Green Factory May 3, 2008 Strategic Objectives Management Review  Meeting
Objective Starting as from the technical projects Generalized of the Green Factory concept in Yesim Sharing of future plans green  factory (WASTE) (ENERGY / NATURAL SOURCES) INPUT OUTPUT PRODUCTION
Technical Applications 145 lt/kg fabric 110 lt/kg fabric %25 23 million kg CO 2 /year 19.5 million kg CO 2 /year 5.4 million kg/year CO 2 3 million kg/year CO 2 %45 Project How ? Result ? Natural Gas Wastewater Heat Recovery System  (using of hot wastewater to warm up the clean water) Cancellation of the Heat Transfer Oil Boiler  (using of direct burning system instead of heat transfer oil at fabric finishing process) - %26 Reduction of Natural Gas consumption Carbon dioxide causes global warming Water Savings Reduction of the water rate at dyeing process (Kg fabric: Lt water) Previous Flotte Rate: 1:10 – 1:8 New Flotte Rate: 1:8 – 1:6 Reusing of the cooling water at dyehouses:   1750 m3/day water saving Increasing of the ‘correct dyeing at first’ rate:  Electricity Savings - Cancellation of the heat oil transfer pumps,  - Changing of knittig ventilation fan wings (fiber fan wings using instead of aluminium wings )  - Changing of boiler water pumps (low kWh)  - Renewal of the power panels  - Using transparent roof materials to benefit from daylight for illumination  - Reducing the active-reactive power rate by installing condensers on transformers  - Using AC engines instead of DC engines at dyehouses (low kWh)   %16 Electricity Saving 1 kWh electricity production causes 0.46 kg CO2 emission
299 tonnes 127 tonnes %58 480,000 $ 277,000 $ %43 Technical Applications Lean Production Applications - Reduction of the fabric production stock  (ton/fabric) (saving the resources that are spended for stocks) - Reduction of the chemical stock  (reduction of chemical stock also decreasing the EHS risks) Moving the Chemical Warehouse near to dyehouses ,[object Object],[object Object]
Green Factory Workshops After trainings, suggestions that could be applicable for Yesim and related to the green factory concept were requested from attendees. Talent Pool Trainings Green Factory Workshop 23 Attendees 52 suggestions from attendees ,[object Object],[object Object],[object Object]
Green Factory Suggestion Poll Poll study and green factory suggestions are announced inside the factory
Poll conducted between  March 31 – April 4 from; - Computers (on intranet) &  - Survey Sheets 3 favorite suggestions requested to be picked from 52 1807 people voted (%55 of Yesim) Information about green factory is  given on site Green Factory Suggestion Poll
Favorite 10 Suggestions Rank Vote How ? Effect ? Proponent 1 417 Illumination system of the places like warehouses and toilets could be turned into sensored illumination system * Power saving Özlem Senkoyuncu (PR) 2 276 Using of water saving materials on all fauces and reduce the individual water consumption * Water saving Aydin Sarpkaya (CR) 3 210 Establishing the chemical automation system at dyehouses (increasing the rate of correct dyeing at first and minimize the using of chemicals) * Energy savings * Water saving * Decreasing of the hazardous wastes * Decrese the chemical costs * Decrese the EHS risks Aydin Sarpkaya (CR) 4 195 %50 decresing of the chemical (fular) capacities of the fabric finishing machines at dyehouses. %50 decreasing the waste chemical amount and %5 decreasing of general chemical costs. * Decreasing the chemical charge to wastewater treatment plant  * Decreasing the chemical costs Taner Alan (Dyehouses) 5 177 Using two sides of all papers. * Decreasing the cutting of trees Kadir Kutlu  (Fabric Planning) 6 170 Decreasing the unnecessary usage of lightenings by controlling the offices & sections. * Power saving Kadir Kutlu  (Fabric Planning) 7 155 Establishing a vacuum system at raw fabric opening section. * Prevention of dust contamination to air Berkant Taskin (Dyehouses) 8 140 Starting an awareness-raising campaign to inform all employees about using of water at toilets by informative posters and noticeboards. * Water saving Pinar Babaoglu (HR) 9 124 “ Turn off the computers at break times” campaign. * Power saving * Decreasing the energy costs  * Decresing the CO (carbon monoxide) emissions Hilal Koca  (Export) 10 116 * Planning of environment and energy saving awareness trainings (for work and private life) * Environment, energy saving and green factory applications could be making one of the performance indicators of the deparments. * Increase the environmental awareness  * Social responsibility Aydin Sarpkaya (CR)
Green Factory Project Competition All suggestions will be requested to prepared as projects  (regardless of the votes) Proponents will be create their own project teams and make their project proposals  (both open for white & blue collar employees) Projects will be implemented By the end of 2008 best projects will be selected and rewarded

