Technical Decision Group offers technical support and consulting services for the entire production life cycle for equipment manufacturers and suppliers
2. Our service
Technical Decision Group offers
technical support and consulting
services for the entire production life
cycle for equipment manufacturers
and suppliers
Having unique experience in the field
of conformity assessment, testing
and equipment acceptance, as well
as the necessary accompanying
technical documentation
development, Technical Decision
Group is the first and only company
in Russia carrying out this set of
services
We can rightly talk about an expert
approach
Consulting
Technical
documentation
development
IT
Training
courses
Technical
translation
Amount
Technical
support
3. Akkuyu NPP
Location — near Mersin
Number of power units — 4
(under construction)
Unit type — VVER-1200
Reference unit —
Novovoronezh NPP-2
Total capacity — 4800 mW
The commissioning period is one
unit per year from 2023 to 2026
Mersin province
4. VVER-1200 reactor is:
- increased power
- service life of 60 years
-capacity maneuver
capability
-high coefficient of use of
installed capacity (90%)
-capability to work for 18
months without refueling
-other improved specific
indicators
5. The participant’s roles
Turkish Atomic Energy
Authority (TAEK)
Official nuclear energy institution
Nuclear Regulatory Agency
of the Republic of Turkey
(NDK)
Authorized to supervise activities
AKKUYU NÜKLEER
ANONİM ŞİRKETİ
General contractor and investor
ASE
General designer
VO Safety
Authorized organization
CNIITMASH
Head materials science organization
NRC «Kurchatov Institute»
Scientific supervisor
TİTAN2 IC İÇTAŞ İNŞAAT A.Ş.
Contractor for the construction
OJSC «GIDROPRESS»
Reactor facility designer
Suppliers / Manufacturers
6. Safety class
NPP elements differ on the impact on NPP safety
А higher safety class must meet higher
quality assurance requirements
NPP elements safety classes are assigned by the
General designer
There are 4 safety classes and there are 4 safety categories
4
3
2
1
Impact on
NPP safety
7. Conformity assessment forms
To assess the conformity of equipment, components, materials and semi-finished products the following forms of
conformity assessment should be applied: state control (supervision), testing, acceptance, confirmation of
compliance
It is allowed to apply not all forms of conformity assessment for specific equipment, components,
materials and semi-finished products, if it is possible to use a smaller number of forms of
conformity assessment
8. Acceptance
Checking and documenting the
compliance of products with mandatory
requirements, carried out at agreed
points of delay of development and
production
Equipment, components, materials and semi-finished products should not be supplied
or used until the operations specified in the quality plans, programs and test methods
are completed, with results confirming their compliance with the established technical
requirements
WP WP (R) HP
9. Testing
rs
or)
Determination by experimental methods
of compliance with the specified
characteristics (quantitative, qualitative)
properties of products, reproduction of
operating conditions and paramete
during operation, modeling and (
impact on products
If, as a result of the tests, it is established that the parameters
(characteristics) of the equipment, components, materials and
semi-finished products do not meet the established technical
requirements, then for their application at the NPP
, the
consequences of the identified deviations must be established and
appropriate corrective measures developed, agreed with the
operating organization or the organization acting on its behalf and
considered by the state regulatory organization
10. State control
Within the framework of supervision and
control over observance of federal norms
and rules in the field of atomic energy
use and over the conditions of validity of
licenses for the right to manufacture,
issued by the state regulatory body for
safety in the use of atomic energy
11. Certification
Performed in the Certification System of
equipment, products and technologies
for nuclear installations, radiation sources
and storage facilities in the form of
mandatory certification
During the mandatory certification, the compliance of the
characteristics (parameters) of the equipment, components,
materials and semi-finished products with the technical
requirements established in the federal norms, as well as in other
documents: technical specifications, technical conditions, and
technical requirements is checked
13. 1
NDK
approval
Manufacturers who are willing to take part in the equipment procurement process
shall obtain approval from the NDK. In order to obtain the approval, manufacturers
shall apply to the Authority with a petition that includes the document set
Application is assessed in 30 working days with regard to adequacy of the
manufacturer to carry out the activity for which application has been made
considering the information in the application documents. If necessary, this period
may be extended by the Authority
14. 2
Quality documents
development
The Manufacturer will develop the quality assurance program and all necessary
documented procedures in accordance with the quality management to the contract
Quality Plans will be developed and approved by the Manufacturer
15. 3
Quality documents
agreement
The Manufacturer will submit quality assurance program to the Customer for review
and approval within 3 months from the date of the signing in accordance with the
quality management to the contract
Quality Plans will be approved by the Manufacturer
16. 4
Quality plan review
Quality Plans will be agreed with the Authorized organization, the Supplier and the
Customer. The Service Provider shall approve the Quality Plans by the approval letter
without marks in the relevant Quality Plan
Quality Plans shall be submitted to AKKUYU NÜKLEER ANONİM ŞİRKETİ for the
approval not later than 3 months prior to the particular equipment manufacture
17. 5
Supervision plan development
(for construction and
installation works)
Supervision plan will be developed in 3 days by the NDK
It will include the list of inspectors tasks for certain quality plan
20. 8
The
results
The results on certain quality Plan control points will be:
- For control points In the manufacturer process it will inspection conclusion
- For control point “Acceptance inspection” it will be Acceptance Inspection Report
21. Thank you for your attention