Lanner client TST discuss simulation application and benefit
Curriculum Vitae - Rafi Azis - 2016
1. Resume of Rafi Azis – Page 1 of 6
CurricuCurricuCurricuCurriculum Vitaelum Vitaelum Vitaelum Vitae
NAMENAMENAMENAME :::: Rafi Azis
IndonesiaNATIONALITYNATIONALITYNATIONALITYNATIONALITY ::::
12 January 1979DATE OF BIRTHDATE OF BIRTHDATE OF BIRTHDATE OF BIRTH ::::
EDUCATIONEDUCATIONEDUCATIONEDUCATION :::: Polytechnic Institute Technology Bandung, Diploma III (D-3)
• Mechanical Engineer, Refrigeration and Air Conditioning.
: University Jenderal Achmad Yani Bandung, Bachelor Degree (S-1)
• Mechanical Engineer, Conversion Energy.
Contact Number :Contact Number :Contact Number :Contact Number :+628111462463,+628111462463,+628111462463,+628111462463, +6281282763145+6281282763145+6281282763145+6281282763145,,,, +6281+6281+6281+6281931458661931458661931458661931458661
Email :Email :Email :Email : azisrafi@gmail.azisrafi@gmail.azisrafi@gmail.azisrafi@gmail.comcomcomcom
Work ExperienceWork ExperienceWork ExperienceWork Experience
Pipeline Inspection Engineer (Field Tech Level II)TITLE:TITLE:TITLE:TITLE:
8 yearsLENGTH OF TDW SERVICE:LENGTH OF TDW SERVICE:LENGTH OF TDW SERVICE:LENGTH OF TDW SERVICE:
PT. TDWilliamson IndonesiaTDW LOCATION:TDW LOCATION:TDW LOCATION:TDW LOCATION:
LOCATIONS OF WORK EXPERIENCE:LOCATIONS OF WORK EXPERIENCE:LOCATIONS OF WORK EXPERIENCE:LOCATIONS OF WORK EXPERIENCE: Asia Pacific ( FEAP)
LANGUAGES:LANGUAGES:LANGUAGES:LANGUAGES: English
PASSPORT NO.:PASSPORT NO.:PASSPORT NO.:PASSPORT NO.: A 6268410
SAFETY ACCREDITATION:SAFETY ACCREDITATION:SAFETY ACCREDITATION:SAFETY ACCREDITATION: XXXXXX
2. Resume of Rafi Azis – Page 2 of 6
FIELD TECHNICIFIELD TECHNICIFIELD TECHNICIFIELD TECHNICIAN, ILIAN, ILIAN, ILIAN, ILI 2002002002007777----NOWNOWNOWNOW
ResponsibilityResponsibilityResponsibilityResponsibility ::::
Planning and execution of pipeline integrity project engineering and operation for
pipeline cleaning, geometry inspection and MFL tools.
Respond to technical queries from customer
Project Experience:Project Experience:Project Experience:Project Experience:
• Assist in the preparation and finalization of various pipeline maintenance contract
• Develop SOP / Work Procedures, Pig Ability Study and execution pipeline project
such as Pipeline cleaning service and Site Survey and Intelligent Pigging for PHE
ONWJ/BP west java, Conoco Phillips Indonesia, HESS Tanjung Pangkah, Pertagas,
Pertamina EP West Java,
• Execution of pipeline integrity project engineering and operation for pipeline
cleaning, geometry inspection and MFL tools for Asia Pacific Region.
• Execution of pipeline Inline Inspection for pipeline High Temperature Natural Gas
Line (96 Celsius degree), geometry inspection and MFL tools for Conoco Phillips
Indonesia.
• Execution of pipeline Inline Inspection for pipeline in Subzero Temperatures,
Bohai Sea, using geometry and MFL tools for Conoco Phillips China.
