CASE STUDY: STI Engineering, Italy
STI Engineering Designs a Waste-
to-Energy Plant WITH INTERGRAPH®
CADWORX®
& Analysis SOLUTIONS
Italian engineering company, STI Engineering, selects
Intergraph CADWorx solutions to improve design
execution
IDENTIFYING GOALS
STI Engineering won an international tender for a multidisciplinary design, waste
to energy plant on the island of Terceira, a small island in the Azores archipelago
(Portugal). This plant is set to process 40,000 tons of municipal solid waste per year,
generating power for 20,000 residents. The new facility would produce 24 million KWh
per year of electricity, from the 10 structures, 30 equipments and 300 piping lines. The
main goals for STI Engineering were to save time and cost whilst creating accurate,
timely, and detailed engineering information.
With a tender valuing a total amount of 30 million euros, STI Engineering needed to
stringently evaluate various solutions available in the market to be able to select the
best engineering and analysis solutions provider.
OVERCOMING CHALLENGES
The project involved considerable engineering challenges, and so any solution
selected would need to increase productivity, require only minimal training to get
users productive, and be easy to implement and configure. The solution also needed
to provide efficient modelling and manipulation of piping supports, whilst enabling
interoperability with other solutions.
The greatest challenge for STI Engineering was finding a tool that could reduce the
overall execution time of the plant design phase. Generally, the company found that
many of the solutions provided by other vendors had long start up and implementation
times, which could have affected the entire project schedule. Having a solution that
was easy to learn, could be set up quickly, and easily customised in accordance with
the project requirements, in terms of both documentation and reporting deliverables,
was fundamental to the success of the project. Additionally, many of the other
solutions considered required the use of a dedicated CAD administrator, which would
have increased administration costs for the project.
The shortlist consisted of just three solutions. After a thorough and detailed evaluation
of each solution, weighing up the respective capabilities of each against the needs
of the project, Intergraph CADWorx Plant Professional was selected as the primary
FACTS AT A GLANCE
Company: STI Engineering
Website: www.sti-engineering.it
Description: STI Engineering offers
design and consulting services in
civil construction and industrial plant
industries. The company has 25+ years
of experience, and has developed over
3000 projects in 50 countries across
the world.
Employees: 150
Industry: Construction, industrial plant
design
Country: Italy
PRODUCTS USED:
• Intergraph®
CADWorx®
Plant
Professional
•	CAESAR II®
• OrthoGen®
KEY BENEFITS:
•	30% engineering man hour savings.
• Easy, intuitive, and efficient 3D
modelling.
•	Efficient placement and manipulation
of pipe supports.
• Automatic deliverables - piping
isometrics, 2D layouts, and bills of
material.
• Accurate materials management.
3D platform due to its ease of use and efficiency. This was due
to the object-based system providing greater and more flexible
access to design data, and easier modelling and manipulation of
piping supports, helping to reduce engineering work and lower
design costs. Additionally, CADWorx Plant Professional was the
only software considered providing bi-directional integration with
CAESAR II, and interoperability with OrthoGen and CADWorx
P&ID Professional.
REALIZING RESULTS
CADWorx Plant Professional was the fundamental base to
manage cost control and planning for the project. The engineering
work comprised of creation of piping specifications, P&IDs, a 3D
model, isometrics, layouts, and material take offs.
Once specifications were defined and made available, the first
step in the project execution involved creating a 3D model of the
plant. The complete model was created and completed in just 4
months. The second step, to avoid rework in the field, was the
CADWorx interference check between all disciplines included in
the multidisciplinary design.
Finally, utilizing Isogen and OrthoGen, STI Engineering generated
accurate isometrics and layouts automatically from the model,
saving considerable man hours during this critical step in the
project execution.
Next, a database linked to CADWorx Plant Professional,
containing all components present in the model and all of the
client’s purchase order codes, was created so that bills of
materials could be reported and submitted for procurement.
Customization and integration of the database with the
procurement system was possible without the assistance of
Intergraph personnel.
STI Engineering, with three offices in Italy and 4 operative offices
worldwide, currently employs 150 people, 15 of which have
successfully mastered how to use CADWorx having received
only a few days of introductory training.
Future trainings can now be done in-house, saving both time and
cost, with resources immediately ready for productive work upon
completion of their training.
When asked about the results of using Intergraph CADWorx
Plant Professional, STI Engineering said:
““The use of Intergraph tools reduced engineering work
by approximately 30%, and engineering software cost by
approximately 60% compared to similar previous projects. We
are currently looking into expanding our knowledge of other
Intergraph software like CADWorx fieldPipe Professional, which
enables the use of laser-scan and laser-trace technology to
capture the real as-built.”
MOVING FORWARD
The integration of CADWorx Plant Professional has allowed STI
Engineering to save vital man hours and engineering software
costs. Subsequently, STI Engineering will also use CAESAR II in
its new oil and gas division, and continue to use CADWorx Plant
Professional for the industrial division of the company.
Soon to be known as Hexagon Process, Power & Marine, Intergraph
Process, Power & Marine is the leading global provider of engineering
software for the design, construction and operation of plants, ships and
offshore facilities.
Hexagon Process, Power & Marine is part of Hexagon (Nasdaq Stockholm:
HEXA B; hexagon.com), a leading global provider of information technolo-
gies that drive quality and productivity improvements across geospatial and
industrial enterprise applications.
About Intergraph Process, Power & Marine
© 2016 Intergraph Corporation. All rights reserved. Intergraph is part of Hexagon. Intergraph and the Intergraph logo are registered trademarks of Intergraph Corporation or its subsidiaries in the United States and in other countries. Other brands
and product names are trademarks of their respective owners. 04/2016 PPM–NL–0394A-ENG
View of the turbine system, created in CADWorx Plant Professional.
View of the filtering system, created in CADWorx Plant Professional.

