Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant
Dana Noavaran Energy & industry Co.
Engineering
Genset
Lubricating oil system
Overhead Cranes
Emergency Diesel Generator (1250 KVA)
Power Transformer (11/33KV),3MVA
ONAN-OCT
20KV Switchgear Panels
Mechanical Engineering
Electrical Engineering
Water Treatment System
HVAC
Evaluation of Heat Consumption Market
Detailed Design of Heat recovery system
Exhaust gases system
Cooling system
Fuel gas system
Fire Fighting System
Power Plant LV Panels
Procedure
1
2. Date
Number
Qty. Origin
Unit
price(€)
Total price(€)
Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant
Dana Noavaran Energy & industry Co.
Procedure
4 1pack IR
5 1pack IR
6 1pack IR
7 1pack IR
8 1pack IR
9 1pack IR
10 1pack IR
11 1pack IR
12 1pack IR
13 1pack IR
III. 65000
1 1 pack IR 40000
1.1
1.1.1
1.1.2
1.1.3
Control Panel for Monitoring and Control
of entire 9 Generators and substation
sequences with Operator and engineering
stations
Auxiliary Transformer
Earthing and Lighting System,Cables
Cable Tray and Terminations
Detialed Design
Generator – Transformer Unit Protection
Panel
Generator Metering Panel
Power plant Control panels
Civil Engineering
110V DC System
Power Plant protection panels
11KV Suitable Generator NGR
Calculation Data Sheet
Engine Room
Plant Civil & Architectal Design
Layout
2
3. Date
Number
Qty. Origin
Unit
price(€)
Total price(€)
Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant
Dana Noavaran Energy & industry Co.
Procedure
1.1.4
1.2
1.2.1
1.2.2
1.2.3
1.2.4
1.3
1.3.1
1.3.2
1.3.3
1.3.4
2 1 pack 25000
2 10144000
2.a 8514000
1 9 set EU 750000 6750000
Part Description
1.1.2 Engine type
MTU
20V4000L62
1.1
Engineering Procurement
Mechanical Engineering Procurement
Evaluation of Soil, water sources,Power Grid
Detialed Design
Calculation Data Sheet
Layout
Switchgear Room
MTO
Genset
MTO
Engine Specification
Detialed Design
Calculation Data Sheet
Layout
Plant Control Room
MTO
3
4. Date
Number
Qty. Origin
Unit
price(€)
Total price(€)
Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant
Dana Noavaran Energy & industry Co.
Procedure
1.1.3 Cylinder arrangement V
1.1.4 Number of cylinder 20
1.1.5 Bore /stroke 170/210 mm
1.1.6 volume 9533 liter
1.1.7 Speed 1500 rpm
1.1.8 Mean piston speed 10.5 m/s
1.1.9 Compression ratio 12.1:1
1.1.10 Mean effective pressure 16.8 bar
1.1.11
Standard power according to
ISO 3046
2000 kWmech
1.1.12 Specific full-load consumption
2.42
kWh/kWhmech
1.1.13
Gas consumption(based on
LHV = 10/03 kWh/m3n)
482.9 m3/h
1.1.14 Lube oil consumption 0.3 g/kWhmech
1.1.15 Electric starter
2 x 9 kW, 24
VDC
Part Description
1.2.1 Generator spannung 1100 V
1.2.2 Rating 2744 KVA
1.2.3 Insulation class F
Generator specificatoin
1.2
4
5. Date
Number
Qty. Origin
Unit
price(€)
Total price(€)
Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant
Dana Noavaran Energy & industry Co.
Procedure
1.2
1.2.4 Temperature-rise rating F
1.2.5 Cos ɸ 0.8-1
1.2.6 Frequency 50Hz
1.2.7 speed 1500 rpm
1.2.8 efficiency 97.50%
1.2.9 Stator connection Star star
1.2.10 Voltage tolerance ± 5%
1.2.11 Frequency tolerance ± 5%
1.2.12 Max. Ambient temperature. 40°C
1.2.13 Installation altitude max. 1000m
1.2.14 Type of protection IP 23
1.3
1.3.1
1.3.1.1 Thermal output 1244 KW
1.3.1.2
Cooling water temperature,
inlet / outlet
78 / 90°C
1.3.1.3 Cooling water volume flow 94m³/h
1.3.1.4 Pressure loss 2.6 bar
Heat Generation
Engine Cooling
Generator specificatoin
5
6. Date
Number
Qty. Origin
Unit
price(€)
Total price(€)
Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant
Dana Noavaran Energy & industry Co.