• Execution of Geometry Tool in New Construction Line Inspection for Singapore
Air NNEG Natural Gas Pipeline System_TTTThailandhailandhailandhailandPower Gas and ,
Countries of work experience :Countries of work experience :Countries of work experience :Countries of work experience :
Indonesia, England, USA, China, Singapore, Malaysia, India, Brunei Darussalam,
Australia, Thailand, South Korea.
Professional Training and CertificationsProfessional Training and CertificationsProfessional Training and CertificationsProfessional Training and Certifications
• In house training, Jakarta. Pipeline Pigging Operation 2007
• Field Training, Salt Lake City & Houston TDW/Magpie Service Centre – MFL,
Deformation, Kaliper 360, and Mapping Inspection Tool Operation. 2009
• Sea Water Survival Training, Fire Fighting, First Aid level 1 Jakarta 2007
Offshore Training Center, Indonesia,
• In house training, Jakarta. Pig tracking using TDW-CDI track master 2007
• In house training, Jakarta. Pig tracking using TDW-Geophone 2008
• In house training, Swindon, UK, TDW/Magpie Service Centre – MFL 2009
3. Resume of Rafi Azis – Page 3 of 6
and Deformation Inspection Tool Operation
• Helicopter Under Evacuation Training (HUET). 2009
• Tropical BOSIET including Safety Induction, Fire Fighting & 2015
Self-Rescue, Sea Survival & Lifeboat, HUET, First Aid & Hypothermia,
Travel Safety by Boat, Tropical EBS-Code 5506
• Level I MFL ILI Tool Operator Certification 2011
• Level I DEF ILI Tool Operator Certification 2011
• Level I Mapping XYZ ILI Tool Operator Certification 2015
• New Construction Line ILI Tool Operator Certification 2015
• Level II MFL ILI Tool Operator Certification 2015
• Level II DEF ILI Tool Operator Certification 2015
ProjectProjectProjectProject ExperienceExperienceExperienceExperience
BP / PHE ONWJ
(2008-2011)
Progressive Cleaning Pig
• 14” Mol ZA – ZAA
• 14” Mol KLA – LPRO
• 12” Mol EC – EPRO
• 12” Mol FG – FPRO
• 14” Mol EA – EPRO
• 14” Mol BA – BPRO
• 12” Mol BC – BPRO
Perform Site Survey pre-inspection tool preparation, operational and
logistics planning of pigging activities at ;
• Uniform Flow Station
• KLA Flow Station
• Echo Flow Station
• Foxtrot Flow Station
• Papa Flow Station
• Mike-Mike Flow Station
• Bravo Flow Station
• NGL Flow Station
• Site survey Pigging facility at 26” GL TP Muara Karang
(Perform pre-inspection tool preparation, operational and
logistics planning of pigging activities).
Perform ILI Tools:
• Inline Inspection Deformation and MFL ILI Tools for 12” MGL
KKNA – KLB
• Inline Inspection Kaliper 360 and GMFL ILI Tools for 24” MGL
LCOM to NGLB
4. Resume of Rafi Azis – Page 4 of 6
• Inline Inspection Deformation ILI Tools for 12” MGL BC-BPRO
HESSHESSHESSHESS
(2008)(2008)(2008)(2008)
• 18” SS V-Jet Cleaning Pig
PERTAGASPERTAGASPERTAGASPERTAGAS
(2011)(2011)(2011)(2011)
(2011)(2011)(2011)(2011)
(2014)(2014)(2014)(2014)
(2014)(2014)(2014)(2014)
