P M P
PMBOK V6
1
2
Acceptance Criteria
•
Accepted Deliverables
•
Accuracy
•
Acquire Resources
•
Acquisition
•
Activity
•
3
Activity Attributes
•
Activity Duration
•
Activity Duration Estimates
•
Activity List
•
Activity-on-Node (AON)
•
PDM
4
Actual Cost (AC)
•
Duration
•
Adaptive Life Cycle
•
Affinity Diagrams
•
Agreements
•
5
Alternative Analysis
•
Analogous Estimating
•
Analytical Techniques
•
Assumption
•
Assumption Log
•
6
Attribute Sampling
•
Authority
•
Backward Pass
•
Bar Chart
•
Baseline
•
7
Basis of Estimates
•
Benchmarking
•
Benefits Management Plan
•
Bid documents
•
Bidder Conference
•
8
Bottom-Up Estimating
•
WBS)
Budget
•
Budget at Completion (BAC)
•
Buffer
•
Business Case
•
Business Value
•
9
Cause and Effect Diagram
•
Change
•
Change Control
•
Change Control Board (CCB)
•
Change Control System
•
10
Change Control Tools
•
Change Log
•
Change Management Plan
•
Change Request
•
Charter
•
Checklist Analysis
•
11
Check sheets
•
Claim
•
Claims Administration /
•
Close Project or Phase
•
Closing Process Group
•
Code of Accounts
•
12
Collect Requirements
•
Colocation
•
Communication Methods
•
Communication Models
•
Communication Requirements
Analysis
•
13
Communication Styles Assessment
•
Communication Technology
•
Conduct Procurements
•
Configuration Management Plan
•
Configuration Management System
•
Conformance
•
14
Constraint
•
Context Diagrams
•
Contingency
•
Contingency Reserve
•
Contingent Response Strategies
•
Contract
•
15
Contract Change Control System
•
Control
•
Control Account
•
Control Costs
•
Control Chart
•
16
Control Limits
•
Control Procurements
•
Control Schedule
•
Control Resources
•
Control Quality
•
17
Control Scope /
•
Corrective Action
•
Cost Aggregation
•
Cost Baseline
•
Cost-Benefit Analysis
•
18
Cost Management Plan
•
Cost of Quality (CoQ)
•
Cost Performance Index (CPI)
•
Cost Plus Fixed Fee Contract (CPFF)
•
Cost Plus Award Fee Contract (CPAF)
•
19
Cost Plus Incentive Fee Contract (CPIF)
•
Cost-Reimbursable Contract
•
Cost Variance (CV)
•
Crashing
•
Create WBS
•
20
Criteria
•
Critical Path
•
Critical Path Activity
•
Critical Path Method (CPM)
•
Data
•
Data Analysis Techniques
•
21
Data Date
•
Data Gathering Techniques
•
Data Representation Techniques
•
Decision-Making Techniques
•
Decision Tree Analysis
•
Decomposition
•
22
Deliverable
•
Dependency
•
Determine Budget
•
Develop Project Charter
•
Development Approach
•
Develop Project Management Plan
•
23
Develop Schedule
•
Develop Team
•
Diagramming Techniques
•
Direct and Manage Project Work
•
Discrete Effort
•
EVM
24
Discretionary Dependency
•
Documentation Reviews
•
Duration
•
Early Finish Date (EF)
•
Early Start Date (ES)
•
25
Earned Value (EV)
•
Earned Value Management
•
Effort
•
Emotional Intelligence
•
Enterprise Environmental Factors
•
Estimate
•
26
Estimate Activity Durations
•
Estimate Activity Resources
•
Estimate at Completion (EAC)
•
Estimate Costs
•
Estimate to Complete (ETC)
•
Execute
•
27
Executing Process Group
•
Expert Judgment
•
Explicit Knowledge
•
External Dependency
•
Fallback Plan
•
28
Fast Tracking
•
Fee
•
Finish Date
•
Finish-to-Finish (FF)
•
Finish-to-Start (FS)
•
Firm Fixed Price Contract (FFP)
•
29
Fishbone diagram
•
Fixed-Price Contract
•
Fixed Price Incentive Fee Contract (FPIF)
•
Fixed Price with Economic
Price Adjustment Contract (FPEPA)
•
Float
•
Flowchart
•
30
Focus Groups
•
Forecast
•
Forward Pass
•
Free Float
•
Functional Organization
•
31