More Related Content

What's hot

Exploring the-circular-economy
Exploring the-circular-economyExploring the-circular-economy
Exploring the-circular-economyAndy Dorn
 
The Circular Economy - Prospects and Challenges 2017
The Circular Economy - Prospects and Challenges 2017The Circular Economy - Prospects and Challenges 2017
The Circular Economy - Prospects and Challenges 2017Circular Economy Asia
 
Scope 3 Emissions
Scope 3 EmissionsScope 3 Emissions
Scope 3 EmissionsKarl Letten
 
Biomass Power Plants
Biomass Power PlantsBiomass Power Plants
Biomass Power PlantsDaniel Campos
 
Business model and circular economy
Business model and circular economyBusiness model and circular economy
Business model and circular economyWiithaa
 
Circular economy - a new paradigm in manufacutring
Circular economy - a new paradigm in manufacutringCircular economy - a new paradigm in manufacutring
Circular economy - a new paradigm in manufacutringRanjani491
 
Waste Management system in Bangladesh
Waste Management system in BangladeshWaste Management system in Bangladesh
Waste Management system in BangladeshPsyful Bappi
 
The business case for life cycle assessment Steve Allen & Marcelle McManus
The business case for life cycle assessment   Steve Allen & Marcelle McManusThe business case for life cycle assessment   Steve Allen & Marcelle McManus
The business case for life cycle assessment Steve Allen & Marcelle McManusThe Future Economy Network
 
Circular economy as strategy for sustainable development and business innovation
Circular economy as strategy for sustainable development and business innovationCircular economy as strategy for sustainable development and business innovation
Circular economy as strategy for sustainable development and business innovationMichael Søgaard Jørgensen
 
Sustainable small-scale biogas production from agrofood waste for energy self...
Sustainable small-scale biogas production from agrofood waste for energy self...Sustainable small-scale biogas production from agrofood waste for energy self...
Sustainable small-scale biogas production from agrofood waste for energy self...OriginGreenPlatform
 
Perform, Achieve, and Trade (PAT) – An Innovative Programme to Promote Indust...
Perform, Achieve, and Trade (PAT) – An Innovative Programme to Promote Indust...Perform, Achieve, and Trade (PAT) – An Innovative Programme to Promote Indust...
Perform, Achieve, and Trade (PAT) – An Innovative Programme to Promote Indust...Leonardo ENERGY
 

What's hot (20)

Exploring the-circular-economy
Exploring the-circular-economyExploring the-circular-economy
Exploring the-circular-economy
 
Circular Economy
Circular EconomyCircular Economy
Circular Economy
 
Polymer and Environment -LCA (Group 6)
Polymer and Environment -LCA (Group 6)Polymer and Environment -LCA (Group 6)
Polymer and Environment -LCA (Group 6)
 
The Circular Economy - Prospects and Challenges 2017
The Circular Economy - Prospects and Challenges 2017The Circular Economy - Prospects and Challenges 2017
The Circular Economy - Prospects and Challenges 2017
 
Life cycle assessment
Life cycle assessmentLife cycle assessment
Life cycle assessment
 
Scope 3 Emissions
Scope 3 EmissionsScope 3 Emissions
Scope 3 Emissions
 
Biomass Power Plants
Biomass Power PlantsBiomass Power Plants
Biomass Power Plants
 
LEED & Green Materials
LEED & Green MaterialsLEED & Green Materials
LEED & Green Materials
 
Business model and circular economy
Business model and circular economyBusiness model and circular economy
Business model and circular economy
 
