SlideShare a Scribd company logo
1 of 2
PROJECT CHARTER:DHU% Reduction
Project Name: Expected Benefit: Target Timeline:
Start & Estimated end
date
Date: Project
No.
Reduction ofDHU% Reduce DHU% (current 9.37%) 2% Start – 8 August,2016
End – 26 August, 2016
8 Aug,2016
01/ GTL
Unit 1,
line 1
Reduction oftop defect 20%
What is the problem statement?
What havecustomers toldus is currentlya
problem and they want tochange? (Voiceof
Customer)
What is the project objective?
Objectives should beSpecific,Measurable, Achievable,
Relevant, Timely
On project completion what does ‘goodlook like’?
Measure Current Target
Implement Quality tools to improve quality Identify top defects in sewing section and
Data analysisto improveQuality
DHU 9.37% 7%
Reduce top defects in sewing operation Continuous work ontop defects Raw Edge 1094 875
What is the scope of the project? (e.g. department, Categories, geographies)
In Scope Out of Scope
Unit 1, line 1 (Sewing) Unit 1 other linesand Cutting, Finishing
What are the project milestones?
Specify whenyou willbe reporting back to your sponsor / steering group, andDefine, Measure,Analyse,Improve, Controlendstage reviews ifappropriate
Description Planned
Complete date
Actual Complete
Date
Define (Current Assessment)—2 days 8 August 8 August
Measured Quality level-- (current)—2 days 11 August 10 August
Analyse (Current vs. Future –variance)— 2 days 13 August 13 August
Improved (Action towards goals) --- 10 24 August 24 August
Control— 2 days 26 August
What are the project deliverables?
Describe the expected outputs oftheproject,including whatcustomers / staffwould see new (e.g. Documents, presentation decks)
Description Planned date Actual Date
Use the current reports on Quality land Inspection study report.
As per requirement enhance to capture the required data to track the project report
26 August 2016 24 August 2016
Resources
Name, Position
Effort/Method/Notes What is the approximate project value?
Mr. Dimuth – QualityGM
Shamsul- QualityManager
Rony
7/0
TLS
Effective Problemsolving culture
Area Impacted: Quality
Estimate Value:
USD/Local currency
Method/Notes:
Prepared by: ME project Leader ME program Leader ME champion ME sponsor WMGS ME
Jayed
Improvement - Action Points
1 Identify Top 5 defect in Sewing & FinishingSection- Completed
2 Daily Top 5 Defect Identification and Documentation - Completed
3 Select the Line with Highest DHU% & Identify top 5 process- Completed
4 Root CauseAnalysis & Progress check- Completed
5 Train & Motivate operator for 100% Inspection before passing(Startwith top defect operators) - Completed
6 Train Line Controller on TLS & 7/0 (selected Line) - Completed
7 Hourly check & Update TLS & 7/0 report – Completed
8 Start Needle & Thread tension check (twice a Day) top defect process- Not Properly done
9 Feasibility & accuracy of all Quality Data- Completed
10 Monitor Clock-wiseCheck in Sewing & FinishingQ.I and Set Standard time- Completed for Sewing
11 Maintain LineDiscipline& Proper M/C Cleaningfor Quality issue- Not maintained
12 Replace Dull Needle and Knife from top 5 defected process- Completed
13 Remove All Sharp edge, Rusty and spotsource from sewing Table- Completed
14 Change or Improve Foldingsystemfor raw edge defect (top 5 process) - Completed
15 Instructoperator for proper margin and trimming process –Completed
16 Instruction operator proper Feeding and Handlingof garments- Completed
17 Empowerment of Operator to Immediately Send back defected garments to previous operator & followup- Not Completed
18 Proper Ironingsystem & pattern Check- Completed
19 Instruction for Check for Miss Match parts before sewing(operator) & Line-feeding (Line supervisor) & followUp- Complete

More Related Content

Similar to Project Charter GTL_Sewing DHU_ 24_ August 2016

Project Charter GTL2 _Sewing_6_June_ 2016
Project Charter GTL2 _Sewing_6_June_ 2016Project Charter GTL2 _Sewing_6_June_ 2016
Project Charter GTL2 _Sewing_6_June_ 2016Anik Mazumdar
 
Six Sigma Project Charter Attributa Data of Roshan Weeratunga
Six Sigma Project Charter Attributa Data of Roshan   WeeratungaSix Sigma Project Charter Attributa Data of Roshan   Weeratunga
Six Sigma Project Charter Attributa Data of Roshan WeeratungaRoshan Sujeewa Weeratunga
 
