Introduction to Project Management
Chapter 1
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
‹#›
The Element of Discipline
“A key to success in project management, as well as in
mountain climbing, is to identify the pillars that will be
practiced with discipline...I believe that project management is
about applying common sense with uncommon discipline.”
Michael O’Brochta, PMP
founder of Zozer Inc.
previously senior project manager at the Central Intelligence
Agency
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Deaths climbing Mt. Aconcagua are an extreme example of
consequences associated with a lack of discipline
Discipline to act on the earlier decision to curtain summit
attempts after the agreed-to-turn-around time or in severe
weather
Avoid pressure to cast aside or shortcut project management
practices
Practices, like planning, are the pillars of project management
discipline
Managing projects at the CIA involved short notice to acquire
unspent funds
Discipline required needed planning and quick action
The top 2 percent of project managers spend twice as much ti me
planning as the other 98 percent
Identify those pillars that we will decide to practice with the
required levels of discipline
3
Chapter 1 Core Objectives
Define a project and project management and tell why
organizations would use them
Describe major activities and deliverables, at each project life
cycle stage
List the 10 knowledge areas and 5 process groups of the Project
Management Body of Knowledge (PMBOK)
Describe project success and failure, as well as reasons both
may occur
Contrast predictive and adaptive project life cycles
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
4
Chapter 1 Behavioral Objectives:
Identify project roles and key responsibilities for project team
members
Describe the importance of collaborative effort throughout a
project
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
What is a project?
Projects require:
an organized set of work efforts.
progressively elaborated detail.
a defined beginning and ending.
a unique combination of stakeholders.
Projects are subject to time and resource limitations
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
project – “a temporary endeavor undertaken to
create a unique product, service, or result.” PMBOK® Guide
stakeholders – “an individual, or organization who may affect,
be affected by, or perceive itself to be affected by a decision,
activity, or outcome of a project.” PMBOK® Guide
A project requires an organized set of work efforts.
Projects require a level of detail that is progressively elaborated
upon as more information is discovered.
Projects are subject to limitations of time and resources such as
money and people.
Projects have a defined beginning and ending.
A project has a unique combination of stakeholders
6
Project Management (PM)
Work processes
Tradeoffs among
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Project management – “the application of knowledge, skills,
tools and techniques to project activities to meet project
requirements.” PMBOK® Guide
initiate, plan, execute, monitor/control, close
Scope Schedule
Quality Resources
Cost Risks
PM includes work processes that initiate, plan, execute, and
close work
Work processes require tradeoffs among the scope, quality,
cost, and schedule of the project
PM includes administrative tasks for planning, documenting,
and controlling work
PM includes leadership tasks for visioning, motivating, and
promoting work associates.
PM knowledge, skills, and methods apply for most projects
7
Project Management (PM)
Administrative tasks
Leadership tasks for work associates
Knowledge, skills, and methods apply for most projects
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Planning, documenting controlling
Visioning, motivating, promoting
PM includes administrative tasks for planning, documenting,
and controlling work
PM includes leadership tasks for visioning, motivating, and
promoting work associates.
PM knowledge, skills, and methods apply for most projects
8
History of PM
Emerged as a formal discipline in the 1950s
Developed for aerospace and construction
Involved determining and controlling project schedules
In 2001, Agile was created for adaptive project planning,
originally for software projects
In recent years, more focus has been given to the “soft skills” of
communications, leadership, and teamwork
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
PM emerged as a formal discipline in the 1950s
Techniques for planning and controlling schedules and costs
were developed for huge aerospace and construction projects in
the 1950s and 1960s
Early PM involved determining project schedules based on
order of project activities
Manufacturing, research and development, government, and
construction projects used and refined management techniques
Software companies offered software for planning and
controlling project costs and schedules in the 1980s and 1990s
Risk management techniques for complex projects have been
applied to less complex projects
Communication and leadership playa major role in project
success
Rapid growth and change in information technology and
telecommunications fueled use of PM in the 1990s and 2000s
9
How Can Project Work Be Described?
Projects versus operations
Soft skills and hard skills
Authority and responsibility
Project Life Cycle
Agile (adaptive) vs. Waterfall (predictive) approach
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Projects are temporary and unique; operations are more
continuous.
Project managers need “soft skills” and “hard skills” to be
effective.
Project managers frequently have more responsibility than
authority.
Projects go through predictable stages called a life cycle.
10
Projects Versus Operations
Projects are temporary
Projects have routine and unique characteristics
Operations are ongoing work
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Operations consist of the ongoing work needed to ensure that an
organization continues to function effectively
11
Soft Skills and Hard Skills
Soft skills activities
Communication
Leadership
Conflict resolution
Hard skills activities
Risk analysis
Quality control
Scheduling work
Budgeting work
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
A successful project manager needs both soft and hard skills
along with the judgment of when each is more necessary.
Training, experience, and mentoring are instrumental in
developing necessary skills.
12
Authority and Responsibility
One person being assigned accountability
Project managers negotiate with functional managers
Strong communication and leadership skills to persuade
subordinates
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Functional manager – “someone with management authority
over an organizational unit.…the manager of any group that
actually makes a product or performs a service.” PMBOK®
Guide
Projects are most effectively managed with one person being
assigned accountability
Project managers negotiate with functional managers
A project manager needs to develop strong communication and
leadership skills to persuade subordinates to focus on the
project when other work beckons.
13
Project Life Cycle (PLC)
Project life cycles vary among different disciplines but
generally are comprised of the same general stages
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Project life cycle – “the series of phases that a project goes
through from its initiation to its closure.” PMBOK® Guide
Life cycle allows for control to assure that the project is
proceeding in a satisfactory manner and that the results are
likely to serve its customer’s intended purpose
14
Project Life Cycle Stages
Selecting and initiating
Planning
Executing (includes monitoring/controlling)
Closing and realizing
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Selecting and initiating— a project is selected from an emerging
idea, planned at a high level, and key participants commit to it
in broad terms
Planning—starts after the initial commitment, includes detailed
planning, and ends when all stakeholders accept the entire
detailed plan.
Executing—includes authorizing, executing, monitoring, and
controlling work until the customer accepts the project
deliverables.
Closing and realizing—all activities after customer acceptance
to ensure project is completed, lessons are learned, resources
are reassigned, contributions are recognized, and benefits are
realized.
15
Project Life Cycle (PLC)
A project must gain approval to move from one stage to the next
Projects are measured at additional points
Selection
Progress reporting
Benefits realization
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Predictive (Plan-Driven) PLC
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Product is well-understood
All planning precedes all executing
17
Adaptive (Change-Driven) PLC
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Early results lead into planning later work
18
Midland Insurance PLC for Quality Improvement Projects
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Understanding Projects
Project Management Institute (PMI)
Project Management Body of Knowledge (PMBOK)
PMI Talent Triangle
Selecting and Prioritizing Projects
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Understanding Projects