Circular economy - a new paradigm in manufacutring
Circular economy - a new paradigm in manufacutringCircular economy - a new paradigm in manufacutring
Circular economy - a new paradigm in manufacutring
 
carbon footprint
carbon footprintcarbon footprint
carbon footprint
 
Cleaner production
Cleaner productionCleaner production
Cleaner production
 
Waste Management system in Bangladesh
Waste Management system in BangladeshWaste Management system in Bangladesh
Waste Management system in Bangladesh
 
Cleaner production
Cleaner productionCleaner production
Cleaner production
 
The business case for life cycle assessment Steve Allen & Marcelle McManus
The business case for life cycle assessment   Steve Allen & Marcelle McManusThe business case for life cycle assessment   Steve Allen & Marcelle McManus
The business case for life cycle assessment Steve Allen & Marcelle McManus
 
Circular economy as strategy for sustainable development and business innovation
Circular economy as strategy for sustainable development and business innovationCircular economy as strategy for sustainable development and business innovation
Circular economy as strategy for sustainable development and business innovation
 
Sustainable small-scale biogas production from agrofood waste for energy self...
Sustainable small-scale biogas production from agrofood waste for energy self...Sustainable small-scale biogas production from agrofood waste for energy self...
Sustainable small-scale biogas production from agrofood waste for energy self...
 
Perform, Achieve, and Trade (PAT) – An Innovative Programme to Promote Indust...
Perform, Achieve, and Trade (PAT) – An Innovative Programme to Promote Indust...Perform, Achieve, and Trade (PAT) – An Innovative Programme to Promote Indust...
Perform, Achieve, and Trade (PAT) – An Innovative Programme to Promote Indust...
 
Presentation on Green Data Centres
Presentation on Green Data CentresPresentation on Green Data Centres
Presentation on Green Data Centres
 
Life Cycle Assessment
Life Cycle AssessmentLife Cycle Assessment
Life Cycle Assessment
 

Viewers also liked

our factory presentation pictures
our factory presentation picturesour factory presentation pictures
our factory presentation picturesAbdul Kayum
 
Introduction to IGBC Green Factory Rating System_January 2015
Introduction to IGBC Green Factory Rating System_January 2015Introduction to IGBC Green Factory Rating System_January 2015
Introduction to IGBC Green Factory Rating System_January 2015Godrej Green Building Consultancy
 
Going Green in the Workplace
Going Green in the WorkplaceGoing Green in the Workplace
Going Green in the WorkplaceAaron Cannistraci
 
What to wear to work
What to wear to workWhat to wear to work
What to wear to workJacobram
 
How to create a green and productive workplace
How to create a green and productive workplaceHow to create a green and productive workplace
How to create a green and productive workplaceJLL
 
Improving learning transfer in the workplace
Improving learning transfer in the workplaceImproving learning transfer in the workplace
Improving learning transfer in the workplaceRachel Donley
 
Strategic Process Integration
Strategic Process IntegrationStrategic Process Integration
Strategic Process IntegrationBao Nguyen
 
Comparative study of compliant & non compliant RMG
Comparative study of compliant & non  compliant RMGComparative study of compliant & non  compliant RMG
Comparative study of compliant & non compliant RMGAzmir Latif Beg
 
Go green presentation
Go green presentationGo green presentation
Go green presentationBriannakc10
 
Sustainable Fashion
Sustainable FashionSustainable Fashion
Sustainable Fashionglivneh
 
The Green Workplace
The Green WorkplaceThe Green Workplace
The Green WorkplaceEarthsite
 
How To Go Green At Work
How To Go Green At WorkHow To Go Green At Work
How To Go Green At WorkLeo Zalki
 

Viewers also liked (20)

LEED Green Factory
LEED Green FactoryLEED Green Factory
LEED Green Factory
 
our factory presentation pictures
our factory presentation picturesour factory presentation pictures
our factory presentation pictures
 
Introduction to IGBC Green Factory Rating System_January 2015
Introduction to IGBC Green Factory Rating System_January 2015Introduction to IGBC Green Factory Rating System_January 2015
Introduction to IGBC Green Factory Rating System_January 2015
 