Baskaren Accomplishments Summary
Baskaren Accomplishments SummaryBaskaren Accomplishments Summary
Baskaren Accomplishments Summaryguest524810
 
Managing projects by data
Managing projects by dataManaging projects by data
Managing projects by dataMobi Marketing
 
Six-Sigma-Black-Belt-Project-sample
Six-Sigma-Black-Belt-Project-sampleSix-Sigma-Black-Belt-Project-sample
Six-Sigma-Black-Belt-Project-sampleDheerendra S Negi
 
Six sigma ajal
Six sigma ajalSix sigma ajal
Six sigma ajalAJAL A J
 
Lean Six Sigma project Caponera
Lean Six Sigma project CaponeraLean Six Sigma project Caponera
Lean Six Sigma project CaponeraAnnalisa Caponera
 
Six-Sigma-Green-belt.8169983.powerpoint.pptx
Six-Sigma-Green-belt.8169983.powerpoint.pptxSix-Sigma-Green-belt.8169983.powerpoint.pptx
Six-Sigma-Green-belt.8169983.powerpoint.pptxWFD02BLR13Outlet
 
Six Sigma Green Belt Training Part 7
Six Sigma Green Belt Training Part 7Six Sigma Green Belt Training Part 7
Six Sigma Green Belt Training Part 7Skillogic Solutions
 
Combining qualitative and quantitative software process evaluation sylvie t...
Combining qualitative and quantitative software process evaluation   sylvie t...Combining qualitative and quantitative software process evaluation   sylvie t...
Combining qualitative and quantitative software process evaluation sylvie t...IWSM Mensura
 
Northeast Lean Conference 2019 - Employee Engagement - McMahon Roman.ppt
Northeast Lean Conference 2019 - Employee Engagement - McMahon Roman.pptNortheast Lean Conference 2019 - Employee Engagement - McMahon Roman.ppt
Northeast Lean Conference 2019 - Employee Engagement - McMahon Roman.pptTim McMahon
 
Metrics based Management
Metrics based ManagementMetrics based Management
Metrics based ManagementSPIN Chennai
 
Project Execution PowerPoint Presentation Slides
Project Execution PowerPoint Presentation SlidesProject Execution PowerPoint Presentation Slides
Project Execution PowerPoint Presentation SlidesSlideTeam
 
Introduction to six sigma
Introduction to six sigmaIntroduction to six sigma
Introduction to six sigmanatrajsenthil
 
Quality improvement
Quality improvementQuality improvement
Quality improvementAdel Younis
 
Project Execution Powerpoint Presentation Slides
Project Execution Powerpoint Presentation SlidesProject Execution Powerpoint Presentation Slides
Project Execution Powerpoint Presentation SlidesSlideTeam
 
Building best in-class quality in footwear manufacturing
Building best in-class quality in footwear manufacturingBuilding best in-class quality in footwear manufacturing
Building best in-class quality in footwear manufacturingTony Lopez
 

Similar to Project Charter GTL_Sewing DHU_ 24_ August 2016 (20)

Project Charter GTL2 _Sewing_6_June_ 2016
Project Charter GTL2 _Sewing_6_June_ 2016Project Charter GTL2 _Sewing_6_June_ 2016
Project Charter GTL2 _Sewing_6_June_ 2016
 
Six Sigma Project Charter Attributa Data of Roshan Weeratunga
Six Sigma Project Charter Attributa Data of Roshan   WeeratungaSix Sigma Project Charter Attributa Data of Roshan   Weeratunga
Six Sigma Project Charter Attributa Data of Roshan Weeratunga
 
Baskaren Accomplishments Summary
Baskaren Accomplishments SummaryBaskaren Accomplishments Summary
Baskaren Accomplishments Summary
 
Managing projects by data
Managing projects by dataManaging projects by data
Managing projects by data
 
Six sigma-black-belt-project-sample
Six sigma-black-belt-project-sampleSix sigma-black-belt-project-sample
Six sigma-black-belt-project-sample
 
Six-Sigma-Black-Belt-Project-sample
Six-Sigma-Black-Belt-Project-sampleSix-Sigma-Black-Belt-Project-sample
Six-Sigma-Black-Belt-Project-sample
 
