ADEL GALAL EL EKHRITY
Cell Phone: +971-50-1269464
E-mail: alekhrety_adel@yahoo.com
____________________________________________________________________________
PROFESSIONAL TRAINING COURSES
_____________________________________________________________________________
Following courses attended at Damanhour Power Plant in Italy, USA, Netherlands @ Egypt.
The training courses were conducted by Elsag Bailey Italy, General Electric USA and NEM
Netherlands:
 Site Planning and Preparation for Bailey Infi-90 DCS system.
 IS6-99B – Configuration and Maintenance of OIS Operator Station.
 IS6-91C – Infi-90 Control System Hardware.
 IS6-97 – EWS Configuration for Infi-90 control system, including control logic development.
 IS6-99 – EWS Configuration for Infi-90 OIS, including display and database configuration.
 IS6-91A – General Maintenance and troubleshooting of Infi-90 Control System.
 IS6-9920M – Maintenance and troubleshooting of Infi-90 Control System Hardware.
 IS6-101A – Maintenance and troubleshooting of Infi-90 OIS hardware.
 PTS-SEEK-02 – Configuration, tuning and maintenance smart field instruments.
 General Electric Steam Turbine Generator – Operation and Maintenance
 General Electric ST Generator – Control and Excitation.
 General Electric Steam Turbine (Speedtronic) – Mark-V Controls.
 NEM HRSG – including instrumentation and Electrical/ Mechanical equipment of HRSG.
_____________________________________________________________________________
QUALIFICATIONS
I'm working as a DCS Control systems and Instruments engineering designer, Most expert
but not limited to all Bailey and ABB control systems with a total of 21 years experience
on Energy Plants, Petroleum Oil and Gas fields, Water treatment plants Plus Sugar and
Pulp paper factories.
Latest employer is ABB Automation LLC. Abu Dhabi, UAE. for the last 8 years.
____________________________________________________________________________
EDUCATION
______________________________________________________________________
Bachelor of Electronics Engineering in1993:
“Automatic Control Systems Modern Design Technology and Measurements”
University - Menoufia, Egypt.
Boiler Drum Level Control System. With degree Excellent as major subject.
____________________________________________________________________________
PERSONAL PROFILE AND SKILLS
______________________________________________________________________
I have good command over written/ spoken English, French and Arabic; including Management,
Communication, Presentation, Negotiation, Leadership, Motivation and Teamwork skills, which I
have learned and developed in my personality after working in different organizations, cultures
and work environments. These skills and experiences helped me to modulate my self to handle
different type of jobs/ tasks i.e. handling multitasks and working under pressure for engineering,
configuration design, services, maintenance and lead projects, and finally managerial projects
specialist for Power generation plants, Gas and Oil fields, and water treatment plants for over
than 27 varied projects.
Following is brief description of my knowledge skills related to computers:
 Operating System: QNX, VMS and Open VMS to handle all OIS series and Conductor
VMS. Windows NT 4.0, Windows 2000/ 2003 to handle Conductor NT series.
 Languages: Arabic, English and French.
 Database: Dbase, Foxboro, MS Access, MS Project and MS SQL
 Package: MS Office 2000/ 2003/ 2007/XP/2010
 Documentation: Adobe PDF and Auto CAD
EXPERIENCE
______________________________________________________________________
1993 TO 1998: Egyptian Electrical Authority.
Mahmoudia Gas Power Generation Plant, Mahmoudia, Behera – Egypt.
POSITION: Instrumentation and Control Systems Engineer.
RESPONSIBILITIES: Maintenance of Elsag Bailey Infi-90 Control System for Combine Cycle Unit i.e.
GE Steam Turbine (50MW *2) and Heat Recovery Steam Generators.
Maintenance of Instrumentation and control system related to Rolls Royce Gas
Turbine Units (50MW *4), GE Gas Turbine Units (25MW *8), LV/ HV Switch Yard
and Power Transmission Lines (11KV/ 66KV/ 220 KV. Maintenance of
Woodward GT Control System for Rolls Royce GTs, Mark-II Control System for
GE Gas Turbines.
1998 TO 2007: ACETO Industries Inc. Cairo – Egypt.
A system Integrator Company, acting as representative in Egypt for former Elsag
Bailey/ ABB Automation Inc.
POSITION: Sr. System Engineer
RESPONSIBILITIES: Planning & scheduling of projects. Design, Engineering, Implementation,
Erection/ Installation and Start up/Commissioning of Distributed Control Systems
(DCS), Develop, Manage and Supervise major projects in:
 Power Generation Plants.
 Oil & Gas and Petroleum Plants.
 Water Treatment Plants.
 Sugar Plants.
 Pulp and Paper Plants.
2007 TO 2008: ABB Utilities GmbH – United Arab Of Emirates.
POSITION: Sr. Projects System Engineer.
RESPONSIBILITIES: Planning & scheduling of projects. Design, Engineering, Implementation,
erection/ installation.
Start up/Commissioning, Develop, Manage and Supervise of Distributed
Control with Infi90 control Systems In:
§ Power Generation Plants.
§ Oil & Gas and Petroleum Plants.
§ Water Treatment Plants.
2008 T O 2015: ABB Automation L.L.C – United Arab Of Emirates.
POSITION: Sr. Lead Projects Specialist.
RESPONSIBILITIES: Planning & scheduling of projects. Design, Engineering, FAT implementation,
erection/ installation.
Start up/Commissioning and develop, manage and supervise of Distributed
Control with Infi90 and 800XA control Systems In:
§ Oil & Gas and Petroleum Plants.
EXECUTED PROJECTS – OIL & GAS/ PROCESS INDUSTRIES
1- Alexandria National Refinery & Petrochemicals – Alexandria, Egypt.
Customer: ANRPC – Egypt.
End User: Alexandria National Refinery & Petrochemicals – Alexandria, Egypt.
System: Symphony/ Harmony block series with Conductor VMS and Composer
Scope of Work: Erection/ Installation, Commissioning and Start up of Symphony/ Harmony control
system, consists of new HCU cabinets (with block I/Os & HAC) and Conductor
VMS server-client.
2- Cairo Oil Refinery – Cairo, Egypt.
Customer: ABB Inc. USA – Egypt.
End User: Cairo Oil Refinery – Cairo, Egypt.
System: Symphony/ Harmony rack series with Process Portal B and Composer
Scope of Work: Erection/ Installation, Commissioning and Start up of Symphony/ Harmony control
system, consists of new HCU cabinets (with rack I/Os & BRCs) and Process
Portal B server-client.
3- Suez Oil Petroleum Co. – Suez, Egypt.
Customer: SOPC – Egypt.
End User: Suez Oil Petroleum Co – Suez, Egypt.
System: Infi-90 Open DCS System with OIS43 series and EWS (Win tool).
Scope of Work: Erection/ Installation, Commissioning and Start up of Infi-90 Open DCS PCV
LAN90 HSIs for new Sulpher Treatment Unit. Including new cabinets and PCV
LAN90 HSIs.
4- Fayoum Sugar Plant – Fayoum, Egypt.
Customer: SIIC - Egypt
End User: Fayoum Sugar Plant – Fayoum, Egypt.
System: Infi-90 Open DCS System with Conductor NT and EWS (Composer)
Scope of Work: Start up/ Commissioning of Infi-90 Open DCS System for a new Sugar factory.
5- Miser Edfu for Printing Paper Co. – Aswan, Egypt.
Customer: MEPPCO – Egypt.
End User: Miser Edfu for Printing Paper Co – Aswan, Egypt.
System: Infi-90 Open DCS System with PCV LAN90 and EWS (Win tool)
Scope of Work: Erection/ Installation, Commissioning and Start up of Infi-90 Open DCS System
for a new Paper Mill machinery.
EXECUTED PROJECTS – POWER GENERATION
1- Ayoun Moussa Power Generation Plant – Sinai, Egypt.
Customer: EEA – Egypt.
End User: Ayoun Moussa Power Generation Plant – Sinai, Egypt.
System: Infi-90 open DCS with OIS43 and EWS (Win tool)
Scope of Work: Coordination with project consultant (PEGESCO) on behalf of EEA for project
activities. Site planning/ preparation, Pre-installation activities for Erection/
Installation, Commissioning and Start up of Infi-90 open DCS.
2- Sidi Krir Power Generation Plant (Unit3&4) – Alexandria, Egypt.
Customer: Inter Gen – USA.
End User: Sidi Krir Power Generation Plant (Unit3&4) – Alexandria, Egypt.
System: Infi-90 Open DCS System with OIS43 series and EWS (Win tool)
Scope of Work: Start up/ Commissioning of Infi-90 Open DCS System for new Units 3&4.
3- Egyptian French Power Generation Co – Suez, Egypt.
Customer: EDF – France.
End User: Egyptian French Power Generation Co – Suez, Egypt.
System: Alstom Control System for Boiler and Turbine Controls
Scope of Work: Engineering Design, Start up/ Commissioning of Alstom Control System.
4- Setubal Power Generation Plant, Setubal, Portugal.
Customer: NEM Co. Holland
End User: Portugal Power Generation Co.
System: Infi-90 with OIS40 and EWS (Dos tool)
Scope of Work: Erection/ Installation, Commissioning and Start up of Infi-90 DCS.
5- Kafr El Dawar Power Generation Plant – Unit-3 Retrofit Project, Behera, Egypt.
Customer: WDEPC – Egypt.
End User: Kafr El Dawar Power Generation Plant - Behera, Egypt.
System: Infi-90 open DCS with Conductor NT & EWS (Composer) for Boiler Controls/
Electrical BOP; Westinghouse (Ovation) control system for Steam Turbine and
Field Instrumentation.
Responsibility: Start it as a Project Engineering Manager, End it as a Project Manger.
Scope of Work: Proposal preparation and technical clarifications for contract award. Site survey
and data collection for basic engineering. Control system design and detailed
engineering. Supervision of Erection/ Installation, Commission and Start up of all
control systems equipment and field instrumentation.
Supervise cold / hot commissioning, process commissioning for commercial
operation of the unit. Project Management lead responsibility including
maintenance and system troubleshooting for routine maintenance and warranty
issues.
EXECUTED SERVICES – OIL & GAS/ PROCESS INDUSTRIES AND POWER GENERATION
1- Delta Sugar Plant – Hamol, Egypt.
Customer: SIIC – Egypt.
End User: Delta Sugar Plant – Hamol, Egypt.
System: Infi-90 Open DCS System with PCV LAN90 and EWS (Win tool)
Scope of Work: Modification and troubleshooting in Infi-90 DCS.
2- Abu Korkas Sugar Plant – Menya, Egypt.
Customer: SIIC - Egypt
End User: Abu Korkas Sugar Plant – Menya, Egypt.
System: Infi-90 Open DCS System with PCV LAN90 and EWS (Win tool)
Scope of Work: Modification and troubleshooting in Infi-90 DCS.
3- Bailey Network-90 OIU to Infi-90 OIS43 upgrade
Customer: Egyptian Electricity Authority.
End User: Damanhour Power Generation Plant, Damanhour – Behera, Egypt.
System: Bailey Network-90 with OIU, EWS (Dos tool) and OIS43.
Scope of Work: Erection/ Installation, Commissioning and Start up of new OIS43 consoles.
4- Sidi Krir Power Generation Plant (Unit1&2) – Alexandria, Egypt.
Customer: EEA – Egypt.
End User: Sidi Krir Power Generation Plant (Unit1&2) – Alexandria, Egypt.
System: Infi-90 Open DCS System with OIS43 series and EWS (Win tool)
Scope of Work: Engineering support for modification and changes in Infi-90 DCS System.
5- New Abu Qir P-1 Platform – Alexandria, Egypt.
Customer: WEPCO – Egypt.
End User: New Abu Qir P-1 Platform – Alexandria, Egypt.
System: Infi-90 Open DCS System with OIS43 series and EWS (Win tool)
