SlideShare a Scribd company logo
1 of 26
Execution
Certainty
By Hanover, Sadoff, and Wallace
For Megaprojects
™
“Over Budget, Over Time,
Over and Over Again.
– Bent Flyvbjerg,
Oxford Handbook of Megaproject Management
The Iron Law of Megaprojects:
Layers of Complexity
Inadequate
Management
Underperforming Contractors
OptimismBias
Craft Workers
Unavailable
Logistical Challenges
Materials/Equipment Delays
Regulatory/Environmental Delays
Limited Capable Contractors
Jurisdictional
Complexities
Ineffective Stakeholder Communication
Inadequate Integrated Schedule
Baseline Schedule Acceleration
Misalignment in
Partner Organization
Lack of Execution
Plan Alignment
– Paraphrased from ‘Successful Delivery of Mega-Projects’, Construction Industry Institute, 2015
Nonetheless…
On the last 10 megaprojects we have
worked, our clients achieved:
 54 Days Early on Average
 80-105% of Budget
 6 Major Safety Awards
© 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute.
Our clients are setting a
different course…
Operating with new levels of:
• Confidence
• Discernment
• Transparency
© 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute.
ConfidenceIn achieving success every step of the
way on fully constrained projects.
(schedule, cost, scope, quality, & safety)
© 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute.
DiscernmentFor the handful of strategic issues that will undermine
success versus the countless challenges that must be
mitigated through traditional means.
© 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute.
Transparency
On exactly what is required to
effectively address challenges.
© 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute.
Execution Certainty
A complementary approach…
™
© 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute.
…that enhances existing
project management and
governance through:
© 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute.
PROCESS
Impact Behaviors
& PEOPLE
Bridges Disconnects
It starts with:
© 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute.
PROCESS
Bridges Disconnects Impact Behaviors
& PEOPLE
Project Team & Scope
Executive Intent
Existing Management &
Level 1-2 Milestones
Strategic Imperative
© 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute.
There is Almost Always a Disconnect Between
Planning & Strategy
Functions
Vendors
Operations
Misc. Contributors
Project Team & Scope
Executive Intent
Existing Management &
Level 1-2 Milestones
Strategic Imperative
Planning & Strategy
Functions
Vendors
Operations
Misc. Contributors
Establish Waypoints
Crystalize Success
© 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute.
Execution Certainty™ Bridges the Disconnect
Establish Waypoints to Build an Integrated Roadmap
Crystalize the
Definition of Success
© 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute.
Process – Sample Output
Process alone is not
enough...
Success
Waypoints
Crystalize
Establish
© 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute.
PROCESS
Integrated Roadmap Impact Behaviors
& PEOPLE
With experience on 50+
megaprojects, we have discovered
the greatest impact is made through
two key project differentiators:
Ownership
of What is
Required
Coherence
Everyone is
in Sync
© 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute.
The People Side
When Ownership & Coherence are NOT there…
Overview
Ownership
Coherence
Elevate
Ensure
Execution Certainty™
© 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute.
Success
Waypoints
Crystalize
Establish
PROCESS
Integrated Roadmap Impact Behaviors
& PEOPLE
Mitigate & OptimizeScope:
Roadmap
Governance
Waypoint
Ownership
Ensure
Coherence
Crystalize the
Definition of Success
Establish Waypoints
Identify Disconnects and
Establish Ownership
Embed Structure and
Best Practices
Engage Larger Team
and Align Contributing
Schedules
Resolve Initial
Disconnect and Embed
Practices
Elevate Governance
Support meeting all
Waypoints
Intervene Where
Required
Phase IV: 6-12 MonthsPhase II: 3 MonthsPhase I: 3 Months Phase III: 12-36 Months
Establish Expand Foundation Reliability
Project Success :
e.g. First Oil
Reliability
Success:
e.g.
Nameplate
Capacity
© 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute.
Phases of Execution Certainty™
Roadmap Governance Waypoint Ownership
Engage Larger Team Ensure Coherence
Sample
Output
© 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute.
Roadmap Governance
Meeting Modifications & Agenda:
Templates and Process:
Waypoint
Ensuring Quality & Consistency:
Detailed Strategies:
© 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute.
Strategic Focus to Ensure Confidence:
Attendance Matrix:
© 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute.
Engage Larger Team Coherence
Process and Decks:
© 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute.
Levels Duration
3 Weeks
~3 Months
1-4 Years
3 Years
Readiness Review
Establish Roadmap
Overall Project Performance
Embed in Company
Engagement Levels
Ownership
Coherence
Elevate
Ensure
© 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute.
Success
Waypoints
Crystalize
Establish
PROCESS
Integrated Roadmap
PEOPLE
Impact Behaviors
A complementary approach
that enhances existing
project management and
governance on fully
constrained projects.
Execution Certainty™
&
“Over Budget, Over Time,
Over and Over Again.
Your projects don’t have to end…
– Bent Flyvbjerg,
Oxford Handbook of Megaproject Management
Doug Hanover
Principal
Doug@lumeri.com
Adam Wallace
Sr. Consultant
Adam@lumeri.com
Carla Sadoff
Partner
Carla@lumeri.com
www.lumeri.com
Contact Us
Name
Email
Message
Submit