Procedure
1.3.2
1.3.2.1 Thermal output 99 KW
1.3.2.2
Mixture cooling water volume
flow
30 m³/h
1.3.2.3
Inlet temperature mixture
cooling water max.
52°C
1.3.2.4
Outlet temperature mixture
cooling water max.
55°C
1.3.2.5
Maximum permissible
pressure loss outside the heat
recovery
0.5 bar
1.3.2.6
System pressure permitted
maximum
6 bar
1.3.3
1.3.3.1 Thermal output by 120°C 1089 KW
1.3.3.2 Exhaust temperature 444°C
1.3.3.3 Exhaust gas mass flow, dry 10027 kg/h
1.3.3.4 Exhaust gas mass flow, moist 10787 kg/h
1.3.3.5 Exhaust gas volume flow, dry 7607 m³/h
1.3.3.6
Exhaust gas volume flow,
moist
8498 m³/h
1.4 Engine manegment system MMC-400
1.3.3.7
Permissible back-pressure
downstream of engine min. /
max.
30 / 60 mbar
Mixture Cooling
Exhaust Gas
6
7. Date
Number
Qty. Origin
Unit
price(€)
Total price(€)
Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant
Dana Noavaran Energy & industry Co.
Procedure
2 9 set EU 72000 648000
2.1
2.2
3 9 set IR 16000 144000
3.1
3.2
3.3
3.4
3.5
4 1 pack IR 36000 36000
4.1
4.2
4.3
4.4
4.5
4.5
5 1 pack IR 65000 65000
5.1
steam heat exchanger system with 622 KW
Thermal power
Heat Recovery System
HVAC
hot water heat exchanger system with 524 KW
Thermal power(Hot water max 80 C)
Firefighting pump house
Water treatment package
Water Treatment System
Diffusers
Distribution Duct
Control & Admin room air condition Unit
Fire Fighting System
Miscellaneous pumps
Chemical storage tanks
Waste water treatment
Raw water tank
Engine room ventilation & Exhaust fan
Engine room Air condition (Air Washer)
Permeate water tank
7
8. Date
Number
Qty. Origin
Unit
price(€)
Total price(€)
Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant
Dana Noavaran Energy & industry Co.
Procedure
5.2
5.3
5.4
5.5
5.6
6 1 pack IR 68000 68000
6.1
6.2
6.3
7 1pack IR 42000 42000
7.1
7.2
7.3
7.4
8 9 IR 38000 342000
8.1
8.2
8.3 Standby heater
Maintenance water tank
Expansion tank
Pipework for gas distribution
Gas regulating station (250 psi to 60 psi)
Fuel gas system
pipework for sprinkler
Fire alarm system
CO2 for transformers & control room
Foam tank
Cooling system
Elastic hoses
Waste lube oil tank
Lube service tank
Lube oil storage tank
Lubricating oil system
Pipework for gas venting
Sprinkler
8
9. Date
Number
Qty. Origin
Unit
price(€)
Total price(€)
Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant
Dana Noavaran Energy & industry Co.
Procedure
8.4
8.5
9 9 set IR 22000 198000
9.1
9.2
9.3
9.4
11 3 set IR 32000 96000
12 1 set IR 125000 125000
12.1
12.2
12.3
2.b 1340000
13 9 set IR 95000 855000
14 1pack IR
15 1 set IR
16 1 set IR
18 9 set IR
240000
20KV Switchgear Panels
Power Plant LV Panels
11KV Suitable Generator NGR
240000
Generator – Transformer Unit Protection
Panel
Power Transformer (11/33KV),3MVA ONAN-
OCT
Raidiator Cooler
Circulated pump
Electrical Engineering Procurement
Overhead Cranes
Emergency Diesel Generator (1250 KVA)
Gas oil storage tank
Gas oil daily tank
Automatic transfer switch
Exhaust Stack
Oxidization catalyst convertor
Exhaust silencer
Exhaust duct
Exhaust gases system
9
10. Date
Number
Qty. Origin
Unit
price(€)
Total price(€)
Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant
Dana Noavaran Energy & industry Co.