Scope of Work: Testing of system hardware and field instrumentation.
6- Esna Power Generation Plant – Luxer, Egypt.
Customer: EEA – Egypt.
End User: Esna Power Generation Plant – Luxer, Egypt.
System: Bailey Network-90 with MCS series and EWS (Dos tool)
Scope of Work: Troubleshooting/ replacement of Power Supply of Net-90 PCU and online
modification in controller for navigation lock gate.
7- Enabbi Power Generation Plant, Enabbi, Algeria.
Customer: ABB Controls Inc. USA
End User: Enabbi Power Generation Plant, Enabbi, Algeria.
System: Infi-90 Open DCS System with OIS43 series and EWS (Win tool).
Scope of Work: Troubleshoot hardware and configuration problems.
EXECUTED PROJECTS – OIL & GAS/ PROCESS INDUSTRIES (INSIDE ABB).
 ABB Utilities GMBH &
 ABB Automation L.L.C
1- AE-33512020_CCIC-ADMA OPC 100MBD, Das Island. UAE.
Customer: Consolidated Contractors Company (CCC)
End User: Abu Dhabi Marine Operating Company (ADMA_OPCO).
System: Harmony – INFI90, S800 I/O Hardware.
Scope of Work: Lead the project Control Design Configurations which will be installed on a new
Cabinets with a new BRC410 Controllers to maintain new field instrumentation for the new project.
2- AE-33512018_NPCC-ADMA OPC 100MBD, (ZWSC), Zakum West, UAE.
Customer: National Petroleum Company (NPCC)
End User: Abu Dhabi Marine Operating Company (ADMA_OPCO).
System: Harmony – INFI90
Scope of Work: Lead the project Control Design Configurations which will be
installed on a new Cabinets with the new BRC410 Controllers to maintain the new field
instrumentation for the new project.
3- Upgrade Of Habshan-1 Boilers Obsolete Local Control System, HABSHAN, UAE.
Customer: Emirates Electrical & Instrumentation Company L.L.C (E&I)
End User: GASCO Abu Dhabi Gas Industries LTD.
System: Infi-90 Control System with S800 IO.
Scope of Work: Leading the project, upgrading DCS I/O hardware to state of art hardware for
3 new system cabinets and 3 new marshaling cabinets. This upgrade will mainly
include I/O hardware upgrade from the conventional rack I/O and SLC to S800
I/Os. A new design will use the existing BRC400 as a processor.
4- ADMA Zakum (ZWSC) WIP Pressure Upgrade Project, Zakum West UAE.
Customer: McDERMOTT MIDDLE EAST INC
End User: Abu Dhabi Marine Operating Company (ADMA_OPCO).
System: Harmony – INFI90, S800 I/O Hardware
PLC-with a new SIL3 rated AC800M
Scope of Work: Lead The following:
 Modification of the existing system with a new hardwired IO’s,
 Install a new cabinet for Distributed Control System (DCS) for FSC- New Filter sequence
controller with BRC 400 and IOR-800 with S800 IO,
 OPP PLC-with a new SIL3 rated AC800M HI redundant system,
 Redundant TCP/IP serial communication between:
 New FSC & OPP PLC
 New FSC & MMS PLC
5- Habshan Flare Gas Recovery, HFGR, HABSHAN, UAE.
Customer: Consolidated Contractors Company (CCC)
End User: GASCO Abu Dhabi Gas Industries LTD.
System: Harmony – INFI90, S800 I/O Hardware.
Scope of Work: Lead HFGR project which is mainly installed in IES 19 (Flare 0)
and IES 20 (Flare 1 and Flare 2) and designed to be integrated into the DCS C-Net loop 1.
Additional software modifications will also be implemented in existing IES8A and IES15.
6- Green Diesel Project, GDP, GSE & C, TAKREER, UAE.
Customer: GSE & C
End User: TAKREER.
System: Infi-90 DCS Control System.
Scope of Work: Supporting during factory acceptance test all running activities the
procedure applies to the hardware and software part of the Mod bus application of
the control system supplied for the Green Diesel Project.
7- Installation of Waste Gas Handling Unit at NGTP, USSC, ADMA OPCO, UAE.
Customer: National Petroleum Construction Company (NPCC).
End User: Abu Dhabi Marine Operating Company (ADMA_OPCO).
System: Infi-90 Control System with OIS41 Operator Interface Consoles.
Scope of Work: Lead the project, modify the existing DCS control system to provide Process
control and monitoring functions associated with the Waste Gas Handling Unit
Project.
8- I&CS Upgrade Project THAMMAMA C, OGD1, HABSHAN, UAE.
Customer: Abu Dhabi Gas Industries Ltd (GASCO)/ (UTS-Kent’s)
End User: GASCO Abu Dhabi Gas Industries LTD.
System: Infi-90 Control System with Conductor NT HSI.
Scope of Work: Lead the Modification in existing control systems, supply new hardware,
software configurations, simulated FAT, Installation, commissioning and
documentation (limited to DCS scope), integration of Pneumatic controllers with
DCS, ESD configurations need for the existing system in OGD1. Configuration
philosophy will be followed to develop logic configurations with the same
functionality.
9- Distilled Water From Takreer Gup To Casco Ruwais Project, RUWAIS, UAE.
Customer: GALFAR
End User: GASCO Abu Dhabi Gas Industries LTD.
System: Infi-90 Control System with Conductor NT HSI.
Scope of Work: Lead the New Harmony INFI-90 DCS for supply of distilled water from
TAKREER GUP to GASCO Ruwais, supply a new hardware PCU cabinets,
software configurations, simulated FAT, Installation, commissioning and
documentation including ESD configurations needed. Configurations philosophy
will be followed to develop logic configuration with the same functionality.
10- ADCOP- Abu Dhabi CRUDE Oil Pipeline Project. Habshan to Fujairah, UAE.
Customer: International Petroleum Investment Company
End User: GASCO Abu Dhabi Gas Industries LTD.
System: ACM800 Control with 800XA HMI.
Scope of Work: Project engineering Manger, For a Multi Different Packages of H.V
and M.V Switch Gears Control and Protection Systems.