(2015)(2015)(2015)(2015)
• 18” Kandang Haur to Cilamaya Metering Station (ILI Kaliper
360 and MFL Tools)
• 24” Subang to Citarik ( GMFL Tools )
• 14” Lebak to Simpang Y (ILI 14” GMFL + XYZ Mapping Tool)
• 24” Simpang Y to Pulau Layang (ILI 24” KALIPER® and GMFL
Tool)
• 20” Looping & Existing SKG Cambai to Simpang Y (ILI
DEF+XYZ & GMFL)
INCOINCOINCOINCO
(2010)(2010)(2010)(2010)
• 12” HFSO Mangkasa Point to Mangkasa Plant (Progressive
Cleaning Pig and ILI DEF and MFL Tools)
Conoco PhillipsConoco PhillipsConoco PhillipsConoco Phillips
IndonesiaIndonesiaIndonesiaIndonesia
(2009(2009(2009(2009----2014)2014)2014)2014)
• 16” GL Suban Gas Plant – SB#4 (Progressive Cleaning Pig
and (Progressive Cleaning Pig and ILI COMBO Tools)
• 6” MOL Puyuh Shipping Line Section1 (Progressive Cleaning
Pig and ILI DEF and MFL Tools)
• 16” GL Sumpal Station to Sumpal Junction (Progressive
Cleaning Pig and (Progressive Cleaning Pig and ILI COMBO
Tools)
• 8” GL Suban #6 to Suban Plant (Progressive Cleaning Pig
and ILI DEF and MFL Tools)
• 8” Condensate Line Sumpal Junction to Grissik Plant
(Progressive Cleaning Pig and ILI DEF and MFL Tools)
• 16” Combo Suban Gas Plant to DM #2 (Progressive Cleaning
Pig and (Progressive Cleaning Pig and ILI COMBO Tools)
• 8” MFL Condensate line Suban Gas Plant to Sumpal
Junction (Progressive Cleaning Pig and ILI DEF and MFL
Tools)
• 6” Suban Well #3 to Suban Gas Plant (Progressive Cleaning
Pig and ILI DEF and MFL Tools)
• 16” Suban Gas Plant to Suban Well #11 (Progressive
Cleaning Pig and (Progressive Cleaning Pig and ILI COMBO
Tools)
• 6” MOL Puyuh Shipping Line Section 2(Progressive Cleaning
Pig and ILI DEF and MFL Tools)
• 12” MOL Grissik Station to Ramba Station (0 KM– 12 KM).
(Progressive Cleaning Pig and ILI DEF and MFL Tools)
• 12” MOL Grissik Station to Ramba Station (12 KM– 28 KM).
(Progressive Cleaning Pig and ILI DEF and MFL Tools)
• 8” MGL Suban 7 to Suban Gas Plant (ILI DEF and MFL Tools)
• 8” MGL Suban 8 to Suban Gas Plant (ILI DEF and MFL Tools)
5. Resume of Rafi Azis – Page 5 of 6
• 10” MGL Suban 5 to Suban Gas Plant (ILI DEF and MFLTools)
• 8” Condensate Suban Station to Sumpal Junction (ILI DEF
and MFL Tools)
• 8” Condensate Sumpal Junction to Grissik Gas Plant (ILI DEF
and MFL Tools)
Conoco PhillipsConoco PhillipsConoco PhillipsConoco Phillips
ChinaChinaChinaChina
(2013(2013(2013(2013----2014)2014)2014)2014)
• 12” PENGBO to RUP (ILI LGT and GMFL Tools)
• 12” RUP to WHPD (ILI LGT and GMFL Tools)
• 12” RUP to WHPE (ILI LGT and GMFL Tools)
• 12” RUP to WHPF (ILI LGT and GMFL Tools)
• 12” WHPM to WHPA (ILI LGT and GMFL Tools)
• 12” RUP to WHPC (ILI LGT and GMFL Tools)
• 8” WHPA to WHPB (ILI LGT and GMFL Tools)
• 16” RUP to WHPC (ILI Deformation Tools)
SINOPEC CHINASINOPEC CHINASINOPEC CHINASINOPEC CHINA
(2013)(2013)(2013)(2013)
• 28” Crude oil storage tank to Refinery Tank
GSPL INDIAGSPL INDIAGSPL INDIAGSPL INDIA
