Amardeep Singh
Inspection of Pre
and Post
Concreting works
2
OBJECTIVES
 To enable systematic process within reasonable
cost and time.
 To have standard Quality System .
 Measuring constructed works against Workmanship
standards, Drawings and Specifications.
 Acceptable Quality /Tolerances for Concrete
Works.
 Independent Structure report.
 Address Corrective action.
3
WHAT TO
CHECK ?
4
FORMWORK
Visual
 Free from Defects.
 No gaps at joints.
 Interiors free from debris.
 Adequate support, bracing and tie-back
Dimensions
 Cross-sectional dimensions as per drawing.
 Penetration / opening for services.
 Length of precast members (major dimension of unit).
Alignment
 Departure of any point from its position.
 Verticality.
 Mean level of staircase thread to temporary benchmark.
 Level for cast in-situ elements.
5
EMBEDDED ITEMS
Visual
 Surface Defects -cracks/ damaged threads
 Twist/ bend/warpage.
 Application of sleeves
Dimensions
 Numbers as per drawings.
 Sizes as per drawings.
 Inclination of Pockets for smooth extraction after pouring.
Alignment/Fixing
 C/C distances between Bolts/Pockets.
 Verticality .
 Stability of Fixing arrangement (welding in case of Bolts/IPs).
 Removability of Pockets
6
Dimension for elements / opening for services
FINISHED CONCRETE
 Cross-sectional dimension of cast in-situ and precast elements.
 Required opening for services.
 Precast members:
– Length
– Straightness or bow (deviation from intended line)
– Dimension
– Twist
– Flatness
7
FINISHED CONCRETE
Alignment, plumb and level
 Departure of any point from its position.
 Verticality
 Deviation from mean level.
 Camber at mid span
Exposed surface
 No visual exposure of coarse aggregates.
 Cold joint & formwork joint must be smooth.
 No bulging of structural elements.
 Free from formwork, nails, zinc strips, etc.
8
FOR PRECAST CONCRETE
Lifting points / inserts
 Free from Damages.
 Position / Placement
Sleeve System / Connections
 Free from concrete droppings or corrosion.
 Sleeves, grout holes, grout tubes not congested with debris.
 Position / Placement.
 Bar protrusion length according to requirements. Bars should be
free from bending, cracks or damages.
9
FOR PRECAST CONCRETE
Interface / Joint Requirements
 Alignment of horizontal and vertical joint.
 Joint taper alignment.
 Jog in alignment of matching edges
 Sitting of element as per specifications.
 Installation of sealant and waterproofing as per specifications.
Cast-in steel items / welded & bolted connections
 Position of embedded steel items / Pockets as per drawing.
 Position of openings for bolt connections.
 Other requirements as per drawing.
10
TOLERENCES
FOR
CHECKING
11
1
Tolerance for cross-sectional dimensions of cast in-situ & precast
elements: +12mm / -6mm
Tolerance for penetration / opening for services: +10mm for size
and ±25mm for location
Tolerance for length of precast members (major dimension of
unit):
· Up to 3m: ±6mm
· 3m to 4.5m: ±9mm
· Additional deviation for every subsequent 6m: ±12mm
1) Tolerance for departure of any point from its position: 10mm
2) Tolerance for plumb: 3mm / m, maximum 20mm
Maximum deviation of mean level of staircase thread to
temporary bench mark: ±5mm
For cast in-situ elements, the deviation of level of any point from
the intended level: ±10mm
