DATE : TRANSMITTAL No. :
04-ago-09 33 70 02.00 10 - 6
TO : U.S ARMY CORPS OF ENGINEERS FROM : CONTRACT No. CHECK ONE :
THIS IS A NEW TRANSMITTAL
THIS IS A RESUBMITTAL OF
TRANSMITTAL
SPECIFICATION SEC. No. 33 70 02.00 10 PROJECT TITLE AND LOCATION CHECK ONE : THIS TRANSMITTAL IS
(Cover only one section with each transmittal) FOR FIO GOV'T APPROVAL
ITEM MFG OR CONTR No. FOR VARIATION FOR
No. CAT CURVE OF CONTRACTOR (See CE
DRAWING OR COPIES SPEC. DRAWING USE CODE instruction USE
BROCHURE No. PARA No. SHEET No. No.6) CODE
(See instruction No. 8)
a. c d e f g h i
5 SD-03 3 3.12.3 N/A A
6 SD-03 3 3.12.6 N/A A
REMARKS.
Standards on page 1.
Operating Instructions: Digital Earth Tester on pages 5 to 8.
Operating Instructions: Digital Insulation Tester on pages 6 & 7.
Testing Equipment: Digital Earth Tester on pages 9 & 11.
Testing Equipment: Digital Insulation Tester on pages 12 & 14.
ENCLOSURES RETURNED (List by Item No.) NAME, TITLE AND SIGNATURE OF APPROVING AUTHORITY DATE
ENG FORM 4025-R, MAR 95 EDITION OF SEPT 93 IS OBSOLETE SHEET 1 OF 1
contract drawings and specifications except as other wise stated
ANDRES GALVIS
CQC MANAGER
CAICEDO INGENIERIA LTDA
SECTION II - APPROVAL ACTION
ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND
Ground - Resistance Tests
Low-Voltage Cable Test
I certify that the above submitted items have been reviewed
in detail and are correct and in strict conformance with the
AIRFIELD IMPROVEMENTS & D/B UPGRADE HANGAR, JUANCHACO, COLOMBIA
DESCRIPTION OF ITEM SUBMITTED CONTRACT REFERENCE
(Type, size, model, number, etc.) DOCUMENT
b.
TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES OR
MANUFACTURER'S CERTIFICATES OF COMPLIANCE
(Read instructions on the reverse side prior to initiating this form) ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND
SECTION I - REQUEST FOR APPROVAL OF THE FOLLOWING ITEM
Colombia Project Office
UNIT 5147 APO -
AA 340
CAICEDO INGENIERIA LTDA.
Calle 68No. 4A - 77 Bogotá, Colombia
W 91278-04-D-028
Tel 011 57 1 322 11 04
caidedoing@etb.net.co TASK ORDER No. 010
CAICEDO ING. LTDA
CONTRACT W91278-04-D-0028 TASK ORDER No. 0010
Transmittal No. 6
Specification SECTION 33 70 02.00 10 - Paragraphs: 3.12.3 & 3.12.6
PHASE I – ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND
CONTRACTOR:
Caicedo Ingenieria LTDA
CONTRACT W91278-04-D-0028 TASK ORDER
No. 0010 AIRFIELD IMPROVEMENTS & D/B
HANGAR UPGRADE
Calle 68 # 4A - 77, Bogotá Ph. (057) 1 3221104, Fax (057) 1 3221105
e-mail: caicedoing@yahoo.es, jcaicedoh@supercabletv.net.co
PAGE 1
Attached to this submittal is the testing data for:
Table 1. Earth and Insulation Testing.
ISSUE
SPECS&
DESIGN
REQUIERMENTS
PARRAGRAPH
SUPPLIERS
SUPPLIER
STANDARD
Ground-Resistance
Tests
 The combined resistance of
separate systems may be used to
meet the required resistance:
 Ground ring - 5 ohms.
3.12.3 Logistics
S&S Ltd.
Measurement made with the Digital
Earth Tester Model 4105A.
 Dust and drip proof.(Designed to
IEC60529 IP54).
 Designed to meet IEC61010-1,
IEC61557 safety standard.
Low-VoltageCableTest
Low-voltage cable, complete with
splices, shall be tested for
insulation resistance after the
cables are installed, in their final
configuration, ready for connection
to the equipment, and prior to
energization.
 The test voltage shall be 500
volts dc.
 The minimum value of insulation
shall be:
R in megohms =
(rated voltage in kV + 1) x
304.8/(length of cable in meters).
 R in megohms = 0.3418
For both lighting circuits 1 & 2.
3.12.6 Logistics
S&S Ltd.
Measurement made with the Digital
High Voltage Insulation Tester
Model 3125.
 IEC 61010-1 CAT.III 600V, pollution
Degree 2. Safety Standard.
IEC 61557.
 Wide range from 500V to 5000V and
up to 1000GΩ.
 Polarization Index measurement (PI).
 Timer Measurement functions.
R in megohms = 204MΩ Circuit 1.
PI = 2.41
R in megohms = 260MΩ Circuit 2.
PI = 1.51
ANDRES GALVIS
QCME
CAICEDO ING. LTDA
CONTRACT W91278-04-D-0028 TASK ORDER No. 0010
Transmittal No. 6
Specification SECTION 33 70 02.00 10 - Paragraphs: 3.12.3 & 3.12.6
PHASE I – ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND
CONTRACTOR:
Caicedo Ingenieria LTDA
CONTRACT W91278-04-D-0028 TASK ORDER
No. 0010 AIRFIELD IMPROVEMENTS & D/B
HANGAR UPGRADE
Calle 68 # 4A - 77, Bogotá Ph. (057) 1 3221104, Fax (057) 1 3221105
e-mail: caicedoing@yahoo.es, jcaicedoh@supercabletv.net.co
PAGE 2
KYORITSU - DIGITAL EARTH TESTER MODEL 4105A
OPERATING INSTRUCTIONS
1. Battery voltage check if a battery low symbol shows, do not proceed with testing.
2. Test Leads connection (Precise Measurement).
Stick the attached Auxiliary earth Spikes in line and connect the test leads as shown below.
3. Earth Voltage Measurement Set the range switch to Earth Voltage position and make sure
that the indicated value is 10V or less. If the earth voltage is higher, it may result in
excessive errors in earth resistance measurement.
4. Checking of Auxiliary Earth Spikes Connection (Check Function of Auxiliary Earth
Resistance). Set the range switch to 2000 Ω position and press the “PRESS TO TEST”
Button if the auxiliary earth resistance is too higher the symbol “ . . . “Blinks. Reduce
the resistance by rechecking the connection, changing the site to stick earth spikes, of
pouring water over the spikes.
5. Measurements (Precise Measurement) Set the range switch to the desire position and
press the “PRESS TO TEST” button.
6. Measurement (Simplified Measurement)
When auxiliary earth spikes cannot be stick, an approximate earth resistance can be
obtained by two wire system designed to make measurement using an existing earth
electrode. Make sure to use the specified simplified measurement probe.
CAICEDO ING. LTDA
CONTRACT W91278-04-D-0028 TASK ORDER No. 0010
Transmittal No. 6
Specification SECTION 33 70 02.00 10 - Paragraphs: 3.12.3 & 3.12.6
PHASE I – ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND
CONTRACTOR:
Caicedo Ingenieria LTDA
CONTRACT W91278-04-D-0028 TASK ORDER
No. 0010 AIRFIELD IMPROVEMENTS & D/B
HANGAR UPGRADE
Calle 68 # 4A - 77, Bogotá Ph. (057) 1 3221104, Fax (057) 1 3221105
e-mail: caicedoing@yahoo.es, jcaicedoh@supercabletv.net.co
PAGE 3
EARTH TESTING ON-SITE – JULY 1TH AND 31TH, 2009.
First Test located on electrical vault behind of Bravo´s Hangar and the last test, locate on Bravo’s
taxiway.
Figure 1. Grounding Electrode and Bonding system test, grounding wire connection.