Funding Limit Reconciliation
•
Gantt Chart
•
Grade
•
Ground Rules
•
Histogram
•
Historical Information
•
32
Identify Risks
•
Identify Stakeholders
•
Implement Risk Responses
•
Ground Rules
•
Histogram
•
Incremental Life Cycle
•
33
Independent Estimates
•
Influence Diagram
•
Information
•
Information Management Systems
•
Initiating Process Group
•
34
Input
•
Inspection
•
Interpersonal and Team Skills
•
Interpersonal Skills
•
Interviews
•
Invitation for Bid (IFB)
•
35
Issue
•
Issue Log
•
Iterative Life Cycle
•
Knowledge
•
Lag
•
36
Late Finish Date (LF)
•
Late Start Date (LS)
•
Lead
•
Lead
•
37
Lessons Learned Register
•
Lessons Learned Repository
•
Level of Effort (LOE)
•
Life Cycle
•
Log
•
Logical Relationship
•
38
Make-or-Buy Analysis
•
Make-or-Buy Decisions
•
Manage Communications
•
Management Reserve
•
Management Skills
•
39
Manage Project Knowledge
•
Manage Quality
•
Manage Stakeholder Engagement
•
Manage Team
•
Mandatory Dependency
•
Master Schedule
•
40
Matrix Diagrams
•
Matrix Organization
•
Methodology
•
Milestone
•
Milestone Schedule
•
41
Mind-Mapping
•
Monitor
•
Monitor and Control Project Work
•
Monitor Communications
•
Monitoring and Controlling Process Group
•
42
Monitor Risks
•
Monitor Stakeholder
Engagement
•
Monte Carlo Simulation
•
Multicriteria Decision Analysis
•
43
Network
•
Network Logic
•
Networking
•
Node
•
Nominal Group Technique
•
Objective
•
44
Opportunity
•
Organizational Breakdown Structure (OBS)
•
Organizational Learning
•
Organizational Process Assets
•
Output
•
Overall Project Risk
•
45
Parametric Estimating
•
Path Convergence
•
Path Divergence
•
Percent Complete
•
Performance Measurement Baseline (PMB)
•
Performance Reviews
•
Perform Integrated Change Control
•
46
Perform Qualitative Risk Analysis
•
Perform Quantitative Risk Analysis
•
Phase
•
Phase Gate
•
Plan Communications Management
•
Plan Cost Management
•
47
Planned Value (PV)
•
Planning Package
•
Plan Procurement Management
•
Plan Quality Management
•
Plan Resource Management
•
Plan Risk Management
•
48
Plan Risk Responses
•
Plan Schedule Management
•
Plan Scope Management
•
Plan Stakeholder Engagement
•
Plurality
•
49
Policy
•
Portfolio
•
Portfolio Management
•
Practice
•
Precedence Diagramming Method (PDM)
•
50
Precedence Relationship
•
Predecessor Activity
•
Predictive Life Cycle
•
Probability and Impact Matrix
•
Procedure
•
Process
•
51
Procurement Audits
•
Procurement Documents
•
Procurement Management Plan
•
Procurement Strategy
•
Procurement Documents
•
Procurement Statement of Work
•
52
Procurement Audits
•
Product
•
Product Analysis
•
Product Life Cycle
•
Product Scope
•
Product Scope Description
•
Product Life Cycle
•
53
Procurement Audits
•
Program Management
•
Progressive Elaboration
•
Project
•
Project Calendar
•
Project Charter
•
54
Procurement Audits
•
Project Communications Management
•
Project Cost Management
•
Project Funding Requirements
•
Project Governance
•
Project Initiation
•
55
Project Integration Management
•
Project Life Cycle
•
Project Management
•
Project Management Body of
Knowledge
•
Project Management Information System
•
56
Project Management Information System
•
Project Management
Knowledge Area
•
Project Management Office (PMO)
•
Project Management Plan
•
Project Management Process Grou
•
57
Project Management System
•
Project Management Team
•
Project Manager (PM)
•
Project Organization Chart
•
Project Phase
•
Project Procurement Management
•
58