Project Goals and Constraints
Defining Project Success and Failure
Using MS Project
Types of Projects
Scalability of Project Tools
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
The Project Management Institute (PMI)
The largest professional organization
Produces A Guide to the Project Management Body of
Knowledge (PMBOK® Guide)
Talent Triangle—Technical PM, Leadership, & Strategic and
Business Management
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Over 650,000 members and credential holders in 185 countries
Publishes and regularly updates A Guide to the Project
Management Body of Knowledge (PMBOK® Guide)
22
The Project Management Institute (PMI)
Project Management Professional (PMP®) certification
Certified Associate in Project Management (CAPM)
certification
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
© 2015 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Project Management Body of Knowledge (PMBOK®)
Project Life Cycle
5 process groups
10 knowledge areas
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Project management process group – “a logical grouping of the
project management inputs, tools and techniques, and outputs.”
PMBOK® Guide
PMBOK® Process Groups
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Initiating— “define a project or a new phase by obtaining
authorization”
Planning— “establish the project scope, refine objectives and
define actions to attain objectives”
Executing— “complete the work defined to satisfy project
specifications”
Monitoring and controlling— “track, review, and regulate
progress and performance, identify changes required, and
initiate changes”
Closing— “finalize all activities to formally close project of
phase”
PMBOK®’s 10 Knowledge Areas
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Integration management - “processes and activities to identify,
define, combine, unify, and coordinate the various processes
and project management activities”
Scope management - “processes to ensure that the project
includes all the work required, and only the work required, to
complete the project successfully”
Schedule management - “processes to manage timely completion
of the project”
PMBOK® Knowledge Areas
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Cost management – “processes involved in planning, estimating,
budgeting, financing, funding, managing, and controlling
costs so that the project can be completed within the approved
budget”
Quality management - “processes and activities of the
performing organization that determine quality policies,
objectives, and responsibilities so that the project will satisfy
the needs for which it was undertaken”
Resource management - “processes that organize, manage, and
lead the project team”
PMBOK® Knowledge Areas
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Communications management - “processes to ensure timely and
appropriate planning, collection, creation, distribution, storage,
retrieval, management, control, monitoring, and ultimate
disposition of project information”
Risk management - “processes of conducting risk management
planning, identification, analysis, response planning, and
control…to increase the likelihood and impact of positive
events and decrease the likelihood and impact of negative
events in the project”
PMBOK® Knowledge Areas
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Procurement management - “processes to purchase or acquire
products, services, or results from outside the project team”
Stakeholder management - “processes to identify the people,
groups, or organizations, that could impact or be impacted by
the project, analyze their expectations and impact, and develop
strategies for engaging them and managing conflicting
interests”
Selecting and Prioritizing Projects
Identify potential projects
All parts of the organization are involved
Determine which projects align best with organizational goals
Organizational priorities:
Understood
Communicated
Accepted
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
?
Selecting and Prioritizing Projects
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
What value does each potential project bring to the
organization?
Are the demands of performing each project understood?
Are the resources needed to perform the project available?
Is there enthusiastic support both from the external customers
and from one or more internal champions?
Which projects will best help the organization achieve its goals?
Project Goals and Constraints
Projects are undertaken to accomplish specific goals
Scope and quality are performance goals
Subject to constraints of time and cost
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Scope – “the sum of the products, services, and results to be
provided as a project.” PMBOK® Guide
Quality – “the degree to which a set of inherent characteristics
fulfills requirements.” PMBOK® Guide
Scope and quality measure performance and should result in
outputs that satisfy customers
Consider scope and quality subject to constraints of time and
cost
32
Project Goals and Constraints
Obstacles or challenges may limit ability to perform
Opportunities may allow projects to exceed original
expectations.
Project Managers (PMs) decide which goals and constraints take
precedence
Additional constraints
Amount of resources available
Decision maker’s risk tolerance
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Project Customer Tradeoff Matrix
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Break-out Session!
How do YOU define project success and failure?
What are some common reasons for project success or failure?
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Project Success and Failure
Deliverables include all agreed-upon features
Outputs please customers
Customers use the outputs effectively
Completed on schedule and on budget
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Project success is creating deliverables that include all of the
agreed upon features
Outputs please the project’s customers.
Customers use the outputs effectively as they do their work
(meet quality goals)
The project should be completed on schedule and on budget
(meet time and cost constraints).
36
Project Success and Failure
Completed without heroics
Learn new and/or refine skills
Organizational learning
Reap business-level benefits
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Successful projects are completed without heroics
People who work on the project should learn new skills and/or
refine existing skills.
Organizational learning should take place and be captured for
future projects.
Reap business-level benefits such as development of new
products, increased market share, increased profitability,
decreased cost, etc.
37
Project Success
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Why Projects Fail
Insufficient resources and/or time
Unclear expectations
Changes in the scope not understood or agreed upon
Stakeholders disagree on expectations
Inadequate project planning
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Not enough resources are available for project completion.
Not enough time has been given to the project.
Project expectations are unclear.
Changes in the scope are not understood or agreed upon by all
parties involved.
Stakeholders disagree regarding expectations for the project.
Adequate project planning is not used.
39
Types of Projects
Classifying by industry
Classifying by size
Classifying by understanding of project scope
Classifying by application
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
PMI Communities of Practice
Projects in different industries often have unique requirements
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Classifying by Size
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Large projects often require more detailed planning and control
Classifying by Timing of Project Scope Clarity
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
How early in the project the project manager and team are able
to determine the project scope
Classification by Application
All projects require planning and control
The art of project management:
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
when to use certain techniques
how much detail to use
how to tailor techniques to the needs of a project.
Scalability of Project Tools
All projects require
Project specifications
Understanding of work involved
Budget and schedule determinations
Assignment of available workers to tasks
Project management
Projects are scaled up or down to meet the complexity of the
task
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
All projects require:
Determination of the wants and needs of the customer(s)
Understanding of the amount of work involved
Determination of a budget and schedule
Decisions about available workers and who will do which tasks
Management until the owner accepts the project results
45
Traditional Project Roles
Project Executive-Level Roles
Project Management-Level Roles
Project Associate-Level Roles
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Project Executive-Level Roles
The steering team
The top leader (CEO) and his/her direct reports
Select, prioritize, and resource projects
Ensure that accurate progress is reported