1) Formwork must be free from defects
2) Before concreting, the interior must be free from debris
3) All formwork joints must not have gaps to prevent leakage
There must be adequate support, bracing and tie-back for the
formwork to prevent bulging or displacement of structural
elements
Alignment, plumb
and level
1b
Formwork (Cast in situ & Precast)
1c
Condition of
formwork,
1)
2)
3)
3)
4)
4)
Formwork
dimensions and
openings for
services
1a
12
13
14
15
2
1) According to structuraldrawings(numbers/sizes)
2) Spacing of Rebars- +15mm.
2b Anchorages& lap
lengths
1) Required lap length not lessthan that specified
2c Coverprovision 1) +10mm/-0mmfromspecified.
1) According to structuraldrawings(numbers/sizes)
2) Spacing of linksnot morethan specified
1) Rebarsmust besecurelyand properlytied in place
2) Rebarsmust befreed fromconcretedropping,corrosion etc
2e
Rebar
RebarCondition
2a
Main & Secondary
rebars
Links,stirrupsand
trimming bars
2d
16
17
18
19
20
21
22
23
3
1) Visual Defects - No cracks/ damaged threads/ rusting
2) Tolerance Bending of Bolts - 1mmper 500 mmlength
3) Protection measures for Bolt threads
4) Warpage of Insert Plates - 2mmper 500 mmin any direction
5) Welding of lug with insert plates - Full weld or as drg, without visual defects
1) Numbers- Strictly as per Drawing
2) Diameter of Bolts - +1mm-2mm
3) Length /breadth of Insert Plates - + 20 mm-5mm
4) Thickness of IP - + 1mm
5) Inclination of Pockets - Min 10% (10mmper 100 mmdepth)
1) Fixing of Insert plates/Bolts - Welded properly with reinforcement.
2)
Fixing of Pockets -Restricted for horizontal & downward movement but easily
removable restriction in up ward direction.
3) C/c Distance between Bolts:- + 2mm.
4) Verticality of Bolt: +3mm/meter
5) C/c Distance between Pockets/Insert Plates:- + 10mm.
6) Position of Bolts/Pocket/IP WRTFormwork : - + 5mm
7) Diagonal Distance between Bolts:- + 5mm.
Embedded Items
Visual3a
3c
Fixing / Alignment
Tolerances
Dimensional
tolerances
3b
24
1
1) Tolerance for cross-sectional dimension of cast in-situ and
precast elements: +10mm / -5mm
2) Tolerance for opening: +10 for size and ±25mm for location
3) Tolerance for length of precast members (major dimension of
unit):
· Up to 3m: ±6mm
· 3m to 4.5m: ±9mm
· Additional deviation for every subsequent 6m: ±12mm
4) Straightness or bow (deviation from intended line) of precast
member:
· Up to 3m: 6mm
· 3m to 6m: 9mm
· Additional for every subsequent 6m: 6mm
5) Squareness of precast member - Difference between the greatest
and shortest dimensions should not exceed the following:
Length of shorter sides
· Up to and including 1.2m: 6mm
· Over 1.2m but less than 1.8m: 9mm
· 1.8m and over: 12mm
6) Twist of precast member - Any corner should not be more than
the deviation stated from the plane containing the other 3 corners:
· Up to 600mm wide and 6m in length: 6mm
· Over 600mm wide and for any length: 12mm
7) Flatness: 6mm per 1.5m
1) Tolerance for departure of any point from its position: ±10mm
2) Tolerance for plumb: 3mm / 1m, maximum 20mm for floor to
floor height and 40mm for the entire building height
3) Maximum deviation of mean level: ±10mm
4) For cast in-situ elements, the maximum deviation of levels within
the element: 10mm
5) Camber at mid-span: according to specifications