Figure 2. Auxiliary earth Spikes connections.
CAICEDO ING. LTDA
CONTRACT W91278-04-D-0028 TASK ORDER No. 0010
Transmittal No. 6
Specification SECTION 33 70 02.00 10 - Paragraphs: 3.12.3 & 3.12.6
PHASE I – ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND
CONTRACTOR:
Caicedo Ingenieria LTDA
CONTRACT W91278-04-D-0028 TASK ORDER
No. 0010 AIRFIELD IMPROVEMENTS & D/B
HANGAR UPGRADE
Calle 68 # 4A - 77, Bogotá Ph. (057) 1 3221104, Fax (057) 1 3221105
e-mail: caicedoing@yahoo.es, jcaicedoh@supercabletv.net.co
PAGE 4
Figure 4. Grounding rod & wire on Handole. (The same for Manholes distribution).
Figure 5. Earth Voltage very good, 0.03V less than 10V limit.
CAICEDO ING. LTDA
CONTRACT W91278-04-D-0028 TASK ORDER No. 0010
Transmittal No. 6
Specification SECTION 33 70 02.00 10 - Paragraphs: 3.12.3 & 3.12.6
PHASE I – ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND
CONTRACTOR:
Caicedo Ingenieria LTDA
CONTRACT W91278-04-D-0028 TASK ORDER
No. 0010 AIRFIELD IMPROVEMENTS & D/B
HANGAR UPGRADE
Calle 68 # 4A - 77, Bogotá Ph. (057) 1 3221104, Fax (057) 1 3221105
e-mail: caicedoing@yahoo.es, jcaicedoh@supercabletv.net.co
PAGE 5
Figure 6. Earth testing at 2000Ω, very good rate 1Ω below than 5Ω limit.
(Same rate Measurement for all connections in electrical vault).
Figure 7. Earth testing at 2000Ω, good rate 4Ω below than 5Ω limit.
(Same rate Measurement for grounding rod and wire installed on airfield).
CAICEDO ING. LTDA
CONTRACT W91278-04-D-0028 TASK ORDER No. 0010
Transmittal No. 6
Specification SECTION 33 70 02.00 10 - Paragraphs: 3.12.3 & 3.12.6
PHASE I – ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND
CONTRACTOR:
Caicedo Ingenieria LTDA
CONTRACT W91278-04-D-0028 TASK ORDER
No. 0010 AIRFIELD IMPROVEMENTS & D/B
HANGAR UPGRADE
Calle 68 # 4A - 77, Bogotá Ph. (057) 1 3221104, Fax (057) 1 3221105
e-mail: caicedoing@yahoo.es, jcaicedoh@supercabletv.net.co
PAGE 6
KYORITSU - DIGITAL HIGH VOLTAGE INSULATION TESTER MODEL 3125
1. Battery voltage check if a battery low symbol shows, do not proceed with testing.
2. Test Leads connection (Precise Measurement).
Stick the attached cable conductor and ground earth wire in line and connect the test
leads as shown below.
3. Insulation Measurement Set the range switch to 5000V position and make sure that the
indicated value is 5000V or grater. If the voltage is lower, it may result in excessive errors
in isolation measurement.
4. Checking the conductor and ground connection is correctly the measurement in earth
shall be zero 0V. Set the range switch to 5000 V position and press the “PRESS TO TEST”
5. Measurements (Precise Measurement) Set the range switch to the desire position and
press the “PRESS TO TEST” button.
Figure 8. Insulation testing, circuit 1.
CAICEDO ING. LTDA
CONTRACT W91278-04-D-0028 TASK ORDER No. 0010
Transmittal No. 6
Specification SECTION 33 70 02.00 10 - Paragraphs: 3.12.3 & 3.12.6
PHASE I – ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND
CONTRACTOR:
Caicedo Ingenieria LTDA
CONTRACT W91278-04-D-0028 TASK ORDER
No. 0010 AIRFIELD IMPROVEMENTS & D/B
HANGAR UPGRADE
Calle 68 # 4A - 77, Bogotá Ph. (057) 1 3221104, Fax (057) 1 3221105
e-mail: caicedoing@yahoo.es, jcaicedoh@supercabletv.net.co
PAGE 7
Figure 9. Insulation testing, circuit 2.
CAICEDO ING. LTDA
CONTRACT W91278-04-D-0028 TASK ORDER No. 0010
Transmittal No. 6
Specification SECTION 33 70 02.00 10 - Paragraphs: 3.12.3 & 3.12.6
PHASE I – ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND
CONTRACTOR:
Caicedo Ingenieria LTDA
CONTRACT W91278-04-D-0028 TASK ORDER
No. 0010 AIRFIELD IMPROVEMENTS & D/B
HANGAR UPGRADE
Calle 68 # 4A - 77, Bogotá Ph. (057) 1 3221104, Fax (057) 1 3221105
e-mail: caicedoing@yahoo.es, jcaicedoh@supercabletv.net.co
PAGE 8
TESTING EQUIPMENT
SPECIFICATION SECTION
33 70 02.00 10
Paragraphs: 3.12.3 & 3.12.6
Ground-Resistance Tests
& Low-Voltage Cable Test
Products Catalogue
CAICEDO ING. LTDA
CONTRACT W91278-04-D-0028 TASK ORDER No. 0010
Transmittal No. 6
Specification SECTION 33 70 02.00 10 - Paragraphs: 3.12.3 & 3.12.6
PHASE I – ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND
CONTRACTOR:
Caicedo Ingenieria LTDA
CONTRACT W91278-04-D-0028 TASK ORDER
No. 0010 AIRFIELD IMPROVEMENTS & D/B
HANGAR UPGRADE
Calle 68 # 4A - 77, Bogotá Ph. (057) 1 3221104, Fax (057) 1 3221105
e-mail: caicedoing@yahoo.es, jcaicedoh@supercabletv.net.co
PAGE 9
DIGITAL EARTH TESTER MODEL 4105A Soft Case Model
• Dust and drip proof.(designed to IEC 529 IP54)
• In addition to the facility for precision measurement, test leads for simplified two wire
measuring system also supplied as standard accessories.
(unit can be hung from the neck for simplified measurement)
• Designed to meet IEC 61010-1 safety standard.
• Capable of measuring earth voltage.
• Automatic warning when resistance of auxiliary earth spikes is in excess of tolerance.
• Small and lightweight. Shock resistant new case material.
• 2mA measuring current permits earth resistance tests without tripping earth leakage current
breakers in the circuit under test.
Figure 10. Earth Tester Equipment.
Quality and reliability is our tradition.
NEW
NEW
KEW EARTH
●Dust and drip proof.(Designed to IEC60529 IP54)
●In addition to the facility for precision measurement, test leads for simplified two wire
 measuring system also supplied as standard accessories.(unit can be hung from
 the neck for simplified measurement)
●Designed to meet IEC61010-1, IEC61557 safety standard.
●Capable of measuring earth voltage.
●Automatic warning when resistance of auxiliary earth spikes is in excess of tolerance.
●Small and Iightweight. Shock resistant new case material and taut-band movement.
●2mA measuring current permits earth resistance tests without tripping earth leakage
 current breakers in the circuit under test.
KYORITSU ELECTRICALINSTRUMENTSWORKS,LTD.
ISO9001/EN29001/BS5750
APPROVEDBYBVQI
Earth Resistance Tester Series
are small, lightweight
and dust & drip-proof.
MODEL 4102A
Earth Tester
MODEL 4105A
Digital Earth Tester
MODEL 4102A
  Soft Case Model
MODEL 4102A-H
  Hard Case Model
MODEL 4105A
  Soft Case Model
MODEL 4105A-H
  Hard Case Model
MODEL 4102A-H
(Hard Case Model)
Digital tester selected:
STANDARDS
PAGE 10
MODEL7095 MODEL8032 MODEL7127
SafetyWarnings
Please read the“Safety Warnings”in the instruction manual supplied with the instrument