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Select, prioritize, and resource projects in accordance with the
organization’s strategic planning
Ensure that accurate progress is reported and necessary
adjustments are made.
47
Project Executive-Level Roles
Sponsor Active role:
Charter the project
Review progress reports
Sponsor Behind-the-scenes role:
Mentor the project manager
Assist the project manager
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Sponsor – “the person or group that provides resources and
support for the project and is accountable for enabling success.”
PMBOK® Guide
Project Executive-Level Roles
The chief projects officer or PMO
Supports project managers
Require compliance to project directives
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Project Management Office (PMO) – “an organizational
structure that standardizes the project related governance
processes and facilitates the sharing of resources,
methodologies, tools and techniques.” PMBOK® Guide
Project Management-Level Roles
Project manager
Directly accountable for project results, schedule, and budget
The main communicator
Responsible for project planning and execution, from start to
finish
Limited formal power
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Project manager – “the person assigned by the performing
organization to lead the team that is responsible for achieving
the project objectives.” PMBOK® Guide
Directly accountable for the project results, schedule, and
budget
The main communicator
Responsible for the planning and execution of the project
Works on the project from start to finish.
The project manager often must get things done through the
power of influence since his or her formal power may be
limited.
50
Functional manager
Department heads
Determine the “how” of project work
Supervise the work
Negotiate with the project manager
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Project Management-Level Roles
The department heads—the ongoing managers of the
organization
Determine how the work of the project is to be accomplished
Supervise the work
Negotiate with the project manager regarding which workers are
assigned to the project
51
Facilitator
Helps the project manager with the process of running meetings
and making decisions
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Project Management-Level Roles
Project Associate-Level Roles
Project management team
Core team members—part of team throughout
Subject matter experts (SMEs)—only involved in part of
project; not involved in most planning and decision making
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Project management team – “members who are directly involved
in project management activities.” PMBOK® Guide
Temporary team members, called subject matter experts are
used on an as-needed basis
53
Agile Project Roles
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Project Executive-Level Roles
The senior customer representative
Identifies and prioritizes constituents requirements
Ensures project progress support customer desires
Continuous and active role
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Scrum Master
Project manager who serves and leads as:
Collaborator
Facilitator
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Project Management-Level Roles
Break-out Session!
In your own words, what are the main differences between
adaptive (Agile) and predictive (Waterfall) approaches to
Project Management?
What are some pros and cons of each approach?
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
© 2015 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Overview of the Book
Project management is integrative, iterative, and collaborative
This book has four major parts
Organizing and Initiating Projects
Leading Projects
Planning Projects
Performing Projects
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Project management is integrative since it consists of the 10
knowledge areas and the 5 process groups described
in the PMBOK® Guide, and one must integrate all of them into
one coherent and ethical
whole.
Project management is iterative in that one starts by planning at
a high level and then repeats the planning in greater detail as
more information becomes available and the date for the work
performance approaches.
Project management is collaborative since there are many
stakeholders to be satisfied and a team of workers with various
skills and ideas who need to work together to plan and complete
the project.
58
Part I - Organizing and Initiating Projects
Intro to Project Management (Chapter 1)
Project Selection and Prioritization (Chapter 2)
Chartering Projects (Chapter 3)
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Project charter – “a document issued by the project initiator or
sponsor that formally authorizes the existence of a project, and
provides the project manager with the authority to apply
organizational resources to project activities.” PMBOK® Guide
Part II – Leading Projects
Organizational structure & culture, project life cycle, and
project management roles of the parent organization (Chapter 4)
Project team (Chapter 5)
Project stakeholders (Chapter 6)
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Part II – Planning Projects
Scheduling projects (Chapter 7)
Scheduling resources on projects (Chapter 8)
Project budgeting (Chapter 9)
Risk planning (Chapter 10)
Project Quality (Chapter 11)
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Project schedule – “presents linked activities with planned
dates, durations, milestones and resources.” PMBOK® Guide
Budget – “the approved estimate for the project or any work
breakdown structure component or any schedule activity.”
PMBOK® Guide
Part III – Planning Projects
Scope Planning (Chapter 7)
Scheduling Projects (Chapter 8)
Resourcing Projects (Chapter 9)
Budgeting Projects (Chapter 10)
Project Risk Planning (Chapter 11)
Project Quality Planning and Kick-off (Chapter 12)
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Part IV—Performing Projects
Project Supply Chain Management (Chapter 13)
Determining Project Progress and Results (Chapter 14)
Finishing Projects and Realizing the Benefits (Chapter 15)
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
© 2015 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
Summary
A project is an organized set of work efforts
Tradeoffs must be made between the scope, quality, cost, and
schedule
Projects need to be planned and managed.
PMI® is a large professional organization devoted to promoting
and standardizing project managemen t understanding and
methods
Project management requires an understanding of the various
executive, managerial, and associate roles in project
management
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
A project is an organized set of work efforts undertaken to
produce a unique output subject to limitations of time and
resources such as money and people
Project management includes work processes that initiate, plan,
execute, control, and close project work.
Tradeoffs must be made between the scope, quality, cost, and
schedule
All projects, regardless of size, complexity, or application, need
to be planned and managed.
PMI® is a large professional organization devoted to promoting
and standardizing project management understanding and
methods
64
Summary
PMBOK® Guide
Five process groups: initiating, planning, executing, monitoring
and controlling, and closing
Ten knowledge areas: cost, schedule, scope, quality, risk,
communications, resource, stakeholder, procurement, and
integration.
Projects require an understanding of what project success is
Projects require an understanding of the causes of project
failure
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
What is Appreciative Inquiry?
Tool for engaging project stakeholders
Recognizes the power of the whole and builds on conversational
learning
Change is based on inquiry
What has worked in the past?
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
PM IN ACTION
Implications of AI on Defining Project Scope
Tool for navigating through inquiries via positive conversations
Discovery – storytelling to collectively discover process
selection and prioritization
Dreaming – dream a perfect, desirable state for the stakeholders
Designing – what would the project look like if there were no
resource constraints
Delivery – “sustain the design from the dream that is
discovered”
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
PM IN ACTION
Key Outcome
AI is an effective way to address ambiguity and uncertainty in
PM
Elicit and articulate expectations
Better understanding of desirable future state
Commitment is clearly articulated
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.
PM IN ACTION
PMBOK Exams
Everything in this textbook is consistent with PMBOK’s most
recent, 6th edition
PMP (Project Management Professional) certification—200
questions
CAPM (Certified Associate of Project Management)
certification—150 questions
More info at www.pmi.org/certifications/types
© 2019 Cengage Learning. All Rights Reserved. May not be
copied, scanned, or duplicated, in whole or in part, except for
use as permitted in a license distributed with a certain product
or service or otherwise on a password-protected website for
classroom use.