1) Should not have visual exposure of groups of coarse aggregates
resulting from grout leakage
2) Cold joint & formwork joint must be smooth
3) No bulging of structural elements
4) All formwork, nails, zinc strips, etc must be removed
Exposed surface1c
Exposed Surface
Dimension for
elements / opening
for services
1a
1b
Alignment, plumb
and level
25
2
1) Bolts - Removal of all concrete laitances, greasing of threads
2) Insert - Removal of cement Slurry and complete exposure of plate.
3) Pocket - Removal of all pieces of Forms, no concrete debris
1) Bolts Wrapping of bolts with gunny bags / suitable means to protect its threads
2) Demarcation of bolts - Signal tap or isolation of fdn from movement areas.
3) Painting of Insert plates - Anticorrosive paint/ Red oxide application
2b
Protection of
embedded itesm
Cleanliness2a
Embedded Items
3
Center of Form Work in both direction
a) For padestals of Equipment Fdns, pipe racks &column 1st lifts etc - + 5mm
b) For footings - + 25 mm or 5% of length / width which ever is less.
2) RL of marking of Top of concrete - + 10mm WRT Drawings requirements.
1) Co-ordinates/Distance of center of bolts - + 2 mm.
2) Co-ordinates/Distance of center of Pockets/Insert plates - + 5 mm.
3) Top level of Bolts - + 10 mm, - 5 mm.
4) Top level for top Insert plates - + 2 mm, - 5 mm.
5) Level of top/center line for side Insert plates - + 5 mm.
Location of
Embedded Items
w.r.t. co-ordinate
lines / Bench Mark
levels
3b
Location (applicable only for Equipment Fdn, Pipe rack Fdn/pedastals/column 1st lifts.
1)
Location of Form
Work w.r.t. Co-
ordiante line / Bench
marks levels
3a
26
1) Tolerance for position: ±20mm from centre line location in
drawing
2) Lifting devices and inserts free from damages
1) Tolerance for position: ±6mm from centre line location in
drawings
2) Bar protrusion length according to requirements. No bending,
cranking or damages to bars
3) Bars free from concrete droppings or corrosion
4) Sleeves, grout holes, grout tubes not congested with debris
1) Joint taper:
· Over 3m length: 6mm
· Maximum for entire length: 9mm
2) Alignment of horizontal and vertical joint: ±6mm
3) Jog in alignment of matching edges: 6mm
4) Sitting of element: according to specifications
5) Installation of sealant and waterproofing: according to specifications
Precast Specific Requirements
4a
Lifting
points/inserts
4b
Sleeve system/
connections
Interface/joint
requirements
4c
27
28
29
30
31
TOLERANCE LIMITS OF LOCATION
4
Center of FormWork in both direction
a) For padestals of Equipment Fdns, pipe racks &column 1st lifts etc - + 5mm
b) For footings - + 25 mmor 5%of length / width which ever is less.
2) RL of marking of Top of concrete - + 10mmWRTDrawings requirements.
1) Co-ordinates/Distance of center of bolts - + 2 mm.
2) Co-ordinates/Distance of center of Pockets/Insert plates - + 5 mm.
3) Top level of Bolts - + 10 mm, - 2 mm.
4) Top level for top Insert plates - + 2 mm, - 5 mm.
5) Level of top/center line for side Insert plates - + 5 mm.
Location of
Embedded Items
w.r.t. co-ordinate
lines / Bench Mark
levels
4b
Location (applicable only for Equipment Fdn, Pipe rack Fdn/pedastals/column 1st lifts.
1)
Location of Form
Work w.r.t. Co-
ordiante line / Bench
marks levels
4a
32
33
34
35
36