More Related Content

What's hot

Project stakeholders management arabic ادارة المعنيين في المشروع
Project stakeholders management arabic ادارة المعنيين في المشروعProject stakeholders management arabic ادارة المعنيين في المشروع
Project stakeholders management arabic ادارة المعنيين في المشروعOmer Alsayed PhD,MBA, PMP®
 
Distributed PI Planning with SAFe.pdf
Distributed PI Planning with SAFe.pdfDistributed PI Planning with SAFe.pdf
Distributed PI Planning with SAFe.pdfssuser8b3715
 
Discovering your company's purpose vision & values
Discovering your company's purpose vision & valuesDiscovering your company's purpose vision & values
Discovering your company's purpose vision & valuesMichael Timms, MBA
 
تنظيم و إدارة الفعاليات . محمد ربعي
تنظيم و إدارة الفعاليات . محمد ربعي تنظيم و إدارة الفعاليات . محمد ربعي
تنظيم و إدارة الفعاليات . محمد ربعي Mohammad Rabiee محمد ربعي
 
تحويل الفكرة إلى فرصة
تحويل الفكرة إلى فرصةتحويل الفكرة إلى فرصة
تحويل الفكرة إلى فرصةIbrahim Neyaz
 
كيف تكتب خطة عمل في عشر خطوات , لرواد الأعمال وأصحاب المشاريع الصغيرة
كيف تكتب خطة عمل في عشر خطوات , لرواد الأعمال وأصحاب المشاريع الصغيرةكيف تكتب خطة عمل في عشر خطوات , لرواد الأعمال وأصحاب المشاريع الصغيرة
كيف تكتب خطة عمل في عشر خطوات , لرواد الأعمال وأصحاب المشاريع الصغيرةHatem Kameli
 
Boundary Spanning Leadership Jeff08
Boundary Spanning Leadership Jeff08Boundary Spanning Leadership Jeff08
Boundary Spanning Leadership Jeff08jeffyip
 
Código de Cultura - GuiaInvest
Código de Cultura - GuiaInvestCódigo de Cultura - GuiaInvest
Código de Cultura - GuiaInvestGuiaInvest
 
تصميم وإبتكار نماذج الأعمال أو النماذج الربحية Business Models
تصميم وإبتكار نماذج الأعمال أو النماذج الربحية Business Modelsتصميم وإبتكار نماذج الأعمال أو النماذج الربحية Business Models
تصميم وإبتكار نماذج الأعمال أو النماذج الربحية Business ModelsHatem Kameli
 
Arabic Blue Ocean Strategy استراتيجية المحيط الأزرق باللغة العربية
Arabic Blue Ocean Strategy  استراتيجية المحيط الأزرق باللغة العربيةArabic Blue Ocean Strategy  استراتيجية المحيط الأزرق باللغة العربية
Arabic Blue Ocean Strategy استراتيجية المحيط الأزرق باللغة العربيةTECHNOLEAD
 