More Related Content

Similar to CONTEMPORARY PROJECT MANAGEMENT, 4ETimothy J. KloppenborgVit

Pmp pmbok6 -2018 (1)
Pmp   pmbok6 -2018 (1)Pmp   pmbok6 -2018 (1)
Pmp pmbok6 -2018 (1)sai12234
 
025218911.pdf
025218911.pdf025218911.pdf
025218911.pdfEidTahir
 
MidTerm Assessment Business ModelsThe business model canvas is
MidTerm Assessment  Business ModelsThe business model canvas isMidTerm Assessment  Business ModelsThe business model canvas is
MidTerm Assessment Business ModelsThe business model canvas isDioneWang844
 
Project review, assurance and governance support v1.0
Project review, assurance and governance support v1.0Project review, assurance and governance support v1.0
Project review, assurance and governance support v1.0Project Management Academy
 
Project Mng Basics Belarusian State University Final
Project Mng Basics Belarusian State University FinalProject Mng Basics Belarusian State University Final
Project Mng Basics Belarusian State University FinalТранслируем.бел
 
2019 | E-Brochure | Impactful PMO - IPMO ( 2 Days) | Project Management Train...
2019 | E-Brochure | Impactful PMO - IPMO ( 2 Days) | Project Management Train...2019 | E-Brochure | Impactful PMO - IPMO ( 2 Days) | Project Management Train...
2019 | E-Brochure | Impactful PMO - IPMO ( 2 Days) | Project Management Train...Dcolearning
 
Pmp training in kolkata
Pmp training in kolkataPmp training in kolkata
Pmp training in kolkataTejaspathiLV
 
Pmp pmbok6 -2018
Pmp   pmbok6 -2018Pmp   pmbok6 -2018
Pmp pmbok6 -2018sai12234
 
Pmp pmbok6 -2018
Pmp   pmbok6 -2018Pmp   pmbok6 -2018
Pmp pmbok6 -2018sai12234
 
pmp training
pmp trainingpmp training
pmp trainingsanfrrans
 
pmi agile certified practitioner course
pmi agile certified practitioner coursepmi agile certified practitioner course
pmi agile certified practitioner coursekrishna1132
 
PMP Certification Hyderabad
PMP Certification HyderabadPMP Certification Hyderabad
PMP Certification Hyderabadshivajbb
 
Pmp training bangalore
Pmp training bangalorePmp training bangalore
Pmp training bangaloreprathyusha1234
 
Pmp certification hyderabad
Pmp certification hyderabadPmp certification hyderabad
Pmp certification hyderabadprathyusha1234
 
pmi acp training bangalore
pmi acp training bangalorepmi acp training bangalore
pmi acp training bangaloredevipatnala1
 
Pmp pmbok6 -2018
Pmp   pmbok6 -2018Pmp   pmbok6 -2018
Pmp pmbok6 -2018sai12234
 

Similar to CONTEMPORARY PROJECT MANAGEMENT, 4ETimothy J. KloppenborgVit (20)

Pmp pmbok6 -2018 (1)
Pmp   pmbok6 -2018 (1)Pmp   pmbok6 -2018 (1)
Pmp pmbok6 -2018 (1)
 
I2m - Strategy PMO Case Study Presentation
I2m - Strategy PMO Case Study PresentationI2m - Strategy PMO Case Study Presentation
I2m - Strategy PMO Case Study Presentation
 
chapter-01.pptx
chapter-01.pptxchapter-01.pptx
chapter-01.pptx
 
025218911.pdf
025218911.pdf025218911.pdf
025218911.pdf
 
MidTerm Assessment Business ModelsThe business model canvas is
MidTerm Assessment  Business ModelsThe business model canvas isMidTerm Assessment  Business ModelsThe business model canvas is
MidTerm Assessment Business ModelsThe business model canvas is
 
Project review, assurance and governance support v1.0
Project review, assurance and governance support v1.0Project review, assurance and governance support v1.0
Project review, assurance and governance support v1.0
 
Project Mng Basics Belarusian State University Final
Project Mng Basics Belarusian State University FinalProject Mng Basics Belarusian State University Final
Project Mng Basics Belarusian State University Final
 
Pmp
PmpPmp
Pmp
 
2019 | E-Brochure | Impactful PMO - IPMO ( 2 Days) | Project Management Train...
2019 | E-Brochure | Impactful PMO - IPMO ( 2 Days) | Project Management Train...2019 | E-Brochure | Impactful PMO - IPMO ( 2 Days) | Project Management Train...
2019 | E-Brochure | Impactful PMO - IPMO ( 2 Days) | Project Management Train...
 
Pmp training in kolkata
Pmp training in kolkataPmp training in kolkata
Pmp training in kolkata
 
Pmp pmbok6 -2018
Pmp   pmbok6 -2018Pmp   pmbok6 -2018
Pmp pmbok6 -2018
 
PMP Certifiation
PMP CertifiationPMP Certifiation
PMP Certifiation
 
Pmp pmbok6 -2018
Pmp   pmbok6 -2018Pmp   pmbok6 -2018
Pmp pmbok6 -2018
 
pmp training
pmp trainingpmp training
pmp training
 
pmi agile certified practitioner course
pmi agile certified practitioner coursepmi agile certified practitioner course
pmi agile certified practitioner course
 
PMP Certification Hyderabad
PMP Certification HyderabadPMP Certification Hyderabad
PMP Certification Hyderabad
 
Pmp training bangalore
Pmp training bangalorePmp training bangalore
Pmp training bangalore
 
Pmp certification hyderabad
Pmp certification hyderabadPmp certification hyderabad
Pmp certification hyderabad
 
pmi acp training bangalore
pmi acp training bangalorepmi acp training bangalore
pmi acp training bangalore
 
Pmp pmbok6 -2018
Pmp   pmbok6 -2018Pmp   pmbok6 -2018
Pmp pmbok6 -2018
 

More from AlleneMcclendon878

Explain in your own words why it is important to read a statistical .docx
Explain in your own words why it is important to read a statistical .docxExplain in your own words why it is important to read a statistical .docx
Explain in your own words why it is important to read a statistical .docxAlleneMcclendon878
 
Explain how Matthew editedchanged Marks Gospel for each of the fol.docx
Explain how Matthew editedchanged Marks Gospel for each of the fol.docxExplain how Matthew editedchanged Marks Gospel for each of the fol.docx
Explain how Matthew editedchanged Marks Gospel for each of the fol.docxAlleneMcclendon878
 
Explain the degree to which media portrayal of crime relates to publ.docx
Explain the degree to which media portrayal of crime relates to publ.docxExplain the degree to which media portrayal of crime relates to publ.docx
Explain the degree to which media portrayal of crime relates to publ.docxAlleneMcclendon878
 
Explain the difference between genotype and phenotype. Give an examp.docx
Explain the difference between genotype and phenotype. Give an examp.docxExplain the difference between genotype and phenotype. Give an examp.docx
Explain the difference between genotype and phenotype. Give an examp.docxAlleneMcclendon878
 
Explain the history behind the Black Soldier of the Civil War In t.docx
Explain the history behind the Black Soldier of the Civil War In t.docxExplain the history behind the Black Soldier of the Civil War In t.docx
Explain the history behind the Black Soldier of the Civil War In t.docxAlleneMcclendon878
 
Explain the fundamental reasons why brands do not exist in isolation.docx
Explain the fundamental reasons why brands do not exist in isolation.docxExplain the fundamental reasons why brands do not exist in isolation.docx
Explain the fundamental reasons why brands do not exist in isolation.docxAlleneMcclendon878
 
Explain the difference between hypothetical and categorical imperati.docx
Explain the difference between hypothetical and categorical imperati.docxExplain the difference between hypothetical and categorical imperati.docx
Explain the difference between hypothetical and categorical imperati.docxAlleneMcclendon878
 
Explain in 100 words provide exampleThe capital budgeting decisi.docx
Explain in 100 words provide exampleThe capital budgeting decisi.docxExplain in 100 words provide exampleThe capital budgeting decisi.docx
Explain in 100 words provide exampleThe capital budgeting decisi.docxAlleneMcclendon878
 