Six sigma ajal
Six sigma ajalSix sigma ajal
Six sigma ajal
 
Lean Six Sigma project Caponera
Lean Six Sigma project CaponeraLean Six Sigma project Caponera
Lean Six Sigma project Caponera
 
Six-Sigma-Green-belt.8169983.powerpoint.pptx
Six-Sigma-Green-belt.8169983.powerpoint.pptxSix-Sigma-Green-belt.8169983.powerpoint.pptx
Six-Sigma-Green-belt.8169983.powerpoint.pptx
 
Six Sigma Green Belt Training Part 7
Six Sigma Green Belt Training Part 7Six Sigma Green Belt Training Part 7
Six Sigma Green Belt Training Part 7
 
Combining qualitative and quantitative software process evaluation sylvie t...
Combining qualitative and quantitative software process evaluation   sylvie t...Combining qualitative and quantitative software process evaluation   sylvie t...
Combining qualitative and quantitative software process evaluation sylvie t...
 
Northeast Lean Conference 2019 - Employee Engagement - McMahon Roman.ppt
Northeast Lean Conference 2019 - Employee Engagement - McMahon Roman.pptNortheast Lean Conference 2019 - Employee Engagement - McMahon Roman.ppt
Northeast Lean Conference 2019 - Employee Engagement - McMahon Roman.ppt
 
Metrics based Management
Metrics based ManagementMetrics based Management
Metrics based Management
 
Project Execution PowerPoint Presentation Slides
Project Execution PowerPoint Presentation SlidesProject Execution PowerPoint Presentation Slides
Project Execution PowerPoint Presentation Slides
 
Introduction to six sigma
Introduction to six sigmaIntroduction to six sigma
Introduction to six sigma
 
Ssoverview
SsoverviewSsoverview
Ssoverview
 
Quality improvement
Quality improvementQuality improvement
Quality improvement
 
1st module.....
1st module.....1st module.....
1st module.....
 
Project Execution Powerpoint Presentation Slides
Project Execution Powerpoint Presentation SlidesProject Execution Powerpoint Presentation Slides
Project Execution Powerpoint Presentation Slides
 
Building best in-class quality in footwear manufacturing
Building best in-class quality in footwear manufacturingBuilding best in-class quality in footwear manufacturing
Building best in-class quality in footwear manufacturing
 

More from Anik Mazumdar

Friends foundation Certificate
Friends foundation CertificateFriends foundation Certificate
Friends foundation CertificateAnik Mazumdar
 
White Belt Certification-Anik Mazumdar
White Belt Certification-Anik MazumdarWhite Belt Certification-Anik Mazumdar
White Belt Certification-Anik MazumdarAnik Mazumdar
 
Six Sigma Yellow Belt -Anik Mazumdar
Six Sigma Yellow Belt -Anik MazumdarSix Sigma Yellow Belt -Anik Mazumdar
Six Sigma Yellow Belt -Anik MazumdarAnik Mazumdar
 
Manufacturing Excellence Line- Efficiency Improvement Project
Manufacturing Excellence Line- Efficiency Improvement ProjectManufacturing Excellence Line- Efficiency Improvement Project
Manufacturing Excellence Line- Efficiency Improvement ProjectAnik Mazumdar
 
Six Sigma Yellow Belt -Anik Mazumdar
Six Sigma Yellow Belt -Anik MazumdarSix Sigma Yellow Belt -Anik Mazumdar
Six Sigma Yellow Belt -Anik MazumdarAnik Mazumdar
 
White Belt Certification-Anik Mazumdar
White Belt Certification-Anik MazumdarWhite Belt Certification-Anik Mazumdar
White Belt Certification-Anik MazumdarAnik Mazumdar
 

More from Anik Mazumdar (7)

BSC Certificate (1)
BSC Certificate (1)BSC Certificate (1)
BSC Certificate (1)
 
Friends foundation Certificate
Friends foundation CertificateFriends foundation Certificate
Friends foundation Certificate
 
White Belt Certification-Anik Mazumdar
White Belt Certification-Anik MazumdarWhite Belt Certification-Anik Mazumdar
White Belt Certification-Anik Mazumdar
 
Six Sigma Yellow Belt -Anik Mazumdar
Six Sigma Yellow Belt -Anik MazumdarSix Sigma Yellow Belt -Anik Mazumdar
Six Sigma Yellow Belt -Anik Mazumdar
 
