CURRICULUM VITAE 
Name : RIFZANIL 
Place and Date of Birth : Medan, July 26, 1959 
Nationality : Indonesia 
Religion : Moslem 
Address : Jl. H Bara 1 Kav. 46, Pangkalan Jati Baru, Pondok Labu, 
Depok 
Mobile Phone : 08129312446 
Email Adress : rifzanil@yahoo.com 
HISTORY OF EDUCATION 
1. SD Negeri No. I/31 Medan, Graduated 1971 
2. SMP Negeri 1 Medan, Graduated 1975 
3. SMA Negeri 1 Medan, Graduated 1979 
4. Fakultas Teknik Elektro USU Medan, Graduated1988 
HISTORY OF WORK 
1. December 1988 - March 1989, as a supervisor on the Project Transmission Line of 70 
kV Tests - Curup - Bengkulu in Bengkulu. 
Responsibilities: 
- Supervise of survey for transmission line 
- Supervise of construction and erection and stringing for tower of transmission line 
At PT. Citaconas 
2. April 1989 - May 1989, as a supervisor for survey work on the Project Transmission 
Line of 150 kV Baturaja - Tanjung Enim in South Sumatra. 
Responsibility: 
- Supervise of survey for transmission line 
At PT. Citaconas 
3. June 1989 - November 1989, as an Assistant Engineer for Design of Transmission 
Line 70 kV at the Project Kaltim Prima Coal (KPC).
Resposibilities: 
- Supervise of survey for transmission line 
- Supervise of construction and erection and stringing for tower of transmission line 
at PT. Citaconas 
4. December 1989 - December 1992, as a Distribution Engineer in Project of Power XIX 
for Design Distribution Line 20 kV for 80 cities in Indonesia outside Java. 
Responsibilities: 
- Survey for Distribution Line 20 kV for 80 cities in Indonesia outside Java 
- Design and repair Distribution Line 20 kV for 80 cities by CADPAD Program. 
At PT. Citaconas 
5. January 1993 - June 1993, as a Distribution Engineer in Project-Binjai Medan and 
surrounding areas for Design Distribution Line 20 kV 
Responsibilities: 
- Survey for Distribution Line 20 kV for Binjai and Medan 
- Design and repair Distribution Line 20 kV for Binjai and Medan by CADPAD 
Program. 
At PT. Citaconas. 
6. July 1993 - December 1993, as an Electrical Engineer in Project of Large Consumer 
at Central Java. 
Responsibilities: 
- Design for extention of Substation at Central Java 
- Supervise for extention of Substation at Central Java 
At PT. Citaconas 
7. August 1993 - April 1994, as an Electrical Engineer in the Project of Standard 
Construction of Distribution for DKI Jakarta and Tangerang. 
Responsibility: 
- Design and make Standard Construction of Distribution Line for DKI Jakarta dan 
Tangerang. 
At PT. Citaconas
8. January 1994 - April 1994, as a Distribution Engineer in Project 20 kV for shrimp 
ponds Dipasena Citra Darmaja Lampung for Design Distribution Line 20 kV. 
Responsibilities: 
- Survey Distribution Line 20 kV for shrimp ponds Dipasena Citra Darmaja 
Lampung 
- Design Distribution Line 20 kV by CADPAD program for shrimp ponds Dipasena 
Citra Darmaja Lampung 
At PT. Citaconas 
9. May 1994 - March 1995, as a Distribution Engineer in Project Batam Island for 
Design Distribution Line 20 kV. 
Responsibilities: 
- Survey Distribution Line 20 kV for Batam Island. 
- Design Distribution Line 20 kV by CADPAD for Batam Island 
At PT. Citaconas 
10. April 1995 - February 1998, as Electrical Engineer on Projects of Construction 
Transmission Line 150 kV Ring Palembang in Palembang. 
Responsibilities: 
- Supervise of construction, erection and stringing for tower of transmission line 
150 kV Palembang ring 
At PT. Arkonin 
11. April 1998 - January 1999, as an Electrical Engineer at PT. Yodya Karya. 
Standby in the office 
12. February 1999 - March 2000, as an Electrical Engineer in the Reservoir Project 
Wonorejo Multiporpose in East Java 
Responsibilities: 
- Survey of Transmission Line from Hydro Power Plant to Substation. 
- Design of Electrical working for Reservoir Project Wonorejo Multiporpose in East 
