"Instrumentation Maintenance and Control System Supervisor/Superintendent"
Personal Details:
Name: Ahmed M.AL-Dossary
Birth date: 28/02/1976
Nationality: Saudi
Marital Status: Married
Major:
1. DCS Eng.
2. Instrument Main & control system (APCS) specialist.
3. Utility Maintenance engineer and operational strategy specialist.
Objectives:
To work in an environment where I can get a platform to excel in my personal and
professional skills and enhance myself well as organization’s growth. Moreover, exchange
experience and information to be one of the best high-level Professionals in my chosen career
with vision of performing Professional Preventive Maintenance to achieve Zero % Corrective
maintenance.
Education:
1. Bachelor degree in instrumentation and control engineering from University of
Teesside in UK (First Class).
2. Diploma in instrumentation & control (4.48 out of 5).
Experience: Total = 19 Years
Control Systems:
1. 1 year experience in 800XA Control System as Process Automation
2. 10 years’ experience in maintaining Infi-90 system. Familiarize with all types of
modules; BRC100, BRC300, NIS, NPM, ICT, IIL…
3. 6 Years’ experience in Mitsubishi DIASYS Control System Config & Maint.
Engineering and Maintenance:
1. 1 Year and half in Process Automation UPI Engineer in SADARA.
2. 17 years’ experience in steam power plant "Ghazlan power plant".
3. 5 years experience in maintaining the steam turbine control system “Digital electro-
hydraulic control System “and the related instruments.
4. Maintain DCS activities (troubleshooting, Modify logic & graphics update……
5. Maintain Vibration Bentley Nevada 3500.
6. Specialist in Automatic plant control system and maintaining most types of
instruments.
7. Boiler control system engineering.
2. Positions :
1996 ~ 2006 as Instrumentation Tech.
2006 ~ 2009 as DCS Specialist.
2009 ~ 2011 as Instrument and Control Supervisor.
2011 ~ 2013 as Instrument and Control Section Head in Charge.
2013 ~ present as Senior Process Automation Engineer for Utility.
Evaluation:
For 2014 Cato 2 (Meet expectation)
For 2013 Cato 1 (Exceed expectation)
For 2012 Cato 1 (excellent) + promotion
For 2011 Cato 1 (excellent)
For 2010 Cato 1 (excellent)
For 2009 Cato 2 (very good) + promotion
For 2008 Cato 1 (excellent) + promotion
For 2007 Cato 1 (excellent)
For 2006 Cato 1 (excellent)
Achievement:
1. I was nominated as employee of The months Sep + Oct of 2005, month April of 2006
& Oct of 2007.
2. In May 2012 I was group leader for creating new remote control room, this project
was quoted by ABB for 3.7 Million SR and this type of project is the first time
implemented by Saudi employees in Saudi Arabia, it was big challenge but we believe
in that saying "nothing impossible".
3. I get employee of the year 2007.
4. I get employee of the year 2008.
5. Create “ Tracking Development Program “ to Improve the skills on Technician and
engineer.
6. Suggest and implement more than 20 suggestions (software & hardware) which help
to reduce Corrective Maintenance and increase the reliability.
7. Making modification in boiler burner valves which saved more than 1,500,000 SR
yearly , the manufacturer company failed many times to resolve this problem during
10 years.
8. Commissioning engineer for upgrading the HMI from C-VMS44 to PGP
in Ghazlan Power Plant.
9. Making DCS modification guide lines booklet.
10. Maintain power plant units' Trax simulator.
11. Study and solve most of the instrument which has frequent failures.
12. Support other power plant to solve their problem.
13. Discover the mistakes in the main grounding system which leads to DSC modules to
be failed. Mitsubishi & Bailey fail many times to find the root cause of this issue.
14. In 2010 and 2013, the continuous improvement teams which I was leading have been
selected to be the best studies among all studies in my X-Company.
3. Enhancement, continuous improvements:
I join 4 Teams for continuous improvements as Followed:
1. Group leader of the team for Turbine interlock test improvement "Saving 3.5 million
"By year.
2. Member of the team for Boiler interlock test improvement "Saving 3.7 million by year
".
3. Member of the team for annual Test & inspection improvement "Saving 4.2 million
by year".
4. Group leader of the team for Reorganize Test and Inspection (T&I) Activities, and
Develop Strategies for Interrelated T&I Tasks.
Courses:
Control System Courses:
1. PI System Manager I Essential Skills.
2. Composer automation architect.
3. Composer with rack IO.
4. Function code application.
5. Process control unit troubleshooting.
6. Conductor (VMS) troubleshooting.
7. Foreign device interface & process information web server.
8. Maintenance &troubleshooting plc-5 using RS logix5 (Rockwell).
9. Advance plc-5 & introduction to Modbus.
10. AMS (asset management suite (Emerson).
11. Trax simulator maintenance.
12. DIASYS Control System Config & Maint.
13. 800XA Control System Config & Maint.
Management Courses:
1. Basic skills of supervisor.
2. Conducting safety meeting.
3. Creative thinking.
4. Microsoft project.
5. Continues improvement tolls.
Instrument courses:
1. Reading of P&I drawing.
2. Applied electronics.
3. Electronic soldring.
4. Reading of electronic circuit.
5. Valve & actuator & smart positioner.
6. Advance plant control training for I&C.
7. Automatic plant system (Mitsubishi).
8. Boiler & turbine protection system.
9. Smart transmitter.
4. Analyzers courses:
1. Oxygen analyzer (Yokogawa).
2. Co analyzer (horiba).
3. Gas chromatograph.
4. I have experience on other analyzers (conductivity, PH, silica, sodium, hydrazine,
dissolve oxygen…).
SAP courses:
6. PM: Shift log.
7. PM Reporting using ALV Standard Reporting.
8. Work Order Execution.
9. Phase Out Processing.
10. Project Claim Management.
11. Cross Application Time Sheet.
12. Project Scheduling.
13. Contracting & Materials Planning for Capital Projects.
14. Workforce Planning.
15. Project Structure.
16. Requesting Material via PR.
17. Requesting Material via MT.
Other courses:
1. English for technical purposes (British council)"evaluation "A ".
2. Implement & supporting Microsoft window XP professional.
3. Implementing Microsoft window 2000 professional & server.
4. Power plant safety.
5. Battery charger.
Hobbies: 1- football
Contacts: tel +966555852712
E-mail ahmed.bin.misfer@gmail.com
ahmed.aldossary@sadara.com