Manufacturing Excellence Line- Efficiency Improvement Project
Manufacturing Excellence Line- Efficiency Improvement ProjectManufacturing Excellence Line- Efficiency Improvement Project
Manufacturing Excellence Line- Efficiency Improvement Project
 
Six Sigma Yellow Belt -Anik Mazumdar
Six Sigma Yellow Belt -Anik MazumdarSix Sigma Yellow Belt -Anik Mazumdar
Six Sigma Yellow Belt -Anik Mazumdar
 
White Belt Certification-Anik Mazumdar
White Belt Certification-Anik MazumdarWhite Belt Certification-Anik Mazumdar
White Belt Certification-Anik Mazumdar
 

Project Charter GTL_Sewing DHU_ 24_ August 2016

  • 1. PROJECT CHARTER:DHU% Reduction Project Name: Expected Benefit: Target Timeline: Start & Estimated end date Date: Project No. Reduction ofDHU% Reduce DHU% (current 9.37%) 2% Start – 8 August,2016 End – 26 August, 2016 8 Aug,2016 01/ GTL Unit 1, line 1 Reduction oftop defect 20% What is the problem statement? What havecustomers toldus is currentlya problem and they want tochange? (Voiceof Customer) What is the project objective? Objectives should beSpecific,Measurable, Achievable, Relevant, Timely On project completion what does ‘goodlook like’? Measure Current Target Implement Quality tools to improve quality Identify top defects in sewing section and Data analysisto improveQuality DHU 9.37% 7% Reduce top defects in sewing operation Continuous work ontop defects Raw Edge 1094 875 What is the scope of the project? (e.g. department, Categories, geographies) In Scope Out of Scope Unit 1, line 1 (Sewing) Unit 1 other linesand Cutting, Finishing What are the project milestones? Specify whenyou willbe reporting back to your sponsor / steering group, andDefine, Measure,Analyse,Improve, Controlendstage reviews ifappropriate Description Planned Complete date Actual Complete Date Define (Current Assessment)—2 days 8 August 8 August Measured Quality level-- (current)—2 days 11 August 10 August Analyse (Current vs. Future –variance)— 2 days 13 August 13 August Improved (Action towards goals) --- 10 24 August 24 August Control— 2 days 26 August What are the project deliverables? Describe the expected outputs oftheproject,including whatcustomers / staffwould see new (e.g. Documents, presentation decks) Description Planned date Actual Date Use the current reports on Quality land Inspection study report. As per requirement enhance to capture the required data to track the project report 26 August 2016 24 August 2016 Resources Name, Position Effort/Method/Notes What is the approximate project value? Mr. Dimuth – QualityGM Shamsul- QualityManager Rony 7/0 TLS Effective Problemsolving culture Area Impacted: Quality Estimate Value: USD/Local currency Method/Notes: Prepared by: ME project Leader ME program Leader ME champion ME sponsor WMGS ME Jayed
  • 2. Improvement - Action Points 1 Identify Top 5 defect in Sewing & FinishingSection- Completed 2 Daily Top 5 Defect Identification and Documentation - Completed 3 Select the Line with Highest DHU% & Identify top 5 process- Completed 4 Root CauseAnalysis & Progress check- Completed 5 Train & Motivate operator for 100% Inspection before passing(Startwith top defect operators) - Completed 6 Train Line Controller on TLS & 7/0 (selected Line) - Completed 7 Hourly check & Update TLS & 7/0 report – Completed 8 Start Needle & Thread tension check (twice a Day) top defect process- Not Properly done 9 Feasibility & accuracy of all Quality Data- Completed 10 Monitor Clock-wiseCheck in Sewing & FinishingQ.I and Set Standard time- Completed for Sewing 11 Maintain LineDiscipline& Proper M/C Cleaningfor Quality issue- Not maintained 12 Replace Dull Needle and Knife from top 5 defected process- Completed 13 Remove All Sharp edge, Rusty and spotsource from sewing Table- Completed 14 Change or Improve Foldingsystemfor raw edge defect (top 5 process) - Completed 15 Instructoperator for proper margin and trimming process –Completed 16 Instruction operator proper Feeding and Handlingof garments- Completed 17 Empowerment of Operator to Immediately Send back defected garments to previous operator & followup- Not Completed 18 Proper Ironingsystem & pattern Check- Completed 19 Instruction for Check for Miss Match parts before sewing(operator) & Line-feeding (Line supervisor) & followUp- Complete