipt of soil investigation report
2A.1.13.2.2 Installation and Testing of test pile
2A.1.13.2.3 Pile Proof Load Testing
2A.1.13.2.4 Piles
2A.1.13.2.5 Piles Caps
2A.1.13.2.6 Columns
2A.1.13.2.7 Casting and Stressing of Girders
2A.1.13.2.8 Transoms
2A.1.13.2.9 launching of Girders
2A.1.13.2.10 Construction of Diaphragms
2A.1.13.2.11 Construction of Deck Slabs
2A.1.13.2.12 Rip Rap Works Including Filter layers
2A.1.13.2.13 Asphalt, Expansion Joints, Barriers, lane Marking
15. 2A.1.13
Structures (Bridges and Flyovers)
2A.1.13.1
Structure of All Bridges
2A.1.13.1.1 Receipt of
soil investigation
report
2A.1.13.1.2
Installation and
Testing of test pile
2A.1.13.1.3 Pile Proof
Load Testing 2A.1.13.1.4 Piles
2A.1.13.1.5 Piles Caps 2A.1.13.1.6 Columns
2A.1.13.1.7 Casting
and Stressing of
Girders
2A.1.13.1.8 Transoms
2A.1.13.1.9 launching
of Girders
2A.1.13.1.10
Construction of
Diaphragms
2A.1.13.2.11
Construction of Deck
Slabs
2A.1.13.2.12 Rip Rap
Works Including Filter
layers
2A.1.13.1.13 Asphalt,
Expansion Joints,
Barriers, lane Marking
2A.1.13.2
Construction of Flyovers
2A.1.13.2.1 Receipt of
soil investigation
report
2A.1.13.2.2
Installation and
Testing of test pile
2A.1.13.2.3 Pile Proof
Load Testing
2A.1.13.2.4 Piles
2A.1.13.2.5 Piles Caps
2A.1.13.2.6
Columns
2A.1.13.2.7
Casting and Stressing
of Girders
2A.1.13.2.8
Transoms
2A.1.13.2.9
launching of Girders
2A.1.13.2.10
Construction of
Diaphragms
2A.1.13.2.11
Construction of Deck
Slabs
2A.1.13.2.12 Rip Rap
Works Including Filter
layers
2A.1.13.2.13 Asphalt,
Expansion Joints,
Barriers, lane Marking
16. 2A.1.14 Drainage and Erosion Works
2A.1.14.1 Additional RCC Pipe Culverts
2A.1.14.2 RCC Pipe Culverts -760x910mm dia
2A.1.14.3 Construction of Chutes
2A.1.14.4 Stone Gabions
2A.1.14.5 Water courses
2A.1.14.6 Construction of Right Guide Bank upstream
2A.1.14.7 Construction of left Guide Bank upstream
2A.1.14.8 Grouted stone pitching
2A.1.14.9 Left and Right Bank Guide Bank stream
2A.1.14.10 Riprap Works and Layer Filters
2A.1.14
Drainage and Erosion Works
2A.1.14.1
Additional RCC
Pipe Culverts
2A.1.14.2
RCC Pipe
Culverts -
760x910mm dia
2A.1.14.3
Construction of
Chutes
2A.1.14.4
Stone Gabions
2A.1.14.5
Water courses
2A.1.14.6
Construction of
Right Guide
Bank upstream
2A.1.14.7
Construction of
left Guide Bank
upstream
2A.1.14.8
Grouted stone
pitching
2A.1.14.9
Left and Right
Bank Guide
Bank stream
2A.1.14.10
Riprap Works
and Layer
Filters
17. 2A.1.15 Ancillary Works
2A.1.15.1 Provision of service duct along the road
2A.1.15.2 New Jersey Barriers
2A.1.15.3 Pavement Marking
2A.1.15.4 Metal Beam guide rail works
2A.1.15.5 Traffic road signs
2A.1.15.6 GI wire mesh Fence
2A.1.15.7 Gantry signs
2A.1.15.8 Provision of ITS for project
2A.1.15
Ancillary Works
2A.1.15.1
Provision of
service duct
along the
road
2A.1.15.2
New Jersey
Barriers
2A.1.15.3
Pavement
Marking
2A.1.15.4
Metal Beam
guide rail
works
2A.1.15.5
Traffic road
signs
2A.1.15.6
GI wire
mesh Fence
2A.1.15.7
Gantry signs
2A.1.15.8
Provision of
ITS for
project