Green garment
Green garmentGreen garment
Green garment
 
LEED Presentation
LEED PresentationLEED Presentation
LEED Presentation
 
Garments industry and bangladesh presentation
Garments industry and bangladesh presentationGarments industry and bangladesh presentation
Garments industry and bangladesh presentation
 
Team green bangladesh
Team green bangladeshTeam green bangladesh
Team green bangladesh
 
Ten ways to green your workplace 9 30-2010
Ten ways to green your workplace 9 30-2010Ten ways to green your workplace 9 30-2010
Ten ways to green your workplace 9 30-2010
 
Going Green in the Workplace
Going Green in the WorkplaceGoing Green in the Workplace
Going Green in the Workplace
 
What to wear to work
What to wear to workWhat to wear to work
What to wear to work
 
How to create a green and productive workplace
How to create a green and productive workplaceHow to create a green and productive workplace
How to create a green and productive workplace
 
Improving learning transfer in the workplace
Improving learning transfer in the workplaceImproving learning transfer in the workplace
Improving learning transfer in the workplace
 
Strategic Process Integration
Strategic Process IntegrationStrategic Process Integration
Strategic Process Integration
 
Comparative study of compliant & non compliant RMG
Comparative study of compliant & non  compliant RMGComparative study of compliant & non  compliant RMG
Comparative study of compliant & non compliant RMG
 
Go green presentation
Go green presentationGo green presentation
Go green presentation
 
Go green ppt
Go green pptGo green ppt
Go green ppt
 
Sustainable Fashion
Sustainable FashionSustainable Fashion
Sustainable Fashion
 
The Green Workplace
The Green WorkplaceThe Green Workplace
The Green Workplace
 
Green Fashion
Green FashionGreen Fashion
Green Fashion
 
How To Go Green At Work
How To Go Green At WorkHow To Go Green At Work
How To Go Green At Work
 

Similar to Green Factory

Mike Pitts EDN mar 2010
Mike Pitts EDN mar 2010Mike Pitts EDN mar 2010
Mike Pitts EDN mar 2010Info EDCW
 
Sez presentation-6
Sez presentation-6Sez presentation-6
Sez presentation-6domsr
 
Integrated green technologies for msw (mam ver.)
Integrated green technologies for msw (mam ver.)Integrated green technologies for msw (mam ver.)
Integrated green technologies for msw (mam ver.)mamdouh sabour
 
Advit Foundation - Energy Efficiency
Advit Foundation - Energy EfficiencyAdvit Foundation - Energy Efficiency
Advit Foundation - Energy EfficiencyAdvit Foundaion
 
Role of chemical engineer in environment
Role of chemical engineer in environmentRole of chemical engineer in environment
Role of chemical engineer in environmentDillwynS
 
Topic 3 Life Cycle Analysis
Topic 3  Life  Cycle  AnalysisTopic 3  Life  Cycle  Analysis
Topic 3 Life Cycle AnalysisJutka Czirok
 
Sustainable Building Design Lecture: Technical Aspects 2015, Aalto University...
Sustainable Building Design Lecture: Technical Aspects 2015, Aalto University...Sustainable Building Design Lecture: Technical Aspects 2015, Aalto University...
Sustainable Building Design Lecture: Technical Aspects 2015, Aalto University...Ken Dooley
 
f_logbook_modul_pembelajaran-15472-1689027022.pdf
f_logbook_modul_pembelajaran-15472-1689027022.pdff_logbook_modul_pembelajaran-15472-1689027022.pdf
f_logbook_modul_pembelajaran-15472-1689027022.pdfRiswandaHimawan3
 
1 course green_academy_erkman-copie
1 course green_academy_erkman-copie1 course green_academy_erkman-copie
1 course green_academy_erkman-copieGreen_Academy
 
Elements of Sustainable Construction and Design Parameters
Elements of Sustainable Construction and Design ParametersElements of Sustainable Construction and Design Parameters
Elements of Sustainable Construction and Design ParametersAjit Sabnis
 
Feniks Waste To Energy plant
Feniks Waste To Energy plantFeniks Waste To Energy plant
Feniks Waste To Energy plantfeniks_usa
 