More Related Content

What's hot

What's hot (7)

Mahmoud CV
Mahmoud CVMahmoud CV
Mahmoud CV
 
D.Manning CV
D.Manning CVD.Manning CV
D.Manning CV
 
Willy Jr CV - Sept 2016
Willy Jr CV - Sept 2016Willy Jr CV - Sept 2016
Willy Jr CV - Sept 2016
 
Christopher Palmer - Manager 2015
Christopher Palmer - Manager 2015Christopher Palmer - Manager 2015
Christopher Palmer - Manager 2015
 
Shady Younis's cv.
Shady Younis's cv.Shady Younis's cv.
Shady Younis's cv.
 
CV
CVCV
CV
 
ResumeDavidClay090216 (1) (2)
ResumeDavidClay090216 (1) (2)ResumeDavidClay090216 (1) (2)
ResumeDavidClay090216 (1) (2)
 

Similar to AE_cv (20)

Mohamed Elwardany's resume
Mohamed Elwardany's resumeMohamed Elwardany's resume
Mohamed Elwardany's resume
 
ibrahim cv10
ibrahim cv10ibrahim cv10
ibrahim cv10
 
Ahmed El_Nashar
Ahmed El_NasharAhmed El_Nashar
Ahmed El_Nashar
 
BoyleCV
BoyleCVBoyleCV
BoyleCV
 
Majdi Resume-Z
Majdi Resume-ZMajdi Resume-Z
Majdi Resume-Z
 
Mohamed_Abdelsamea_CV
Mohamed_Abdelsamea_CVMohamed_Abdelsamea_CV
Mohamed_Abdelsamea_CV
 