More Related Content

What's hot

mechanical engineer resume
mechanical engineer resumemechanical engineer resume
mechanical engineer resume
Adnan Al shater
 
AutomAPPPS_recent_en_public
AutomAPPPS_recent_en_publicAutomAPPPS_recent_en_public
AutomAPPPS_recent_en_public
Jimmy Chang
 
Design Faster and Lighter:Applications of Topology Optimization in Additive M...
Design Faster and Lighter:Applications of Topology Optimization in Additive M...Design Faster and Lighter:Applications of Topology Optimization in Additive M...
Design Faster and Lighter:Applications of Topology Optimization in Additive M...
Altair
 
CoreTechnologie launches universal 3D printing software with new features
CoreTechnologie launches universal 3D printing software with new featuresCoreTechnologie launches universal 3D printing software with new features
CoreTechnologie launches universal 3D printing software with new features
Keen Ley
 
RESUME
RESUMERESUME
RESUME
Sampad Panda
 
Duerr at a glance (March 2018)
Duerr at a glance (March 2018)Duerr at a glance (March 2018)
Duerr at a glance (March 2018)
Dürr
 
FARO Case study by Tilden-Coil
FARO Case study by Tilden-CoilFARO Case study by Tilden-Coil
FARO Case study by Tilden-Coil
Ulises Uscanga
 
Cadmatic marine e xperience 3 web
Cadmatic marine e xperience 3 webCadmatic marine e xperience 3 web
Cadmatic marine e xperience 3 web
Katerina Moskalenko
 
DS PLM Composites_Solution
DS PLM Composites_SolutionDS PLM Composites_Solution
DS PLM Composites_Solution
Jimmy Chang
 
Curriculum vitae
Curriculum vitaeCurriculum vitae
Curriculum vitae
Indra Dio Aji Prayoga
 
Apeiron Design Services
Apeiron Design ServicesApeiron Design Services
Apeiron Design Services
dharmesh kumar
 
Jeremiah Scott (Boeing): Virtual Tours for Aerospace Manufacturing
Jeremiah Scott (Boeing): Virtual Tours for Aerospace ManufacturingJeremiah Scott (Boeing): Virtual Tours for Aerospace Manufacturing
Jeremiah Scott (Boeing): Virtual Tours for Aerospace Manufacturing
AugmentedWorldExpo
 
CV MJBoon June 2016
CV MJBoon June 2016CV MJBoon June 2016
CV MJBoon June 2016
Michael Boon
 
AUTO CAD
AUTO CADAUTO CAD
Geoshot - CAD Services - Brochure
Geoshot - CAD Services - BrochureGeoshot - CAD Services - Brochure
Geoshot - CAD Services - Brochure
Bigyan Kar
 
Resume_D Hayes for JOBS
Resume_D Hayes for JOBSResume_D Hayes for JOBS
Resume_D Hayes for JOBS
Daniel Hayes
 
