3. A Scheme 1 mile away was found to contain Tar in the existing
carriageway, the planning's were used at Sheffield Green Road
to improve the existing levels . Recycling of Tar bound
planning's is one of the few accepted methods to dispose of tar
bound planning's
Spreading of the additional planning's
WRAP and the CSS acknowledge that In-situ recycling is the First
choice for dealing with Tar bound materials. MST Recycling Ltd
has developed a complete quality protocol uniquely specialised for
handling and recycling Tar bound material.
4. First mix with a Wirtgen Cold recycler
WR 2500 SK
Cutting teeth
After 30
mins work
5. Grading of planning's and sub-base after first pass of the
Wirtgen Cold recycler WR 2500 SK
7. Recycling completed.
A layer of Bond Coat is applied and then a Bit Grit is
spread on top to protect the Bond Coat and to also allow
the area to be trafficked