thoroughly and completely for correct use.
Failure to follow the safety rules can cause fire, trouble, electrical shock, etc.
Therefore, make sure to operate the instrument on a correct power supply and voltage rating
marked on each instrument.
02.02FPRINTEDINJAPAN
■DISTRIBUTOR
No.5-20Nakane2-chome,Meguro-ku,Tokyo,152-0031Japan
Phone:81-3-3723-0131Fax:81-3-3723-0152
URL:http://www.kew-ltd.co.jp
E-mail:info@ kew-ltd.co.jp
Factories:Uwajima&Ehime
KYORITSU ELECTRICALINSTRUMENTSWORKS,LTD.
※Thecontentsofthiscataloguemaybesubjecttochangewithoutnotice.
■INSTRUMENT LAYOUT
■ACCESSORIES
■SPECIFICATIONS
Measurement Ranges
Accuracy
Applicable Standards
Overload Protection
Safety Standard
Withstand Voltage
Power Source
Dimensions
Weight
Accessories
7095(Test Leads)×1set(red-20m,yellow-10m,green-5m)
8032(Auxiliary earth spikes)×1set
7127(Simplified measurement probe)×1set
R6P(AA)×6, Neck strap, Instruction Manual
3700V AC for 1 minute
IEC60529 IP54
Earth Resistance:0-12 Ω/0-120 Ω/0-1200 Ω
Earth Voltage(50,60Hz):0-30V AC
Earth Resistance:0-20 Ω/0-200 Ω/0-2000 Ω
Earth Voltage(50,60Hz):0-200V AC
Earth Resistance:±2%rdg±0.1Ω(20Ωrange)
±2%rdg±3dgt(200Ω/2000Ωrange)
Earth Voltage:±1%rdg±4dgt
Earth Resistance:±3% of full scale
Earth Voltage:±3% of full scale
Earth Resistance:276V AC for 10 seconds
across 2 of the 3 terminals
Earth Voltage:276V AC for 1 minute
Earth Resistance:280V AC for 10 seconds
across 2 of the 3 terminals
Earth Voltage:300V AC for 1 minute
105(L)×158(W)×70(D)mm
550g approx.600g approx.
R6P(AA)(1.5V)×6
Model 4102A/4102A-H Model 4105A/4105A-H
IEC61010-1 CAT. ㈽ 300V Pollution Degree 2,IEC61557
MODEL 4102A
Earth Tester
MODEL 4105A
Digital Earth Tester
㈰
㈭
㈮
㈫
㈫
㈰ Scale Board
㈪ OK Lamp
㈫ Press To Test Button
㈬ Range Selector Switch
㈭ LCD Display
㈮ Indication LED With
㈯ Test Leads
㉀ Auxiliary Earth Spikes
㈷ Simplified Measurement Probe
㉂ Safery Alligator Clip
㉃ Test Bar
㈯
㉀
㈷
㉂㉃㈪
㈬
㈬
Carrying Case
Soft Case(4012A,4105A)
Hard Case(4012A-H,4105A-H)
PAGE 11
CAICEDO ING. LTDA
CONTRACT W91278-04-D-0028 TASK ORDER No. 0010
Transmittal No. 6
Specification SECTION 33 70 02.00 10 - Paragraphs: 3.12.3 & 3.12.6
PHASE I – ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND
CONTRACTOR:
Caicedo Ingenieria LTDA
CONTRACT W91278-04-D-0028 TASK ORDER
No. 0010 AIRFIELD IMPROVEMENTS & D/B
HANGAR UPGRADE
Calle 68 # 4A - 77, Bogotá Ph. (057) 1 3221104, Fax (057) 1 3221105
e-mail: caicedoing@yahoo.es, jcaicedoh@supercabletv.net.co
PAGE 12
Digital High Voltage Insulation Tester Model 3125
• Wide range measurements from 500V to 5000V and up to 1000GΩ.
• Large digital display with Bar Graph indication and back light.
• Polarization Index measurement (PI).
• Timer measurement function.
• Indication of Output voltage and Discharge voltage.
• Auto-discharge function and Voltage output warning function.
• Auto power off and Battery Check.
• Safety standard IEC 61010-1 CAT.III 600V
Figure 11. Insulation Tester Equipment.
PAGE 13
●Optional Accessories
●Polarization Index
●Specifications
500V
0.0∼99.9MΩ
100∼999MΩ
±5%rdg±3dgt
1mA to1.2mA
@0.5MΩload
500VDC+30%
-0%
1000V
0.0∼99.9MΩ
100∼999MΩ
1.00∼1.99GΩ
±5%rdg±3dgt
1mA to1.2mA
@1MΩload
1000VDC+20%
-0%
2500V
0.0∼99.9MΩ
100∼999MΩ
1.00∼9.99GΩ
10.0∼99.9GΩ
±5%rdg±3dgt
1mA to1.2mA
@2.5MΩload
2500VDC+20%
-0%
999 Counts(1000 counts only at 1000GΩ)
About 1000mA(During measurement)
5320V AC for 5 seconds
IEC 61010-1 CAT.3 600V, pollution Degree 2
DC12V : R14×
8 pcs
205(L) × 152(W) × 94(D)mm
approx. 1.8kg
Polarization Index is one of the factors to check the condition of insulation.
The polarization Index is defined as the ratio between the resistance value in 10 minutes and the
resistance value in 1 minute after switch is on.
1.3mA approx.
5000V
0.0∼99.9MΩ
100∼999MΩ
1.00∼9.99GΩ
10.0∼99.9GΩ
100∼1000GΩ(1TΩ)
±5%rdg±3dgt 
±20%(100GΩor more)
1mA to1.2mA
@5MΩload
5000VDC+20%
-0%
AC/DC V
30∼600V
AC/DC
(50/60Hz)
±2%rdg±3dgt
630 Counts
25mA approx.
Polarization index 4 or more
Very good Good
1.5∼1.04.0∼1.5
Dubious
1.0 or less
UnsatisfactoryCriteria
●LINE PROBE WITH
ALLIGATOR CLIP : 3000mm
●ADAPTOR FOR RECORDER
(OUTPUT 1mV/1μA)
CONNECTOR SIDE : 200mm
ALLIGATOR CLIP SIDE : 1100mm
MODEL 7168 MODEL 8302
Insulation resistance Voltage measurement
Range
Measuring
range
Accuracy
Short Circuit Current
Rated test Current
Open circuit voltage
Maximum display
Current consumption
Withstand Voltage
Safety standard
Power supply
Dimensions
Weight
Accessories
MODEL 3125 Output characteristics
6000
5000
OutputVoltage(V)
Insulation Resistance(GΩ)
4000
3000
2000
1000
0
0.0001 0.001 0.01 0.1 1 10 100 1000
LINE PROBE 7165 ALKALINE BATTERY SIZE C(LR14×8PCS) EARTH CORD 7166 INSTRUCTION MANUAL
GUARD CORD 7164 HARD CASE : MODEL 9124 PICKEL TYPE PROD 8019
Calculation formula :
Polarization Index = resistance value in 10 minutes (TIME2) / resistance value in 1 minute (TIME1)
Setting interval is as follows.
TIME1 00:10∼59:30 TIME2 00:20∼60:00 (Remarks : 00:10 means 10 seconds)
Since polarization Index varies with moisture absorption regardless of the shape or size of insulator,
it gives significant criteria to verify the insulation. Following table shows the criteria.
For inquires or orders :
Safety Warnings :
Please read the "Safety Warnings" in the instruction manual supplied with the instrument thoroughly and
completely for correct use. Failure to follow the safety rules can cause fire, trouble, electrical shock, etc. Therefore,
make sure to operate the instrument on a correct power supply and voltage rating marked on each instrument.
The contents of this leaflet are subject to change without notice. 04.04ADIn consideration of the environment, soy ink and recycled paper were used in this publication.
PAGE 14
CAICEDO ING. LTDA
CONTRACT W91278-04-D-0028 TASK ORDER No. 0010
Transmittal No. 6
Specification SECTION 33 70 02.00 10 - Paragraphs: 3.12.3 & 3.12.6
PHASE I – ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND
CONTRACTOR:
Caicedo Ingenieria LTDA
CONTRACT W91278-04-D-0028 TASK ORDER
No. 0010 AIRFIELD IMPROVEMENTS & D/B
HANGAR UPGRADE
Calle 68 # 4A - 77, Bogotá Ph. (057) 1 3221104, Fax (057) 1 3221105
e-mail: caicedoing@yahoo.es, jcaicedoh@supercabletv.net.co
PAGE 15
TESTING RESULTS
& CERTIFICATION
SPECIFICATION SECTION
33 70 02.00 10
Paragraphs: 3.12.3 & 3.12.6
Ground-Resistance Tests
& Low-Voltage Cable Test
Products Catalogue