Inspiring Day "Industria y Fábrica del Futuro" (Fernando Lasagni - Catec)
Inspiring Day "Industria y Fábrica del Futuro" (Fernando Lasagni - Catec) Inspiring Day "Industria y Fábrica del Futuro" (Fernando Lasagni - Catec)
Inspiring Day "Industria y Fábrica del Futuro" (Fernando Lasagni - Catec)
TECNALIA Research & Innovation
 
sudhakar_alfanar_2015_cselectric
sudhakar_alfanar_2015_cselectricsudhakar_alfanar_2015_cselectric
sudhakar_alfanar_2015_cselectric
sudhakar sapuram
 
Cad software programs engineer's handbook.
Cad software programs   engineer's handbook.Cad software programs   engineer's handbook.
Cad software programs engineer's handbook.
ENDEAVOUR INTERNATIONAL
 
Sridhar resume latest ver 1
Sridhar resume latest ver 1Sridhar resume latest ver 1
Sridhar resume latest ver 1
Sridhar V
 

What's hot (20)

mechanical engineer resume
mechanical engineer resumemechanical engineer resume
mechanical engineer resume
 
AutomAPPPS_recent_en_public
AutomAPPPS_recent_en_publicAutomAPPPS_recent_en_public
AutomAPPPS_recent_en_public
 
Design Faster and Lighter:Applications of Topology Optimization in Additive M...
Design Faster and Lighter:Applications of Topology Optimization in Additive M...Design Faster and Lighter:Applications of Topology Optimization in Additive M...
Design Faster and Lighter:Applications of Topology Optimization in Additive M...
 
CoreTechnologie launches universal 3D printing software with new features
CoreTechnologie launches universal 3D printing software with new featuresCoreTechnologie launches universal 3D printing software with new features
CoreTechnologie launches universal 3D printing software with new features
 
RESUME
RESUMERESUME
RESUME
 
Duerr at a glance (March 2018)
Duerr at a glance (March 2018)Duerr at a glance (March 2018)
Duerr at a glance (March 2018)
 
FARO Case study by Tilden-Coil
FARO Case study by Tilden-CoilFARO Case study by Tilden-Coil
FARO Case study by Tilden-Coil
 
Cadmatic marine e xperience 3 web
Cadmatic marine e xperience 3 webCadmatic marine e xperience 3 web
Cadmatic marine e xperience 3 web
 
DS PLM Composites_Solution
DS PLM Composites_SolutionDS PLM Composites_Solution
DS PLM Composites_Solution
 
Curriculum vitae
Curriculum vitaeCurriculum vitae
Curriculum vitae
 
Apeiron Design Services
Apeiron Design ServicesApeiron Design Services
Apeiron Design Services
 
Jeremiah Scott (Boeing): Virtual Tours for Aerospace Manufacturing
Jeremiah Scott (Boeing): Virtual Tours for Aerospace ManufacturingJeremiah Scott (Boeing): Virtual Tours for Aerospace Manufacturing
Jeremiah Scott (Boeing): Virtual Tours for Aerospace Manufacturing
 
CV MJBoon June 2016
CV MJBoon June 2016CV MJBoon June 2016
CV MJBoon June 2016
 
AUTO CAD
AUTO CADAUTO CAD
AUTO CAD
 
Geoshot - CAD Services - Brochure
Geoshot - CAD Services - BrochureGeoshot - CAD Services - Brochure
Geoshot - CAD Services - Brochure
 
Resume_D Hayes for JOBS
Resume_D Hayes for JOBSResume_D Hayes for JOBS
Resume_D Hayes for JOBS
 
Inspiring Day "Industria y Fábrica del Futuro" (Fernando Lasagni - Catec)
Inspiring Day "Industria y Fábrica del Futuro" (Fernando Lasagni - Catec) Inspiring Day "Industria y Fábrica del Futuro" (Fernando Lasagni - Catec)
Inspiring Day "Industria y Fábrica del Futuro" (Fernando Lasagni - Catec)
 
sudhakar_alfanar_2015_cselectric
sudhakar_alfanar_2015_cselectricsudhakar_alfanar_2015_cselectric
sudhakar_alfanar_2015_cselectric
 
Cad software programs engineer's handbook.
Cad software programs   engineer's handbook.Cad software programs   engineer's handbook.
Cad software programs engineer's handbook.
 