More Related Content

What's hot

Cable Layout, Continuous Beam & Load Balancing Method
 Cable Layout, Continuous Beam & Load Balancing Method Cable Layout, Continuous Beam & Load Balancing Method
Cable Layout, Continuous Beam & Load Balancing Method
Md Tanvir Alam
 
Method aluminum door & window
Method aluminum door & windowMethod aluminum door & window
Method aluminum door & window
Minh Bui Si
 
Structure Reinforced Concrete
Structure Reinforced ConcreteStructure Reinforced Concrete
Structure Reinforced Concrete
Nik M Farid
 

What's hot (20)

Ch7 Box Girder Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metw...
Ch7 Box Girder Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metw...Ch7 Box Girder Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metw...
Ch7 Box Girder Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metw...
 
BALANCED CANTILEVER BRIDGE
BALANCED CANTILEVER BRIDGEBALANCED CANTILEVER BRIDGE
BALANCED CANTILEVER BRIDGE
 
Design of flat plate slab and its Punching Shear Reinf.
Design of flat plate slab and its Punching Shear Reinf.Design of flat plate slab and its Punching Shear Reinf.
Design of flat plate slab and its Punching Shear Reinf.
 
Cable Layout, Continuous Beam & Load Balancing Method
 Cable Layout, Continuous Beam & Load Balancing Method Cable Layout, Continuous Beam & Load Balancing Method
Cable Layout, Continuous Beam & Load Balancing Method
 
Method aluminum door & window
Method aluminum door & windowMethod aluminum door & window
Method aluminum door & window
 
Ductile detailing IS 13920
Ductile detailing IS 13920Ductile detailing IS 13920
Ductile detailing IS 13920
 
62617938 launching-girder
62617938 launching-girder62617938 launching-girder
62617938 launching-girder
 
Precast segmental construction of bridges
Precast segmental construction of bridgesPrecast segmental construction of bridges
Precast segmental construction of bridges
 
Connections in steel structures
Connections in steel structuresConnections in steel structures
Connections in steel structures
 
Structure Reinforced Concrete
Structure Reinforced ConcreteStructure Reinforced Concrete
Structure Reinforced Concrete
 
Rcs1-Chapter2-Standards
Rcs1-Chapter2-StandardsRcs1-Chapter2-Standards
Rcs1-Chapter2-Standards
 
Shoring system and Dewatering
Shoring system and DewateringShoring system and Dewatering
Shoring system and Dewatering
 
Mivan shuttering
Mivan shutteringMivan shuttering
Mivan shuttering
 
Top Down Construction Presentation.
Top Down Construction Presentation.Top Down Construction Presentation.
Top Down Construction Presentation.
 
Two way slab
Two way slabTwo way slab
Two way slab
 
Circular slabs
Circular slabsCircular slabs
Circular slabs
 
Concrete bridge-design-to-bs5400
Concrete bridge-design-to-bs5400Concrete bridge-design-to-bs5400
Concrete bridge-design-to-bs5400
 
Yield line theory
Yield line theoryYield line theory
Yield line theory
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...
 
Pull out test for concrete
Pull out test for concretePull out test for concrete
Pull out test for concrete
 

Similar to Pre and post concreting checks

98f5ce56 bca9-41ef-b8c9-095d7bf17a1c-151202050517-lva1-app6891
98f5ce56 bca9-41ef-b8c9-095d7bf17a1c-151202050517-lva1-app689198f5ce56 bca9-41ef-b8c9-095d7bf17a1c-151202050517-lva1-app6891
98f5ce56 bca9-41ef-b8c9-095d7bf17a1c-151202050517-lva1-app6891
AkashPatel747
 
Coupler (08102015)
Coupler (08102015)Coupler (08102015)
Coupler (08102015)
Khairul Amri
 
Bulb Flats Brochure
Bulb Flats BrochureBulb Flats Brochure
Bulb Flats Brochure
Mike Nielsen
 
Rereindetailing
RereindetailingRereindetailing
Rereindetailing
archi2012
 
Advantages of Eddy Current Array over Magnetic Particle and Penetrant Testing...
Advantages of Eddy Current Array over Magnetic Particle and Penetrant Testing...Advantages of Eddy Current Array over Magnetic Particle and Penetrant Testing...
Advantages of Eddy Current Array over Magnetic Particle and Penetrant Testing...
Olympus IMS
 

Similar to Pre and post concreting checks (20)

report of open web girder (railway)
report of open web girder (railway)report of open web girder (railway)
report of open web girder (railway)
 
Presentation on steel, fabrication & erection Munger Ganga Bridge
Presentation on steel, fabrication & erection  Munger Ganga BridgePresentation on steel, fabrication & erection  Munger Ganga Bridge
Presentation on steel, fabrication & erection Munger Ganga Bridge
 