Explain how Supreme Court decisions influenced the evolution of the .docx
Explain how Supreme Court decisions influenced the evolution of the .docxExplain how Supreme Court decisions influenced the evolution of the .docx
Explain how Supreme Court decisions influenced the evolution of the .docxAlleneMcclendon878
 
Explain how an offender is classified according to risk when he or s.docx
Explain how an offender is classified according to risk when he or s.docxExplain how an offender is classified according to risk when he or s.docx
Explain how an offender is classified according to risk when he or s.docxAlleneMcclendon878
 
Explain a lesson plan. Describe the different types of information.docx
Explain a lesson plan. Describe the different types of information.docxExplain a lesson plan. Describe the different types of information.docx
Explain a lesson plan. Describe the different types of information.docxAlleneMcclendon878
 
explain the different roles of basic and applied researchdescribe .docx
explain the different roles of basic and applied researchdescribe .docxexplain the different roles of basic and applied researchdescribe .docx
explain the different roles of basic and applied researchdescribe .docxAlleneMcclendon878
 
Explain the basics of inspirational and emotion-provoking communicat.docx
Explain the basics of inspirational and emotion-provoking communicat.docxExplain the basics of inspirational and emotion-provoking communicat.docx
Explain the basics of inspirational and emotion-provoking communicat.docxAlleneMcclendon878
 
Explain how leaders develop through self-awareness and self-discipli.docx
Explain how leaders develop through self-awareness and self-discipli.docxExplain how leaders develop through self-awareness and self-discipli.docx
Explain how leaders develop through self-awareness and self-discipli.docxAlleneMcclendon878
 
Explain five ways that you can maintain professionalism in the meeti.docx
Explain five ways that you can maintain professionalism in the meeti.docxExplain five ways that you can maintain professionalism in the meeti.docx
Explain five ways that you can maintain professionalism in the meeti.docxAlleneMcclendon878
 
Explain security awareness and its importance.Your response should.docx
Explain security awareness and its importance.Your response should.docxExplain security awareness and its importance.Your response should.docx
Explain security awareness and its importance.Your response should.docxAlleneMcclendon878
 
Experimental Design AssignmentYou were given an Aedesaegyp.docx
Experimental Design AssignmentYou were given an Aedesaegyp.docxExperimental Design AssignmentYou were given an Aedesaegyp.docx
Experimental Design AssignmentYou were given an Aedesaegyp.docxAlleneMcclendon878
 
Expand your website plan.Select at least three interactive fea.docx
Expand your website plan.Select at least three interactive fea.docxExpand your website plan.Select at least three interactive fea.docx
Expand your website plan.Select at least three interactive fea.docxAlleneMcclendon878
 
Exercise 7 Use el pronombre y la forma correcta del verbo._.docx
Exercise 7 Use el pronombre y la forma correcta del verbo._.docxExercise 7 Use el pronombre y la forma correcta del verbo._.docx
Exercise 7 Use el pronombre y la forma correcta del verbo._.docxAlleneMcclendon878
 
Exercise 21-8 (Part Level Submission)The following facts pertain.docx
Exercise 21-8 (Part Level Submission)The following facts pertain.docxExercise 21-8 (Part Level Submission)The following facts pertain.docx
Exercise 21-8 (Part Level Submission)The following facts pertain.docxAlleneMcclendon878
 

More from AlleneMcclendon878 (20)

Explain in your own words why it is important to read a statistical .docx
Explain in your own words why it is important to read a statistical .docxExplain in your own words why it is important to read a statistical .docx
Explain in your own words why it is important to read a statistical .docx
 
Explain how Matthew editedchanged Marks Gospel for each of the fol.docx
Explain how Matthew editedchanged Marks Gospel for each of the fol.docxExplain how Matthew editedchanged Marks Gospel for each of the fol.docx
Explain how Matthew editedchanged Marks Gospel for each of the fol.docx
 
Explain the degree to which media portrayal of crime relates to publ.docx
Explain the degree to which media portrayal of crime relates to publ.docxExplain the degree to which media portrayal of crime relates to publ.docx
Explain the degree to which media portrayal of crime relates to publ.docx
 
Explain the difference between genotype and phenotype. Give an examp.docx
Explain the difference between genotype and phenotype. Give an examp.docxExplain the difference between genotype and phenotype. Give an examp.docx
Explain the difference between genotype and phenotype. Give an examp.docx
 
Explain the history behind the Black Soldier of the Civil War In t.docx
Explain the history behind the Black Soldier of the Civil War In t.docxExplain the history behind the Black Soldier of the Civil War In t.docx
Explain the history behind the Black Soldier of the Civil War In t.docx
 
Explain the fundamental reasons why brands do not exist in isolation.docx
Explain the fundamental reasons why brands do not exist in isolation.docxExplain the fundamental reasons why brands do not exist in isolation.docx
Explain the fundamental reasons why brands do not exist in isolation.docx
 
Explain the difference between hypothetical and categorical imperati.docx
Explain the difference between hypothetical and categorical imperati.docxExplain the difference between hypothetical and categorical imperati.docx
Explain the difference between hypothetical and categorical imperati.docx
 
Explain in 100 words provide exampleThe capital budgeting decisi.docx
Explain in 100 words provide exampleThe capital budgeting decisi.docxExplain in 100 words provide exampleThe capital budgeting decisi.docx
Explain in 100 words provide exampleThe capital budgeting decisi.docx
 
Explain how Supreme Court decisions influenced the evolution of the .docx
Explain how Supreme Court decisions influenced the evolution of the .docxExplain how Supreme Court decisions influenced the evolution of the .docx
Explain how Supreme Court decisions influenced the evolution of the .docx
 
Explain how an offender is classified according to risk when he or s.docx
Explain how an offender is classified according to risk when he or s.docxExplain how an offender is classified according to risk when he or s.docx
Explain how an offender is classified according to risk when he or s.docx
 
Explain a lesson plan. Describe the different types of information.docx
Explain a lesson plan. Describe the different types of information.docxExplain a lesson plan. Describe the different types of information.docx
Explain a lesson plan. Describe the different types of information.docx
 
explain the different roles of basic and applied researchdescribe .docx
explain the different roles of basic and applied researchdescribe .docxexplain the different roles of basic and applied researchdescribe .docx
explain the different roles of basic and applied researchdescribe .docx
 
Explain the basics of inspirational and emotion-provoking communicat.docx
Explain the basics of inspirational and emotion-provoking communicat.docxExplain the basics of inspirational and emotion-provoking communicat.docx
Explain the basics of inspirational and emotion-provoking communicat.docx
 
Explain how leaders develop through self-awareness and self-discipli.docx
Explain how leaders develop through self-awareness and self-discipli.docxExplain how leaders develop through self-awareness and self-discipli.docx
Explain how leaders develop through self-awareness and self-discipli.docx
 
Explain five ways that you can maintain professionalism in the meeti.docx
Explain five ways that you can maintain professionalism in the meeti.docxExplain five ways that you can maintain professionalism in the meeti.docx
Explain five ways that you can maintain professionalism in the meeti.docx
 