Java 
At PT. Yodya Karya.
13. April 2000 - October 2000, as Electrical Engineer at Project Design of Substation for 
Indocement Cement plant in West Java Cibinong 
Responsibility: 
- Design for substation of Indocement Cement plant in West Java Cibinong 
At Inter Sinclair Night (an Australian Company). 
14. November 2000 - February 2001, as an Electrical Engineer for Commissioning in 
Wonorejo Multiporpose Reservoir Project. 
Responsibility: 
- Comissioning Test for Hydro Power Plant of Wonorejo Multiporpose Reservoir 
Project. 
At PT. Yodya Karya. 
15. March 2001 - August 2001, as an Electrical Engineer at Project of PDAM Surabaya, 
for the rehabilitation of all Water Treatment Plant on PDAM Surabaya. 
Responsibilities: 
- Survey for Electrical System for all Water Treatment Plant on PDAM Surabaya. 
- Design and repair Electrical System for all Water Treatment Plant on PDAM 
Surabaya. 
At PT. Yodya Karya. 
16. November 2001 - July 2002 as an Electrical Engineer at PT Yodya Karya. 
Standby in the office 
17. August 2002 - February 2003, as an Electrical Engineer for Project Pre Feasibility 
Study Coal Fire plant in southern West Java. 
Responsibilities: 
- Survey for development of Coal Fired Power Plant in Southern West Java. 
- Study for Coal Fired Power Plant in Southern West Java 
At PT. Wiratman. 
18. March 2003 - June 2004, as Electrical Engineer at PT. Wiratman. 
Standby in the office 
19. July 2004 - December 2004, as an Electrical Engineer Hydropower Project 
Sipansihaporas Sibolga for Commissioning Test in North Sumatra
Responsibilities: 
- Comissioning Test for Hydropower Project Sipansihaporas Sibolga in North 
Sumatra 
At PT. Jaya CM. 
20. January 2005 - May 2005, as a Plant Electrical Engineer at Tanjung Jati Project Units 
1 & 2 for Commissioning Test. 
Responsibilitiy: 
- Comissioning for Coal fired Power Plant at Tanjung Jati Project Unit 1 & 2. 
At PT. Jaya CM. 
21. June 2005 - May 2006, as an I & C Engineer at Project PLTGU Tanjung Priok in 
Jakarta. 
Responsibilities: 
- Feasibility Study for Combined Cycle Power Plant at Tanjung Priok Jakarta 
- Basic design for Combined Cycle Power Plant at Tanjung Priok Jakarta. 
At PT. Jaya CM. 
22. May 2006 - May 2007, as an Electrical Engineer at Railway Project from Serpong to 
Tanah Abang. 
Responsibilities: 
- Design for Electrical System for Railway of Serpong to Tanah Abang 
- Supervise for consruction for Railway of Serpong to Tanah Abang 
At PT. Jaya CM. 
23. June 2007 - December 2007, as an Electrical Engineer in the Project Feasibility Study 
PLTU Parit Baru in West Kalimantan 
Responsibility: 
- Feasibility study for Coal Fired Power Plant Parit Baru in West Kalimantan. 
At PT. Jaya CM 
24. January 2008 - March 2008, as an Electrical Commissioning Engineer for Railway 
Projects from Serpong to Tanah Abang. 
Responsibility:
- Commissioning test for Railway of Serpong to Tanah Abang 
At PT. Jaya CM. 
25. April 2008 - December 2008, as an Electrical Engineer at PT. Jaya CM. 
Standby in the office 
26. January 2009 - February 2009, as an Electrical Engineer in Project PLTU Asam Asam 
in South Kalimantan 
Responsiblity: 
- Design rivew for Coal Fired Power Plant Asam-Asam in South Kalimantan 
At PT. Jaya CM. 
27. March 2009 - March 2012, the I & C Engineer at Project PLTGU Tanjung Priok in 
Jakarta. 
Responsibilities: 
- Design riview for Combined Cycle Power Plant at Tanjung Priok Jakarta. 
- Supervise for Construction of Combined Cycle Power Plant at Tanjung Priok 
Jakarta. 
At PT. Jaya CM 
28. April 2012 - up to now, as a Plant Electrical Engineer at Project PLTU Sumut 2 
Pangkalan Susu in North Sumatra. 
Responsibility: 
- Supervise for Construction of Coal Fired Power Plant PLTU Sumut 2 Pangkalan 
Susu in North Sumatera. 
At PT. Jaya CM.