98f5ce56 bca9-41ef-b8c9-095d7bf17a1c-151202050517-lva1-app6891
98f5ce56 bca9-41ef-b8c9-095d7bf17a1c-151202050517-lva1-app689198f5ce56 bca9-41ef-b8c9-095d7bf17a1c-151202050517-lva1-app6891
98f5ce56 bca9-41ef-b8c9-095d7bf17a1c-151202050517-lva1-app6891
 
Coupler (08102015)
Coupler (08102015)Coupler (08102015)
Coupler (08102015)
 
Transmission Line Towers and details
Transmission Line Towers and detailsTransmission Line Towers and details
Transmission Line Towers and details
 
Bulb Flats Brochure
Bulb Flats BrochureBulb Flats Brochure
Bulb Flats Brochure
 
21KUIKspec
21KUIKspec21KUIKspec
21KUIKspec
 
Brochure ENG (1)
Brochure ENG (1)Brochure ENG (1)
Brochure ENG (1)
 
Long Form Specification For Structural Glazed Tile
Long Form Specification For Structural Glazed TileLong Form Specification For Structural Glazed Tile
Long Form Specification For Structural Glazed Tile
 
Pipelines welding handbook_welding_techn
Pipelines welding handbook_welding_technPipelines welding handbook_welding_techn
Pipelines welding handbook_welding_techn
 
I Download (1)
I Download (1)I Download (1)
I Download (1)
 
I download
I downloadI download
I download
 
Reinforcement detailing
Reinforcement  detailingReinforcement  detailing
Reinforcement detailing
 
criteria of weld defects
criteria of weld defects criteria of weld defects
criteria of weld defects
 
DIAMATIC INDUSTRIES
DIAMATIC INDUSTRIES DIAMATIC INDUSTRIES
DIAMATIC INDUSTRIES
 
Rereindetailing
RereindetailingRereindetailing
Rereindetailing
 
B m p/ rotary endodontic courses by indian dental academy
B  m p/ rotary endodontic courses by indian dental academyB  m p/ rotary endodontic courses by indian dental academy
B m p/ rotary endodontic courses by indian dental academy
 
Specification for grinding and polishing of mold surface of injection mold -d...
Specification for grinding and polishing of mold surface of injection mold -d...Specification for grinding and polishing of mold surface of injection mold -d...
Specification for grinding and polishing of mold surface of injection mold -d...
 
Eddy Current Array Inspection of Carbon Steel Welds with Dynamic Lift-Off Com...
Eddy Current Array Inspection of Carbon Steel Welds with Dynamic Lift-Off Com...Eddy Current Array Inspection of Carbon Steel Welds with Dynamic Lift-Off Com...
Eddy Current Array Inspection of Carbon Steel Welds with Dynamic Lift-Off Com...
 
Advantages of Eddy Current Array over Magnetic Particle and Penetrant Testing...
Advantages of Eddy Current Array over Magnetic Particle and Penetrant Testing...Advantages of Eddy Current Array over Magnetic Particle and Penetrant Testing...
Advantages of Eddy Current Array over Magnetic Particle and Penetrant Testing...
 

More from Amardeep Singh (11)

Concrete m ix design m 15 with bottom ash
Concrete m ix design m 15 with bottom ashConcrete m ix design m 15 with bottom ash
Concrete m ix design m 15 with bottom ash
 
Bearings in Bridges
Bearings in BridgesBearings in Bridges
Bearings in Bridges
 
Sand chimney and sand blanket in Earthen Dam construction
Sand chimney and sand blanket in Earthen Dam constructionSand chimney and sand blanket in Earthen Dam construction
Sand chimney and sand blanket in Earthen Dam construction
 
Standard Penetration Test for soils
Standard Penetration Test for soilsStandard Penetration Test for soils
Standard Penetration Test for soils
 
Sand chimney in embankment of dam
Sand chimney in embankment of damSand chimney in embankment of dam
Sand chimney in embankment of dam
 