Explain security awareness and its importance.Your response should.docx
Explain security awareness and its importance.Your response should.docxExplain security awareness and its importance.Your response should.docx
Explain security awareness and its importance.Your response should.docx
 
Experimental Design AssignmentYou were given an Aedesaegyp.docx
Experimental Design AssignmentYou were given an Aedesaegyp.docxExperimental Design AssignmentYou were given an Aedesaegyp.docx
Experimental Design AssignmentYou were given an Aedesaegyp.docx
 
Expand your website plan.Select at least three interactive fea.docx
Expand your website plan.Select at least three interactive fea.docxExpand your website plan.Select at least three interactive fea.docx
Expand your website plan.Select at least three interactive fea.docx
 
Exercise 7 Use el pronombre y la forma correcta del verbo._.docx
Exercise 7 Use el pronombre y la forma correcta del verbo._.docxExercise 7 Use el pronombre y la forma correcta del verbo._.docx
Exercise 7 Use el pronombre y la forma correcta del verbo._.docx
 
Exercise 21-8 (Part Level Submission)The following facts pertain.docx
Exercise 21-8 (Part Level Submission)The following facts pertain.docxExercise 21-8 (Part Level Submission)The following facts pertain.docx
Exercise 21-8 (Part Level Submission)The following facts pertain.docx
 

Recently uploaded

Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 

Recently uploaded (20)

Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 

CONTEMPORARY PROJECT MANAGEMENT, 4ETimothy J. KloppenborgVit

  • 1. CONTEMPORARY PROJECT MANAGEMENT, 4E Timothy J. Kloppenborg Vittal Anantatmula Kathryn N. Wells © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. ‹#› Introduction to Project Management Chapter 1 © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. ‹#› The Element of Discipline “A key to success in project management, as well as in mountain climbing, is to identify the pillars that will be practiced with discipline...I believe that project management is about applying common sense with uncommon discipline.” Michael O’Brochta, PMP founder of Zozer Inc.
  • 2. previously senior project manager at the Central Intelligence Agency © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Deaths climbing Mt. Aconcagua are an extreme example of consequences associated with a lack of discipline Discipline to act on the earlier decision to curtain summit attempts after the agreed-to-turn-around time or in severe weather Avoid pressure to cast aside or shortcut project management practices Practices, like planning, are the pillars of project management discipline Managing projects at the CIA involved short notice to acquire unspent funds Discipline required needed planning and quick action The top 2 percent of project managers spend twice as much ti me planning as the other 98 percent Identify those pillars that we will decide to practice with the required levels of discipline 3 Chapter 1 Core Objectives Define a project and project management and tell why organizations would use them Describe major activities and deliverables, at each project life cycle stage List the 10 knowledge areas and 5 process groups of the Project Management Body of Knowledge (PMBOK) Describe project success and failure, as well as reasons both
  • 3. may occur Contrast predictive and adaptive project life cycles © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. 4 Chapter 1 Behavioral Objectives: Identify project roles and key responsibilities for project team members Describe the importance of collaborative effort throughout a project © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. What is a project? Projects require: an organized set of work efforts. progressively elaborated detail. a defined beginning and ending. a unique combination of stakeholders. Projects are subject to time and resource limitations © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for
  • 4. classroom use. project – “a temporary endeavor undertaken to create a unique product, service, or result.” PMBOK® Guide stakeholders – “an individual, or organization who may affect, be affected by, or perceive itself to be affected by a decision, activity, or outcome of a project.” PMBOK® Guide A project requires an organized set of work efforts. Projects require a level of detail that is progressively elaborated upon as more information is discovered. Projects are subject to limitations of time and resources such as money and people. Projects have a defined beginning and ending. A project has a unique combination of stakeholders 6 Project Management (PM) Work processes Tradeoffs among © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Project management – “the application of knowledge, skills, tools and techniques to project activities to meet project requirements.” PMBOK® Guide initiate, plan, execute, monitor/control, close Scope Schedule Quality Resources Cost Risks
  • 5. PM includes work processes that initiate, plan, execute, and close work Work processes require tradeoffs among the scope, quality, cost, and schedule of the project PM includes administrative tasks for planning, documenting, and controlling work PM includes leadership tasks for visioning, motivating, and promoting work associates. PM knowledge, skills, and methods apply for most projects 7 Project Management (PM) Administrative tasks Leadership tasks for work associates Knowledge, skills, and methods apply for most projects © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Planning, documenting controlling Visioning, motivating, promoting PM includes administrative tasks for planning, documenting,
  • 6. and controlling work PM includes leadership tasks for visioning, motivating, and promoting work associates. PM knowledge, skills, and methods apply for most projects 8 History of PM Emerged as a formal discipline in the 1950s Developed for aerospace and construction Involved determining and controlling project schedules In 2001, Agile was created for adaptive project planning, originally for software projects In recent years, more focus has been given to the “soft skills” of communications, leadership, and teamwork © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. PM emerged as a formal discipline in the 1950s Techniques for planning and controlling schedules and costs were developed for huge aerospace and construction projects in the 1950s and 1960s Early PM involved determining project schedules based on order of project activities Manufacturing, research and development, government, and construction projects used and refined management techniques
  • 7. Software companies offered software for planning and controlling project costs and schedules in the 1980s and 1990s Risk management techniques for complex projects have been applied to less complex projects Communication and leadership playa major role in project success Rapid growth and change in information technology and telecommunications fueled use of PM in the 1990s and 2000s 9 How Can Project Work Be Described? Projects versus operations Soft skills and hard skills Authority and responsibility Project Life Cycle Agile (adaptive) vs. Waterfall (predictive) approach © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Projects are temporary and unique; operations are more continuous. Project managers need “soft skills” and “hard skills” to be effective. Project managers frequently have more responsibility than authority. Projects go through predictable stages called a life cycle.
  • 8. 10 Projects Versus Operations Projects are temporary Projects have routine and unique characteristics Operations are ongoing work © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Operations consist of the ongoing work needed to ensure that an organization continues to function effectively 11 Soft Skills and Hard Skills Soft skills activities Communication Leadership Conflict resolution Hard skills activities Risk analysis Quality control Scheduling work Budgeting work © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product
  • 9. or service or otherwise on a password-protected website for classroom use. A successful project manager needs both soft and hard skills along with the judgment of when each is more necessary. Training, experience, and mentoring are instrumental in developing necessary skills. 12 Authority and Responsibility One person being assigned accountability Project managers negotiate with functional managers Strong communication and leadership skills to persuade subordinates © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Functional manager – “someone with management authority over an organizational unit.…the manager of any group that actually makes a product or performs a service.” PMBOK® Guide Projects are most effectively managed with one person being assigned accountability Project managers negotiate with functional managers A project manager needs to develop strong communication and leadership skills to persuade subordinates to focus on the project when other work beckons.
  • 10. 13 Project Life Cycle (PLC) Project life cycles vary among different disciplines but generally are comprised of the same general stages © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Project life cycle – “the series of phases that a project goes through from its initiation to its closure.” PMBOK® Guide Life cycle allows for control to assure that the project is proceeding in a satisfactory manner and that the results are likely to serve its customer’s intended purpose 14 Project Life Cycle Stages Selecting and initiating Planning Executing (includes monitoring/controlling) Closing and realizing © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Selecting and initiating— a project is selected from an emerging idea, planned at a high level, and key participants commit to it
  • 11. in broad terms Planning—starts after the initial commitment, includes detailed planning, and ends when all stakeholders accept the entire detailed plan. Executing—includes authorizing, executing, monitoring, and controlling work until the customer accepts the project deliverables. Closing and realizing—all activities after customer acceptance to ensure project is completed, lessons are learned, resources are reassigned, contributions are recognized, and benefits are realized. 15 Project Life Cycle (PLC) A project must gain approval to move from one stage to the next Projects are measured at additional points Selection Progress reporting Benefits realization © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Predictive (Plan-Driven) PLC © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for
  • 12. classroom use. Product is well-understood All planning precedes all executing 17 Adaptive (Change-Driven) PLC © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Early results lead into planning later work 18 Midland Insurance PLC for Quality Improvement Projects © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Understanding Projects Project Management Institute (PMI) Project Management Body of Knowledge (PMBOK)
  • 13. PMI Talent Triangle Selecting and Prioritizing Projects © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Understanding Projects Project Goals and Constraints Defining Project Success and Failure Using MS Project Types of Projects Scalability of Project Tools © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. The Project Management Institute (PMI) The largest professional organization Produces A Guide to the Project Management Body of Knowledge (PMBOK® Guide) Talent Triangle—Technical PM, Leadership, & Strategic and Business Management © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for
  • 14. use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Over 650,000 members and credential holders in 185 countries Publishes and regularly updates A Guide to the Project Management Body of Knowledge (PMBOK® Guide) 22 The Project Management Institute (PMI) Project Management Professional (PMP®) certification Certified Associate in Project Management (CAPM) certification © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. © 2015 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Project Management Body of Knowledge (PMBOK®) Project Life Cycle 5 process groups 10 knowledge areas © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for
  • 15. use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Project management process group – “a logical grouping of the project management inputs, tools and techniques, and outputs.” PMBOK® Guide PMBOK® Process Groups © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Initiating— “define a project or a new phase by obtaining authorization” Planning— “establish the project scope, refine objectives and define actions to attain objectives” Executing— “complete the work defined to satisfy project specifications” Monitoring and controlling— “track, review, and regulate progress and performance, identify changes required, and initiate changes” Closing— “finalize all activities to formally close project of phase” PMBOK®’s 10 Knowledge Areas © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for
  • 16. classroom use. Integration management - “processes and activities to identify, define, combine, unify, and coordinate the various processes and project management activities” Scope management - “processes to ensure that the project includes all the work required, and only the work required, to complete the project successfully” Schedule management - “processes to manage timely completion of the project” PMBOK® Knowledge Areas © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Cost management – “processes involved in planning, estimating, budgeting, financing, funding, managing, and controlling costs so that the project can be completed within the approved budget” Quality management - “processes and activities of the performing organization that determine quality policies, objectives, and responsibilities so that the project will satisfy the needs for which it was undertaken” Resource management - “processes that organize, manage, and lead the project team” PMBOK® Knowledge Areas © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for
  • 17. use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Communications management - “processes to ensure timely and appropriate planning, collection, creation, distribution, storage, retrieval, management, control, monitoring, and ultimate disposition of project information” Risk management - “processes of conducting risk management planning, identification, analysis, response planning, and control…to increase the likelihood and impact of positive events and decrease the likelihood and impact of negative events in the project” PMBOK® Knowledge Areas © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Procurement management - “processes to purchase or acquire products, services, or results from outside the project team” Stakeholder management - “processes to identify the people, groups, or organizations, that could impact or be impacted by the project, analyze their expectations and impact, and develop strategies for engaging them and managing conflicting interests” Selecting and Prioritizing Projects Identify potential projects All parts of the organization are involved
  • 18. Determine which projects align best with organizational goals Organizational priorities: Understood Communicated Accepted © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. ? Selecting and Prioritizing Projects © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. What value does each potential project bring to the organization? Are the demands of performing each project understood? Are the resources needed to perform the project available? Is there enthusiastic support both from the external customers and from one or more internal champions? Which projects will best help the organization achieve its goals? Project Goals and Constraints Projects are undertaken to accomplish specific goals Scope and quality are performance goals Subject to constraints of time and cost © 2019 Cengage Learning. All Rights Reserved. May not be
