The fourth dimension of BIM is concerned with how to integrate time and schedule into the 3D models. Read this presentation and you will understand how 4D BIM can benefit your AEC project.
You can also visit our website for more information: https://www.topbimcompany.com/bim-services/4d-bim-scheduling-services/
2. WHAT IS 4D BIM
SCHEDULING ?
• The fourth dimension of BIM is concerned with
how to integrate time and schedule into the 3D
models.
• When paired with other scheduling techniques,
the visualization of the schedule produced by 4D
planning methods speeds up decision-making and
communication during the planning and
execution phases.
3. PURPOSE OF 4D
CONSTRUCTION
SIMULATION
• The goal of 4D construction planning and
scheduling is to: promote stakeholder
engagement
• Improve communications
• Enrich the planning process
4. WHAT DOES 4D MODELING
INCORPORATE?
• The start and end dates for the supply and
installation of construction components are
incorporated into 4D BIM Modeling
visualization, which highlights their
significance in relation to the overall
project.
5. • It gives teams accurate and practical
information on construction projects.
• It's gaining traction in the sector by
offering it physical and intangible
benefits.
Accurate & Practical
Information with 4D
Scheduling
6. • The advantages of 4D planning also
enhance spatial restrictions that
support and add to location-based
scheduling and procurement
management.
• The integration of 4D BIM with lean
building techniques is another strategy
that is gaining ground steadily.
4D SCHEDULING ENHANCING
CONSTRUCTION PROJECT
7. VISUAL POWER OF 4D PLANNING
• The team is able to work on the measurement specifics of the structure with the
aid of model-based scheduling and model-based estimating.
• By completing projects on schedule and within budget, 4D immediately boosts the
project's predictability and profitability.
• Utilizing 4D, you can expedite even the largest projects' transition from sketch to
finished product.
• Utilizing the benefits of 4D to promote the building team's members' most
effective communication.
• Determine issues that regular routines might not reveal
8. • Run scenarios to determine whether they can be carried out and
to identify the best answers.
• Aa you make updates to the chart, see the effects in the 3D
view.
• Look into how the process will play out at various project
stages.
• Incorporate as-built data
• Improve and expedite the tender paperwork.
• Make the most of your resources with precise planning
OTHER KEY ADVANTAGES OF 4D BIM SIMULATION
9. WHY CHOOSE 4D BIM
SCHEDULING?
• Reduced risk as a result of better team
cooperation and communication
• Identification of conflicts (Problem
Solving)
• Accelerated delivery and reduced costs
• Enhanced quality