MOTAZ ALI C.V LAST UPDATE
MOTAZ ALI C.V LAST UPDATEMOTAZ ALI C.V LAST UPDATE
MOTAZ ALI C.V LAST UPDATE
 
Eng. Ali Nabil Khedr
Eng. Ali Nabil KhedrEng. Ali Nabil Khedr
Eng. Ali Nabil Khedr
 
Ahmed El_Nashar
Ahmed El_NasharAhmed El_Nashar
Ahmed El_Nashar
 
Ahmed El_Nashar
Ahmed El_NasharAhmed El_Nashar
Ahmed El_Nashar
 
Vinay Resume
Vinay ResumeVinay Resume
Vinay Resume
 
Kuldeep Singh
Kuldeep SinghKuldeep Singh
Kuldeep Singh
 
CV_Bassel Onabi
CV_Bassel OnabiCV_Bassel Onabi
CV_Bassel Onabi
 
Cv bassel onabi
Cv bassel onabiCv bassel onabi
Cv bassel onabi
 
ibrahim cv10a
ibrahim cv10aibrahim cv10a
ibrahim cv10a
 
Nagy_CV_Docx
Nagy_CV_DocxNagy_CV_Docx
Nagy_CV_Docx
 
ahmed saad cv
ahmed saad cvahmed saad cv
ahmed saad cv
 
Eng. Nader Elzamly (English)
Eng. Nader Elzamly (English)Eng. Nader Elzamly (English)
Eng. Nader Elzamly (English)
 
MOHAMED KORASHY CV 2016 new
MOHAMED KORASHY CV 2016 newMOHAMED KORASHY CV 2016 new
MOHAMED KORASHY CV 2016 new
 
CV-Mohamed Mabrouk-Technical Trainer
CV-Mohamed Mabrouk-Technical TrainerCV-Mohamed Mabrouk-Technical Trainer
CV-Mohamed Mabrouk-Technical Trainer
 