Procedure
19 9 set IR
20 1 set IR
21 1 set IR
22 1 set IR
21 1 pack IR 145000 145000
22 1 set IR 45000 35000
23 1 pack IR
24 1pack IR
2.c 290000
26 1 pack
27 1 pack
28 1 pack
29 1 pack
30 1 pack
31 1 pack
32 1 pack
240000
Civil Engineering Procurement
240000
65000
Cable Tray and Terminations
Generator Metering Panel
Power plant Control panels
Power Plant protection panels
110V DC System
Genset Foundation
Warehouse Building
Machine Room Structure
Switchgear Room Stucture
Plant control Room structure
Office room Stucture
Salon Foundation
Control Panel for Monitoring and Control of
entire 9 Generators and substation sequences
with Operator and engineering stations
Auxiliary Transformer
Earthing and Lighting System,Cables
65000
10
11. Date
Number
Qty. Origin
Unit
price(€)
Total price(€)
Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant
Dana Noavaran Energy & industry Co.
Procedure
33 1 pack
34 1 pack
35 1 pack
36 1 pack
37 1 pack
3 693550
3.a 305550
1 9 IR 11000 99000
2 9 IR 4000 36000
Construction
Mechanical Installation
Genset
Transport of all equipment to iranian border
custom
Erection
Assembly
Piping
Cabeling
Combustion air ducting
Testing,Start up , Commissioning & Training
Heat recovery system
Transportation
Erection
Landscaping
Security Building
Water treatment pump station Building
Fire Fighting pump station Building
Excavation
11
12. Date
Number
Qty. Origin
Unit
price(€)
Total price(€)
Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant
Dana Noavaran Energy & industry Co.
Procedure
3 9 IR 1600 14400
4 1 5400 5400
5 1 12000 12000
Testing
Fire Fighting System
Transportation
Water treatment System
Transportation
Erection
Piping
Cabeling
Erection
Piping
Ducting
Cabeling
Testing
Pipe and piping work for Heat exchanger
Cabeling
Testing
HVAC
Transportation
12
13. Date
Number
Qty. Origin
Unit
price(€)
Total price(€)
Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant
Dana Noavaran Energy & industry Co.
Procedure
6 1 11600 11600
7 1 8400 8400
8 9 7600 68400Cooling system
Transportation
Erection
Piping
Cabeling
Testing
Erection
Piping
Cabeling
Testing
Lubricating oil system
Cabeling
Testing
Fuel gas system
Transportation
Construction
Erection
Piping
13
14. Date
Number
Qty. Origin
Unit
price(€)
Total price(€)
Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant
Dana Noavaran Energy & industry Co.
Procedure
9 9 3300 29700
10 3 4800 14400
12 1 6250 6250
Testing
Emergency Diesel Generator
Transportation
Erection
Testing
Overhead Cranes
Transportation
Erection
Cabeling
Testing
Exhaust gases system
Transportation
Erection
Ducting
Transportation
Erection
Piping
Cabeling
14
15. Date
Number
Qty. Origin
Unit
price(€)
Total price(€)
Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant
Dana Noavaran Energy & industry Co.
Procedure
3.b 268000
1 1
2 1
3 1
4 1
5 1
6 1
7 1
8 1
9 1
10 1
11 1
3.c 120000
26 1
Installation of 110 V DC
Electerical Installation of auxiliary
transformers
Installation of medium voltage system
Test,Start up & Commissionig
Installation of low voltage Switchgear
Installation of station auxiliary
transformers
Cabeling
Testing
Installation Of Electrical Equipment
Electrical installation of generators
Installation of automation system
Installation of system Grounding system
Plant electrification
Installation Of transmission line
Piping
Civil construction
Machine Room Structure
Construction
15
16. Date
Number
Qty. Origin
Unit
price(€)
Total price(€)
Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant
Dana Noavaran Energy & industry Co.
Procedure
1
27 1
28 1
29 1
30 1
31 1
32 1
33 1
34 1
Switchgear Room Stucture
Construction
Plant control Room structure
Transportation
Construction
Genset Bedframe
Construction
Fire Fighting pump station Building
Construction
Erection
Office room Stucture
Construction
Salon Foundation
Construction
Excavation
Warehouse Building
Construction
Water treatment pump station Building
16
17. Date
Number
Qty. Origin
Unit
price(€)
Total price(€)
Proposal of CHP power generation ( 18MW ) for Khoramshahr Power Plant
Dana Noavaran Energy & industry Co.
Procedure
35 1
36 1
4 115000
898000
1772000
155000
573550
475000
11172550EPC & Testing
Mechanical BOP & Electrical BOP
Genset & Auxiliary
Mechanical & Electrical engineering
Mechanical & Electrical installation
Civil Engineering & Construction
Testing, Filling & 3 months Operation
Security Building
Construction
Landscaping
Construction