Roads design as per IRC 37
Roads design as per IRC 37Roads design as per IRC 37
Roads design as per IRC 37
 
Reinforcement welding in civil engineering
Reinforcement welding in civil engineeringReinforcement welding in civil engineering
Reinforcement welding in civil engineering
 
Triaxial shear test of soils
Triaxial shear test of soilsTriaxial shear test of soils
Triaxial shear test of soils
 
Bearing capacity of rocky strata
Bearing capacity of rocky strata Bearing capacity of rocky strata
Bearing capacity of rocky strata
 
Min max dosage of admixture
Min max dosage of admixtureMin max dosage of admixture
Min max dosage of admixture
 
Design mix method of bitumenous materials by Marshall stability method
Design mix method of bitumenous materials by Marshall stability methodDesign mix method of bitumenous materials by Marshall stability method
Design mix method of bitumenous materials by Marshall stability method
 

Recently uploaded

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
pritamlangde
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 

Recently uploaded (20)

Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 

Pre and post concreting checks

  • 1. 1 Amardeep Singh Inspection of Pre and Post Concreting works
  • 2. 2 OBJECTIVES  To enable systematic process within reasonable cost and time.  To have standard Quality System .  Measuring constructed works against Workmanship standards, Drawings and Specifications.  Acceptable Quality /Tolerances for Concrete Works.  Independent Structure report.  Address Corrective action.
  • 4. 4 FORMWORK Visual  Free from Defects.  No gaps at joints.  Interiors free from debris.  Adequate support, bracing and tie-back Dimensions  Cross-sectional dimensions as per drawing.  Penetration / opening for services.  Length of precast members (major dimension of unit). Alignment  Departure of any point from its position.  Verticality.  Mean level of staircase thread to temporary benchmark.  Level for cast in-situ elements.
  • 5. 5 EMBEDDED ITEMS Visual  Surface Defects -cracks/ damaged threads  Twist/ bend/warpage.  Application of sleeves Dimensions  Numbers as per drawings.  Sizes as per drawings.  Inclination of Pockets for smooth extraction after pouring. Alignment/Fixing  C/C distances between Bolts/Pockets.  Verticality .  Stability of Fixing arrangement (welding in case of Bolts/IPs).  Removability of Pockets
  • 6. 6 Dimension for elements / opening for services FINISHED CONCRETE  Cross-sectional dimension of cast in-situ and precast elements.  Required opening for services.  Precast members: – Length – Straightness or bow (deviation from intended line) – Dimension – Twist – Flatness
  • 7. 7 FINISHED CONCRETE Alignment, plumb and level  Departure of any point from its position.  Verticality  Deviation from mean level.  Camber at mid span Exposed surface  No visual exposure of coarse aggregates.  Cold joint & formwork joint must be smooth.  No bulging of structural elements.  Free from formwork, nails, zinc strips, etc.
  • 8. 8 FOR PRECAST CONCRETE Lifting points / inserts  Free from Damages.  Position / Placement Sleeve System / Connections  Free from concrete droppings or corrosion.  Sleeves, grout holes, grout tubes not congested with debris.  Position / Placement.  Bar protrusion length according to requirements. Bars should be free from bending, cracks or damages.
  • 9. 9 FOR PRECAST CONCRETE Interface / Joint Requirements  Alignment of horizontal and vertical joint.  Joint taper alignment.  Jog in alignment of matching edges  Sitting of element as per specifications.  Installation of sealant and waterproofing as per specifications. Cast-in steel items / welded & bolted connections  Position of embedded steel items / Pockets as per drawing.  Position of openings for bolt connections.  Other requirements as per drawing.