Project Quality Management
•
Project Resource Management
•
Project Risk Management
•
Project Schedule
•
Project Schedule Management
•
Project Schedule Network Diagram
•
59
Project Scope
•
Project Scope Statement
•
Project Stakeholder Management
•
Project Team
•
Proposal Evaluation Techniques
•
Project Team Directory
•
60
Project Scope
•
Prototypes
•
Quality Audits
•
Quality Control Measurements
•
Quality Checklists
•
Quality
•
61
Quality Management Plan
•
Quality Management System
•
Quality Metrics
•
Quality Policy
•
Quality Report
•
62
Quality Requirement
•
Questionnaires
•
RACI Chart
•
RACI Chart
•
Regression Analysis
•
Regulations
•
63
Request for Information (RFI)
•
Request for Proposal (RFP
•
Request for Quotation (RFQ)
•
Requirement
•
Requirements Documentation
•
Requirements Management Plan
•
64
Requirements Traceability Matrix
•
Reserve
•
Reserve Analysis
•
Residual Risk
•
Resource
•
Resource Breakdown Structure
•
Resource Calendar
•
65
Resource Histogram
•
Resource Leveling
•
Resource Management Plan
•
Resource Manager
•
Resource Optimization Technique
•
Resource Requirements
•
66
Resource Smoothing
•
Responsibility
•
Responsibility Assignment Matrix (RAM)
•
Result
•
Risk
•
Rework
•
67
Risk Acceptance
•
Risk Appetite
•
Risk Audit
•
Risk Avoidance
•
Risk Breakdown Structure (RBS)
•
Risk Category
•
Risk Categorization
•
68
Risk Data Quality Assessmen
•
Risk Appetite
•
Risk Enhancement
•
Risk Escalation
•
Risk Exploiting
•
Risk Exposure
•
69
Risk Management Plan
•
Risk Mitigation
•
Risk Owner
•
Risk Escalation
•
Risk Register
•
Risk Report
•
70
Risk Review
•
Risk Sharing
•
Risk Threshold
•
Risk Transference
•
Role
•
Rolling Wave Planning
•
71
Root Cause Analysis
•
Schedule
•
Schedule Baseline
•
Schedule Compression
•
Schedule Data
•
Schedule Forecasts
•
Schedule Management Plan
•
72
Root Cause Analysis
•
Schedule Model
•
Schedule Network Analysis
•
Schedule Performance Index (SPI)
•
Schedule Variance (SV)
•
Scheduling Tool
•
73
Scope
•
Scope Baseline
•
Scope Creep
•
Scope Management Plan
•
Secondary Risk
•
Self-Organizing Teams
•
Seller
•
74
Seller Proposals
•
Sensitivity Analysis
•
Service Level Agreement (SLA
•
Simulation
•
Source Selection Criteria
•
Specification
•
75
Specification Limits
•
Sponsor
•
Sponsoring Organization
•
Stakeholder
•
Stakeholder Analysis
•
Stakeholder Engagement Assessment Matrix
•
76
Stakeholder Engagement Plan
•
Stakeholder Register
•
Standard
•
Start Date
•
Start-to-Finish (SF)
•
Start-to-Start (SS)
•
77
Statement of Work (SOW)
•
Statistical Sampling
•
Successor Activity
•
SWOT Analysis
•
Tacit Knowledge
•
Summary Activity
•
78
Tailoring
•
Team Charter
•
Team Management Plan
•
Technique
•
Templates
•
Test and Evaluation Documents
•
79
Threat
•
Three-Point Estimating
•
Threshold
•
Time and Material Contract (T&M)
•
To-Complete Performance Index (TCPI)
•
Tolerance
•
80
Tool
•
Tornado Diagram
•
Total Float
•
Trend Analysis
•
Trigger Condition
•
81
Unanimity
•
Update
•
Validate Scope
•
Variance
•
Variance Analysis
•
Validation
•
Variance At Completion (VAC)
•
82
Variation
•
Verification
•
•
Virtual Teams
•
Voice of the Customer
•
Verified Deliverables
•
WBS Dictionary
•
83
What-If Scenario Analysis
•
/
Work Breakdown Structure (WBS)
•
Work Package
•
Work Performance Data
•
Work Breakdown Structure Component
•
Work Performance Information
•
Work Performance Reports
•
www.linkedin.com/in/alsenosy
www.facebook.com/alsenosy
www.twitter.com/dralsenosy