More Related Content

What's hot

Pid controllers
Pid controllersPid controllers
Pid controllersESD India
 
HNT4018MT2R2 (1120-S0000126-01Z)訊舟承認書
HNT4018MT2R2 (1120-S0000126-01Z)訊舟承認書HNT4018MT2R2 (1120-S0000126-01Z)訊舟承認書
HNT4018MT2R2 (1120-S0000126-01Z)訊舟承認書HTTECHCORPORATION
 
KOLECTRIC MC8020 MICROCOVERMETER
KOLECTRIC MC8020 MICROCOVERMETER KOLECTRIC MC8020 MICROCOVERMETER
KOLECTRIC MC8020 MICROCOVERMETER Asian Contec Ltd.
 
Ttl interface-7-inch-1024x600-all-view-angle-lcd-d
Ttl interface-7-inch-1024x600-all-view-angle-lcd-dTtl interface-7-inch-1024x600-all-view-angle-lcd-d
Ttl interface-7-inch-1024x600-all-view-angle-lcd-dkingtech display
 
Infra control systems price list and catalogue 2
Infra control systems price list and catalogue 2Infra control systems price list and catalogue 2
Infra control systems price list and catalogue 2Kalpeshkumar Vaghela
 
10.1 inch-1200x1920-mipi-interface-ips-lcd-module
10.1 inch-1200x1920-mipi-interface-ips-lcd-module10.1 inch-1200x1920-mipi-interface-ips-lcd-module
10.1 inch-1200x1920-mipi-interface-ips-lcd-modulekingtech display
 
K type Thermocouple Manufacturers in India - Canopus Instruments
K type Thermocouple Manufacturers in India - Canopus InstrumentsK type Thermocouple Manufacturers in India - Canopus Instruments
K type Thermocouple Manufacturers in India - Canopus Instrumentssmita_kale
 
Agar interface probe200_ds
Agar interface probe200_dsAgar interface probe200_ds
Agar interface probe200_dsCristianPaci80
 
ATC Bi-metal thermostats
ATC Bi-metal thermostatsATC Bi-metal thermostats
ATC Bi-metal thermostatsJordanIrwin2
 
Thermocouple Signal Converter - Canopus Instruments
Thermocouple Signal Converter - Canopus InstrumentsThermocouple Signal Converter - Canopus Instruments
Thermocouple Signal Converter - Canopus Instrumentssmita_kale
 

What's hot (14)

Pid controllers
Pid controllersPid controllers
Pid controllers
 
HNT4018MT2R2 (1120-S0000126-01Z)訊舟承認書
HNT4018MT2R2 (1120-S0000126-01Z)訊舟承認書HNT4018MT2R2 (1120-S0000126-01Z)訊舟承認書
HNT4018MT2R2 (1120-S0000126-01Z)訊舟承認書
 
KOLECTRIC MC8020 MICROCOVERMETER
KOLECTRIC MC8020 MICROCOVERMETER KOLECTRIC MC8020 MICROCOVERMETER
KOLECTRIC MC8020 MICROCOVERMETER
 
Ttl interface-7-inch-1024x600-all-view-angle-lcd-d
Ttl interface-7-inch-1024x600-all-view-angle-lcd-dTtl interface-7-inch-1024x600-all-view-angle-lcd-d
Ttl interface-7-inch-1024x600-all-view-angle-lcd-d
 
ATS-Catalogue-Latest
ATS-Catalogue-LatestATS-Catalogue-Latest
ATS-Catalogue-Latest
 
Catalogue-Oil Cooled-Resin Cast CTs-PTs-ATS
Catalogue-Oil Cooled-Resin Cast CTs-PTs-ATSCatalogue-Oil Cooled-Resin Cast CTs-PTs-ATS
Catalogue-Oil Cooled-Resin Cast CTs-PTs-ATS
 
Infra control systems price list and catalogue 2
Infra control systems price list and catalogue 2Infra control systems price list and catalogue 2
Infra control systems price list and catalogue 2
 
10.1 inch-1200x1920-mipi-interface-ips-lcd-module
10.1 inch-1200x1920-mipi-interface-ips-lcd-module10.1 inch-1200x1920-mipi-interface-ips-lcd-module
10.1 inch-1200x1920-mipi-interface-ips-lcd-module
 
indicadores de paso intrusivos
indicadores de paso intrusivosindicadores de paso intrusivos
indicadores de paso intrusivos
 
K type Thermocouple Manufacturers in India - Canopus Instruments
K type Thermocouple Manufacturers in India - Canopus InstrumentsK type Thermocouple Manufacturers in India - Canopus Instruments
K type Thermocouple Manufacturers in India - Canopus Instruments
 
Agar interface probe200_ds
Agar interface probe200_dsAgar interface probe200_ds
Agar interface probe200_ds
 
ATC Bi-metal thermostats
ATC Bi-metal thermostatsATC Bi-metal thermostats
ATC Bi-metal thermostats
 
WellVizor Well Monitoring - AEGEOSoilfield
WellVizor Well Monitoring  - AEGEOSoilfieldWellVizor Well Monitoring  - AEGEOSoilfield
WellVizor Well Monitoring - AEGEOSoilfield
 
Thermocouple Signal Converter - Canopus Instruments
Thermocouple Signal Converter - Canopus InstrumentsThermocouple Signal Converter - Canopus Instruments
Thermocouple Signal Converter - Canopus Instruments
 

Viewers also liked

Bonfire of the Vanity Metrics: Numbers You’re Still Using and Shouldn’t
Bonfire of the Vanity Metrics: Numbers You’re Still Using and Shouldn’tBonfire of the Vanity Metrics: Numbers You’re Still Using and Shouldn’t
Bonfire of the Vanity Metrics: Numbers You’re Still Using and Shouldn’tLean Startup Co.
 
ambiente de aprendizaje
ambiente de aprendizajeambiente de aprendizaje
ambiente de aprendizajeramces18
 
Earthing and Lightning Protection Accessories
Earthing and Lightning Protection AccessoriesEarthing and Lightning Protection Accessories
Earthing and Lightning Protection AccessoriesFlare Electricals LLP
 
631 earthing-systems-fundamentals-of-calculation
631 earthing-systems-fundamentals-of-calculation631 earthing-systems-fundamentals-of-calculation
631 earthing-systems-fundamentals-of-calculationursharji
 
Lean Content: Testing Marketing Copy (Instead of Spinning Your Wheels)
Lean Content: Testing Marketing Copy (Instead of Spinning Your Wheels)Lean Content: Testing Marketing Copy (Instead of Spinning Your Wheels)
Lean Content: Testing Marketing Copy (Instead of Spinning Your Wheels)Lean Startup Co.
 
Gault - Bibliotherapy Lesson 2
Gault - Bibliotherapy Lesson 2Gault - Bibliotherapy Lesson 2
Gault - Bibliotherapy Lesson 2Lisa Gault
 
Endocrine glands
Endocrine glandsEndocrine glands
Endocrine glandsMacVasquez
 
Earth Resistance Calculation
Earth Resistance CalculationEarth Resistance Calculation
Earth Resistance Calculationabdullah ali
 
Calculation of grounding resistance and earth
Calculation of grounding resistance and earthCalculation of grounding resistance and earth
Calculation of grounding resistance and earthiaemedu
 
Exposiciones
ExposicionesExposiciones
Exposicionesramces18
 
El saber filosófico
El saber filosóficoEl saber filosófico
El saber filosóficoAlicia Blanco
 
practical earth measure
practical earth measurepractical earth measure
practical earth measureRakesh Singh
 
Network Optimization
Network OptimizationNetwork Optimization
Network Optimizationsinghmk74
 

Viewers also liked (18)

Bonfire of the Vanity Metrics: Numbers You’re Still Using and Shouldn’t
Bonfire of the Vanity Metrics: Numbers You’re Still Using and Shouldn’tBonfire of the Vanity Metrics: Numbers You’re Still Using and Shouldn’t
Bonfire of the Vanity Metrics: Numbers You’re Still Using and Shouldn’t
 
ambiente de aprendizaje
ambiente de aprendizajeambiente de aprendizaje
ambiente de aprendizaje
 
Secuencia Didáctica
Secuencia Didáctica Secuencia Didáctica
Secuencia Didáctica
 
Earthing and Lightning Protection Accessories
Earthing and Lightning Protection AccessoriesEarthing and Lightning Protection Accessories
Earthing and Lightning Protection Accessories
 
Trabajo 3ºeso 1º trimestre
Trabajo 3ºeso 1º trimestreTrabajo 3ºeso 1º trimestre
Trabajo 3ºeso 1º trimestre
 