مهارات حل المشاكل.ppt
مهارات حل المشاكل.pptمهارات حل المشاكل.ppt
مهارات حل المشاكل.pptwasa27
 
كيف تكتب خطة تشغيلية لمنظمة - د. طارق السويدان
كيف تكتب خطة تشغيلية لمنظمة - د. طارق السويدانكيف تكتب خطة تشغيلية لمنظمة - د. طارق السويدان
كيف تكتب خطة تشغيلية لمنظمة - د. طارق السويدانMohammed Azab
 
ريادة الأعمال الاجتماعية و تأسيس المنظمات
ريادة الأعمال الاجتماعية و تأسيس المنظماتريادة الأعمال الاجتماعية و تأسيس المنظمات
ريادة الأعمال الاجتماعية و تأسيس المنظماتHuda Al Midani
 
كيف تؤسس مشروعا ناجحا
كيف تؤسس مشروعا ناجحا  كيف تؤسس مشروعا ناجحا
كيف تؤسس مشروعا ناجحا Fadhel Alsheikh
 
Volunteerism العمل التطوعي
Volunteerism العمل التطوعيVolunteerism العمل التطوعي
Volunteerism العمل التطوعيguest65ade7
 

What's hot (20)

Project stakeholders management arabic ادارة المعنيين في المشروع
Project stakeholders management arabic ادارة المعنيين في المشروعProject stakeholders management arabic ادارة المعنيين في المشروع
Project stakeholders management arabic ادارة المعنيين في المشروع
 
EFQM & RADAR
EFQM & RADAREFQM & RADAR
EFQM & RADAR
 
Distributed PI Planning with SAFe.pdf
Distributed PI Planning with SAFe.pdfDistributed PI Planning with SAFe.pdf
Distributed PI Planning with SAFe.pdf
 
Discovering your company's purpose vision & values
Discovering your company's purpose vision & valuesDiscovering your company's purpose vision & values
Discovering your company's purpose vision & values
 
تنظيم و إدارة الفعاليات . محمد ربعي
تنظيم و إدارة الفعاليات . محمد ربعي تنظيم و إدارة الفعاليات . محمد ربعي
تنظيم و إدارة الفعاليات . محمد ربعي
 
تحويل الفكرة إلى فرصة
تحويل الفكرة إلى فرصةتحويل الفكرة إلى فرصة
تحويل الفكرة إلى فرصة
 
كيف تكتب خطة عمل في عشر خطوات , لرواد الأعمال وأصحاب المشاريع الصغيرة
كيف تكتب خطة عمل في عشر خطوات , لرواد الأعمال وأصحاب المشاريع الصغيرةكيف تكتب خطة عمل في عشر خطوات , لرواد الأعمال وأصحاب المشاريع الصغيرة
كيف تكتب خطة عمل في عشر خطوات , لرواد الأعمال وأصحاب المشاريع الصغيرة
 
Boundary Spanning Leadership Jeff08
Boundary Spanning Leadership Jeff08Boundary Spanning Leadership Jeff08
Boundary Spanning Leadership Jeff08
 
Código de Cultura - GuiaInvest
Código de Cultura - GuiaInvestCódigo de Cultura - GuiaInvest
Código de Cultura - GuiaInvest
 
E-Types and Its Strategy Dilemma
E-Types and Its Strategy DilemmaE-Types and Its Strategy Dilemma
E-Types and Its Strategy Dilemma
 
تصميم وإبتكار نماذج الأعمال أو النماذج الربحية Business Models
تصميم وإبتكار نماذج الأعمال أو النماذج الربحية Business Modelsتصميم وإبتكار نماذج الأعمال أو النماذج الربحية Business Models
تصميم وإبتكار نماذج الأعمال أو النماذج الربحية Business Models
 
Company Profile sample Plus 4
Company Profile sample Plus 4Company Profile sample Plus 4
Company Profile sample Plus 4
 
Arabic Blue Ocean Strategy استراتيجية المحيط الأزرق باللغة العربية
Arabic Blue Ocean Strategy  استراتيجية المحيط الأزرق باللغة العربيةArabic Blue Ocean Strategy  استراتيجية المحيط الأزرق باللغة العربية
Arabic Blue Ocean Strategy استراتيجية المحيط الأزرق باللغة العربية
 
