FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
Rafael correa cv (ingles)
1. Urb Saman la Ceiba condo “c” house N·271, Tipuro
Maturín City, Monagas state zip code: 6201, Venezuela
+58 (0426) 5940907 / +58 (0291) 6418365
email: rafaelcorreamata@gmail.com
RAFAEL JOSÉ CORREA MATA
Personal data:
C.I. .: 11,827,657.
Date of birth: 01/24/1975
Marital Status: Married
Birthplace: Cumana, Edo. Sucre.
Nationality: Venezuelan
Passport: 104695047
Visa n#:E3653627
PETROLEUM ENGINEER
OBJECTIVE Perform, provide, develop and apply all my skills, innate and acquired
knowledge, achieving excellent results in the work and assigned area; besides
get through responsibility and trust placed in me, a unique experience, which
I'll get to important steps forward in my personal development, along with the
pride of being part of your team.
SKILLS &
ABILITIES
Software in drilling fluid.
Well Control.
Drilling Engineer Experience Running Water Base Fluids, 100% Oil-In Drill in Northern
Monagas (Field Carito, Mulata, Musipán). Southern Monagas (Morichal), North-East Field
Orocual.
Chemical Engineer Experience, Treatment in Field and Flow Stations PDVSA (Bare 5.7, 10, Ofc-
18, Santa Rosa, Compressor Plant Jusepín, Carito, Santa Barbara, Musipán Morichal)
.Petroquiriquire (Field Quiriquire Qe-1 Qe-2) Petro Onado (Onado, Leona, Fox-1, Araibel, Ored-
5). Identification and Quantification of corrosion. Chemical Treatment in Oil, Gas And Water.
Formulation of chemicals.
Knowledge of drilling fluids and drilling operations.
Extensive knowledge in Microsoft Office, Internet, Free Software
ACTUAL
EXPERIENCE
Currently the Carabobo division has 49 drill rig and 16 rig for services, these
operates with vertical and horizontal wells, J type, stratigraphic. The surface
phase is drilled with a diameter of 17.5 "and native mud formulated with water
2. and bentonite, intermediate phase is pierced with an inhibited polymer fluid,
the production phase drilling with viscoelastic fluid. It is noteworthy that
currently I manage nine contracts of different companies of fluid, four of those
contracts of solid control. I have a number of ten engineers under my charge
to handle both, the technical field fluid conducting audits and providing
recommendations and solutions to the problems presented. We also perform
administrative tasks to perform well due bill or section and cancel the service
provided agree to the contract. It is evaluated in conjunction with Intevep new
products to reduce the torque to achieve greater number of feet drilled in the
producing section.
EDUCATION Postgraduate: Specialty in metal corrosion. 2009-2011
Universite:UNEXPO. Puerto Ordaz city. Bolivar state
Average 16.4 points, waiting for thesis.
Universidad de Oriente. Puerto La Cruz city, Anzoategui state. 1992-1999. Degree:
PETROLEUM ENGINEER
LICEO CRUZ SALMERON ACOSTA – CUMANA – HIGH SCHOOL DIPOLMA
1986-1991
[Degree in Science]
PROFESSIONAL TRAINING COURSES
• PREVENTION AND CONTROL OF WELLS ONSLAUGHT. 28/02/98 SPE. UDO.
ANZOATEGUI 32 HOURS.
• MICROSOFT OFFICE 97, WORD, EXCEL, POWER POINT, ACCESS 28/11/98
INFOTRONIT ORIT. CUMANA-SUCRE 32 HOURS
• TECHNOLOGY OF ASPHALTENES. COMPANY PQB VEN. 04/10/03. 24 HOURS.
• ISO 9000: 2000. 05/31/03 KAIZEN CONSULTANTS, C.A. 16 HOURS
• SALES TECHNIQUES. 18/08/03. COMPANY PQB VEN. 32 HOURS
• EXTINGUISHER PROPER HANDLING. 03/06/04 COMPANY PQB VEN. 16
HOURS
• CRUDE DEHYDRATION 3/13/04. COMPANY PQB VEN. 30 HOURS
• DEFENSIVE DRIVING. 16/10/04. TRANSFI. 16 HOURS
Page 2
3. • APPLICATION AND FUNDAMENTALS OF CORROSION. 06/01/05 COMPANY
PQB VEN. 60 HOURS
• SAFE HANDLING OF CHEMICALS 06/01/05 COMPANY PQB VEN. 32 HOURS
• CHEMICAL HAZARD COMUNICATION 31/03/06. HALLIBURTON. 8 HOURS
• SAFETY ORIENTATION COASTAL 31/03/06. HALLIBURTON. 8 HOURS
• ENERGY SERVICES EMPLOYEE ORIENTATION 31/03/06. HALLIBURTON. 8
HOURS
• DEFENSIVE DRIVING COASTAL MULTIMEDIA. HALLIBURTON 30/03/06. 8
HOURS
• PERSONAL PROTECTIVE EQUIPMENT. HALLIBURTON 31/03/06. 8 HOURS
• STOP FOR SAFETY 11/11/06. HALLIBURTON-ACTIMAR 32 HOURS
• MANAGEMENT OF CHEMICALS 05/03/07 HALLIBURTON. 20 HOURS
• ENVIRONMENTALAWARENESS. HALLIBURTON 10/01/2007. 16 HOURS
• INTEGRATE FLUIDS TEC. I, II, III 05/01/08. HALLIBURTON. 150 HOURS
• WELL CONTROL. 22/02/2010. HALLIBURTON. WELL CONTROL SCHOOL 50
HOURS
• BAROID DRILLING THECNOLOGY FLUIDS. 19/03/2010 HALLIBURTON-
HOUSTON 3 MONTHS
• STUCK PIPES. SCHLUMBERGER 24 HOURS
• FORMATION DAMAGE. SCHLUMBERGER INTEVEP 40 HOURS
• IADC WELL CONTROL. 40 HOURS
• DIRECTIONAL DRILLING SEMINAR. SCHLUMBERGER 24 HOURS
• SAFETY DRIVING. PDVSA. 8 HOURS
• EXCEL BASIC. PDVSA. 24 HOURS
Note: The documents supporting this information are available.
WORK EXPERIENCE Engineer fluids II. Halliburton (March 2006/ August 2011)
Job Description:
Page 3
4. To act as a fluids engineer in vertical and deviated wells in HP/HT areas with 4 drilling phases:
first phase of 22 "native mud, playoff 17.5" lignosulfonate mud, 100% oil third phase, fourth
phase-in drill mud.
Act as coordinator of fluids having four Engineers under my charge in exploratory wells in HT/HP
areas
Fluid engineer in Colombia in horizontal wells in the area of Yopal, drilling with inhibited
viscoelastic polymer fluid.
Chemical treatment Engineer. PQB Venezuela. (January 2001/ January 20 05)
Job Description:
Treatment of wet gas H2S inhibitors, injection of corrosion inhibitors, emulsifiers for heavy and
light crude in bottom and surface water treatment through biosidas, scale inhibitors, clarifiers etc.
Intern degree. PDVSA. (June 1999)
Job Description:
Develop drill in densified fluids with calcium carbonate.
Page 4