Daniel Alonso - Integrated approach to energy optimization in the paint shop...
Daniel Alonso  - Integrated approach to energy optimization in the paint shop...Daniel Alonso  - Integrated approach to energy optimization in the paint shop...
Daniel Alonso - Integrated approach to energy optimization in the paint shop...ponencias.eurosurfas2011
 
Greg Gahagan - How green is your crate (ICEFAT Green Committee)
Greg Gahagan - How green is your crate (ICEFAT Green Committee)Greg Gahagan - How green is your crate (ICEFAT Green Committee)
Greg Gahagan - How green is your crate (ICEFAT Green Committee)European Registrars Conference
 
Tp Case Study L
Tp Case Study LTp Case Study L
Tp Case Study LFNian
 

Similar to Green Factory (20)

Mike Pitts EDN mar 2010
Mike Pitts EDN mar 2010Mike Pitts EDN mar 2010
Mike Pitts EDN mar 2010
 
Waste 2 Fuel Technology
Waste 2 Fuel TechnologyWaste 2 Fuel Technology
Waste 2 Fuel Technology
 
Sez presentation-6
Sez presentation-6Sez presentation-6
Sez presentation-6
 
Integrated green technologies for msw (mam ver.)
Integrated green technologies for msw (mam ver.)Integrated green technologies for msw (mam ver.)
Integrated green technologies for msw (mam ver.)
 
Advit Foundation - Energy Efficiency
Advit Foundation - Energy EfficiencyAdvit Foundation - Energy Efficiency
Advit Foundation - Energy Efficiency
 
linked in isa
linked in isalinked in isa
linked in isa
 
Role of chemical engineer in environment
Role of chemical engineer in environmentRole of chemical engineer in environment
Role of chemical engineer in environment
 
Topic 3 Life Cycle Analysis
Topic 3  Life  Cycle  AnalysisTopic 3  Life  Cycle  Analysis
Topic 3 Life Cycle Analysis
 
Waste to energy
Waste to energyWaste to energy
Waste to energy
 
Sustainable Building Design Lecture: Technical Aspects 2015, Aalto University...
Sustainable Building Design Lecture: Technical Aspects 2015, Aalto University...Sustainable Building Design Lecture: Technical Aspects 2015, Aalto University...
Sustainable Building Design Lecture: Technical Aspects 2015, Aalto University...
 
Industrial ecology
Industrial ecologyIndustrial ecology
Industrial ecology
 
f_logbook_modul_pembelajaran-15472-1689027022.pdf
f_logbook_modul_pembelajaran-15472-1689027022.pdff_logbook_modul_pembelajaran-15472-1689027022.pdf
f_logbook_modul_pembelajaran-15472-1689027022.pdf
 
1 course green_academy_erkman-copie
1 course green_academy_erkman-copie1 course green_academy_erkman-copie
1 course green_academy_erkman-copie
 
Elements of Sustainable Construction and Design Parameters
Elements of Sustainable Construction and Design ParametersElements of Sustainable Construction and Design Parameters
Elements of Sustainable Construction and Design Parameters
 
Feniks Waste To Energy plant
Feniks Waste To Energy plantFeniks Waste To Energy plant
Feniks Waste To Energy plant
 
M.Sc_Thesis_1
M.Sc_Thesis_1M.Sc_Thesis_1
M.Sc_Thesis_1
 
Daniel Alonso - Integrated approach to energy optimization in the paint shop...
Daniel Alonso  - Integrated approach to energy optimization in the paint shop...Daniel Alonso  - Integrated approach to energy optimization in the paint shop...
Daniel Alonso - Integrated approach to energy optimization in the paint shop...
 
Greg Gahagan - How green is your crate (ICEFAT Green Committee)
Greg Gahagan - How green is your crate (ICEFAT Green Committee)Greg Gahagan - How green is your crate (ICEFAT Green Committee)
Greg Gahagan - How green is your crate (ICEFAT Green Committee)
 
2014nov5 Booosting - AGC Glas - Circonomie
2014nov5 Booosting - AGC Glas - Circonomie2014nov5 Booosting - AGC Glas - Circonomie
2014nov5 Booosting - AGC Glas - Circonomie
 