Sridhar resume latest ver 1
Sridhar resume latest ver 1Sridhar resume latest ver 1
Sridhar resume latest ver 1
 

Similar to CaseStudy - STI Engineering

CaseStudy- Gelsia_FINAL-
CaseStudy- Gelsia_FINAL-CaseStudy- Gelsia_FINAL-
CaseStudy- Gelsia_FINAL-
Maurizio Sirica
 
CaseStudy - MARSON 3D-ISAGRO
CaseStudy - MARSON 3D-ISAGROCaseStudy - MARSON 3D-ISAGRO
CaseStudy - MARSON 3D-ISAGRO
Maurizio Sirica
 
CaseStudy-Nortech
CaseStudy-NortechCaseStudy-Nortech
CaseStudy-Nortech
Peter Van Der Weijde
 
Smartplant application and effectiveness
Smartplant application and effectivenessSmartplant application and effectiveness
Smartplant application and effectiveness
raghunathan janarthanan
 
Mpds4 brochure en
Mpds4 brochure enMpds4 brochure en
Mpds4 brochure en
Edgar Castelo
 
Intergraph CADWorx & Analysis Flyer
Intergraph CADWorx & Analysis FlyerIntergraph CADWorx & Analysis Flyer
Intergraph CADWorx & Analysis Flyer
Nicole Brlek
 
Intergraph cad worx_analysis_flyer_2012
Intergraph cad worx_analysis_flyer_2012Intergraph cad worx_analysis_flyer_2012
Intergraph cad worx_analysis_flyer_2012
Nicole Brlek
 
Field Engineering & 3D Modeling For 105MW Tarakhil Power Plant In Kabul
Field Engineering & 3D Modeling For 105MW Tarakhil Power Plant In KabulField Engineering & 3D Modeling For 105MW Tarakhil Power Plant In Kabul
Field Engineering & 3D Modeling For 105MW Tarakhil Power Plant In Kabul
Rishabh Engineering Services
 
Cadison world-issue-01-2013
Cadison world-issue-01-2013Cadison world-issue-01-2013
Cadison world-issue-01-2013
CADISON
 
CADISON world Issue-1-2013
CADISON world Issue-1-2013CADISON world Issue-1-2013
CADISON world Issue-1-2013
CADISON
 
CaseStudy_Mahler_CADWorx_CAESARII
CaseStudy_Mahler_CADWorx_CAESARIICaseStudy_Mahler_CADWorx_CAESARII
CaseStudy_Mahler_CADWorx_CAESARII
Peter Van Der Weijde
 
Showcase slide
Showcase slideShowcase slide
Showcase slide
Victor Mitov
 
Addimadour - centre d’excellence sur les technologies de fabrication additiv...
Addimadour -  centre d’excellence sur les technologies de fabrication additiv...Addimadour -  centre d’excellence sur les technologies de fabrication additiv...
Addimadour - centre d’excellence sur les technologies de fabrication additiv...
polenumerique33
 
Piping engineering
Piping engineeringPiping engineering
Piping engineering
CADISON
 
3 d designer
3 d designer3 d designer
3 d designer
CADISON
 
CaseStudy_OnLine_Design
CaseStudy_OnLine_DesignCaseStudy_OnLine_Design
CaseStudy_OnLine_Design
Peter Van Der Weijde
 
DOD USES SMARTPLANT ® MATERIALS TO IMPROVE PROCUREMENT EFFICIENCY
DOD USES SMARTPLANT ® MATERIALS TO IMPROVE PROCUREMENT EFFICIENCY DOD USES SMARTPLANT ® MATERIALS TO IMPROVE PROCUREMENT EFFICIENCY
DOD USES SMARTPLANT ® MATERIALS TO IMPROVE PROCUREMENT EFFICIENCY
raghunathan janarthanan
 
Citec Group brochure 2016_lowres
Citec Group brochure 2016_lowresCitec Group brochure 2016_lowres
Citec Group brochure 2016_lowres
Austin Antony
 
Educadd Corporate PPt_Raipur_Final
Educadd Corporate PPt_Raipur_FinalEducadd Corporate PPt_Raipur_Final
Educadd Corporate PPt_Raipur_Final
Educadd Raipur
 
Google
GoogleGoogle
Google
DVJ
 

Similar to CaseStudy - STI Engineering (20)

CaseStudy- Gelsia_FINAL-
CaseStudy- Gelsia_FINAL-CaseStudy- Gelsia_FINAL-
CaseStudy- Gelsia_FINAL-
 
CaseStudy - MARSON 3D-ISAGRO
CaseStudy - MARSON 3D-ISAGROCaseStudy - MARSON 3D-ISAGRO
CaseStudy - MARSON 3D-ISAGRO
 