631 earthing-systems-fundamentals-of-calculation
631 earthing-systems-fundamentals-of-calculation631 earthing-systems-fundamentals-of-calculation
631 earthing-systems-fundamentals-of-calculation
 
Psicoanálisis
PsicoanálisisPsicoanálisis
Psicoanálisis
 
Lean Content: Testing Marketing Copy (Instead of Spinning Your Wheels)
Lean Content: Testing Marketing Copy (Instead of Spinning Your Wheels)Lean Content: Testing Marketing Copy (Instead of Spinning Your Wheels)
Lean Content: Testing Marketing Copy (Instead of Spinning Your Wheels)
 
Gault - Bibliotherapy Lesson 2
Gault - Bibliotherapy Lesson 2Gault - Bibliotherapy Lesson 2
Gault - Bibliotherapy Lesson 2
 
Endocrine glands
Endocrine glandsEndocrine glands
Endocrine glands
 
Earth Resistance Calculation
Earth Resistance CalculationEarth Resistance Calculation
Earth Resistance Calculation
 
Calculation of grounding resistance and earth
Calculation of grounding resistance and earthCalculation of grounding resistance and earth
Calculation of grounding resistance and earth
 
Exposiciones
ExposicionesExposiciones
Exposiciones
 
El saber filosófico
El saber filosóficoEl saber filosófico
El saber filosófico
 
Textiles Industry
Textiles IndustryTextiles Industry
Textiles Industry
 
practical earth measure
practical earth measurepractical earth measure
practical earth measure
 
Network Optimization
Network OptimizationNetwork Optimization
Network Optimization
 
Earth Resistance Testing
Earth Resistance TestingEarth Resistance Testing
Earth Resistance Testing
 

Similar to T6 - Lighting tests

Technical specifications for three phase meters
Technical specifications for three phase metersTechnical specifications for three phase meters
Technical specifications for three phase metersRashidulIslam50
 
8 inch TFT-LCD Datesheet, AUO, 800*1280, MIPI Interface
8 inch TFT-LCD Datesheet, AUO, 800*1280, MIPI Interface8 inch TFT-LCD Datesheet, AUO, 800*1280, MIPI Interface
8 inch TFT-LCD Datesheet, AUO, 800*1280, MIPI InterfacePanox Display
 
Original NPN Darlington Transistor MC1413DR2G 1413DR2G NCV1413BDG 1413BDG 141...
Original NPN Darlington Transistor MC1413DR2G 1413DR2G NCV1413BDG 1413BDG 141...Original NPN Darlington Transistor MC1413DR2G 1413DR2G NCV1413BDG 1413BDG 141...
Original NPN Darlington Transistor MC1413DR2G 1413DR2G NCV1413BDG 1413BDG 141...AUTHELECTRONIC
 
Original PNP Transistor A1020-Y A1020 1020 2SA1020 TO-92 New ON semiconductor
Original PNP Transistor A1020-Y A1020 1020 2SA1020 TO-92 New ON semiconductorOriginal PNP Transistor A1020-Y A1020 1020 2SA1020 TO-92 New ON semiconductor
Original PNP Transistor A1020-Y A1020 1020 2SA1020 TO-92 New ON semiconductorAUTHELECTRONIC
 
KZG7_SC02_220KV LINE CRP r0 210423.pdf
KZG7_SC02_220KV LINE CRP r0 210423.pdfKZG7_SC02_220KV LINE CRP r0 210423.pdf
KZG7_SC02_220KV LINE CRP r0 210423.pdfAmitKunduDVC
 
samsung_bn44-00523b_pd55b2qcdy.pdf
samsung_bn44-00523b_pd55b2qcdy.pdfsamsung_bn44-00523b_pd55b2qcdy.pdf
samsung_bn44-00523b_pd55b2qcdy.pdffreznell
 
HNT5040MT4R7 訊舟 20121002
HNT5040MT4R7 訊舟 20121002HNT5040MT4R7 訊舟 20121002
HNT5040MT4R7 訊舟 20121002HTTECHCORPORATION
 
04 ret670 test report
04 ret670 test report04 ret670 test report
04 ret670 test reportniranjan131
 
Bhel vis powerplant
Bhel vis powerplantBhel vis powerplant
Bhel vis powerplantmgr2222
 
Original High Current NPN Transistor BC639 639 TO-92 New ON Semiconductor
Original High Current NPN Transistor BC639 639 TO-92 New ON SemiconductorOriginal High Current NPN Transistor BC639 639 TO-92 New ON Semiconductor
Original High Current NPN Transistor BC639 639 TO-92 New ON SemiconductorAUTHELECTRONIC
 
Netzer ds 58-specsheet
Netzer ds 58-specsheetNetzer ds 58-specsheet
Netzer ds 58-specsheetElectromate
 
TRANSFORMER FAULT DETECTION AND MONITORING
TRANSFORMER FAULT DETECTION AND MONITORINGTRANSFORMER FAULT DETECTION AND MONITORING
TRANSFORMER FAULT DETECTION AND MONITORINGIRJET Journal
 
NEN-3140 SAMPLE REPORT
NEN-3140 SAMPLE REPORTNEN-3140 SAMPLE REPORT
NEN-3140 SAMPLE REPORTArkady Mitnik
 

Similar to T6 - Lighting tests (20)

Sar07030 series 2016
Sar07030 series 2016Sar07030 series 2016
Sar07030 series 2016
 
TDA18273HN_C1_518
TDA18273HN_C1_518TDA18273HN_C1_518
TDA18273HN_C1_518
 
Technical specifications for three phase meters
Technical specifications for three phase metersTechnical specifications for three phase meters
Technical specifications for three phase meters
 
8 inch TFT-LCD Datesheet, AUO, 800*1280, MIPI Interface
8 inch TFT-LCD Datesheet, AUO, 800*1280, MIPI Interface8 inch TFT-LCD Datesheet, AUO, 800*1280, MIPI Interface
8 inch TFT-LCD Datesheet, AUO, 800*1280, MIPI Interface
 
Original NPN Darlington Transistor MC1413DR2G 1413DR2G NCV1413BDG 1413BDG 141...
Original NPN Darlington Transistor MC1413DR2G 1413DR2G NCV1413BDG 1413BDG 141...Original NPN Darlington Transistor MC1413DR2G 1413DR2G NCV1413BDG 1413BDG 141...
Original NPN Darlington Transistor MC1413DR2G 1413DR2G NCV1413BDG 1413BDG 141...
 
Original PNP Transistor A1020-Y A1020 1020 2SA1020 TO-92 New ON semiconductor
Original PNP Transistor A1020-Y A1020 1020 2SA1020 TO-92 New ON semiconductorOriginal PNP Transistor A1020-Y A1020 1020 2SA1020 TO-92 New ON semiconductor
Original PNP Transistor A1020-Y A1020 1020 2SA1020 TO-92 New ON semiconductor
 
KZG7_SC02_220KV LINE CRP r0 210423.pdf
KZG7_SC02_220KV LINE CRP r0 210423.pdfKZG7_SC02_220KV LINE CRP r0 210423.pdf
KZG7_SC02_220KV LINE CRP r0 210423.pdf
 
samsung_bn44-00523b_pd55b2qcdy.pdf
samsung_bn44-00523b_pd55b2qcdy.pdfsamsung_bn44-00523b_pd55b2qcdy.pdf
samsung_bn44-00523b_pd55b2qcdy.pdf
 
BMS Automation wiring
BMS Automation wiringBMS Automation wiring
BMS Automation wiring
 
HNT5040MT4R7 訊舟 20121002
HNT5040MT4R7 訊舟 20121002HNT5040MT4R7 訊舟 20121002
HNT5040MT4R7 訊舟 20121002
 
04 ret670 test report
04 ret670 test report04 ret670 test report
04 ret670 test report
 
Bhel vis powerplant
Bhel vis powerplantBhel vis powerplant
Bhel vis powerplant
 
Head Mounted Temperature Transmitter
Head Mounted Temperature TransmitterHead Mounted Temperature Transmitter
Head Mounted Temperature Transmitter
 
Original High Current NPN Transistor BC639 639 TO-92 New ON Semiconductor
Original High Current NPN Transistor BC639 639 TO-92 New ON SemiconductorOriginal High Current NPN Transistor BC639 639 TO-92 New ON Semiconductor
Original High Current NPN Transistor BC639 639 TO-92 New ON Semiconductor
 