Tp Case Study L
Tp Case Study LTp Case Study L
Tp Case Study L
 

Green Factory

  • 1. Green Factory May 3, 2008 Strategic Objectives Management Review Meeting
  • 2. Objective Starting as from the technical projects Generalized of the Green Factory concept in Yesim Sharing of future plans green factory (WASTE) (ENERGY / NATURAL SOURCES) INPUT OUTPUT PRODUCTION
  • 3. Technical Applications 145 lt/kg fabric 110 lt/kg fabric %25 23 million kg CO 2 /year 19.5 million kg CO 2 /year 5.4 million kg/year CO 2 3 million kg/year CO 2 %45 Project How ? Result ? Natural Gas Wastewater Heat Recovery System (using of hot wastewater to warm up the clean water) Cancellation of the Heat Transfer Oil Boiler (using of direct burning system instead of heat transfer oil at fabric finishing process) - %26 Reduction of Natural Gas consumption Carbon dioxide causes global warming Water Savings Reduction of the water rate at dyeing process (Kg fabric: Lt water) Previous Flotte Rate: 1:10 – 1:8 New Flotte Rate: 1:8 – 1:6 Reusing of the cooling water at dyehouses: 1750 m3/day water saving Increasing of the ‘correct dyeing at first’ rate: Electricity Savings - Cancellation of the heat oil transfer pumps, - Changing of knittig ventilation fan wings (fiber fan wings using instead of aluminium wings ) - Changing of boiler water pumps (low kWh) - Renewal of the power panels - Using transparent roof materials to benefit from daylight for illumination - Reducing the active-reactive power rate by installing condensers on transformers - Using AC engines instead of DC engines at dyehouses (low kWh) %16 Electricity Saving 1 kWh electricity production causes 0.46 kg CO2 emission
  • 4.
  • 5.
  • 6. Green Factory Suggestion Poll Poll study and green factory suggestions are announced inside the factory
  • 7. Poll conducted between March 31 – April 4 from; - Computers (on intranet) & - Survey Sheets 3 favorite suggestions requested to be picked from 52 1807 people voted (%55 of Yesim) Information about green factory is given on site Green Factory Suggestion Poll
  • 8. Favorite 10 Suggestions Rank Vote How ? Effect ? Proponent 1 417 Illumination system of the places like warehouses and toilets could be turned into sensored illumination system * Power saving Özlem Senkoyuncu (PR) 2 276 Using of water saving materials on all fauces and reduce the individual water consumption * Water saving Aydin Sarpkaya (CR) 3 210 Establishing the chemical automation system at dyehouses (increasing the rate of correct dyeing at first and minimize the using of chemicals) * Energy savings * Water saving * Decreasing of the hazardous wastes * Decrese the chemical costs * Decrese the EHS risks Aydin Sarpkaya (CR) 4 195 %50 decresing of the chemical (fular) capacities of the fabric finishing machines at dyehouses. %50 decreasing the waste chemical amount and %5 decreasing of general chemical costs. * Decreasing the chemical charge to wastewater treatment plant * Decreasing the chemical costs Taner Alan (Dyehouses) 5 177 Using two sides of all papers. * Decreasing the cutting of trees Kadir Kutlu (Fabric Planning) 6 170 Decreasing the unnecessary usage of lightenings by controlling the offices & sections. * Power saving Kadir Kutlu (Fabric Planning) 7 155 Establishing a vacuum system at raw fabric opening section. * Prevention of dust contamination to air Berkant Taskin (Dyehouses) 8 140 Starting an awareness-raising campaign to inform all employees about using of water at toilets by informative posters and noticeboards. * Water saving Pinar Babaoglu (HR) 9 124 “ Turn off the computers at break times” campaign. * Power saving * Decreasing the energy costs * Decresing the CO (carbon monoxide) emissions Hilal Koca (Export) 10 116 * Planning of environment and energy saving awareness trainings (for work and private life) * Environment, energy saving and green factory applications could be making one of the performance indicators of the deparments. * Increase the environmental awareness * Social responsibility Aydin Sarpkaya (CR)
  • 9. Green Factory Project Competition All suggestions will be requested to prepared as projects (regardless of the votes) Proponents will be create their own project teams and make their project proposals (both open for white & blue collar employees) Projects will be implemented By the end of 2008 best projects will be selected and rewarded