مهارات العلاقات العامة
مهارات العلاقات العامةمهارات العلاقات العامة
مهارات العلاقات العامة
 
مهارات حل المشاكل.ppt
مهارات حل المشاكل.pptمهارات حل المشاكل.ppt
مهارات حل المشاكل.ppt
 
كيف تكتب خطة تشغيلية لمنظمة - د. طارق السويدان
كيف تكتب خطة تشغيلية لمنظمة - د. طارق السويدانكيف تكتب خطة تشغيلية لمنظمة - د. طارق السويدان
كيف تكتب خطة تشغيلية لمنظمة - د. طارق السويدان
 
فن الاتيكيت الوظيفي والأعمال
فن الاتيكيت الوظيفي والأعمالفن الاتيكيت الوظيفي والأعمال
فن الاتيكيت الوظيفي والأعمال
 
ريادة الأعمال الاجتماعية و تأسيس المنظمات
ريادة الأعمال الاجتماعية و تأسيس المنظماتريادة الأعمال الاجتماعية و تأسيس المنظمات
ريادة الأعمال الاجتماعية و تأسيس المنظمات
 
كيف تؤسس مشروعا ناجحا
كيف تؤسس مشروعا ناجحا  كيف تؤسس مشروعا ناجحا
كيف تؤسس مشروعا ناجحا
 
Volunteerism العمل التطوعي
Volunteerism العمل التطوعيVolunteerism العمل التطوعي
Volunteerism العمل التطوعي
 

Similar to Execution Certainty

Embracing Agile Leadership - Don MacIntyre
Embracing Agile Leadership - Don MacIntyreEmbracing Agile Leadership - Don MacIntyre
Embracing Agile Leadership - Don MacIntyreagilemaine
 
LKIN 17: Implementing SAFe w Kanban - Vikas
LKIN 17: Implementing SAFe w Kanban - VikasLKIN 17: Implementing SAFe w Kanban - Vikas
LKIN 17: Implementing SAFe w Kanban - VikasInnovation Roots
 
Breakthrough Portfolio Performance: Managing a Mix of Agile and Non-Agile Pro...
Breakthrough Portfolio Performance: Managing a Mix of Agile and Non-Agile Pro...Breakthrough Portfolio Performance: Managing a Mix of Agile and Non-Agile Pro...
Breakthrough Portfolio Performance: Managing a Mix of Agile and Non-Agile Pro...TechWell
 
FCB Partners Webinar: Implementation and Execution
FCB Partners Webinar:  Implementation and ExecutionFCB Partners Webinar:  Implementation and Execution
FCB Partners Webinar: Implementation and ExecutionFCBPartners
 
Quality Princilple
Quality PrincilpleQuality Princilple
Quality PrincilpleTRIGON
 
Introducing_SAFe_for_Lean_Enterprises-1.pptx
Introducing_SAFe_for_Lean_Enterprises-1.pptxIntroducing_SAFe_for_Lean_Enterprises-1.pptx
Introducing_SAFe_for_Lean_Enterprises-1.pptxAmeur BENTOUTA
 
Power Your PMO with the Adaptive Enterprise
Power Your PMO with the Adaptive Enterprise Power Your PMO with the Adaptive Enterprise
Power Your PMO with the Adaptive Enterprise Stephen Parry
 
Transformation some assembly required - 05-21-2017
Transformation   some assembly required - 05-21-2017Transformation   some assembly required - 05-21-2017
Transformation some assembly required - 05-21-2017AgileDenver
 
Lean Agile Center of Excellence LACE – Drink our own Champagne
Lean Agile Center of Excellence LACE – Drink our own ChampagneLean Agile Center of Excellence LACE – Drink our own Champagne
Lean Agile Center of Excellence LACE – Drink our own ChampagneCA Technologies
 
Lean Agile Center of Excellence - Agile2017 Talk
Lean Agile Center of Excellence - Agile2017 TalkLean Agile Center of Excellence - Agile2017 Talk
Lean Agile Center of Excellence - Agile2017 TalkDeema Dajani
 