CaseStudy-Nortech
CaseStudy-NortechCaseStudy-Nortech
CaseStudy-Nortech
 
Smartplant application and effectiveness
Smartplant application and effectivenessSmartplant application and effectiveness
Smartplant application and effectiveness
 
Mpds4 brochure en
Mpds4 brochure enMpds4 brochure en
Mpds4 brochure en
 
Intergraph CADWorx & Analysis Flyer
Intergraph CADWorx & Analysis FlyerIntergraph CADWorx & Analysis Flyer
Intergraph CADWorx & Analysis Flyer
 
Intergraph cad worx_analysis_flyer_2012
Intergraph cad worx_analysis_flyer_2012Intergraph cad worx_analysis_flyer_2012
Intergraph cad worx_analysis_flyer_2012
 
Field Engineering & 3D Modeling For 105MW Tarakhil Power Plant In Kabul
Field Engineering & 3D Modeling For 105MW Tarakhil Power Plant In KabulField Engineering & 3D Modeling For 105MW Tarakhil Power Plant In Kabul
Field Engineering & 3D Modeling For 105MW Tarakhil Power Plant In Kabul
 
Cadison world-issue-01-2013
Cadison world-issue-01-2013Cadison world-issue-01-2013
Cadison world-issue-01-2013
 
CADISON world Issue-1-2013
CADISON world Issue-1-2013CADISON world Issue-1-2013
CADISON world Issue-1-2013
 
CaseStudy_Mahler_CADWorx_CAESARII
CaseStudy_Mahler_CADWorx_CAESARIICaseStudy_Mahler_CADWorx_CAESARII
CaseStudy_Mahler_CADWorx_CAESARII
 
Showcase slide
Showcase slideShowcase slide
Showcase slide
 
Addimadour - centre d’excellence sur les technologies de fabrication additiv...
Addimadour -  centre d’excellence sur les technologies de fabrication additiv...Addimadour -  centre d’excellence sur les technologies de fabrication additiv...
Addimadour - centre d’excellence sur les technologies de fabrication additiv...
 
Piping engineering
Piping engineeringPiping engineering
Piping engineering
 
3 d designer
3 d designer3 d designer
3 d designer
 
CaseStudy_OnLine_Design
CaseStudy_OnLine_DesignCaseStudy_OnLine_Design
CaseStudy_OnLine_Design
 
DOD USES SMARTPLANT ® MATERIALS TO IMPROVE PROCUREMENT EFFICIENCY
DOD USES SMARTPLANT ® MATERIALS TO IMPROVE PROCUREMENT EFFICIENCY DOD USES SMARTPLANT ® MATERIALS TO IMPROVE PROCUREMENT EFFICIENCY
DOD USES SMARTPLANT ® MATERIALS TO IMPROVE PROCUREMENT EFFICIENCY
 
Citec Group brochure 2016_lowres
Citec Group brochure 2016_lowresCitec Group brochure 2016_lowres
Citec Group brochure 2016_lowres
 
Educadd Corporate PPt_Raipur_Final
Educadd Corporate PPt_Raipur_FinalEducadd Corporate PPt_Raipur_Final
Educadd Corporate PPt_Raipur_Final
 