More Related Content

Similar to CURRICULUM VITAE complete (20)

CV Eko Fuji SM
CV Eko Fuji SMCV Eko Fuji SM
CV Eko Fuji SM
 
CV Achmad Zaelani
CV Achmad ZaelaniCV Achmad Zaelani
CV Achmad Zaelani
 
CV_Arijanto EP_2016
CV_Arijanto EP_2016CV_Arijanto EP_2016
CV_Arijanto EP_2016
 
CV Ahmad
CV AhmadCV Ahmad
CV Ahmad
 
CV-Gusryan Zari Khamsya
CV-Gusryan Zari KhamsyaCV-Gusryan Zari Khamsya
CV-Gusryan Zari Khamsya
 
Resume-Venkata Vamsi Krishna Y
Resume-Venkata Vamsi Krishna YResume-Venkata Vamsi Krishna Y
Resume-Venkata Vamsi Krishna Y
 
CV Hari B Achmad SEPT 2015-1(1)
CV Hari B Achmad SEPT 2015-1(1)CV Hari B Achmad SEPT 2015-1(1)
CV Hari B Achmad SEPT 2015-1(1)
 
CV karim convert[1] (2)
CV karim convert[1] (2)CV karim convert[1] (2)
CV karim convert[1] (2)
 
CV Bambang Eko Hermawan
CV Bambang Eko HermawanCV Bambang Eko Hermawan
CV Bambang Eko Hermawan
 
dharmapandian
dharmapandiandharmapandian
dharmapandian
 
CV
CVCV
CV
 
COMPANY PROFILE 2015
COMPANY PROFILE 2015COMPANY PROFILE 2015
COMPANY PROFILE 2015
 
RFFlores resume
RFFlores resumeRFFlores resume
RFFlores resume
 
CV
CVCV
CV
 
jamespickering
jamespickeringjamespickering
jamespickering
 
CV_Rachmad Arif
CV_Rachmad ArifCV_Rachmad Arif
CV_Rachmad Arif
 
Curicculum Vitae Mardianto
Curicculum Vitae MardiantoCuricculum Vitae Mardianto
Curicculum Vitae Mardianto
 
My CV
My CVMy CV
My CV
 
CV Yudi Syah Putra OS
CV Yudi Syah Putra OSCV Yudi Syah Putra OS
CV Yudi Syah Putra OS
 