AE_cv

  • 1. ADEL GALAL EL EKHRITY Cell Phone: +971-50-1269464 E-mail: alekhrety_adel@yahoo.com ____________________________________________________________________________ PROFESSIONAL TRAINING COURSES _____________________________________________________________________________ Following courses attended at Damanhour Power Plant in Italy, USA, Netherlands @ Egypt. The training courses were conducted by Elsag Bailey Italy, General Electric USA and NEM Netherlands:  Site Planning and Preparation for Bailey Infi-90 DCS system.  IS6-99B – Configuration and Maintenance of OIS Operator Station.  IS6-91C – Infi-90 Control System Hardware.  IS6-97 – EWS Configuration for Infi-90 control system, including control logic development.  IS6-99 – EWS Configuration for Infi-90 OIS, including display and database configuration.  IS6-91A – General Maintenance and troubleshooting of Infi-90 Control System.  IS6-9920M – Maintenance and troubleshooting of Infi-90 Control System Hardware.  IS6-101A – Maintenance and troubleshooting of Infi-90 OIS hardware.  PTS-SEEK-02 – Configuration, tuning and maintenance smart field instruments.  General Electric Steam Turbine Generator – Operation and Maintenance  General Electric ST Generator – Control and Excitation.  General Electric Steam Turbine (Speedtronic) – Mark-V Controls.  NEM HRSG – including instrumentation and Electrical/ Mechanical equipment of HRSG. _____________________________________________________________________________ QUALIFICATIONS I'm working as a DCS Control systems and Instruments engineering designer, Most expert but not limited to all Bailey and ABB control systems with a total of 21 years experience on Energy Plants, Petroleum Oil and Gas fields, Water treatment plants Plus Sugar and Pulp paper factories. Latest employer is ABB Automation LLC. Abu Dhabi, UAE. for the last 8 years.
  • 2. ____________________________________________________________________________ EDUCATION ______________________________________________________________________ Bachelor of Electronics Engineering in1993: “Automatic Control Systems Modern Design Technology and Measurements” University - Menoufia, Egypt. Boiler Drum Level Control System. With degree Excellent as major subject. ____________________________________________________________________________ PERSONAL PROFILE AND SKILLS ______________________________________________________________________ I have good command over written/ spoken English, French and Arabic; including Management, Communication, Presentation, Negotiation, Leadership, Motivation and Teamwork skills, which I have learned and developed in my personality after working in different organizations, cultures and work environments. These skills and experiences helped me to modulate my self to handle different type of jobs/ tasks i.e. handling multitasks and working under pressure for engineering, configuration design, services, maintenance and lead projects, and finally managerial projects specialist for Power generation plants, Gas and Oil fields, and water treatment plants for over than 27 varied projects. Following is brief description of my knowledge skills related to computers:  Operating System: QNX, VMS and Open VMS to handle all OIS series and Conductor VMS. Windows NT 4.0, Windows 2000/ 2003 to handle Conductor NT series.  Languages: Arabic, English and French.  Database: Dbase, Foxboro, MS Access, MS Project and MS SQL  Package: MS Office 2000/ 2003/ 2007/XP/2010  Documentation: Adobe PDF and Auto CAD
  • 3. EXPERIENCE ______________________________________________________________________ 1993 TO 1998: Egyptian Electrical Authority. Mahmoudia Gas Power Generation Plant, Mahmoudia, Behera – Egypt. POSITION: Instrumentation and Control Systems Engineer. RESPONSIBILITIES: Maintenance of Elsag Bailey Infi-90 Control System for Combine Cycle Unit i.e. GE Steam Turbine (50MW *2) and Heat Recovery Steam Generators. Maintenance of Instrumentation and control system related to Rolls Royce Gas Turbine Units (50MW *4), GE Gas Turbine Units (25MW *8), LV/ HV Switch Yard and Power Transmission Lines (11KV/ 66KV/ 220 KV. Maintenance of Woodward GT Control System for Rolls Royce GTs, Mark-II Control System for GE Gas Turbines. 1998 TO 2007: ACETO Industries Inc. Cairo – Egypt. A system Integrator Company, acting as representative in Egypt for former Elsag Bailey/ ABB Automation Inc. POSITION: Sr. System Engineer RESPONSIBILITIES: Planning & scheduling of projects. Design, Engineering, Implementation, Erection/ Installation and Start up/Commissioning of Distributed Control Systems (DCS), Develop, Manage and Supervise major projects in:  Power Generation Plants.  Oil & Gas and Petroleum Plants.  Water Treatment Plants.  Sugar Plants.  Pulp and Paper Plants. 2007 TO 2008: ABB Utilities GmbH – United Arab Of Emirates. POSITION: Sr. Projects System Engineer. RESPONSIBILITIES: Planning & scheduling of projects. Design, Engineering, Implementation, erection/ installation. Start up/Commissioning, Develop, Manage and Supervise of Distributed Control with Infi90 control Systems In: § Power Generation Plants. § Oil & Gas and Petroleum Plants. § Water Treatment Plants. 2008 T O 2015: ABB Automation L.L.C – United Arab Of Emirates. POSITION: Sr. Lead Projects Specialist. RESPONSIBILITIES: Planning & scheduling of projects. Design, Engineering, FAT implementation, erection/ installation. Start up/Commissioning and develop, manage and supervise of Distributed Control with Infi90 and 800XA control Systems In: § Oil & Gas and Petroleum Plants.