Netzer ds 58-specsheet
Netzer ds 58-specsheetNetzer ds 58-specsheet
Netzer ds 58-specsheet
 
TRANSFORMER FAULT DETECTION AND MONITORING
TRANSFORMER FAULT DETECTION AND MONITORINGTRANSFORMER FAULT DETECTION AND MONITORING
TRANSFORMER FAULT DETECTION AND MONITORING
 
DCS Infra Structure
DCS Infra StructureDCS Infra Structure
DCS Infra Structure
 
Sistem breaker pro abb
Sistem breaker pro abbSistem breaker pro abb
Sistem breaker pro abb
 
NEN-3140 SAMPLE REPORT
NEN-3140 SAMPLE REPORTNEN-3140 SAMPLE REPORT
NEN-3140 SAMPLE REPORT
 
EMC report.pdf
EMC report.pdfEMC report.pdf
EMC report.pdf
 

T6 - Lighting tests

  • 1. DATE : TRANSMITTAL No. : 04-ago-09 33 70 02.00 10 - 6 TO : U.S ARMY CORPS OF ENGINEERS FROM : CONTRACT No. CHECK ONE : THIS IS A NEW TRANSMITTAL THIS IS A RESUBMITTAL OF TRANSMITTAL SPECIFICATION SEC. No. 33 70 02.00 10 PROJECT TITLE AND LOCATION CHECK ONE : THIS TRANSMITTAL IS (Cover only one section with each transmittal) FOR FIO GOV'T APPROVAL ITEM MFG OR CONTR No. FOR VARIATION FOR No. CAT CURVE OF CONTRACTOR (See CE DRAWING OR COPIES SPEC. DRAWING USE CODE instruction USE BROCHURE No. PARA No. SHEET No. No.6) CODE (See instruction No. 8) a. c d e f g h i 5 SD-03 3 3.12.3 N/A A 6 SD-03 3 3.12.6 N/A A REMARKS. Standards on page 1. Operating Instructions: Digital Earth Tester on pages 5 to 8. Operating Instructions: Digital Insulation Tester on pages 6 & 7. Testing Equipment: Digital Earth Tester on pages 9 & 11. Testing Equipment: Digital Insulation Tester on pages 12 & 14. ENCLOSURES RETURNED (List by Item No.) NAME, TITLE AND SIGNATURE OF APPROVING AUTHORITY DATE ENG FORM 4025-R, MAR 95 EDITION OF SEPT 93 IS OBSOLETE SHEET 1 OF 1 contract drawings and specifications except as other wise stated ANDRES GALVIS CQC MANAGER CAICEDO INGENIERIA LTDA SECTION II - APPROVAL ACTION ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND Ground - Resistance Tests Low-Voltage Cable Test I certify that the above submitted items have been reviewed in detail and are correct and in strict conformance with the AIRFIELD IMPROVEMENTS & D/B UPGRADE HANGAR, JUANCHACO, COLOMBIA DESCRIPTION OF ITEM SUBMITTED CONTRACT REFERENCE (Type, size, model, number, etc.) DOCUMENT b. TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES OR MANUFACTURER'S CERTIFICATES OF COMPLIANCE (Read instructions on the reverse side prior to initiating this form) ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND SECTION I - REQUEST FOR APPROVAL OF THE FOLLOWING ITEM Colombia Project Office UNIT 5147 APO - AA 340 CAICEDO INGENIERIA LTDA. Calle 68No. 4A - 77 Bogotá, Colombia W 91278-04-D-028 Tel 011 57 1 322 11 04 caidedoing@etb.net.co TASK ORDER No. 010
  • 2. CAICEDO ING. LTDA CONTRACT W91278-04-D-0028 TASK ORDER No. 0010 Transmittal No. 6 Specification SECTION 33 70 02.00 10 - Paragraphs: 3.12.3 & 3.12.6 PHASE I – ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND CONTRACTOR: Caicedo Ingenieria LTDA CONTRACT W91278-04-D-0028 TASK ORDER No. 0010 AIRFIELD IMPROVEMENTS & D/B HANGAR UPGRADE Calle 68 # 4A - 77, Bogotá Ph. (057) 1 3221104, Fax (057) 1 3221105 e-mail: caicedoing@yahoo.es, jcaicedoh@supercabletv.net.co PAGE 1 Attached to this submittal is the testing data for: Table 1. Earth and Insulation Testing. ISSUE SPECS& DESIGN REQUIERMENTS PARRAGRAPH SUPPLIERS SUPPLIER STANDARD Ground-Resistance Tests  The combined resistance of separate systems may be used to meet the required resistance:  Ground ring - 5 ohms. 3.12.3 Logistics S&S Ltd. Measurement made with the Digital Earth Tester Model 4105A.  Dust and drip proof.(Designed to IEC60529 IP54).  Designed to meet IEC61010-1, IEC61557 safety standard. Low-VoltageCableTest Low-voltage cable, complete with splices, shall be tested for insulation resistance after the cables are installed, in their final configuration, ready for connection to the equipment, and prior to energization.  The test voltage shall be 500 volts dc.  The minimum value of insulation shall be: R in megohms = (rated voltage in kV + 1) x 304.8/(length of cable in meters).  R in megohms = 0.3418 For both lighting circuits 1 & 2. 3.12.6 Logistics S&S Ltd. Measurement made with the Digital High Voltage Insulation Tester Model 3125.  IEC 61010-1 CAT.III 600V, pollution Degree 2. Safety Standard. IEC 61557.  Wide range from 500V to 5000V and up to 1000GΩ.  Polarization Index measurement (PI).  Timer Measurement functions. R in megohms = 204MΩ Circuit 1. PI = 2.41 R in megohms = 260MΩ Circuit 2. PI = 1.51 ANDRES GALVIS QCME
  • 3. CAICEDO ING. LTDA CONTRACT W91278-04-D-0028 TASK ORDER No. 0010 Transmittal No. 6 Specification SECTION 33 70 02.00 10 - Paragraphs: 3.12.3 & 3.12.6 PHASE I – ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND CONTRACTOR: Caicedo Ingenieria LTDA CONTRACT W91278-04-D-0028 TASK ORDER No. 0010 AIRFIELD IMPROVEMENTS & D/B HANGAR UPGRADE Calle 68 # 4A - 77, Bogotá Ph. (057) 1 3221104, Fax (057) 1 3221105 e-mail: caicedoing@yahoo.es, jcaicedoh@supercabletv.net.co PAGE 2 KYORITSU - DIGITAL EARTH TESTER MODEL 4105A OPERATING INSTRUCTIONS 1. Battery voltage check if a battery low symbol shows, do not proceed with testing. 2. Test Leads connection (Precise Measurement). Stick the attached Auxiliary earth Spikes in line and connect the test leads as shown below. 3. Earth Voltage Measurement Set the range switch to Earth Voltage position and make sure that the indicated value is 10V or less. If the earth voltage is higher, it may result in excessive errors in earth resistance measurement. 4. Checking of Auxiliary Earth Spikes Connection (Check Function of Auxiliary Earth Resistance). Set the range switch to 2000 Ω position and press the “PRESS TO TEST” Button if the auxiliary earth resistance is too higher the symbol “ . . . “Blinks. Reduce the resistance by rechecking the connection, changing the site to stick earth spikes, of pouring water over the spikes. 5. Measurements (Precise Measurement) Set the range switch to the desire position and press the “PRESS TO TEST” button. 6. Measurement (Simplified Measurement) When auxiliary earth spikes cannot be stick, an approximate earth resistance can be obtained by two wire system designed to make measurement using an existing earth electrode. Make sure to use the specified simplified measurement probe.