jragojo CV
jragojo CVjragojo CV
jragojo CV
 

CURRICULUM VITAE complete

  • 1. CURRICULUM VITAE Name : RIFZANIL Place and Date of Birth : Medan, July 26, 1959 Nationality : Indonesia Religion : Moslem Address : Jl. H Bara 1 Kav. 46, Pangkalan Jati Baru, Pondok Labu, Depok Mobile Phone : 08129312446 Email Adress : rifzanil@yahoo.com HISTORY OF EDUCATION 1. SD Negeri No. I/31 Medan, Graduated 1971 2. SMP Negeri 1 Medan, Graduated 1975 3. SMA Negeri 1 Medan, Graduated 1979 4. Fakultas Teknik Elektro USU Medan, Graduated1988 HISTORY OF WORK 1. December 1988 - March 1989, as a supervisor on the Project Transmission Line of 70 kV Tests - Curup - Bengkulu in Bengkulu. Responsibilities: - Supervise of survey for transmission line - Supervise of construction and erection and stringing for tower of transmission line At PT. Citaconas 2. April 1989 - May 1989, as a supervisor for survey work on the Project Transmission Line of 150 kV Baturaja - Tanjung Enim in South Sumatra. Responsibility: - Supervise of survey for transmission line At PT. Citaconas 3. June 1989 - November 1989, as an Assistant Engineer for Design of Transmission Line 70 kV at the Project Kaltim Prima Coal (KPC).
  • 2. Resposibilities: - Supervise of survey for transmission line - Supervise of construction and erection and stringing for tower of transmission line at PT. Citaconas 4. December 1989 - December 1992, as a Distribution Engineer in Project of Power XIX for Design Distribution Line 20 kV for 80 cities in Indonesia outside Java. Responsibilities: - Survey for Distribution Line 20 kV for 80 cities in Indonesia outside Java - Design and repair Distribution Line 20 kV for 80 cities by CADPAD Program. At PT. Citaconas 5. January 1993 - June 1993, as a Distribution Engineer in Project-Binjai Medan and surrounding areas for Design Distribution Line 20 kV Responsibilities: - Survey for Distribution Line 20 kV for Binjai and Medan - Design and repair Distribution Line 20 kV for Binjai and Medan by CADPAD Program. At PT. Citaconas. 6. July 1993 - December 1993, as an Electrical Engineer in Project of Large Consumer at Central Java. Responsibilities: - Design for extention of Substation at Central Java - Supervise for extention of Substation at Central Java At PT. Citaconas 7. August 1993 - April 1994, as an Electrical Engineer in the Project of Standard Construction of Distribution for DKI Jakarta and Tangerang. Responsibility: - Design and make Standard Construction of Distribution Line for DKI Jakarta dan Tangerang. At PT. Citaconas
  • 3. 8. January 1994 - April 1994, as a Distribution Engineer in Project 20 kV for shrimp ponds Dipasena Citra Darmaja Lampung for Design Distribution Line 20 kV. Responsibilities: - Survey Distribution Line 20 kV for shrimp ponds Dipasena Citra Darmaja Lampung - Design Distribution Line 20 kV by CADPAD program for shrimp ponds Dipasena Citra Darmaja Lampung At PT. Citaconas 9. May 1994 - March 1995, as a Distribution Engineer in Project Batam Island for Design Distribution Line 20 kV. Responsibilities: - Survey Distribution Line 20 kV for Batam Island. - Design Distribution Line 20 kV by CADPAD for Batam Island At PT. Citaconas 10. April 1995 - February 1998, as Electrical Engineer on Projects of Construction Transmission Line 150 kV Ring Palembang in Palembang. Responsibilities: - Supervise of construction, erection and stringing for tower of transmission line 150 kV Palembang ring At PT. Arkonin 11. April 1998 - January 1999, as an Electrical Engineer at PT. Yodya Karya. Standby in the office 12. February 1999 - March 2000, as an Electrical Engineer in the Reservoir Project Wonorejo Multiporpose in East Java Responsibilities: - Survey of Transmission Line from Hydro Power Plant to Substation. - Design of Electrical working for Reservoir Project Wonorejo Multiporpose in East Java At PT. Yodya Karya.