  • 4. EXECUTED PROJECTS – OIL & GAS/ PROCESS INDUSTRIES 1- Alexandria National Refinery & Petrochemicals – Alexandria, Egypt. Customer: ANRPC – Egypt. End User: Alexandria National Refinery & Petrochemicals – Alexandria, Egypt. System: Symphony/ Harmony block series with Conductor VMS and Composer Scope of Work: Erection/ Installation, Commissioning and Start up of Symphony/ Harmony control system, consists of new HCU cabinets (with block I/Os & HAC) and Conductor VMS server-client. 2- Cairo Oil Refinery – Cairo, Egypt. Customer: ABB Inc. USA – Egypt. End User: Cairo Oil Refinery – Cairo, Egypt. System: Symphony/ Harmony rack series with Process Portal B and Composer Scope of Work: Erection/ Installation, Commissioning and Start up of Symphony/ Harmony control system, consists of new HCU cabinets (with rack I/Os & BRCs) and Process Portal B server-client. 3- Suez Oil Petroleum Co. – Suez, Egypt. Customer: SOPC – Egypt. End User: Suez Oil Petroleum Co – Suez, Egypt. System: Infi-90 Open DCS System with OIS43 series and EWS (Win tool). Scope of Work: Erection/ Installation, Commissioning and Start up of Infi-90 Open DCS PCV LAN90 HSIs for new Sulpher Treatment Unit. Including new cabinets and PCV LAN90 HSIs. 4- Fayoum Sugar Plant – Fayoum, Egypt. Customer: SIIC - Egypt End User: Fayoum Sugar Plant – Fayoum, Egypt. System: Infi-90 Open DCS System with Conductor NT and EWS (Composer) Scope of Work: Start up/ Commissioning of Infi-90 Open DCS System for a new Sugar factory. 5- Miser Edfu for Printing Paper Co. – Aswan, Egypt. Customer: MEPPCO – Egypt. End User: Miser Edfu for Printing Paper Co – Aswan, Egypt. System: Infi-90 Open DCS System with PCV LAN90 and EWS (Win tool) Scope of Work: Erection/ Installation, Commissioning and Start up of Infi-90 Open DCS System for a new Paper Mill machinery.
  • 5. EXECUTED PROJECTS – POWER GENERATION 1- Ayoun Moussa Power Generation Plant – Sinai, Egypt. Customer: EEA – Egypt. End User: Ayoun Moussa Power Generation Plant – Sinai, Egypt. System: Infi-90 open DCS with OIS43 and EWS (Win tool) Scope of Work: Coordination with project consultant (PEGESCO) on behalf of EEA for project activities. Site planning/ preparation, Pre-installation activities for Erection/ Installation, Commissioning and Start up of Infi-90 open DCS. 2- Sidi Krir Power Generation Plant (Unit3&4) – Alexandria, Egypt. Customer: Inter Gen – USA. End User: Sidi Krir Power Generation Plant (Unit3&4) – Alexandria, Egypt. System: Infi-90 Open DCS System with OIS43 series and EWS (Win tool) Scope of Work: Start up/ Commissioning of Infi-90 Open DCS System for new Units 3&4. 3- Egyptian French Power Generation Co – Suez, Egypt. Customer: EDF – France. End User: Egyptian French Power Generation Co – Suez, Egypt. System: Alstom Control System for Boiler and Turbine Controls Scope of Work: Engineering Design, Start up/ Commissioning of Alstom Control System. 4- Setubal Power Generation Plant, Setubal, Portugal. Customer: NEM Co. Holland End User: Portugal Power Generation Co. System: Infi-90 with OIS40 and EWS (Dos tool) Scope of Work: Erection/ Installation, Commissioning and Start up of Infi-90 DCS. 5- Kafr El Dawar Power Generation Plant – Unit-3 Retrofit Project, Behera, Egypt. Customer: WDEPC – Egypt. End User: Kafr El Dawar Power Generation Plant - Behera, Egypt. System: Infi-90 open DCS with Conductor NT & EWS (Composer) for Boiler Controls/ Electrical BOP; Westinghouse (Ovation) control system for Steam Turbine and Field Instrumentation. Responsibility: Start it as a Project Engineering Manager, End it as a Project Manger. Scope of Work: Proposal preparation and technical clarifications for contract award. Site survey and data collection for basic engineering. Control system design and detailed engineering. Supervision of Erection/ Installation, Commission and Start up of all control systems equipment and field instrumentation. Supervise cold / hot commissioning, process commissioning for commercial operation of the unit. Project Management lead responsibility including maintenance and system troubleshooting for routine maintenance and warranty issues.
  • 6. EXECUTED SERVICES – OIL & GAS/ PROCESS INDUSTRIES AND POWER GENERATION 1- Delta Sugar Plant – Hamol, Egypt. Customer: SIIC – Egypt. End User: Delta Sugar Plant – Hamol, Egypt. System: Infi-90 Open DCS System with PCV LAN90 and EWS (Win tool) Scope of Work: Modification and troubleshooting in Infi-90 DCS. 2- Abu Korkas Sugar Plant – Menya, Egypt. Customer: SIIC - Egypt End User: Abu Korkas Sugar Plant – Menya, Egypt. System: Infi-90 Open DCS System with PCV LAN90 and EWS (Win tool) Scope of Work: Modification and troubleshooting in Infi-90 DCS. 3- Bailey Network-90 OIU to Infi-90 OIS43 upgrade Customer: Egyptian Electricity Authority. End User: Damanhour Power Generation Plant, Damanhour – Behera, Egypt. System: Bailey Network-90 with OIU, EWS (Dos tool) and OIS43. Scope of Work: Erection/ Installation, Commissioning and Start up of new OIS43 consoles. 4- Sidi Krir Power Generation Plant (Unit1&2) – Alexandria, Egypt. Customer: EEA – Egypt. End User: Sidi Krir Power Generation Plant (Unit1&2) – Alexandria, Egypt. System: Infi-90 Open DCS System with OIS43 series and EWS (Win tool) Scope of Work: Engineering support for modification and changes in Infi-90 DCS System. 5- New Abu Qir P-1 Platform – Alexandria, Egypt. Customer: WEPCO – Egypt. End User: New Abu Qir P-1 Platform – Alexandria, Egypt. System: Infi-90 Open DCS System with OIS43 series and EWS (Win tool) Scope of Work: Testing of system hardware and field instrumentation. 6- Esna Power Generation Plant – Luxer, Egypt. Customer: EEA – Egypt. End User: Esna Power Generation Plant – Luxer, Egypt. System: Bailey Network-90 with MCS series and EWS (Dos tool) Scope of Work: Troubleshooting/ replacement of Power Supply of Net-90 PCU and online modification in controller for navigation lock gate. 7- Enabbi Power Generation Plant, Enabbi, Algeria. Customer: ABB Controls Inc. USA End User: Enabbi Power Generation Plant, Enabbi, Algeria. System: Infi-90 Open DCS System with OIS43 series and EWS (Win tool). Scope of Work: Troubleshoot hardware and configuration problems.