  • 11. 11 1 Tolerance for cross-sectional dimensions of cast in-situ & precast elements: +12mm / -6mm Tolerance for penetration / opening for services: +10mm for size and ±25mm for location Tolerance for length of precast members (major dimension of unit): · Up to 3m: ±6mm · 3m to 4.5m: ±9mm · Additional deviation for every subsequent 6m: ±12mm 1) Tolerance for departure of any point from its position: 10mm 2) Tolerance for plumb: 3mm / m, maximum 20mm Maximum deviation of mean level of staircase thread to temporary bench mark: ±5mm For cast in-situ elements, the deviation of level of any point from the intended level: ±10mm 1) Formwork must be free from defects 2) Before concreting, the interior must be free from debris 3) All formwork joints must not have gaps to prevent leakage There must be adequate support, bracing and tie-back for the formwork to prevent bulging or displacement of structural elements Alignment, plumb and level 1b Formwork (Cast in situ & Precast) 1c Condition of formwork, 1) 2) 3) 3) 4) 4) Formwork dimensions and openings for services 1a
  • 12. 12
  • 13. 13
  • 14. 14
  • 15. 15 2 1) According to structuraldrawings(numbers/sizes) 2) Spacing of Rebars- +15mm. 2b Anchorages& lap lengths 1) Required lap length not lessthan that specified 2c Coverprovision 1) +10mm/-0mmfromspecified. 1) According to structuraldrawings(numbers/sizes) 2) Spacing of linksnot morethan specified 1) Rebarsmust besecurelyand properlytied in place 2) Rebarsmust befreed fromconcretedropping,corrosion etc 2e Rebar RebarCondition 2a Main & Secondary rebars Links,stirrupsand trimming bars 2d
  • 16. 16
  • 17. 17
  • 18. 18
  • 19. 19
  • 20. 20
  • 21. 21
  • 22. 22
  • 23. 23 3 1) Visual Defects - No cracks/ damaged threads/ rusting 2) Tolerance Bending of Bolts - 1mmper 500 mmlength 3) Protection measures for Bolt threads 4) Warpage of Insert Plates - 2mmper 500 mmin any direction 5) Welding of lug with insert plates - Full weld or as drg, without visual defects 1) Numbers- Strictly as per Drawing 2) Diameter of Bolts - +1mm-2mm 3) Length /breadth of Insert Plates - + 20 mm-5mm 4) Thickness of IP - + 1mm 5) Inclination of Pockets - Min 10% (10mmper 100 mmdepth) 1) Fixing of Insert plates/Bolts - Welded properly with reinforcement. 2) Fixing of Pockets -Restricted for horizontal & downward movement but easily removable restriction in up ward direction. 3) C/c Distance between Bolts:- + 2mm. 4) Verticality of Bolt: +3mm/meter 5) C/c Distance between Pockets/Insert Plates:- + 10mm. 6) Position of Bolts/Pocket/IP WRTFormwork : - + 5mm 7) Diagonal Distance between Bolts:- + 5mm. Embedded Items Visual3a 3c Fixing / Alignment Tolerances Dimensional tolerances 3b
  • 24. 24 1 1) Tolerance for cross-sectional dimension of cast in-situ and precast elements: +10mm / -5mm 2) Tolerance for opening: +10 for size and ±25mm for location 3) Tolerance for length of precast members (major dimension of unit): · Up to 3m: ±6mm · 3m to 4.5m: ±9mm · Additional deviation for every subsequent 6m: ±12mm 4) Straightness or bow (deviation from intended line) of precast member: · Up to 3m: 6mm · 3m to 6m: 9mm · Additional for every subsequent 6m: 6mm 5) Squareness of precast member - Difference between the greatest and shortest dimensions should not exceed the following: Length of shorter sides · Up to and including 1.2m: 6mm · Over 1.2m but less than 1.8m: 9mm · 1.8m and over: 12mm 6) Twist of precast member - Any corner should not be more than the deviation stated from the plane containing the other 3 corners: · Up to 600mm wide and 6m in length: 6mm · Over 600mm wide and for any length: 