  • 4. CAICEDO ING. LTDA CONTRACT W91278-04-D-0028 TASK ORDER No. 0010 Transmittal No. 6 Specification SECTION 33 70 02.00 10 - Paragraphs: 3.12.3 & 3.12.6 PHASE I – ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND CONTRACTOR: Caicedo Ingenieria LTDA CONTRACT W91278-04-D-0028 TASK ORDER No. 0010 AIRFIELD IMPROVEMENTS & D/B HANGAR UPGRADE Calle 68 # 4A - 77, Bogotá Ph. (057) 1 3221104, Fax (057) 1 3221105 e-mail: caicedoing@yahoo.es, jcaicedoh@supercabletv.net.co PAGE 3 EARTH TESTING ON-SITE – JULY 1TH AND 31TH, 2009. First Test located on electrical vault behind of Bravo´s Hangar and the last test, locate on Bravo’s taxiway. Figure 1. Grounding Electrode and Bonding system test, grounding wire connection. Figure 2. Auxiliary earth Spikes connections.
  • 5. CAICEDO ING. LTDA CONTRACT W91278-04-D-0028 TASK ORDER No. 0010 Transmittal No. 6 Specification SECTION 33 70 02.00 10 - Paragraphs: 3.12.3 & 3.12.6 PHASE I – ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND CONTRACTOR: Caicedo Ingenieria LTDA CONTRACT W91278-04-D-0028 TASK ORDER No. 0010 AIRFIELD IMPROVEMENTS & D/B HANGAR UPGRADE Calle 68 # 4A - 77, Bogotá Ph. (057) 1 3221104, Fax (057) 1 3221105 e-mail: caicedoing@yahoo.es, jcaicedoh@supercabletv.net.co PAGE 4 Figure 4. Grounding rod & wire on Handole. (The same for Manholes distribution). Figure 5. Earth Voltage very good, 0.03V less than 10V limit.
  • 6. CAICEDO ING. LTDA CONTRACT W91278-04-D-0028 TASK ORDER No. 0010 Transmittal No. 6 Specification SECTION 33 70 02.00 10 - Paragraphs: 3.12.3 & 3.12.6 PHASE I – ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND CONTRACTOR: Caicedo Ingenieria LTDA CONTRACT W91278-04-D-0028 TASK ORDER No. 0010 AIRFIELD IMPROVEMENTS & D/B HANGAR UPGRADE Calle 68 # 4A - 77, Bogotá Ph. (057) 1 3221104, Fax (057) 1 3221105 e-mail: caicedoing@yahoo.es, jcaicedoh@supercabletv.net.co PAGE 5 Figure 6. Earth testing at 2000Ω, very good rate 1Ω below than 5Ω limit. (Same rate Measurement for all connections in electrical vault). Figure 7. Earth testing at 2000Ω, good rate 4Ω below than 5Ω limit. (Same rate Measurement for grounding rod and wire installed on airfield).
  • 7. CAICEDO ING. LTDA CONTRACT W91278-04-D-0028 TASK ORDER No. 0010 Transmittal No. 6 Specification SECTION 33 70 02.00 10 - Paragraphs: 3.12.3 & 3.12.6 PHASE I – ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND CONTRACTOR: Caicedo Ingenieria LTDA CONTRACT W91278-04-D-0028 TASK ORDER No. 0010 AIRFIELD IMPROVEMENTS & D/B HANGAR UPGRADE Calle 68 # 4A - 77, Bogotá Ph. (057) 1 3221104, Fax (057) 1 3221105 e-mail: caicedoing@yahoo.es, jcaicedoh@supercabletv.net.co PAGE 6 KYORITSU - DIGITAL HIGH VOLTAGE INSULATION TESTER MODEL 3125 1. Battery voltage check if a battery low symbol shows, do not proceed with testing. 2. Test Leads connection (Precise Measurement). Stick the attached cable conductor and ground earth wire in line and connect the test leads as shown below. 3. Insulation Measurement Set the range switch to 5000V position and make sure that the indicated value is 5000V or grater. If the voltage is lower, it may result in excessive errors in isolation measurement. 4. Checking the conductor and ground connection is correctly the measurement in earth shall be zero 0V. Set the range switch to 5000 V position and press the “PRESS TO TEST” 5. Measurements (Precise Measurement) Set the range switch to the desire position and press the “PRESS TO TEST” button. Figure 8. Insulation testing, circuit 1.
  • 8. CAICEDO ING. LTDA CONTRACT W91278-04-D-0028 TASK ORDER No. 0010 Transmittal No. 6 Specification SECTION 33 70 02.00 10 - Paragraphs: 3.12.3 & 3.12.6 PHASE I – ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND CONTRACTOR: Caicedo Ingenieria LTDA CONTRACT W91278-04-D-0028 TASK ORDER No. 0010 AIRFIELD IMPROVEMENTS & D/B HANGAR UPGRADE Calle 68 # 4A - 77, Bogotá Ph. (057) 1 3221104, Fax (057) 1 3221105 e-mail: caicedoing@yahoo.es, jcaicedoh@supercabletv.net.co PAGE 7 Figure 9. Insulation testing, circuit 2.
  • 9. CAICEDO ING. LTDA CONTRACT W91278-04-D-0028 TASK ORDER No. 0010 Transmittal No. 6 Specification SECTION 33 70 02.00 10 - Paragraphs: 3.12.3 & 3.12.6 PHASE I – ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND CONTRACTOR: Caicedo Ingenieria LTDA CONTRACT W91278-04-D-0028 TASK ORDER No. 0010 AIRFIELD IMPROVEMENTS & D/B HANGAR UPGRADE Calle 68 # 4A - 77, Bogotá Ph. (057) 1 3221104, Fax (057) 1 3221105 e-mail: caicedoing@yahoo.es, jcaicedoh@supercabletv.net.co PAGE 8 TESTING EQUIPMENT SPECIFICATION SECTION 33 70 02.00 10 Paragraphs: 3.12.3 & 3.12.6 Ground-Resistance Tests & Low-Voltage Cable Test Products Catalogue
  • 10. CAICEDO ING. LTDA CONTRACT W91278-04-D-0028 TASK ORDER No. 0010 Transmittal No. 6 Specification SECTION 33 70 02.00 10 - Paragraphs: 3.12.3 & 3.12.6 PHASE I – ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND CONTRACTOR: Caicedo Ingenieria LTDA CONTRACT W91278-04-D-0028 TASK ORDER No. 0010 AIRFIELD IMPROVEMENTS & D/B HANGAR UPGRADE Calle 68 # 4A - 77, Bogotá Ph. (057) 1 3221104, Fax (057) 1 3221105 e-mail: caicedoing@yahoo.es, jcaicedoh@supercabletv.net.co PAGE 9 DIGITAL EARTH TESTER MODEL 4105A Soft Case Model • Dust and drip proof.(designed to IEC 529 IP54) • In addition to the facility for precision measurement, test leads for simplified two wire measuring system also supplied as standard accessories. (unit can be hung from the neck for simplified measurement) • Designed to meet IEC 61010-1 safety standard. • Capable of measuring earth voltage. • Automatic warning when resistance of auxiliary earth spikes is in excess of tolerance. • Small and lightweight. Shock resistant new case material. • 2mA measuring current permits earth resistance tests without tripping earth leakage current breakers in the circuit under test. Figure 10. Earth Tester Equipment.
  • 11. Quality and reliability is our tradition. NEW NEW KEW EARTH ●Dust and drip proof.(Designed to IEC60529 IP54) ●In addition to the facility for precision measurement, test leads for simplified two wire  measuring system also supplied as standard accessories.(unit can be hung from  the neck for simplified measurement) ●Designed to meet IEC61010-1, IEC61557 safety standard. ●Capable of measuring earth voltage. ●Automatic warning when resistance of auxiliary earth spikes is in excess of tolerance. ●Small and Iightweight. Shock resistant new case material and taut-band movement. ●2mA measuring current permits earth resistance tests without tripping earth leakage  current breakers in the circuit under test. KYORITSU ELECTRICALINSTRUMENTSWORKS,LTD. ISO9001/EN29001/BS5750 APPROVEDBYBVQI Earth Resistance Tester Series are small, lightweight and dust & drip-proof. MODEL 4102A Earth Tester MODEL 4105A Digital Earth Tester MODEL 4102A   Soft Case Model MODEL 4102A-H   Hard Case Model MODEL 4105A   Soft Case Model MODEL 4105A-H   Hard Case Model MODEL 4102A-H (Hard Case Model) Digital tester selected: STANDARDS PAGE 10