FCB Partners Webinar: Plan for Implementation - Manage Up
FCB Partners Webinar: Plan for Implementation - Manage UpFCB Partners Webinar: Plan for Implementation - Manage Up
FCB Partners Webinar: Plan for Implementation - Manage UpFCBPartners
 
Martin Hinshelwood - Empirical & Incremental change for Enterprise
Martin Hinshelwood - Empirical & Incremental change for EnterpriseMartin Hinshelwood - Empirical & Incremental change for Enterprise
Martin Hinshelwood - Empirical & Incremental change for EnterpriseScrumDayLondon
 
Project Charter in 45 mins or less for IACET #pm #training
Project Charter in 45 mins or less for IACET  #pm #trainingProject Charter in 45 mins or less for IACET  #pm #training
Project Charter in 45 mins or less for IACET #pm #trainingRussell Martin & Associates
 
Opportunities for Project Managers in the Lean-Agile Enterprise with SAFe
Opportunities for Project Managers in the Lean-Agile Enterprise with SAFeOpportunities for Project Managers in the Lean-Agile Enterprise with SAFe
Opportunities for Project Managers in the Lean-Agile Enterprise with SAFeRichard Knaster
 
Opportunities for Project Managers in the Lean-Agile Enterprise with SAFe
Opportunities for Project Managers in the Lean-Agile Enterprise with SAFeOpportunities for Project Managers in the Lean-Agile Enterprise with SAFe
Opportunities for Project Managers in the Lean-Agile Enterprise with SAFeRichard Knaster
 
Scrumban - What it is and when to use it.
Scrumban - What it is and when to use it.Scrumban - What it is and when to use it.
Scrumban - What it is and when to use it.Ajay Reddy
 
Transform Yourself into an Agile Project Manager
Transform Yourself into an Agile Project ManagerTransform Yourself into an Agile Project Manager
Transform Yourself into an Agile Project ManagerChuck Cobb
 
Finesta ci 360 project year 1 cm strategy presentation
Finesta ci 360 project year 1 cm strategy presentationFinesta ci 360 project year 1 cm strategy presentation
Finesta ci 360 project year 1 cm strategy presentationCourtney Schultz
 
Finesta ci360-year1-cm-strategy-presentation 2018
Finesta ci360-year1-cm-strategy-presentation 2018Finesta ci360-year1-cm-strategy-presentation 2018
Finesta ci360-year1-cm-strategy-presentation 2018Courtney Schultz
 

Similar to Execution Certainty (20)

Embracing Agile Leadership - Don MacIntyre
Embracing Agile Leadership - Don MacIntyreEmbracing Agile Leadership - Don MacIntyre
Embracing Agile Leadership - Don MacIntyre
 
I2m - Strategy PMO Case Study Presentation
I2m - Strategy PMO Case Study PresentationI2m - Strategy PMO Case Study Presentation
I2m - Strategy PMO Case Study Presentation
 
LKIN 17: Implementing SAFe w Kanban - Vikas
LKIN 17: Implementing SAFe w Kanban - VikasLKIN 17: Implementing SAFe w Kanban - Vikas
LKIN 17: Implementing SAFe w Kanban - Vikas
 
Breakthrough Portfolio Performance: Managing a Mix of Agile and Non-Agile Pro...
Breakthrough Portfolio Performance: Managing a Mix of Agile and Non-Agile Pro...Breakthrough Portfolio Performance: Managing a Mix of Agile and Non-Agile Pro...
Breakthrough Portfolio Performance: Managing a Mix of Agile and Non-Agile Pro...
 
FCB Partners Webinar: Implementation and Execution
FCB Partners Webinar:  Implementation and ExecutionFCB Partners Webinar:  Implementation and Execution
FCB Partners Webinar: Implementation and Execution
 
Quality Princilple
Quality PrincilpleQuality Princilple
Quality Princilple
 
Introducing_SAFe_for_Lean_Enterprises-1.pptx
Introducing_SAFe_for_Lean_Enterprises-1.pptxIntroducing_SAFe_for_Lean_Enterprises-1.pptx
Introducing_SAFe_for_Lean_Enterprises-1.pptx
 