  • 19. copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Scope – “the sum of the products, services, and results to be provided as a project.” PMBOK® Guide Quality – “the degree to which a set of inherent characteristics fulfills requirements.” PMBOK® Guide Scope and quality measure performance and should result in outputs that satisfy customers Consider scope and quality subject to constraints of time and cost 32 Project Goals and Constraints Obstacles or challenges may limit ability to perform Opportunities may allow projects to exceed original expectations. Project Managers (PMs) decide which goals and constraints take precedence Additional constraints Amount of resources available Decision maker’s risk tolerance © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.
  • 20. Project Customer Tradeoff Matrix © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Break-out Session! How do YOU define project success and failure? What are some common reasons for project success or failure? © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Project Success and Failure Deliverables include all agreed-upon features Outputs please customers Customers use the outputs effectively Completed on schedule and on budget © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Project success is creating deliverables that include all of the agreed upon features Outputs please the project’s customers. Customers use the outputs effectively as they do their work
  • 21. (meet quality goals) The project should be completed on schedule and on budget (meet time and cost constraints). 36 Project Success and Failure Completed without heroics Learn new and/or refine skills Organizational learning Reap business-level benefits © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Successful projects are completed without heroics People who work on the project should learn new skills and/or refine existing skills. Organizational learning should take place and be captured for future projects. Reap business-level benefits such as development of new products, increased market share, increased profitability, decreased cost, etc. 37 Project Success © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.
  • 22. Why Projects Fail Insufficient resources and/or time Unclear expectations Changes in the scope not understood or agreed upon Stakeholders disagree on expectations Inadequate project planning © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Not enough resources are available for project completion. Not enough time has been given to the project. Project expectations are unclear. Changes in the scope are not understood or agreed upon by all parties involved. Stakeholders disagree regarding expectations for the project. Adequate project planning is not used. 39 Types of Projects Classifying by industry Classifying by size Classifying by understanding of project scope Classifying by application © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.
  • 23. PMI Communities of Practice Projects in different industries often have unique requirements © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Classifying by Size © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Large projects often require more detailed planning and control Classifying by Timing of Project Scope Clarity © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. How early in the project the project manager and team are able to determine the project scope Classification by Application All projects require planning and control The art of project management: © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for
  • 24. use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. when to use certain techniques how much detail to use how to tailor techniques to the needs of a project. Scalability of Project Tools All projects require Project specifications Understanding of work involved Budget and schedule determinations Assignment of available workers to tasks Project management Projects are scaled up or down to meet the complexity of the task © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. All projects require: Determination of the wants and needs of the customer(s) Understanding of the amount of work involved Determination of a budget and schedule Decisions about available workers and who will do which tasks Management until the owner accepts the project results 45 Traditional Project Roles
  • 25. Project Executive-Level Roles Project Management-Level Roles Project Associate-Level Roles © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Project Executive-Level Roles The steering team The top leader (CEO) and his/her direct reports Select, prioritize, and resource projects Ensure that accurate progress is reported © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Select, prioritize, and resource projects in accordance with the organization’s strategic planning Ensure that accurate progress is reported and necessary adjustments are made. 47 Project Executive-Level Roles Sponsor Active role: Charter the project Review progress reports Sponsor Behind-the-scenes role:
  • 26. Mentor the project manager Assist the project manager © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Sponsor – “the person or group that provides resources and support for the project and is accountable for enabling success.” PMBOK® Guide Project Executive-Level Roles The chief projects officer or PMO Supports project managers Require compliance to project directives © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Project Management Office (PMO) – “an organizational structure that standardizes the project related governance processes and facilitates the sharing of resources, methodologies, tools and techniques.” PMBOK® Guide
  • 27. Project Management-Level Roles Project manager Directly accountable for project results, schedule, and budget The main communicator Responsible for project planning and execution, from start to finish Limited formal power © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Project manager – “the person assigned by the performing organization to lead the team that is responsible for achieving the project objectives.” PMBOK® Guide Directly accountable for the project results, schedule, and budget The main communicator Responsible for the planning and execution of the project Works on the project from start to finish. The project manager often must get things done through the power of influence since his or her formal power may be limited. 50 Functional manager Department heads
  • 28. Determine the “how” of project work Supervise the work Negotiate with the project manager © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Project Management-Level Roles The department heads—the ongoing managers of the organization Determine how the work of the project is to be accomplished Supervise the work Negotiate with the project manager regarding which workers are assigned to the project 51 Facilitator Helps the project manager with the process of running meetings and making decisions © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Project Management-Level Roles Project Associate-Level Roles Project management team Core team members—part of team throughout
  • 29. Subject matter experts (SMEs)—only involved in part of project; not involved in most planning and decision making © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Project management team – “members who are directly involved in project management activities.” PMBOK® Guide Temporary team members, called subject matter experts are used on an as-needed basis 53 Agile Project Roles © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Project Executive-Level Roles The senior customer representative Identifies and prioritizes constituents requirements Ensures project progress support customer desires Continuous and active role © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product
  • 30. or service or otherwise on a password-protected website for classroom use. Scrum Master Project manager who serves and leads as: Collaborator Facilitator © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Project Management-Level Roles Break-out Session! In your own words, what are the main differences between adaptive (Agile) and predictive (Waterfall) approaches to Project Management? What are some pros and cons of each approach? © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. © 2015 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.
  • 31. Overview of the Book Project management is integrative, iterative, and collaborative This book has four major parts Organizing and Initiating Projects Leading Projects Planning Projects Performing Projects © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Project management is integrative since it consists of the 10 knowledge areas and the 5 process groups described in the PMBOK® Guide, and one must integrate all of them into one coherent and ethical whole. Project management is iterative in that one starts by planning at a high level and then repeats the planning in greater detail as more information becomes available and the date for the work performance approaches. Project management is collaborative since there are many stakeholders to be satisfied and a team of workers with various skills and ideas who need to work together to plan and complete the project. 58 Part I - Organizing and Initiating Projects Intro to Project Management (Chapter 1) Project Selection and Prioritization (Chapter 2) Chartering Projects (Chapter 3)
  • 32. © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Project charter – “a document issued by the project initiator or sponsor that formally authorizes the existence of a project, and provides the project manager with the authority to apply organizational resources to project activities.” PMBOK® Guide Part II – Leading Projects Organizational structure & culture, project life cycle, and project management roles of the parent organization (Chapter 4) Project team (Chapter 5) Project stakeholders (Chapter 6) © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Part II – Planning Projects Scheduling projects (Chapter 7) Scheduling resources on projects (Chapter 8) Project budgeting (Chapter 9) Risk planning (Chapter 10) Project Quality (Chapter 11) © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for
  • 33. use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Project schedule – “presents linked activities with planned dates, durations, milestones and resources.” PMBOK® Guide Budget – “the approved estimate for the project or any work breakdown structure component or any schedule activity.” PMBOK® Guide Part III – Planning Projects Scope Planning (Chapter 7) Scheduling Projects (Chapter 8) Resourcing Projects (Chapter 9) Budgeting Projects (Chapter 10) Project Risk Planning (Chapter 11) Project Quality Planning and Kick-off (Chapter 12) © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. Part IV—Performing Projects Project Supply Chain Management (Chapter 13) Determining Project Progress and Results (Chapter 14) Finishing Projects and Realizing the Benefits (Chapter 15) © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. © 2015 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product
  • 34. or service or otherwise on a password-protected website for classroom use. Summary A project is an organized set of work efforts Tradeoffs must be made between the scope, quality, cost, and schedule Projects need to be planned and managed. PMI® is a large professional organization devoted to promoting and standardizing project managemen t understanding and methods Project management requires an understanding of the various executive, managerial, and associate roles in project management © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. A project is an organized set of work efforts undertaken to produce a unique output subject to limitations of time and resources such as money and people Project management includes work processes that initiate, plan, execute, control, and close project work.
  • 35. Tradeoffs must be made between the scope, quality, cost, and schedule All projects, regardless of size, complexity, or application, need to be planned and managed. PMI® is a large professional organization devoted to promoting and standardizing project management understanding and methods 64 Summary PMBOK® Guide Five process groups: initiating, planning, executing, monitoring and controlling, and closing Ten knowledge areas: cost, schedule, scope, quality, risk, communications, resource, stakeholder, procurement, and integration. Projects require an understanding of what project success is Projects require an understanding of the causes of project failure © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. What is Appreciative Inquiry? Tool for engaging project stakeholders Recognizes the power of the whole and builds on conversational
  • 36. learning Change is based on inquiry What has worked in the past? © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. PM IN ACTION Implications of AI on Defining Project Scope Tool for navigating through inquiries via positive conversations Discovery – storytelling to collectively discover process selection and prioritization Dreaming – dream a perfect, desirable state for the stakeholders Designing – what would the project look like if there were no resource constraints Delivery – “sustain the design from the dream that is discovered” © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. PM IN ACTION Key Outcome AI is an effective way to address ambiguity and uncertainty in PM Elicit and articulate expectations Better understanding of desirable future state Commitment is clearly articulated
  • 37. © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use. PM IN ACTION PMBOK Exams Everything in this textbook is consistent with PMBOK’s most recent, 6th edition PMP (Project Management Professional) certification—200 questions CAPM (Certified Associate of Project Management) certification—150 questions More info at www.pmi.org/certifications/types © 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license distributed with a certain product or service or otherwise on a password-protected website for classroom use.