12mm 7) Flatness: 6mm per 1.5m 1) Tolerance for departure of any point from its position: ±10mm 2) Tolerance for plumb: 3mm / 1m, maximum 20mm for floor to floor height and 40mm for the entire building height 3) Maximum deviation of mean level: ±10mm 4) For cast in-situ elements, the maximum deviation of levels within the element: 10mm 5) Camber at mid-span: according to specifications 1) Should not have visual exposure of groups of coarse aggregates resulting from grout leakage 2) Cold joint & formwork joint must be smooth 3) No bulging of structural elements 4) All formwork, nails, zinc strips, etc must be removed Exposed surface1c Exposed Surface Dimension for elements / opening for services 1a 1b Alignment, plumb and level
  • 25. 25 2 1) Bolts - Removal of all concrete laitances, greasing of threads 2) Insert - Removal of cement Slurry and complete exposure of plate. 3) Pocket - Removal of all pieces of Forms, no concrete debris 1) Bolts Wrapping of bolts with gunny bags / suitable means to protect its threads 2) Demarcation of bolts - Signal tap or isolation of fdn from movement areas. 3) Painting of Insert plates - Anticorrosive paint/ Red oxide application 2b Protection of embedded itesm Cleanliness2a Embedded Items 3 Center of Form Work in both direction a) For padestals of Equipment Fdns, pipe racks &column 1st lifts etc - + 5mm b) For footings - + 25 mm or 5% of length / width which ever is less. 2) RL of marking of Top of concrete - + 10mm WRT Drawings requirements. 1) Co-ordinates/Distance of center of bolts - + 2 mm. 2) Co-ordinates/Distance of center of Pockets/Insert plates - + 5 mm. 3) Top level of Bolts - + 10 mm, - 5 mm. 4) Top level for top Insert plates - + 2 mm, - 5 mm. 5) Level of top/center line for side Insert plates - + 5 mm. Location of Embedded Items w.r.t. co-ordinate lines / Bench Mark levels 3b Location (applicable only for Equipment Fdn, Pipe rack Fdn/pedastals/column 1st lifts. 1) Location of Form Work w.r.t. Co- ordiante line / Bench marks levels 3a
  • 26. 26 1) Tolerance for position: ±20mm from centre line location in drawing 2) Lifting devices and inserts free from damages 1) Tolerance for position: ±6mm from centre line location in drawings 2) Bar protrusion length according to requirements. No bending, cranking or damages to bars 3) Bars free from concrete droppings or corrosion 4) Sleeves, grout holes, grout tubes not congested with debris 1) Joint taper: · Over 3m length: 6mm · Maximum for entire length: 9mm 2) Alignment of horizontal and vertical joint: ±6mm 3) Jog in alignment of matching edges: 6mm 4) Sitting of element: according to specifications 5) Installation of sealant and waterproofing: according to specifications Precast Specific Requirements 4a Lifting points/inserts 4b Sleeve system/ connections Interface/joint requirements 4c
  • 27. 27
  • 28. 28
  • 29. 29
  • 30. 30
  • 31. 31 TOLERANCE LIMITS OF LOCATION 4 Center of FormWork in both direction a) For padestals of Equipment Fdns, pipe racks &column 1st lifts etc - + 5mm b) For footings - + 25 mmor 5%of length / width which ever is less. 2) RL of marking of Top of concrete - + 10mmWRTDrawings requirements. 1) Co-ordinates/Distance of center of bolts - + 2 mm. 2) Co-ordinates/Distance of center of Pockets/Insert plates - + 5 mm. 3) Top level of Bolts - + 10 mm, - 2 mm. 4) Top level for top Insert plates - + 2 mm, - 5 mm. 5) Level of top/center line for side Insert plates - + 5 mm. Location of Embedded Items w.r.t. co-ordinate lines / Bench Mark levels 4b Location (applicable only for Equipment Fdn, Pipe rack Fdn/pedastals/column 1st lifts. 1) Location of Form Work w.r.t. Co- ordiante line / Bench marks levels 4a
  • 32. 32
  • 33. 33
  • 34. 34
  • 35. 35
  • 36. 36