Power Your PMO with the Adaptive Enterprise
Power Your PMO with the Adaptive Enterprise Power Your PMO with the Adaptive Enterprise
Power Your PMO with the Adaptive Enterprise
 
Transformation some assembly required - 05-21-2017
Transformation   some assembly required - 05-21-2017Transformation   some assembly required - 05-21-2017
Transformation some assembly required - 05-21-2017
 
Lean Agile Center of Excellence LACE – Drink our own Champagne
Lean Agile Center of Excellence LACE – Drink our own ChampagneLean Agile Center of Excellence LACE – Drink our own Champagne
Lean Agile Center of Excellence LACE – Drink our own Champagne
 
Lean Agile Center of Excellence - Agile2017 Talk
Lean Agile Center of Excellence - Agile2017 TalkLean Agile Center of Excellence - Agile2017 Talk
Lean Agile Center of Excellence - Agile2017 Talk
 
FCB Partners Webinar: Plan for Implementation - Manage Up
FCB Partners Webinar: Plan for Implementation - Manage UpFCB Partners Webinar: Plan for Implementation - Manage Up
FCB Partners Webinar: Plan for Implementation - Manage Up
 
Martin Hinshelwood - Empirical & Incremental change for Enterprise
Martin Hinshelwood - Empirical & Incremental change for EnterpriseMartin Hinshelwood - Empirical & Incremental change for Enterprise
Martin Hinshelwood - Empirical & Incremental change for Enterprise
 
Project Charter in 45 mins or less for IACET #pm #training
Project Charter in 45 mins or less for IACET  #pm #trainingProject Charter in 45 mins or less for IACET  #pm #training
Project Charter in 45 mins or less for IACET #pm #training
 
Opportunities for Project Managers in the Lean-Agile Enterprise with SAFe
Opportunities for Project Managers in the Lean-Agile Enterprise with SAFeOpportunities for Project Managers in the Lean-Agile Enterprise with SAFe
Opportunities for Project Managers in the Lean-Agile Enterprise with SAFe
 
Opportunities for Project Managers in the Lean-Agile Enterprise with SAFe
Opportunities for Project Managers in the Lean-Agile Enterprise with SAFeOpportunities for Project Managers in the Lean-Agile Enterprise with SAFe
Opportunities for Project Managers in the Lean-Agile Enterprise with SAFe
 
Scrumban - What it is and when to use it.
Scrumban - What it is and when to use it.Scrumban - What it is and when to use it.
Scrumban - What it is and when to use it.
 
Transform Yourself into an Agile Project Manager
Transform Yourself into an Agile Project ManagerTransform Yourself into an Agile Project Manager
Transform Yourself into an Agile Project Manager
 
Finesta ci 360 project year 1 cm strategy presentation
Finesta ci 360 project year 1 cm strategy presentationFinesta ci 360 project year 1 cm strategy presentation
Finesta ci 360 project year 1 cm strategy presentation
 
Finesta ci360-year1-cm-strategy-presentation 2018
Finesta ci360-year1-cm-strategy-presentation 2018Finesta ci360-year1-cm-strategy-presentation 2018
Finesta ci360-year1-cm-strategy-presentation 2018
 

Recently uploaded

Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 

Recently uploaded (20)

Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 

Execution Certainty

  • 1. Execution Certainty By Hanover, Sadoff, and Wallace For Megaprojects ™
  • 2. “Over Budget, Over Time, Over and Over Again. – Bent Flyvbjerg, Oxford Handbook of Megaproject Management The Iron Law of Megaprojects:
  • 3. Layers of Complexity Inadequate Management Underperforming Contractors OptimismBias Craft Workers Unavailable Logistical Challenges Materials/Equipment Delays Regulatory/Environmental Delays Limited Capable Contractors Jurisdictional Complexities Ineffective Stakeholder Communication Inadequate Integrated Schedule Baseline Schedule Acceleration Misalignment in Partner Organization Lack of Execution Plan Alignment – Paraphrased from ‘Successful Delivery of Mega-Projects’, Construction Industry Institute, 2015
  • 4. Nonetheless… On the last 10 megaprojects we have worked, our clients achieved:  54 Days Early on Average  80-105% of Budget  6 Major Safety Awards © 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute.
  • 5. Our clients are setting a different course… Operating with new levels of: • Confidence • Discernment • Transparency © 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute.
  • 6. ConfidenceIn achieving success every step of the way on fully constrained projects. (schedule, cost, scope, quality, & safety) © 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute.
  • 7. DiscernmentFor the handful of strategic issues that will undermine success versus the countless challenges that must be mitigated through traditional means. © 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute.
  • 8. Transparency On exactly what is required to effectively address challenges. © 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute.
  • 9. Execution Certainty A complementary approach… ™ © 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute.
  • 10. …that enhances existing project management and governance through: © 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute. PROCESS Impact Behaviors & PEOPLE Bridges Disconnects
  • 11. It starts with: © 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute. PROCESS Bridges Disconnects Impact Behaviors & PEOPLE
  • 12. Project Team & Scope Executive Intent Existing Management & Level 1-2 Milestones Strategic Imperative © 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute. There is Almost Always a Disconnect Between Planning & Strategy Functions Vendors Operations Misc. Contributors
  • 13. Project Team & Scope Executive Intent Existing Management & Level 1-2 Milestones Strategic Imperative Planning & Strategy Functions Vendors Operations Misc. Contributors Establish Waypoints Crystalize Success © 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute. Execution Certainty™ Bridges the Disconnect
  • 14. Establish Waypoints to Build an Integrated Roadmap Crystalize the Definition of Success © 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute. Process – Sample Output
  • 15. Process alone is not enough... Success Waypoints Crystalize Establish © 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute. PROCESS Integrated Roadmap Impact Behaviors & PEOPLE
  • 16. With experience on 50+ megaprojects, we have discovered the greatest impact is made through two key project differentiators: Ownership of What is Required Coherence Everyone is in Sync © 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute. The People Side
  • 17. When Ownership & Coherence are NOT there…
  • 18. Overview Ownership Coherence Elevate Ensure Execution Certainty™ © 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute. Success Waypoints Crystalize Establish PROCESS Integrated Roadmap Impact Behaviors & PEOPLE
  • 19. Mitigate & OptimizeScope: Roadmap Governance Waypoint Ownership Ensure Coherence Crystalize the Definition of Success Establish Waypoints Identify Disconnects and Establish Ownership Embed Structure and Best Practices Engage Larger Team and Align Contributing Schedules Resolve Initial Disconnect and Embed Practices Elevate Governance Support meeting all Waypoints Intervene Where Required Phase IV: 6-12 MonthsPhase II: 3 MonthsPhase I: 3 Months Phase III: 12-36 Months Establish Expand Foundation Reliability Project Success : e.g. First Oil Reliability Success: e.g. Nameplate Capacity © 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute. Phases of Execution Certainty™
  • 20. Roadmap Governance Waypoint Ownership Engage Larger Team Ensure Coherence Sample Output © 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute.
  • 21. Roadmap Governance Meeting Modifications & Agenda: Templates and Process: Waypoint Ensuring Quality & Consistency: Detailed Strategies: © 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute.
  • 22. Strategic Focus to Ensure Confidence: Attendance Matrix: © 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute. Engage Larger Team Coherence Process and Decks:
  • 23. © 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute. Levels Duration 3 Weeks ~3 Months 1-4 Years 3 Years Readiness Review Establish Roadmap Overall Project Performance Embed in Company Engagement Levels
  • 24. Ownership Coherence Elevate Ensure © 2017 Lumeri LLC. Proprietary and Confidential. Do not copy or distribute. Success Waypoints Crystalize Establish PROCESS Integrated Roadmap PEOPLE Impact Behaviors A complementary approach that enhances existing project management and governance on fully constrained projects. Execution Certainty™ &
  • 25. “Over Budget, Over Time, Over and Over Again. Your projects don’t have to end… – Bent Flyvbjerg, Oxford Handbook of Megaproject Management
  • 26. Doug Hanover Principal Doug@lumeri.com Adam Wallace Sr. Consultant Adam@lumeri.com Carla Sadoff Partner Carla@lumeri.com www.lumeri.com Contact Us Name Email Message Submit