More Related Content

Similar to أهم_التعريفات_والمصطلحات_في_إدارة_المشروعات.pdf

Bagian 5 PTI
Bagian 5 PTIBagian 5 PTI
Bagian 5 PTIHIMTI
 
Project Resource Management - PMBOK6
Project Resource Management - PMBOK6Project Resource Management - PMBOK6
Project Resource Management - PMBOK6Agus Suhanto
 
Project_Integration_Managemen.pptx
Project_Integration_Managemen.pptxProject_Integration_Managemen.pptx
Project_Integration_Managemen.pptxIvarsLinde1
 
Business Analysis - Proposed VHA CRM Enterprise Platform
Business Analysis - Proposed VHA CRM Enterprise PlatformBusiness Analysis - Proposed VHA CRM Enterprise Platform
Business Analysis - Proposed VHA CRM Enterprise PlatformSam Patrick, MSMIT
 
Project Quality Management - PMBOK6
Project Quality Management - PMBOK6Project Quality Management - PMBOK6
Project Quality Management - PMBOK6Agus Suhanto
 
Example Asset Management Framework
Example Asset Management FrameworkExample Asset Management Framework
Example Asset Management FrameworkShaun Nichol
 
Software Project Management Presentation Final
Software Project Management Presentation FinalSoftware Project Management Presentation Final
Software Project Management Presentation FinalMinhas Kamal
 
Eduvolks PMP Training - Course Outline
Eduvolks PMP Training - Course OutlineEduvolks PMP Training - Course Outline
Eduvolks PMP Training - Course OutlineBusiness Fuel LLP
 
Project Management Process Groups 101
Project Management Process Groups 101Project Management Process Groups 101
Project Management Process Groups 101Tipsographic . com
 
128233736-ASCP-Training-Day1.ppt
128233736-ASCP-Training-Day1.ppt128233736-ASCP-Training-Day1.ppt
128233736-ASCP-Training-Day1.pptsathishkumar776149
 
Vendor_Mgmt_101_IIMC_v2
Vendor_Mgmt_101_IIMC_v2Vendor_Mgmt_101_IIMC_v2
Vendor_Mgmt_101_IIMC_v2Steve Markey
 
Session 04 - Project Planning
Session 04 - Project PlanningSession 04 - Project Planning
Session 04 - Project PlanningRakeshSinhaPMP
 
PMP Module 4 - Cost
PMP Module 4 - CostPMP Module 4 - Cost
PMP Module 4 - CostCybrary
 
Project management using six sigma
Project management using six sigmaProject management using six sigma
Project management using six sigmaSuhartono Raharjo
 