  • 12. MODEL7095 MODEL8032 MODEL7127 SafetyWarnings Please read the“Safety Warnings”in the instruction manual supplied with the instrument thoroughly and completely for correct use. Failure to follow the safety rules can cause fire, trouble, electrical shock, etc. Therefore, make sure to operate the instrument on a correct power supply and voltage rating marked on each instrument. 02.02FPRINTEDINJAPAN ■DISTRIBUTOR No.5-20Nakane2-chome,Meguro-ku,Tokyo,152-0031Japan Phone:81-3-3723-0131Fax:81-3-3723-0152 URL:http://www.kew-ltd.co.jp E-mail:info@ kew-ltd.co.jp Factories:Uwajima&Ehime KYORITSU ELECTRICALINSTRUMENTSWORKS,LTD. ※Thecontentsofthiscataloguemaybesubjecttochangewithoutnotice. ■INSTRUMENT LAYOUT ■ACCESSORIES ■SPECIFICATIONS Measurement Ranges Accuracy Applicable Standards Overload Protection Safety Standard Withstand Voltage Power Source Dimensions Weight Accessories 7095(Test Leads)×1set(red-20m,yellow-10m,green-5m) 8032(Auxiliary earth spikes)×1set 7127(Simplified measurement probe)×1set R6P(AA)×6, Neck strap, Instruction Manual 3700V AC for 1 minute IEC60529 IP54 Earth Resistance:0-12 Ω/0-120 Ω/0-1200 Ω Earth Voltage(50,60Hz):0-30V AC Earth Resistance:0-20 Ω/0-200 Ω/0-2000 Ω Earth Voltage(50,60Hz):0-200V AC Earth Resistance:±2%rdg±0.1Ω(20Ωrange) ±2%rdg±3dgt(200Ω/2000Ωrange) Earth Voltage:±1%rdg±4dgt Earth Resistance:±3% of full scale Earth Voltage:±3% of full scale Earth Resistance:276V AC for 10 seconds across 2 of the 3 terminals Earth Voltage:276V AC for 1 minute Earth Resistance:280V AC for 10 seconds across 2 of the 3 terminals Earth Voltage:300V AC for 1 minute 105(L)×158(W)×70(D)mm 550g approx.600g approx. R6P(AA)(1.5V)×6 Model 4102A/4102A-H Model 4105A/4105A-H IEC61010-1 CAT. ㈽ 300V Pollution Degree 2,IEC61557 MODEL 4102A Earth Tester MODEL 4105A Digital Earth Tester ㈰ ㈭ ㈮ ㈫ ㈫ ㈰ Scale Board ㈪ OK Lamp ㈫ Press To Test Button ㈬ Range Selector Switch ㈭ LCD Display ㈮ Indication LED With ㈯ Test Leads ㉀ Auxiliary Earth Spikes ㈷ Simplified Measurement Probe ㉂ Safery Alligator Clip ㉃ Test Bar ㈯ ㉀ ㈷ ㉂㉃㈪ ㈬ ㈬ Carrying Case Soft Case(4012A,4105A) Hard Case(4012A-H,4105A-H) PAGE 11
  • 13. CAICEDO ING. LTDA CONTRACT W91278-04-D-0028 TASK ORDER No. 0010 Transmittal No. 6 Specification SECTION 33 70 02.00 10 - Paragraphs: 3.12.3 & 3.12.6 PHASE I – ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND CONTRACTOR: Caicedo Ingenieria LTDA CONTRACT W91278-04-D-0028 TASK ORDER No. 0010 AIRFIELD IMPROVEMENTS & D/B HANGAR UPGRADE Calle 68 # 4A - 77, Bogotá Ph. (057) 1 3221104, Fax (057) 1 3221105 e-mail: caicedoing@yahoo.es, jcaicedoh@supercabletv.net.co PAGE 12 Digital High Voltage Insulation Tester Model 3125 • Wide range measurements from 500V to 5000V and up to 1000GΩ. • Large digital display with Bar Graph indication and back light. • Polarization Index measurement (PI). • Timer measurement function. • Indication of Output voltage and Discharge voltage. • Auto-discharge function and Voltage output warning function. • Auto power off and Battery Check. • Safety standard IEC 61010-1 CAT.III 600V Figure 11. Insulation Tester Equipment.
  • 15. ●Optional Accessories ●Polarization Index ●Specifications 500V 0.0∼99.9MΩ 100∼999MΩ ±5%rdg±3dgt 1mA to1.2mA @0.5MΩload 500VDC+30% -0% 1000V 0.0∼99.9MΩ 100∼999MΩ 1.00∼1.99GΩ ±5%rdg±3dgt 1mA to1.2mA @1MΩload 1000VDC+20% -0% 2500V 0.0∼99.9MΩ 100∼999MΩ 1.00∼9.99GΩ 10.0∼99.9GΩ ±5%rdg±3dgt 1mA to1.2mA @2.5MΩload 2500VDC+20% -0% 999 Counts(1000 counts only at 1000GΩ) About 1000mA(During measurement) 5320V AC for 5 seconds IEC 61010-1 CAT.3 600V, pollution Degree 2 DC12V : R14× 8 pcs 205(L) × 152(W) × 94(D)mm approx. 1.8kg Polarization Index is one of the factors to check the condition of insulation. The polarization Index is defined as the ratio between the resistance value in 10 minutes and the resistance value in 1 minute after switch is on. 1.3mA approx. 5000V 0.0∼99.9MΩ 100∼999MΩ 1.00∼9.99GΩ 10.0∼99.9GΩ 100∼1000GΩ(1TΩ) ±5%rdg±3dgt  ±20%(100GΩor more) 1mA to1.2mA @5MΩload 5000VDC+20% -0% AC/DC V 30∼600V AC/DC (50/60Hz) ±2%rdg±3dgt 630 Counts 25mA approx. Polarization index 4 or more Very good Good 1.5∼1.04.0∼1.5 Dubious 1.0 or less UnsatisfactoryCriteria ●LINE PROBE WITH ALLIGATOR CLIP : 3000mm ●ADAPTOR FOR RECORDER (OUTPUT 1mV/1μA) CONNECTOR SIDE : 200mm ALLIGATOR CLIP SIDE : 1100mm MODEL 7168 MODEL 8302 Insulation resistance Voltage measurement Range Measuring range Accuracy Short Circuit Current Rated test Current Open circuit voltage Maximum display Current consumption Withstand Voltage Safety standard Power supply Dimensions Weight Accessories MODEL 3125 Output characteristics 6000 5000 OutputVoltage(V) Insulation Resistance(GΩ) 4000 3000 2000 1000 0 0.0001 0.001 0.01 0.1 1 10 100 1000 LINE PROBE 7165 ALKALINE BATTERY SIZE C(LR14×8PCS) EARTH CORD 7166 INSTRUCTION MANUAL GUARD CORD 7164 HARD CASE : MODEL 9124 PICKEL TYPE PROD 8019 Calculation formula : Polarization Index = resistance value in 10 minutes (TIME2) / resistance value in 1 minute (TIME1) Setting interval is as follows. TIME1 00:10∼59:30 TIME2 00:20∼60:00 (Remarks : 00:10 means 10 seconds) Since polarization Index varies with moisture absorption regardless of the shape or size of insulator, it gives significant criteria to verify the insulation. Following table shows the criteria. For inquires or orders : Safety Warnings : Please read the "Safety Warnings" in the instruction manual supplied with the instrument thoroughly and completely for correct use. Failure to follow the safety rules can cause fire, trouble, electrical shock, etc. Therefore, make sure to operate the instrument on a correct power supply and voltage rating marked on each instrument. The contents of this leaflet are subject to change without notice. 04.04ADIn consideration of the environment, soy ink and recycled paper were used in this publication. PAGE 14
  • 16. CAICEDO ING. LTDA CONTRACT W91278-04-D-0028 TASK ORDER No. 0010 Transmittal No. 6 Specification SECTION 33 70 02.00 10 - Paragraphs: 3.12.3 & 3.12.6 PHASE I – ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND CONTRACTOR: Caicedo Ingenieria LTDA CONTRACT W91278-04-D-0028 TASK ORDER No. 0010 AIRFIELD IMPROVEMENTS & D/B HANGAR UPGRADE Calle 68 # 4A - 77, Bogotá Ph. (057) 1 3221104, Fax (057) 1 3221105 e-mail: caicedoing@yahoo.es, jcaicedoh@supercabletv.net.co PAGE 15 TESTING RESULTS & CERTIFICATION SPECIFICATION SECTION 33 70 02.00 10 Paragraphs: 3.12.3 & 3.12.6 Ground-Resistance Tests & Low-Voltage Cable Test Products Catalogue