Google
GoogleGoogle
Google
 

CaseStudy - STI Engineering

  • 1. CASE STUDY: STI Engineering, Italy STI Engineering Designs a Waste- to-Energy Plant WITH INTERGRAPH® CADWORX® & Analysis SOLUTIONS Italian engineering company, STI Engineering, selects Intergraph CADWorx solutions to improve design execution IDENTIFYING GOALS STI Engineering won an international tender for a multidisciplinary design, waste to energy plant on the island of Terceira, a small island in the Azores archipelago (Portugal). This plant is set to process 40,000 tons of municipal solid waste per year, generating power for 20,000 residents. The new facility would produce 24 million KWh per year of electricity, from the 10 structures, 30 equipments and 300 piping lines. The main goals for STI Engineering were to save time and cost whilst creating accurate, timely, and detailed engineering information. With a tender valuing a total amount of 30 million euros, STI Engineering needed to stringently evaluate various solutions available in the market to be able to select the best engineering and analysis solutions provider. OVERCOMING CHALLENGES The project involved considerable engineering challenges, and so any solution selected would need to increase productivity, require only minimal training to get users productive, and be easy to implement and configure. The solution also needed to provide efficient modelling and manipulation of piping supports, whilst enabling interoperability with other solutions. The greatest challenge for STI Engineering was finding a tool that could reduce the overall execution time of the plant design phase. Generally, the company found that many of the solutions provided by other vendors had long start up and implementation times, which could have affected the entire project schedule. Having a solution that was easy to learn, could be set up quickly, and easily customised in accordance with the project requirements, in terms of both documentation and reporting deliverables, was fundamental to the success of the project. Additionally, many of the other solutions considered required the use of a dedicated CAD administrator, which would have increased administration costs for the project. The shortlist consisted of just three solutions. After a thorough and detailed evaluation of each solution, weighing up the respective capabilities of each against the needs of the project, Intergraph CADWorx Plant Professional was selected as the primary FACTS AT A GLANCE Company: STI Engineering Website: www.sti-engineering.it Description: STI Engineering offers design and consulting services in civil construction and industrial plant industries. The company has 25+ years of experience, and has developed over 3000 projects in 50 countries across the world. Employees: 150 Industry: Construction, industrial plant design Country: Italy PRODUCTS USED: • Intergraph® CADWorx® Plant Professional • CAESAR II® • OrthoGen® KEY BENEFITS: • 30% engineering man hour savings. • Easy, intuitive, and efficient 3D modelling. • Efficient placement and manipulation of pipe supports. • Automatic deliverables - piping isometrics, 2D layouts, and bills of material. • Accurate materials management.
  • 2. 3D platform due to its ease of use and efficiency. This was due to the object-based system providing greater and more flexible access to design data, and easier modelling and manipulation of piping supports, helping to reduce engineering work and lower design costs. Additionally, CADWorx Plant Professional was the only software considered providing bi-directional integration with CAESAR II, and interoperability with OrthoGen and CADWorx P&ID Professional. REALIZING RESULTS CADWorx Plant Professional was the fundamental base to manage cost control and planning for the project. The engineering work comprised of creation of piping specifications, P&IDs, a 3D model, isometrics, layouts, and material take offs. Once specifications were defined and made available, the first step in the project execution involved creating a 3D model of the plant. The complete model was created and completed in just 4 months. The second step, to avoid rework in the field, was the CADWorx interference check between all disciplines included in the multidisciplinary design. Finally, utilizing Isogen and OrthoGen, STI Engineering generated accurate isometrics and layouts automatically from the model, saving considerable man hours during this critical step in the project execution. Next, a database linked to CADWorx Plant Professional, containing all components present in the model and all of the client’s purchase order codes, was created so that bills of materials could be reported and submitted for procurement. Customization and integration of the database with the procurement system was possible without the assistance of Intergraph personnel. STI Engineering, with three offices in Italy and 4 operative offices worldwide, currently employs 150 people, 15 of which have successfully mastered how to use CADWorx having received only a few days of introductory training. Future trainings can now be done in-house, saving both time and cost, with resources immediately ready for productive work upon completion of their training. When asked about the results of using Intergraph CADWorx Plant Professional, STI Engineering said: ““The use of Intergraph tools reduced engineering work by approximately 30%, and engineering software cost by approximately 60% compared to similar previous projects. We are currently looking into expanding our knowledge of other Intergraph software like CADWorx fieldPipe Professional, which enables the use of laser-scan and laser-trace technology to capture the real as-built.” MOVING FORWARD The integration of CADWorx Plant Professional has allowed STI Engineering to save vital man hours and engineering software costs. Subsequently, STI Engineering will also use CAESAR II in its new oil and gas division, and continue to use CADWorx Plant Professional for the industrial division of the company. Soon to be known as Hexagon Process, Power & Marine, Intergraph Process, Power & Marine is the leading global provider of engineering software for the design, construction and operation of plants, ships and offshore facilities. Hexagon Process, Power & Marine is part of Hexagon (Nasdaq Stockholm: HEXA B; hexagon.com), a leading global provider of information technolo- gies that drive quality and productivity improvements across geospatial and industrial enterprise applications. About Intergraph Process, Power & Marine © 2016 Intergraph Corporation. All rights reserved. Intergraph is part of Hexagon. Intergraph and the Intergraph logo are registered trademarks of Intergraph Corporation or its subsidiaries in the United States and in other countries. Other brands and product names are trademarks of their respective owners. 04/2016 PPM–NL–0394A-ENG View of the turbine system, created in CADWorx Plant Professional. View of the filtering system, created in CADWorx Plant Professional.