(2011)(2011)(2011)(2011)
• 12” Kalol Launching Terminal to Himmathnagar (Progressive
Cleaning Pig and ILI MFL Tools)
Singapore PowerSingapore PowerSingapore PowerSingapore Power
GasGasGasGas
(2010)(2010)(2010)(2010)
• 24” Attap Valley to Admiralty Off take Station (ILI DEF and
GMFL Tools)
• 24” Sakra to Mandai (ILI DEF and GMFL Tools)
• 24” Sakra to Tembusu (ILI DEF and GMFL Tools)
SHELL BukomSHELL BukomSHELL BukomSHELL Bukom
SingaporeSingaporeSingaporeSingapore
(2014)(2014)(2014)(2014)
• 8” Butadiene Bukom to Seraya (ILI LGT and GMFL Tools)
• 12 Butadiene Seraya to Bukom (ILI LGT and GMFL Tools)
TasTasTasTas GasGasGasGas
NetworksNetworksNetworksNetworks_Australia_Australia_Australia_Australia
(2015)(2015)(2015)(2015)
• 8” Carrick Offtake to Prospect DRS (ILI LGT Tool)
Air NNEG Natural
Gas Pipeline
System_ThailandThailandThailandThailand
(2015)(2015)(2015)(2015)
• 12" LGT Air NNEG Natural Gas Pipeline and Metering
Facilities System ( New Construction Line LGT Tool)
DaehanDaehanDaehanDaehan Oil PipelineOil PipelineOil PipelineOil Pipeline
CorporationCorporationCorporationCorporation
(DOPCO)(DOPCO)(DOPCO)(DOPCO) _South_South_South_South
Korea (2015Korea (2015Korea (2015Korea (2015----2016)2016)2016)2016)
• 8” Indeokwon M2 Valve Station to Osan AB (ILI DEF & GMFL+
Mapping XYZ Tools)
• 12" Daesan Pump Station to Cheonan Tank Terminal (ILI LGT
Tool)
Korea National OilKorea National OilKorea National OilKorea National Oil
CompanyCompanyCompanyCompany
(KNOC)_South(KNOC)_South(KNOC)_South(KNOC)_South
KoreaKoreaKoreaKorea
• 10” Pyeongtaek KNOC (ILI DEF & GMFL Tools)
• 18” Pyeongtaek KNOC (ILI DEF & GMFL Tools)
6. Resume of Rafi Azis – Page 6 of 6
Banten Inti GasBanten Inti GasBanten Inti GasBanten Inti Gas
(MAJUKO)(MAJUKO)(MAJUKO)(MAJUKO)
• 12” MGL Metering Pertamina to Ciwandan Offtake
References :References :References :References :
• RahmadRahmadRahmadRahmad
Service Centre Manager FEAPService Centre Manager FEAPService Centre Manager FEAPService Centre Manager FEAP
TDWilliamsonTDWilliamsonTDWilliamsonTDWilliamson
• Azri AzizanAzri AzizanAzri AzizanAzri Azizan
Project Manager FEAPProject Manager FEAPProject Manager FEAPProject Manager FEAP
TDWilliamsonTDWilliamsonTDWilliamsonTDWilliamson
• Iman Y RahmanIman Y RahmanIman Y RahmanIman Y Rahman
Project ManagerProject ManagerProject ManagerProject Manager
TDWilliamsonTDWilliamsonTDWilliamsonTDWilliamson
• Hendra AndriadiHendra AndriadiHendra AndriadiHendra Andriadi
SrSrSrSr.... Pipeline Integrity EngineerPipeline Integrity EngineerPipeline Integrity EngineerPipeline Integrity Engineer
Conoco Phillips IndonesiaConoco Phillips IndonesiaConoco Phillips IndonesiaConoco Phillips Indonesia
• Wawan GunawanWawan GunawanWawan GunawanWawan Gunawan
Lead OffshoreLead OffshoreLead OffshoreLead Offshore AssetAssetAssetAsset IntegrityIntegrityIntegrityIntegrity
Conoco PhillipsConoco PhillipsConoco PhillipsConoco Phillips