  • 7. EXECUTED PROJECTS – OIL & GAS/ PROCESS INDUSTRIES (INSIDE ABB).  ABB Utilities GMBH &  ABB Automation L.L.C 1- AE-33512020_CCIC-ADMA OPC 100MBD, Das Island. UAE. Customer: Consolidated Contractors Company (CCC) End User: Abu Dhabi Marine Operating Company (ADMA_OPCO). System: Harmony – INFI90, S800 I/O Hardware. Scope of Work: Lead the project Control Design Configurations which will be installed on a new Cabinets with a new BRC410 Controllers to maintain new field instrumentation for the new project. 2- AE-33512018_NPCC-ADMA OPC 100MBD, (ZWSC), Zakum West, UAE. Customer: National Petroleum Company (NPCC) End User: Abu Dhabi Marine Operating Company (ADMA_OPCO). System: Harmony – INFI90 Scope of Work: Lead the project Control Design Configurations which will be installed on a new Cabinets with the new BRC410 Controllers to maintain the new field instrumentation for the new project. 3- Upgrade Of Habshan-1 Boilers Obsolete Local Control System, HABSHAN, UAE. Customer: Emirates Electrical & Instrumentation Company L.L.C (E&I) End User: GASCO Abu Dhabi Gas Industries LTD. System: Infi-90 Control System with S800 IO. Scope of Work: Leading the project, upgrading DCS I/O hardware to state of art hardware for 3 new system cabinets and 3 new marshaling cabinets. This upgrade will mainly include I/O hardware upgrade from the conventional rack I/O and SLC to S800 I/Os. A new design will use the existing BRC400 as a processor. 4- ADMA Zakum (ZWSC) WIP Pressure Upgrade Project, Zakum West UAE. Customer: McDERMOTT MIDDLE EAST INC End User: Abu Dhabi Marine Operating Company (ADMA_OPCO). System: Harmony – INFI90, S800 I/O Hardware PLC-with a new SIL3 rated AC800M Scope of Work: Lead The following:  Modification of the existing system with a new hardwired IO’s,  Install a new cabinet for Distributed Control System (DCS) for FSC- New Filter sequence controller with BRC 400 and IOR-800 with S800 IO,  OPP PLC-with a new SIL3 rated AC800M HI redundant system,  Redundant TCP/IP serial communication between:  New FSC & OPP PLC  New FSC & MMS PLC 5- Habshan Flare Gas Recovery, HFGR, HABSHAN, UAE. Customer: Consolidated Contractors Company (CCC) End User: GASCO Abu Dhabi Gas Industries LTD. System: Harmony – INFI90, S800 I/O Hardware. Scope of Work: Lead HFGR project which is mainly installed in IES 19 (Flare 0) and IES 20 (Flare 1 and Flare 2) and designed to be integrated into the DCS C-Net loop 1. Additional software modifications will also be implemented in existing IES8A and IES15.
  • 8. 6- Green Diesel Project, GDP, GSE & C, TAKREER, UAE. Customer: GSE & C End User: TAKREER. System: Infi-90 DCS Control System. Scope of Work: Supporting during factory acceptance test all running activities the procedure applies to the hardware and software part of the Mod bus application of the control system supplied for the Green Diesel Project. 7- Installation of Waste Gas Handling Unit at NGTP, USSC, ADMA OPCO, UAE. Customer: National Petroleum Construction Company (NPCC). End User: Abu Dhabi Marine Operating Company (ADMA_OPCO). System: Infi-90 Control System with OIS41 Operator Interface Consoles. Scope of Work: Lead the project, modify the existing DCS control system to provide Process control and monitoring functions associated with the Waste Gas Handling Unit Project. 8- I&CS Upgrade Project THAMMAMA C, OGD1, HABSHAN, UAE. Customer: Abu Dhabi Gas Industries Ltd (GASCO)/ (UTS-Kent’s) End User: GASCO Abu Dhabi Gas Industries LTD. System: Infi-90 Control System with Conductor NT HSI. Scope of Work: Lead the Modification in existing control systems, supply new hardware, software configurations, simulated FAT, Installation, commissioning and documentation (limited to DCS scope), integration of Pneumatic controllers with DCS, ESD configurations need for the existing system in OGD1. Configuration philosophy will be followed to develop logic configurations with the same functionality. 9- Distilled Water From Takreer Gup To Casco Ruwais Project, RUWAIS, UAE. Customer: GALFAR End User: GASCO Abu Dhabi Gas Industries LTD. System: Infi-90 Control System with Conductor NT HSI. Scope of Work: Lead the New Harmony INFI-90 DCS for supply of distilled water from TAKREER GUP to GASCO Ruwais, supply a new hardware PCU cabinets, software configurations, simulated FAT, Installation, commissioning and documentation including ESD configurations needed. Configurations philosophy will be followed to develop logic configuration with the same functionality. 10- ADCOP- Abu Dhabi CRUDE Oil Pipeline Project. Habshan to Fujairah, UAE. Customer: International Petroleum Investment Company End User: GASCO Abu Dhabi Gas Industries LTD. System: ACM800 Control with 800XA HMI. Scope of Work: Project engineering Manger, For a Multi Different Packages of H.V and M.V Switch Gears Control and Protection Systems.