NetCom Learning :The Ultimate Key to Project Managers Success - PMBOK Guide
NetCom Learning :The Ultimate Key to Project Managers Success - PMBOK GuideNetCom Learning :The Ultimate Key to Project Managers Success - PMBOK Guide
NetCom Learning :The Ultimate Key to Project Managers Success - PMBOK GuideSwati Chhabra
 
chapter06.pptx
chapter06.pptxchapter06.pptx
chapter06.pptxDataRobert
 
Deploying Resource Management with MS Project Online_Projility
Deploying Resource Management with MS Project Online_ProjilityDeploying Resource Management with MS Project Online_Projility
Deploying Resource Management with MS Project Online_ProjilityMicrosoft
 

Similar to أهم_التعريفات_والمصطلحات_في_إدارة_المشروعات.pdf (20)

Bagian 5 PTI
Bagian 5 PTIBagian 5 PTI
Bagian 5 PTI
 
Project Resource Management - PMBOK6
Project Resource Management - PMBOK6Project Resource Management - PMBOK6
Project Resource Management - PMBOK6
 
Complete Framework for CIMA E3
Complete Framework for CIMA E3Complete Framework for CIMA E3
Complete Framework for CIMA E3
 
PMBOK 4th Ed ITTO
PMBOK 4th Ed ITTOPMBOK 4th Ed ITTO
PMBOK 4th Ed ITTO
 
Project_Integration_Managemen.pptx
Project_Integration_Managemen.pptxProject_Integration_Managemen.pptx
Project_Integration_Managemen.pptx
 
Business Analysis - Proposed VHA CRM Enterprise Platform
Business Analysis - Proposed VHA CRM Enterprise PlatformBusiness Analysis - Proposed VHA CRM Enterprise Platform
Business Analysis - Proposed VHA CRM Enterprise Platform
 
Project Quality Management - PMBOK6
Project Quality Management - PMBOK6Project Quality Management - PMBOK6
Project Quality Management - PMBOK6
 
Example Asset Management Framework
Example Asset Management FrameworkExample Asset Management Framework
Example Asset Management Framework
 
Software Project Management Presentation Final
Software Project Management Presentation FinalSoftware Project Management Presentation Final
Software Project Management Presentation Final
 
Eduvolks PMP Training - Course Outline
Eduvolks PMP Training - Course OutlineEduvolks PMP Training - Course Outline
Eduvolks PMP Training - Course Outline
 
Project Management Process Groups 101
Project Management Process Groups 101Project Management Process Groups 101
Project Management Process Groups 101
 
128233736-ASCP-Training-Day1.ppt
128233736-ASCP-Training-Day1.ppt128233736-ASCP-Training-Day1.ppt
128233736-ASCP-Training-Day1.ppt
 
Vendor_Mgmt_101_IIMC_v2
Vendor_Mgmt_101_IIMC_v2Vendor_Mgmt_101_IIMC_v2
Vendor_Mgmt_101_IIMC_v2
 
Session 04 - Project Planning
Session 04 - Project PlanningSession 04 - Project Planning
Session 04 - Project Planning
 
PMP Module 4 - Cost
PMP Module 4 - CostPMP Module 4 - Cost
PMP Module 4 - Cost
 
Project management using six sigma
Project management using six sigmaProject management using six sigma
Project management using six sigma
 
NetCom Learning :The Ultimate Key to Project Managers Success - PMBOK Guide
NetCom Learning :The Ultimate Key to Project Managers Success - PMBOK GuideNetCom Learning :The Ultimate Key to Project Managers Success - PMBOK Guide
NetCom Learning :The Ultimate Key to Project Managers Success - PMBOK Guide
 
chapter06.pptx
chapter06.pptxchapter06.pptx
chapter06.pptx
 
9.6 Control Resources
9.6 Control Resources9.6 Control Resources
9.6 Control Resources
 
Deploying Resource Management with MS Project Online_Projility
Deploying Resource Management with MS Project Online_ProjilityDeploying Resource Management with MS Project Online_Projility
Deploying Resource Management with MS Project Online_Projility
 

Recently uploaded

Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 

Recently uploaded (20)

Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 

أهم_التعريفات_والمصطلحات_في_إدارة_المشروعات.pdf