  • 4. 13. April 2000 - October 2000, as Electrical Engineer at Project Design of Substation for Indocement Cement plant in West Java Cibinong Responsibility: - Design for substation of Indocement Cement plant in West Java Cibinong At Inter Sinclair Night (an Australian Company). 14. November 2000 - February 2001, as an Electrical Engineer for Commissioning in Wonorejo Multiporpose Reservoir Project. Responsibility: - Comissioning Test for Hydro Power Plant of Wonorejo Multiporpose Reservoir Project. At PT. Yodya Karya. 15. March 2001 - August 2001, as an Electrical Engineer at Project of PDAM Surabaya, for the rehabilitation of all Water Treatment Plant on PDAM Surabaya. Responsibilities: - Survey for Electrical System for all Water Treatment Plant on PDAM Surabaya. - Design and repair Electrical System for all Water Treatment Plant on PDAM Surabaya. At PT. Yodya Karya. 16. November 2001 - July 2002 as an Electrical Engineer at PT Yodya Karya. Standby in the office 17. August 2002 - February 2003, as an Electrical Engineer for Project Pre Feasibility Study Coal Fire plant in southern West Java. Responsibilities: - Survey for development of Coal Fired Power Plant in Southern West Java. - Study for Coal Fired Power Plant in Southern West Java At PT. Wiratman. 18. March 2003 - June 2004, as Electrical Engineer at PT. Wiratman. Standby in the office 19. July 2004 - December 2004, as an Electrical Engineer Hydropower Project Sipansihaporas Sibolga for Commissioning Test in North Sumatra
  • 5. Responsibilities: - Comissioning Test for Hydropower Project Sipansihaporas Sibolga in North Sumatra At PT. Jaya CM. 20. January 2005 - May 2005, as a Plant Electrical Engineer at Tanjung Jati Project Units 1 & 2 for Commissioning Test. Responsibilitiy: - Comissioning for Coal fired Power Plant at Tanjung Jati Project Unit 1 & 2. At PT. Jaya CM. 21. June 2005 - May 2006, as an I & C Engineer at Project PLTGU Tanjung Priok in Jakarta. Responsibilities: - Feasibility Study for Combined Cycle Power Plant at Tanjung Priok Jakarta - Basic design for Combined Cycle Power Plant at Tanjung Priok Jakarta. At PT. Jaya CM. 22. May 2006 - May 2007, as an Electrical Engineer at Railway Project from Serpong to Tanah Abang. Responsibilities: - Design for Electrical System for Railway of Serpong to Tanah Abang - Supervise for consruction for Railway of Serpong to Tanah Abang At PT. Jaya CM. 23. June 2007 - December 2007, as an Electrical Engineer in the Project Feasibility Study PLTU Parit Baru in West Kalimantan Responsibility: - Feasibility study for Coal Fired Power Plant Parit Baru in West Kalimantan. At PT. Jaya CM 24. January 2008 - March 2008, as an Electrical Commissioning Engineer for Railway Projects from Serpong to Tanah Abang. Responsibility:
  • 6. - Commissioning test for Railway of Serpong to Tanah Abang At PT. Jaya CM. 25. April 2008 - December 2008, as an Electrical Engineer at PT. Jaya CM. Standby in the office 26. January 2009 - February 2009, as an Electrical Engineer in Project PLTU Asam Asam in South Kalimantan Responsiblity: - Design rivew for Coal Fired Power Plant Asam-Asam in South Kalimantan At PT. Jaya CM. 27. March 2009 - March 2012, the I & C Engineer at Project PLTGU Tanjung Priok in Jakarta. Responsibilities: - Design riview for Combined Cycle Power Plant at Tanjung Priok Jakarta. - Supervise for Construction of Combined Cycle Power Plant at Tanjung Priok Jakarta. At PT. Jaya CM 28. April 2012 - up to now, as a Plant Electrical Engineer at Project PLTU Sumut 2 Pangkalan Susu in North Sumatra. Responsibility: - Supervise for Construction of Coal Fired Power Plant PLTU Sumut 2 Pangkalan Susu in North Sumatera. At PT. Jaya CM.